DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 82, Issue 68 (April 11, 2017)

Page Range17418-17420
FR Document2017-07253

Section 7001 of Water Resources Reform and Development Act (WRRDA) 2014 requires that the Secretary of the Army annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by nonFederal interests, and proposed modifications to an authorized water resources development project or feasibility study that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests.

Federal Register, Volume 82 Issue 68 (Tuesday, April 11, 2017)
[Federal Register Volume 82, Number 68 (Tuesday, April 11, 2017)]
[Notices]
[Pages 17418-17420]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07253]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Proposals by Non-Federal Interests, for Feasibility Studies and 
for Modifications to an Authorized Water Resources Development Project 
or Feasibility Study, for Inclusion in the Annual Report to Congress on 
Future Water Resources Development

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Section 7001 of Water Resources Reform and Development Act 
(WRRDA) 2014 requires that the Secretary of the Army annually submit to 
the Congress a report (Annual Report) that identifies feasibility 
reports, proposed feasibility studies submitted by nonFederal 
interests, and proposed modifications to an authorized water resources 
development project or feasibility study that meet certain criteria. 
The Annual Report is to be based, in part, upon requests for proposals 
submitted by non-Federal interests.

DATES: Proposals must be submitted online by August 9, 2017.

ADDRESSES: Submit proposals online at: http://www.usace.army.mil/Missions/CivilWorks/ProjectPlanning/WRRDA7001Proposals.aspx. If a 
different method of submission is required, use the further information 
below to arrange an alternative submission process.

FOR FURTHER INFORMATION CONTACT: Send an email to the help desk at 
[email protected] or call Lisa Kiefel, Planning and 
Policy Division, Headquarters, USACE, Washington DC at 202-761-0626.

SUPPLEMENTARY INFORMATION: Section 7001 of WRRDA 2014 requires the 
publication of a notice in the Federal Register to request proposals by 
non-Federal interests for feasibility studies and modifications to an 
authorized USACE water resources development project or feasibility 
study. Project feasibility reports that have successfully completed 
Executive Branch review, but have not been authorized will be included 
in the Annual Report table by the Secretary of the Army and these 
proposals do not need to be submitted in response to this notice.
    Proposals by non-Federal interests must be entered online and 
require the following information:
    1. The name of all non-Federal interests planning to act as the 
sponsor, including any non-Federal interest that

[[Page 17419]]

