82_FR_17305 82 FR 17238 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 17238 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 67 (April 10, 2017)

Page Range17238-17238
FR Document2017-07088

Federal Register, Volume 82 Issue 67 (Monday, April 10, 2017)
[Federal Register Volume 82, Number 67 (Monday, April 10, 2017)]
[Notices]
[Page 17238]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07088]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14820-000]


Merchant Hydro Developers, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 18, 2017, Merchant Hydro Developers, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Allegheny Pumped Storage Hydro Project to be located near Juniata 
Township in Blair County, Pennsylvania. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 100 acres and a storage capacity 
of 1,500 acre-feet at a surface elevation of approximately 2,500 feet 
above mean sea level (msl) created through construction of a new 
roller-compacted concrete or rock-fill dam; (2) a new lower reservoir 
with a surface area of 50 acres and a storage capacity of 1,800 acre-
feet at a surface elevation of 1,500 feet msl; (3) a new 3,760-foot-
long, 48-inch-diameter penstock connecting the upper and lower 
reservoirs; (4) a new 150-foot-long, 50-foot-wide, 25-foot-high 
powerhouse containing two turbine-generator units with a total rated 
capacity of 123 megawatts; (5) a new 3,924-foot-long transmission line 
connecting the powerhouse to the Summit Claysburg 115-kilovolt circuit 
owned by the Pennsylvania Electric Company; and (6) appurtenant 
facilities. The proposed project would have an annual generation of 
448,854 megawatt-hours.
    Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14820-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14820) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 4, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-07088 Filed 4-7-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                    17238                          Federal Register / Vol. 82, No. 67 / Monday, April 10, 2017 / Notices

                                                    DEPARTMENT OF ENERGY                                    the permit holder priority to file a                  The first page of any filing should
                                                                                                            license application during the permit                 include docket number P–14820–000.
                                                    Federal Energy Regulatory                               term. A preliminary permit does not                      More information about this project,
                                                    Commission                                              authorize the permit holder to perform                including a copy of the application, can
                                                                                                            any land-disturbing activities or                     be viewed or printed on the ‘‘eLibrary’’
                                                    [Docket Nos. EL17–51–000]
                                                                                                            otherwise enter upon lands or waters                  link of Commission’s Web site at http://
                                                    Arizona Public Service Company;                         owned by others without the owners’                   www.ferc.gov/docs-filing/elibrary.asp.
                                                    Notice of Institution of Section 206                    express permission.                                   Enter the docket number (P–14820) in
                                                    Proceeding and Refund Effective Date                       The proposed project would consist of              the docket number field to access the
                                                                                                            the following: (1) A new upper reservoir              document. For assistance, contact FERC
                                                       On March 28, 2017, a letter order was                with a surface area of 100 acres and a                Online Support.
                                                    issued in Docket No. EL17–51–000 by                     storage capacity of 1,500 acre-feet at a                Dated: April 4, 2017.
                                                    the Director, Division of Electric                      surface elevation of approximately 2,500              Kimberly D. Bose,
                                                    Power—West, Office of Energy Market                     feet above mean sea level (msl) created               Secretary.
                                                    Regulation, pursuant to section 206 of                  through construction of a new roller-
                                                    the Federal Power Act (FPA), 16 U.S.C.                                                                        [FR Doc. 2017–07088 Filed 4–7–17; 8:45 am]
                                                                                                            compacted concrete or rock-fill dam; (2)
                                                    824e (2012), instituting an investigation               a new lower reservoir with a surface                  BILLING CODE 6717–01–P

