82_FR_17508 82 FR 17440 - Proposed Flood Hazard Determinations

82 FR 17440 - Proposed Flood Hazard Determinations

DEPARTMENT OF HOMELAND SECURITY
Federal Emergency Management Agency

Federal Register Volume 82, Issue 68 (April 11, 2017)

Page Range17440-17441
FR Document2017-07277

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.

Federal Register, Volume 82 Issue 68 (Tuesday, April 11, 2017)
[Federal Register Volume 82, Number 68 (Tuesday, April 11, 2017)]
[Notices]
[Pages 17440-17441]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07277]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Federal Emergency Management Agency

[Docket ID FEMA-2017-0002; Internal Agency Docket No. FEMA-B-1707


Proposed Flood Hazard Determinations

AGENCY: Federal Emergency Management Agency, DHS.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Comments are requested on proposed flood hazard 
determinations, which may include additions or modifications of any 
Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area 
(SFHA) boundary or zone designation, or regulatory floodway on the 
Flood Insurance Rate Maps (FIRMs), and where applicable, in the 
supporting Flood Insurance Study (FIS) reports for the communities 
listed in the table below. The purpose of this notice is to seek 
general information and comment regarding the preliminary FIRM, and 
where applicable, the FIS report that the Federal Emergency Management 
Agency (FEMA) has provided to the affected communities. The FIRM and 
FIS report are the basis of the floodplain management measures that the 
community is required either to adopt or to show evidence of having in 
effect in order to qualify or remain qualified for participation in the 
National Flood Insurance Program (NFIP). In addition, the FIRM and FIS 
report, once effective, will be used by insurance agents and others to 
calculate appropriate flood insurance premium rates for new buildings 
and the contents of those buildings.

DATES: Comments are to be submitted on or before July 10, 2017.

ADDRESSES: The Preliminary FIRM, and where applicable, the FIS report 
for each community are available for inspection at both the online 
location and the respective Community Map Repository address listed in 
the tables below. Additionally, the current effective FIRM and FIS 
report for each community are accessible online through the FEMA Map 
Service Center at www.msc.fema.gov for comparison.
    You may submit comments, identified by Docket No. FEMA-B-1707, to 
Rick Sacbibit, Chief, Engineering Services Branch, Federal Insurance 
and Mitigation Administration, FEMA, 400 C Street SW., Washington, DC 
20472, (202) 646-7659, or (email) [email protected].

FOR FURTHER INFORMATION CONTACT: Rick Sacbibit, Chief, Engineering 
Services Branch, Federal Insurance and Mitigation Administration, FEMA, 
400 C Street SW., Washington, DC 20472, (202) 646-7659, or (email) 
[email protected]; or visit the FEMA Map Information 
eXchange (FMIX) online at www.floodmaps.fema.gov/fhm/fmx_main.html.

SUPPLEMENTARY INFORMATION: FEMA proposes to make flood hazard 
determinations for each community listed below, in accordance with 
section 110 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 
4104, and 44 CFR 67.4(a).
    These proposed flood hazard determinations, together with the 
floodplain management criteria required by 44 CFR 60.3, are the minimum 
that are required. They should not be construed to mean that the 
community must change any existing ordinances that are more stringent 
in their floodplain management requirements. The community may at any 
time enact stricter requirements of its own or pursuant to policies 
established by other Federal, State, or regional entities. These flood 
hazard determinations are used to meet the floodplain management 
requirements of the NFIP and also are used to calculate the appropriate 
flood insurance premium rates for new buildings built after the FIRM 
and FIS report become effective.
    The communities affected by the flood hazard determinations are 
provided in the tables below. Any request for reconsideration of the 
revised flood hazard information shown on the Preliminary FIRM and FIS 
report that satisfies the data requirements outlined in 44 CFR 67.6(b) 
is considered an appeal. Comments unrelated to the flood hazard 
determinations also will be considered before the FIRM and FIS report 
become effective.
    Use of a Scientific Resolution Panel (SRP) is available to 
communities in support of the appeal resolution process. SRPs are 
independent panels of experts in hydrology, hydraulics, and other 
pertinent sciences established to review conflicting scientific and 
technical data and provide recommendations for resolution. Use of the 
SRP only may be exercised after FEMA and local communities have been 
engaged in a collaborative consultation process for at least 60 days 
without a mutually acceptable resolution of an appeal. Additional 
information regarding the SRP process can be found online at http://floodsrp.org/pdfs/srp_fact_sheet.pdf.
    The watersheds and/or communities affected are listed in the tables 
below. The Preliminary FIRM, and where applicable, FIS report for each 
community are available for inspection at both the online location and 
the respective Community Map Repository address listed in the tables. 
For communities with multiple ongoing Preliminary studies, the studies 
can be identified by the unique project number and Preliminary FIRM 
date listed in the tables. Additionally, the current effective FIRM and 
FIS report for each community are accessible online

[[Page 17441]]

through the FEMA Map Service Center at www.msc.fema.gov for comparison.