has contributed to or is expected to contribute toward the non-Federal 
share of the proposed feasibility study or modification.
    2. State if this proposal is for a feasibility study or a 
modification to an authorized USACE water resources development project 
or feasibility study and, if a modification, specify the authorized 
water resources development project or study that is proposed for 
modification.
    3. State the specific project purpose(s) of the proposed study or 
modification.
    4. Provide an estimate, to the extent practicable, of the total 
cost, and the Federal and non-Federal share of those costs, of the 
proposed study and, separately, an estimate of the cost of construction 
or modification.
    5. Describe, to the extent applicable and practicable, an estimate 
of the anticipated monetary and non-monetary benefits of the proposal 
with regard to benefits to the protection of human life and property; 
improvement to transportation; the national economy; the environment; 
or the national security interests of the United States.
    6. Describe if local support exists for the proposal.
    7. State if the non-Federal interest has the financial ability to 
provide the required cost share, reference ER 1105-2-100.
    8. Upload a letter or statement of support from each associated 
non-Federal interest.
    All provided information may be included in the Annual Report to 
Congress on Future Water Resources Development. Therefore, information 
that is Confidential Business Information, information that should not 
be disclosed because of statutory restrictions, or other information 
that a non-Federal interest would not want to appear in the Annual 
Report should not be included.
    Process: Proposals received within the time frame set forth in this 
notice will be reviewed by the Army and will be presented in one of two 
tables. The first table will be in the Annual Report itself, and the 
second table will be in an appendix. To be included in the Annual 
Report table, the proposals must meet the following criteria:
    1. Are related to the missions and authorities of the USACE;
    Involves a proposed or existing USACE water resources project or 
effort whose primary purpose is flood and storm damage reduction, 
commercial navigation, or aquatic ecosystem restoration. Following 
long-standing USACE practice, related proposals such as for recreation, 
hydropower, or water supply, are eligible for inclusion if undertaken 
in conjunction with such a project or effort.
    2. Require specific congressional authorization, including by an 
Act of Congress;
    Comprise the following cases:
    a. REQUIRES CONSTRUCTION AUTHORIZATION.
     Signed Chief's Reports
     Non-Federal feasibility reports submitted to the Secretary 
of the Army under Section 203 of WRDA 1986, as amended, under 
Administration review,
     Ongoing feasibility studies that are expected to result in 
a Chief's Report, and
     Proposed modifications to environmental infrastructure 
projects that were authorized prior to the date of enactment of the 
Water Resources Development Act of 2016 (December 16, 2016); and
     Proposed modifications to authorized water resources 
development projects requested by non-Federal interests through the 
Section 7001 of WRRDA 2014 process.
    b. SEEKING STUDY AUTHORIZATION.
     New feasibility studies proposed by non-Federal interests 
through the Section 7001 of WRRDA 2014 process will be evaluated by the 
USACE to determine whether or not there is existing study authority, 
and
     Proposed modifications to studies requested by non-Federal 
interests through the Section 7001 of WRRDA 2014 process will be 
evaluated by the USACE to determine whether or not there is existing 
study authority.
    c. The following cases are NOT ELIGIBLE to be included in the 
Annual Report and will be included in the appendix for transparency:
     Proposals for modifications to non-Federal projects where 
USACE has provided previous technical assistance. Authorization to 
provide technical assistance does not provide authorization of a water 
resources development project.
     Proposals for construction of a new water resources 
development project that is not the subject of a currently authorized 
USACE project or a complete or ongoing feasibility study.
     Proposals that do not include a request for a potential 
future water resources development project through completed 
feasibility reports, proposed feasibility studies, and proposed 
modifications to authorized projects or studies.
    3. Have not been congressionally authorized;
    4. Have not been included in the Annual Report table of any 
previous Annual Report to Congress on Future Water Resources 
Development; and
     If the proposal was included in the Annual Report table in 
a previous Report to Congress on Future Water Resources Development, 
then the proposal is not eligible to be included in the Annual Report 
table. If a proposal was previously included in an appendix it may be 
re-submitted.
    5. If authorized, could be carried out by the USACE.
     Whether following the USACE Chief's Report process or 
Section 7001 of WRRDA 2014, a proposal for a project or a project 
modification would need a current decision document to provide updated 
information on the scope of the potential project and demonstrate a 
clear Federal interest. This determination would include an assessment 
of whether the proposal is:

--Technically sound, economically viable and environmentally 
acceptable.
--Compliant with environmental and other laws including but not limited 
to National Environmental Policy Act, Endangered Species Act, Coastal 
Zone Management Act, and the National Historic Preservation Act.
--Compliant with statutes and regulations related to water resources 
development including various water resources provisions related to the 
authorized cost of projects, level of detail, separable elements, fish 
and wildlife mitigation, project justification, matters to be addressed 
in planning, and the 1958 Water Supply Act.

    Feasibility study proposals submitted by non-Federal interests are 
for the study only. If Congressional authorization of a feasibility 
study results from inclusion in the Annual Report, it is anticipated 
that such authorization would be for the study, not for construction. 
Once a decision document is completed in accordance with Executive 
Branch policies and procedures, the Secretary will determine whether to 
recommend the project for authorization.
    All water resources development projects must meet certain 
requirements before proceeding to construction. These requirements 
include: (1) That the project is authorized for construction by 
Congress; (2) that the Secretary, or other appropriate official, has 
approved a current decision document; and, (3) that the funds for 
project construction have been appropriated and are available.
    Section 902 of WRDA 1986 establishes a maximum authorized cost for 
projects (902 limit). A Post Authorization Change Report (PACR) is 
required to be completed to support