                                                    into whether the proposed revisions of                  area of 50 acres and a storage capacity
                                                    Arizona Public Service Company to its                   of 1,800 acre-feet at a surface elevation
                                                    Open Access Transmission Tariff may                                                                           DEPARTMENT OF ENERGY
                                                                                                            of 1,500 feet msl; (3) a new 3,760-foot-
                                                    be unjust, unreasonable, unduly                         long, 48-inch-diameter penstock                       Federal Energy Regulatory
                                                    discriminatory or preferential. Arizona                 connecting the upper and lower                        Commission
                                                    Public Service Company, 158 FERC                        reservoirs; (4) a new 150-foot-long, 50-
                                                    62,241 (2017).                                          foot-wide, 25-foot-high powerhouse                    Combined Notice of Filings #1
                                                       The refund effective date in Docket                  containing two turbine-generator units
                                                    No. EL17–51–000, established pursuant                   with a total rated capacity of 123                       Take notice that the Commission
                                                    to section 206(b) of the FPA, will be the               megawatts; (5) a new 3,924-foot-long                  received the following electric corporate
                                                    date of publication of this notice in the               transmission line connecting the                      filings:
                                                    Federal Register.                                       powerhouse to the Summit Claysburg                       Docket Numbers: EC17–101–000.
                                                       Any interested person desiring to be                 115-kilovolt circuit owned by the                        Applicants: Beebe 1B Renewable
                                                    heard in Docket No. EL17–51–000 must                    Pennsylvania Electric Company; and (6)                Energy, LLC, Beebe Renewable Energy,
                                                    file a notice of intervention or motion to              appurtenant facilities. The proposed                  LLC, Bluestem Wind Energy, LLC,
                                                    intervene, as appropriate, with the                     project would have an annual                          Cassia Gulch Wind Park LLC, Cow
                                                    Federal Energy Regulatory Commission,                   generation of 448,854 megawatt-hours.                 Branch Wind Power, LLC, CR Clearing,
                                                    888 First Street NE., Washington, DC                       Applicant Contact: Adam Rousselle,                 LLC, Criterion Power Partners, LLC,
                                                    20426, in accordance with Rule 214 of                   Merchant Hydro Developers, LLC, 5710                  Fourmile Wind Energy, LLC, Harvest
                                                    the Commission’s Rules of Practice and                  Oak Crest Drive, Doylestown, PA 18902;                Windfarm, LLC, Harvest Windfarm II,
                                                    Procedure, 18 CFR 385.214, within 21                    phone: 267–254–6107.                                  LLC, High Mesa Energy, LLC, Michigan
                                                    days of the date of issuance of the order.                 FERC Contact: Woohee Choi; phone:                  Wind 1, LLC, Michigan Wind 2, LLC,
                                                      Dated: April 4, 2017.                                 (202) 502–6336.                                       Shooting Star Wind Project, LLC, Tuana
                                                                                                               Deadline for filing comments, motions              Springs Energy, LLC, Wind Capital
                                                    Kimberly D. Bose,
                                                                                                            to intervene, competing applications                  Holdings, LLC, John Hancock Life
                                                    Secretary.
                                                                                                            (without notices of intent), or notices of            Insurance Company (U.S.A.).
                                                    [FR Doc. 2017–07083 Filed 4–7–17; 8:45 am]                                                                       Description: Application of the Exelon
                                                                                                            intent to file competing applications: 60
                                                    BILLING CODE 6717–01–P
                                                                                                            days from the issuance of this notice.                Applicants, et al. for Authorization
                                                                                                            Competing applications and notices of                 under Section 203 of the Federal Power
                                                                                                            intent must meet the requirements of 18               Act, Request for Expedited Action and
                                                    DEPARTMENT OF ENERGY                                                                                          Request for Confidential Treatment.
                                                                                                            CFR 4.36.
                                                                                                               The Commission strongly encourages                    Filed Date: 4/3/17.
                                                    Federal Energy Regulatory
                                                                                                                                                                     Accession Number: 20170403–5583.
                                                    Commission                                              electronic filing. Please file comments,
                                                                                                                                                                     Comments Due: 5 p.m. ET 4/24/17.
                                                                                                            motions to intervene, notices of intent,
                                                    [Project No. 14820–000]                                 and competing applications using the                     Take notice that the Commission
                                                                                                            Commission’s eFiling system at http://                received the following exempt
                                                    Merchant Hydro Developers, LLC;                                                                               wholesale generator filings:
                                                    Notice of Preliminary Permit                            www.ferc.gov/docs-filing/efiling.asp.
                                                                                                            Commenters can submit brief comments                     Docket Numbers: EG17–90–000.
                                                    Application Accepted for Filing and                                                                              Applicants: AEM Wind, LLC.
                                                    Soliciting Comments, Motions To                         up to 6,000 characters, without prior
                                                                                                            registration, using the eComment system                  Description: Self-Certification of EWG
                                                    Intervene, and Competing Applications                                                                         Status of AEM Wind, LLC.
                                                                                                            at http://www.ferc.gov/docs-filing/
                                                      On January 18, 2017, Merchant Hydro                   ecomment.asp. You must include your                      Filed Date: 4/4/17.
                                                    Developers, LLC, filed an application for               name and contact information at the end                  Accession Number: 20170404–5218.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    a preliminary permit, pursuant to                       of your comments. For assistance,                        Comments Due: 5 p.m. ET 4/25/17.
                                                    section 4(f) of the Federal Power Act                   please contact FERC Online Support at                    Take notice that the Commission
                                                    (FPA), proposing to study the feasibility               FERCOnlineSupport@ferc.gov, (866)                     received the following electric rate
                                                    of the Allegheny Pumped Storage Hydro                   208–3676 (toll free), or (202) 502–8659               filings:
                                                    Project to be located near Juniata                      (TTY). In lieu of electronic filing, please              Docket Numbers: ER17–1069–001.
                                                    Township in Blair County,                               send a paper copy to: Secretary, Federal                 Applicants: Mid-Atlantic Interstate
                                                    Pennsylvania. The sole purpose of a                     Energy Regulatory Commission, 888                     Transmission, LLC, PJM
                                                    preliminary permit, if issued, is to grant              First Street NE., Washington, DC 20426.               Interconnection, L.L.C.


                                               VerDate Sep<11>2014   20:02 Apr 07, 2017   Jkt 241001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1



Document Created: 2017-04-08 03:30:56
Document Modified: 2017-04-08 03:30:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 17238 