[[Page 17420]]

potential modifications, updates to project costs, and an increase to 
the 902 limit. Authority to undertake a 902 study is inherent in the 
project authority, so no authority is required to proceed with the 
study. Since these PACRs support project modifications, they may be 
considered for inclusion in the Annual Report if a report's 
recommendation requires Congressional authorization.
    The Secretary shall include in the Annual Report to Congress on 
Future Water Resources Development a certification stating that each 
feasibility report, proposed feasibility study, and proposed 
modification to an authorized water resources development project or 
feasibility study included in the Annual Report meets the criteria 
established in Section 7001 of WRRDA 2014.
    Please contact the appropriate district office or use the contact 
information above for assistance in researching and identifying 
existing authorizations and existing USACE decision documents. Those 
proposals that do not meet the criteria will be included in an appendix 
table included in the Annual Report to Congress on Future Water 
Resources Development. Proposals in the appendix table will include a 
description of why those proposals did not meet the criteria.

    Dated: April 5, 2017.
James C. Dalton,
Director of Civil Works.
[FR Doc. 2017-07253 Filed 4-10-17; 8:45 am]
 BILLING CODE 3720-58-P



                                                17418                          Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices

                                                   Public Accessibility to the Meeting:                 statements should be submitted to LTC                 DEPARTMENT OF DEFENSE
                                                Pursuant to 5 U.S.C. 552b, as amended,                  Lunoff, the committee DFO, via
                                                and 41 CFR 102–3.140 through 102–                       electronic mail, the preferred mode of                Department of the Army, Corps of
                                                3.165, and subject to the availability of               submission, at the email address listed               Engineers
                                                space, this meeting is open to the                      in the FOR FURTHER INFORMATION
                                                public. Registration of members of the                  CONTACT section in the following
                                                                                                                                                              Proposals by Non-Federal Interests,
                                                public who wish to attend the meeting                   formats: Adobe Acrobat or Microsoft                   for Feasibility Studies and for
                                                will begin upon publication of this                     Word. The comment or statement must                   Modifications to an Authorized Water
                                                meeting notice and end three business                                                                         Resources Development Project or
                                                                                                        include the author’s name, title,
                                                days (April 21) prior to the start of the                                                                     Feasibility Study, for Inclusion in the
                                                                                                        affiliation, address, and daytime
                                                meeting. All members of the public                                                                            Annual Report to Congress on Future
                                                                                                        telephone number. Written comments or
                                                must contact LTC Lunoff at the phone                                                                          Water Resources Development
                                                                                                        statements being submitted in response
                                                number or email listed in the FOR                       to the agenda set forth in this notice                AGENCY:    U.S. Army Corps of Engineers,
                                                FURTHER INFORMATION CONTACT section to
                                                                                                        must be received by the committee DFO                 DoD.
                                                make arrangements for Pentagon escort,                  at least five (5) business days prior to
                                                if necessary. Public attendees should                                                                         ACTION:   Notice.
                                                                                                        the meeting so that they may be made
                                                arrive at the Pentagon’s Visitor’s Center,                                                                    SUMMARY:    Section 7001 of Water
                                                                                                        available to the Government-Industry
                                                located near the Pentagon Metro                                                                               Resources Reform and Development Act
                                                                                                        Advisory Panel for its consideration
                                                Station’s south exit and adjacent to the                                                                      (WRRDA) 2014 requires that the
                                                                                                        prior to the meeting. Written comments
                                                Pentagon Transit Center bus terminal                                                                          Secretary of the Army annually submit
                                                with sufficient time to complete security               or statements received after this date
                                                                                                        may not be provided to the panel until                to the Congress a report (Annual Report)
                                                screening no later than 8:30 a.m. on                                                                          that identifies feasibility reports,
                                                April 26–27. To complete security                       its next meeting. Please note that
                                                                                                        because the panel operates under the                  proposed feasibility studies submitted
                                                screening, please come prepared to                                                                            by nonFederal interests, and proposed
                                                present two forms of identification of                  provisions of the Federal Advisory
                                                                                                        Committee Act, as amended, all written                modifications to an authorized water
                                                which one must be a pictured                                                                                  resources development project or
                                                identification card. Government and                     comments will be treated as public
                                                                                                        documents and will be made available                  feasibility study that meet certain
                                                military DoD CAC holders are not
                                                                                                        for public inspection.                                criteria. The Annual Report is to be
                                                required to have an escort, but are still
                                                                                                                                                              based, in part, upon requests for
                                                required to pass through the Visitor’s                     Verbal Comments: Members of the                    proposals submitted by non-Federal
                                                Center to gain access to the Building.                  public will be permitted to make verbal               interests.
                                                Seating is limited and is on a first-to-                comments during the meeting only at
                                                arrive basis. Attendees will be asked to                the time and in the manner allowed                    DATES:  Proposals must be submitted
                                                provide their name, title, affiliation, and             herein. If a member of the public is                  online by August 9, 2017.
                                                contact information to include email                    interested in making a verbal comment                 ADDRESSES: Submit proposals online at:
                                                address and daytime telephone number                    at the open meeting, that individual                  http://www.usace.army.mil/Missions/
                                                to the Designated Federal Officer (DFO)                 must submit a request, with a brief                   CivilWorks/ProjectPlanning/WRRDA
                                                listed in the FOR FURTHER INFORMATION                   statement of the subject matter to be                 7001Proposals.aspx. If a different
                                                CONTACT section. Any interested person                                                                        method of submission is required, use
                                                                                                        addressed by the comment, at least three
                                                may attend the meeting, file written                    (3) business days in advance to the                   the further information below to arrange
                                                comments or statements with the                                                                               an alternative submission process.
                                                                                                        committee DFO, via electronic mail, the
                                                committee, or make verbal comments                                                                            FOR FURTHER INFORMATION CONTACT:
                                                                                                        preferred mode of submission, at the
                                                from the floor during the public                                                                              Send an email to the help desk at
                                                                                                        email address listed in the FOR FURTHER
                                                meeting, at the times, and in the                                                                             WRRDA7001Proposal@usace.army.mil
                                                                                                        INFORMATION CONTACT section. The
                                                manner, permitted by the committee.                                                                           or call Lisa Kiefel, Planning and Policy
                                                   Special Accommodations: The                          committee DFO will log each request to
                                                                                                        make a comment, in the order received,                Division, Headquarters, USACE,
                                                meeting venue is fully handicap
                                                                                                        and determine whether the subject                     Washington DC at 202–761–0626.
                                                accessible, with wheelchair access.
                                                   Individuals requiring special                        matter of each comment is relevant to                 SUPPLEMENTARY INFORMATION: Section
                                                accommodations to access the public                     the panel’s mission and/or the topics to              7001 of WRRDA 2014 requires the
                                                meeting or seeking additional                           be addressed in this public meeting. A                publication of a notice in the Federal
                                                information about public access                         30-minute period near the end of the                  Register to request proposals by non-
                                                procedures, should contact LTC Lunoff,                  meeting will be available for verbal                  Federal interests for feasibility studies
                                                the committee DFO, at the email address                 public comments. Members of the                       and modifications to an authorized
                                                or telephone number listed in the FOR                   public who have requested to make a                   USACE water resources development
                                                FURTHER INFORMATION CONTACT section,                    verbal comment and whose comments                     project or feasibility study. Project
                                                at least five (5) business days prior to                have been deemed relevant under the                   feasibility reports that have successfully
                                                the meeting so that appropriate                         process described in this paragraph, will             completed Executive Branch review, but
                                                arrangements can be made.                               be allotted no more than five (5)                     have not been authorized will be
                                                   Written Comments or Statements:                      minutes during this period, and will be               included in the Annual Report table by
                                                Pursuant to 41 CFR 102–3.105(j) and                     invited to speak in the order in which                the Secretary of the Army and these
                                                102–3.140 and section 10(a)(3) of the                   their requests were received by the DFO.              proposals do not need to be submitted
srobinson on DSK5SPTVN1PROD with NOTICES




                                                Federal Advisory Committee Act, the                                                                           in response to this notice.
                                                                                                          Dated: April 6, 2017.
                                                public or interested organizations may                                                                          Proposals by non-Federal interests
                                                submit written comments or statements                   Aaron Siegel,                                         must be entered online and require the
                                                to the Government-Industry Advisory                     Alternate OSD Federal Register Liaison                following information:
                                                Panel about its mission and/or the                      Officer, Department of Defense.                         1. The name of all non-Federal
                                                topics to be addressed in this public                   [FR Doc. 2017–07252 Filed 4–10–17; 8:45 am]           interests planning to act as the sponsor,
                                                meeting. Written comments or                            BILLING CODE 5001–06–P                                including any non-Federal interest that


                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1


                                                                               Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices                                          17419

                                                has contributed to or is expected to                    undertaken in conjunction with such a                    • If the proposal was included in the
                                                contribute toward the non-Federal share                 project or effort.                                    Annual Report table in a previous
                                                of the proposed feasibility study or                      2. Require specific congressional                   Report to Congress on Future Water
                                                modification.                                           authorization, including by an Act of                 Resources Development, then the
                                                   2. State if this proposal is for a                   Congress;                                             proposal is not eligible to be included
                                                feasibility study or a modification to an                 Comprise the following cases:                       in the Annual Report table. If a proposal
                                                authorized USACE water resources                          a. REQUIRES CONSTRUCTION                            was previously included in an appendix
                                                development project or feasibility study                AUTHORIZATION.                                        it may be re-submitted.
                                                and, if a modification, specify the                       • Signed Chief’s Reports                               5. If authorized, could be carried out
                                                authorized water resources development                    • Non-Federal feasibility reports                   by the USACE.
                                                project or study that is proposed for                   submitted to the Secretary of the Army                   • Whether following the USACE
                                                modification.                                           under Section 203 of WRDA 1986, as                    Chief’s Report process or Section 7001
                                                   3. State the specific project purpose(s)             amended, under Administration review,                 of WRRDA 2014, a proposal for a project
                                                of the proposed study or modification.                    • Ongoing feasibility studies that are
                                                                                                                                                              or a project modification would need a
                                                   4. Provide an estimate, to the extent                expected to result in a Chief’s Report,
                                                                                                                                                              current decision document to provide
                                                practicable, of the total cost, and the                 and
                                                                                                          • Proposed modifications to                         updated information on the scope of the
                                                Federal and non-Federal share of those                                                                        potential project and demonstrate a
                                                costs, of the proposed study and,                       environmental infrastructure projects
                                                                                                        that were authorized prior to the date of             clear Federal interest. This
                                                separately, an estimate of the cost of                                                                        determination would include an
                                                construction or modification.                           enactment of the Water Resources
                                                                                                        Development Act of 2016 (December 16,                 assessment of whether the proposal is:
                                                   5. Describe, to the extent applicable                                                                      —Technically sound, economically
                                                and practicable, an estimate of the                     2016); and
                                                                                                          • Proposed modifications to                            viable and environmentally
                                                anticipated monetary and non-monetary                                                                            acceptable.
                                                                                                        authorized water resources development
                                                benefits of the proposal with regard to                                                                       —Compliant with environmental and
                                                                                                        projects requested by non-Federal
                                                benefits to the protection of human life                                                                         other laws including but not limited
                                                                                                        interests through the Section 7001 of
                                                and property; improvement to                                                                                     to National Environmental Policy Act,
                                                                                                        WRRDA 2014 process.
                                                transportation; the national economy;                     b. SEEKING STUDY                                       Endangered Species Act, Coastal Zone
                                                the environment; or the national                        AUTHORIZATION.                                           Management Act, and the National
                                                security interests of the United States.                  • New feasibility studies proposed by                  Historic Preservation Act.
                                                   6. Describe if local support exists for              non-Federal interests through the                     —Compliant with statutes and
                                                the proposal.                                           Section 7001 of WRRDA 2014 process                       regulations related to water resources
                                                   7. State if the non-Federal interest has             will be evaluated by the USACE to                        development including various water
                                                the financial ability to provide the                    determine whether or not there is                        resources provisions related to the
                                                required cost share, reference ER 1105–                 existing study authority, and                            authorized cost of projects, level of
                                                2–100.                                                    • Proposed modifications to studies
                                                   8. Upload a letter or statement of                                                                            detail, separable elements, fish and
                                                                                                        requested by non-Federal interests                       wildlife mitigation, project
                                                support from each associated non-                       through the Section 7001 of WRRDA
                                                Federal interest.                                                                                                justification, matters to be addressed
                                                                                                        2014 process will be evaluated by the                    in planning, and the 1958 Water
                                                   All provided information may be                      USACE to determine whether or not
                                                included in the Annual Report to                                                                                 Supply Act.
                                                                                                        there is existing study authority.                       Feasibility study proposals submitted
                                                Congress on Future Water Resources                        c. The following cases are NOT
                                                Development. Therefore, information                                                                           by non-Federal interests are for the
                                                                                                        ELIGIBLE to be included in the Annual
                                                that is Confidential Business                                                                                 study only. If Congressional
                                                                                                        Report and will be included in the
                                                Information, information that should                                                                          authorization of a feasibility study
                                                                                                        appendix for transparency:
                                                not be disclosed because of statutory                     • Proposals for modifications to non-               results from inclusion in the Annual
                                                restrictions, or other information that a               Federal projects where USACE has                      Report, it is anticipated that such
                                                non-Federal interest would not want to                  provided previous technical assistance.               authorization would be for the study,
                                                appear in the Annual Report should not                  Authorization to provide technical                    not for construction. Once a decision
                                                be included.                                            assistance does not provide                           document is completed in accordance
                                                   Process: Proposals received within the               authorization of a water resources                    with Executive Branch policies and
                                                time frame set forth in this notice will                development project.                                  procedures, the Secretary will
                                                be reviewed by the Army and will be                       • Proposals for construction of a new               determine whether to recommend the
                                                presented in one of two tables. The first               water resources development project                   project for authorization.
                                                table will be in the Annual Report itself,              that is not the subject of a currently                   All water resources development
                                                and the second table will be in an                      authorized USACE project or a complete                projects must meet certain requirements
                                                appendix. To be included in the Annual                  or ongoing feasibility study.                         before proceeding to construction.
                                                Report table, the proposals must meet                     • Proposals that do not include a                   These requirements include: (1) That
                                                the following criteria:                                 request for a potential future water                  the project is authorized for
                                                   1. Are related to the missions and                   resources development project through                 construction by Congress; (2) that the
                                                authorities of the USACE;                               completed feasibility reports, proposed               Secretary, or other appropriate official,
                                                   Involves a proposed or existing                      feasibility studies, and proposed                     has approved a current decision
                                                USACE water resources project or effort                                                                       document; and, (3) that the funds for
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                        modifications to authorized projects or
                                                whose primary purpose is flood and                      studies.                                              project construction have been
                                                storm damage reduction, commercial                        3. Have not been congressionally                    appropriated and are available.
                                                navigation, or aquatic ecosystem                        authorized;                                              Section 902 of WRDA 1986
                                                restoration. Following long-standing                      4. Have not been included in the                    establishes a maximum authorized cost
                                                USACE practice, related proposals such                  Annual Report table of any previous                   for projects (902 limit). A Post
                                                as for recreation, hydropower, or water                 Annual Report to Congress on Future                   Authorization Change Report (PACR) is
                                                supply, are eligible for inclusion if                   Water Resources Development; and                      required to be completed to support


                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1


                                                17420                          Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices

                                                potential modifications, updates to                     9,217,452: BLIND FASTENER                             Annual Report) and FERC Form No. 2A
                                                project costs, and an increase to the 902               ASSEMBLY AND RELEASE PIN                              (Non-major Natural Gas Pipeline
                                                limit. Authority to undertake a 902                     APPARATUS//U.S. Patent No.                            Annual Report).
                                                study is inherent in the project                        9,217,455: QUICK RELEASE                              DATES: Comments on the collection of
                                                authority, so no authority is required to               COLLAPSIBLE BOLT//U.S. Patent No.                     information are due June 12, 2017.
                                                proceed with the study. Since these                     9,246,282: ELECTRICALLY                               ADDRESSES: You may submit comments
                                                PACRs support project modifications,                    CONDUCTING, ENVIRONMENTALLY                           (identified by Docket No. IC17–10–000)
                                                they may be considered for inclusion in                 SEALING, LOAD TRANSFERRING                            by either of the following methods:
                                                the Annual Report if a report’s                         CABLE TERMINATION FITTING//U.S.                          • eFiling at Commission’s Web site:
                                                recommendation requires Congressional                   Patent No. 9,248,894: CONTROLLED                      http://www.ferc.gov/docs-filing/
                                                authorization.                                          CORROSION RELEASE SYSTEM//U.S.                        efiling.asp.
                                                  The Secretary shall include in the                    Patent No. 9,318,239: CORROSION                          • Mail/Hand Delivery/Courier:
                                                Annual Report to Congress on Future                     RESISTANT, ENVIRONMENTALLY                            Federal Energy Regulatory Commission,
                                                Water Resources Development a                           SEALING, ELECTRICALLY                                 Secretary of the Commission, 888 First
                                                certification stating that each feasibility             CONDUCTING, CABLE CONNECTOR//                         Street NE., Washington, DC 20426.
                                                report, proposed feasibility study, and                 U.S. Patent No. 9,373,898: SWAGED–                       Instructions: All submissions must be
                                                proposed modification to an authorized                  ON, EXTERNAL ELECTRODE                                formatted and filed in accordance with
                                                water resources development project or                  ANCHORING CONNECTION//U.S.                            submission guidelines at: http://
                                                feasibility study included in the Annual                Patent No. 9,441,965: OCEANGRAPHIC                    www.ferc.gov/help/submission-
                                                Report meets the criteria established in                ASSEMBLY FOR COLLECTING DATA                          guide.asp. For user assistance contact
                                                Section 7001 of WRRDA 2014.                             ALONG MULTIPLE WATER                                  FERC Online Support by email at
                                                  Please contact the appropriate district               COLUMNS//                                             ferconlinesupport@ferc.gov, or by phone
                                                office or use the contact information                   ADDRESSES: Requests for copies of the                 at: (866) 208–3676 (toll-free), or (202)
                                                above for assistance in researching and                 patents cited should be directed to                   502–8659 for TTY.
                                                identifying existing authorizations and                 Office of Counsel, Naval Surface                         Docket: Users interested in receiving
                                                existing USACE decision documents.                      Warfare Center Panama City Division,                  automatic notification of activity in this
                                                Those proposals that do not meet the                    110 Vernon Ave., Panama City, FL                      docket or in viewing/downloading
                                                criteria will be included in an appendix                32407–7001.                                           comments and issuances in this docket
                                                table included in the Annual Report to                  FOR FURTHER INFORMATION CONTACT: Ms.                  may do so at http://www.ferc.gov/docs-
                                                Congress on Future Water Resources                      Brenda Squires, Patent Administration,                filing/docs-filing.asp.
                                                Development. Proposals in the appendix                  Naval Surface Warfare Center Panama                   FOR FURTHER INFORMATION CONTACT:
                                                table will include a description of why                 City Division, 110 Vernon Ave., Panama                Ellen Brown may be reached by email
                                                those proposals did not meet the                        City, FL 32407–7001, telephone 850–                   at DataClearance@FERC.gov, telephone
                                                criteria.                                               234–4646.                                             at (202) 502–8663, and fax at (202) 273–
                                                  Dated: April 5, 2017.                                 (Authority: 35 U.S.C. 207, 37 CFR part 404)           0873.
                                                James C. Dalton,                                                                                              SUPPLEMENTARY INFORMATION:
                                                                                                          Dated: April 5, 2017.
                                                Director of Civil Works.
                                                                                                        A.M. Nichols,                                            Title: FERC Form No. 2 (Annual
                                                [FR Doc. 2017–07253 Filed 4–10–17; 8:45 am]                                                                   Report of Major Natural Gas Companies)
                                                                                                        Lieutenant Commander, Judge Advocate
                                                BILLING CODE 3720–58–P                                  General’s Corps, U.S. Navy, Federal Register          & FERC Form No. 2A (Annual Report of
                                                                                                        Liaison Officer.                                      Non-major Natural Gas Companies).1
                                                                                                        [FR Doc. 2017–07269 Filed 4–10–17; 8:45 am]
                                                                                                                                                                 OMB Control No.: 1902–0028 (FERC
                                                DEPARTMENT OF DEFENSE                                                                                         Form No. 2) and 1902–0030 (FERC Form
                                                                                                        BILLING CODE 3810–FF–P
                                                                                                                                                              No. 2A).
                                                Department of the Navy                                                                                           Type of Request: Three-year extension
                                                                                                                                                              of the FERC Form No. 2 and FERC Form
                                                Notice of Availability of Government-                   DEPARTMENT OF ENERGY                                  No. 2A information collection
                                                Owned Inventions; Available for                                                                               requirements with no changes to the
                                                Licensing                                               Federal Energy Regulatory
                                                                                                        Commission                                            current reporting requirements.
                                                AGENCY:   Department of the Navy; DoD.                                                                           Abstract: Pursuant to sections 8, 10
                                                                                                        [Docket No. IC17–10–000]                              and 14 of the National Gas Act (NGA),
                                                ACTION:   Notice.
                                                                                                                                                              (15 U.S.C. 717g–717m, Pub. L. 75–688),
                                                SUMMARY:   The inventions listed below                  Commission Information Collection                     the Commission is authorized to make
                                                are assigned to the United States                       Activities (FERC Form No. 2 and FERC                  investigations and collect and record
                                                Government as represented by the                        Form No. 2A) Comment Request;                         data, to prescribe rules and regulations
                                                Secretary of the Navy and are available                 Extension                                             concerning accounts, records and
                                                for domestic and foreign licensing by                   AGENCY: Federal Energy Regulatory                     memoranda as necessary or appropriate
                                                the Department of the Navy.                             Commission, Department of Energy.                     for purposes of administering the NGA.
                                                   The following patents are available for              ACTION: Notice of information collection              The Commission includes the filing
                                                licensing: U.S. Patent No. 9,197,822:                   and request for comments.                             requirements in 18 CFR parts 260.1 and
                                                ARRAY AUGMENTED PARALLAX                                                                                      260.2.
                                                IMAGE ENHANCEMENT SYSTEM AND                            SUMMARY:  In compliance with the                         The forms provide information
srobinson on DSK5SPTVN1PROD with NOTICES




                                                METHOD//U.S. Patent No. 9,199,707:                      requirements of the Paperwork                         concerning a company’s past
                                                CABLE CUTTING SYSTEM FOR                                Reduction Act of 1995, the Federal
                                                RETRIEVAL OF EXERCISE MINES AND                         Energy Regulatory Commission                            1 The FERC Form No. 2 and Form 2A are also part

                                                OTHER UNDERWATER PAYLOADS//                             (Commission or FERC) is soliciting                    of the Forms Refresh effort (started in Docket No.
                                                                                                                                                              AD15–11), which is a separate activity and not
                                                U.S. Patent No. 9,208,386: CROWD                        public comment on the currently                       addressed in this Notice. In addition, there is a
                                                STATE CHARACTERIZATION SYSTEM                           approved information collection, FERC                 pending Docket No. RM15–19 which is a separate
                                                AND METHOD//U.S. Patent No.                             Form No. 2 (Major Natural Gas Pipeline                activity and is not addressed in this Notice.



                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1



Document Created: 2017-04-11 00:48:46
Document Modified: 2017-04-11 00:48:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesProposals must be submitted online by August 9, 2017.
ContactSend an email to the help desk at [email protected] or call Lisa Kiefel, Planning and Policy Division, Headquarters, USACE, Washington DC at 202-761-0626.
FR Citation82 FR 17418 