(Catalog of Federal Domestic Assistance No. 97.022, ``Flood 
Insurance.'')

    Date: March 21, 2017.
Roy E. Wright,
Deputy Associate Administrator for Insurance and Mitigation, Department 
of Homeland Security, Federal Emergency Management Agency.
    I. Non-watershed-based studies:

------------------------------------------------------------------------
                                             Community map repository
               Community                             address
------------------------------------------------------------------------
              Brown County, Illinois and Incorporated Areas
Maps Available for Inspection Online at: http://www.fema.gov/preliminaryfloodhazarddata preliminaryfloodhazarddata
------------------------------------------------------------------------
         Project: 11-05-2492S Preliminary Date: August 31, 2016
------------------------------------------------------------------------
Unincorporated Areas of Brown County...  Brown County Courthouse, 200
                                          West Court Street, Mount
                                          Sterling, IL 62353
------------------------------------------------------------------------
              Pike County, Illinois and Incorporated Areas
Maps Available for Inspection Online at: http://www.fema.gov/preliminaryfloodhazarddata preliminaryfloodhazarddata
------------------------------------------------------------------------
         Project: 11-05-2492S Preliminary Date: August 31, 2016
------------------------------------------------------------------------
Village of Perry.......................  Perry Village Hall, 210 West
                                          Main Street, Perry, IL 62362.
Unincorporated Areas of Pike County....  Pike County Government
                                          Building, 121 East Washington
                                          Street, Pittsfield, IL 62363.
------------------------------------------------------------------------

[FR Doc. 2017-07277 Filed 4-10-17; 8:45 am]
 BILLING CODE 9110-12-P



                                                17440                          Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices

                                                questions will be taken at the discretion               SUMMARY:   Comments are requested on                  listed below, in accordance with section
                                                of the Designated Federal Officer during                proposed flood hazard determinations,                 110 of the Flood Disaster Protection Act
                                                the discussion and recommendation                       which may include additions or                        of 1973, 42 U.S.C. 4104, and 44 CFR
                                                portions of the meeting and during the                  modifications of any Base Flood                       67.4(a).
                                                public comment period, see Agenda                       Elevation (BFE), base flood depth,                       These proposed flood hazard
                                                item (8).                                               Special Flood Hazard Area (SFHA)                      determinations, together with the
                                                   A complete agenda for May 17, 2017                   boundary or zone designation, or                      floodplain management criteria required
                                                Committee meeting is as follows:                        regulatory floodway on the Flood                      by 44 CFR 60.3, are the minimum that
                                                   (1) Welcoming remarks.                               Insurance Rate Maps (FIRMs), and                      are required. They should not be
                                                   (2) General Administration and accept                where applicable, in the supporting                   construed to mean that the community
                                                minutes from February 21, 2017                          Flood Insurance Study (FIS) reports for               must change any existing ordinances
                                                National Offshore Safety Advisory                       the communities listed in the table                   that are more stringent in their
                                                Committee public teleconference                         below. The purpose of this notice is to               floodplain management requirements.
                                                meeting.                                                seek general information and comment                  The community may at any time enact
                                                   (3) Installation of new members.                     regarding the preliminary FIRM, and                   stricter requirements of its own or
                                                   (4) Installation of new Committee                    where applicable, the FIS report that the             pursuant to policies established by other
                                                Chair.                                                  Federal Emergency Management Agency                   Federal, State, or regional entities.
                                                   (5) Current Business—Presentation                    (FEMA) has provided to the affected                   These flood hazard determinations are
                                                and discussion of progress from the                     communities. The FIRM and FIS report                  used to meet the floodplain
                                                Subcommittee on Safety Management                       are the basis of the floodplain                       management requirements of the NFIP
                                                Systems on Vessels Engaging in Well                     management measures that the                          and also are used to calculate the
                                                Intervention Activities.                                community is required either to adopt                 appropriate flood insurance premium
                                                   (6) New Business.                                    or to show evidence of having in effect               rates for new buildings built after the
                                                   (7) Presentations on the following                   in order to qualify or remain qualified               FIRM and FIS report become effective.
                                                matters:                                                for participation in the National Flood                  The communities affected by the
                                                   (a) ‘‘The Internet of Things’’ and how               Insurance Program (NFIP). In addition,                flood hazard determinations are
                                                digital engineering can transform the                   the FIRM and FIS report, once effective,              provided in the tables below. Any
                                                safety and operability of equipment                     will be used by insurance agents and                  request for reconsideration of the
                                                used by the oil and gas industry;                       others to calculate appropriate flood                 revised flood hazard information shown
                                                   (b) United States Coast Guard Cyber                  insurance premium rates for new                       on the Preliminary FIRM and FIS report
                                                Security Initiatives update;                            buildings and the contents of those                   that satisfies the data requirements
                                                   (c) Update from the Bureau of Safety                 buildings.                                            outlined in 44 CFR 67.6(b) is considered
                                                and Environmental Enforcement;                                                                                an appeal. Comments unrelated to the
                                                   (d) Eighth Coast Guard District Officer              DATES:  Comments are to be submitted                  flood hazard determinations also will be
                                                in Charge Marine Inspection Outer                       on or before July 10, 2017.                           considered before the FIRM and FIS
                                                Continental Shelf Inspection Program                    ADDRESSES: The Preliminary FIRM, and                  report become effective.
                                                Updates.                                                where applicable, the FIS report for                     Use of a Scientific Resolution Panel
                                                   (8) Public comment period.                           each community are available for                      (SRP) is available to communities in
                                                                                                        inspection at both the online location                support of the appeal resolution
                                                Minutes                                                 and the respective Community Map                      process. SRPs are independent panels of
                                                   Meeting minutes from this public                     Repository address listed in the tables               experts in hydrology, hydraulics, and
                                                meeting will be available for public                    below. Additionally, the current                      other pertinent sciences established to
                                                view and copying within 90 days                         effective FIRM and FIS report for each                review conflicting scientific and
                                                following the close of the meeting at the               community are accessible online                       technical data and provide
                                                https://homeport.uscg.mil/nosac Web                     through the FEMA Map Service Center                   recommendations for resolution. Use of
                                                site.                                                   at www.msc.fema.gov for comparison.                   the SRP only may be exercised after
                                                                                                           You may submit comments, identified                FEMA and local communities have been
                                                  Dated: April 5, 2017.
                                                                                                        by Docket No. FEMA–B–1707, to Rick                    engaged in a collaborative consultation
                                                J.G. Lantz,                                                                                                   process for at least 60 days without a
                                                Director of Commercial Regulations and
                                                                                                        Sacbibit, Chief, Engineering Services
                                                                                                        Branch, Federal Insurance and                         mutually acceptable resolution of an
                                                Standards.                                                                                                    appeal. Additional information
                                                [FR Doc. 2017–07215 Filed 4–10–17; 8:45 am]
                                                                                                        Mitigation Administration, FEMA, 400
                                                                                                        C Street SW., Washington, DC 20472,                   regarding the SRP process can be found
                                                BILLING CODE 9110–04–P
                                                                                                        (202) 646–7659, or (email)                            online at http://floodsrp.org/pdfs/srp_
                                                                                                        patrick.sacbibit@fema.dhs.gov.                        fact_sheet.pdf.
                                                                                                                                                                 The watersheds and/or communities
                                                DEPARTMENT OF HOMELAND                                  FOR FURTHER INFORMATION CONTACT: Rick
                                                                                                                                                              affected are listed in the tables below.
                                                SECURITY                                                Sacbibit, Chief, Engineering Services                 The Preliminary FIRM, and where
                                                                                                        Branch, Federal Insurance and                         applicable, FIS report for each
                                                Federal Emergency Management                            Mitigation Administration, FEMA, 400                  community are available for inspection
                                                Agency                                                  C Street SW., Washington, DC 20472,                   at both the online location and the
                                                [Docket ID FEMA–2017–0002; Internal
                                                                                                        (202) 646–7659, or (email)                            respective Community Map Repository
                                                Agency Docket No. FEMA–B–1707                           patrick.sacbibit@fema.dhs.gov; or visit               address listed in the tables. For
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                        the FEMA Map Information eXchange                     communities with multiple ongoing
                                                Proposed Flood Hazard                                   (FMIX) online at                                      Preliminary studies, the studies can be
                                                Determinations                                          www.floodmaps.fema.gov/fhm/fmx_                       identified by the unique project number
                                                                                                        main.html.                                            and Preliminary FIRM date listed in the
                                                AGENCY: Federal Emergency
                                                Management Agency, DHS.                                 SUPPLEMENTARY INFORMATION:  FEMA                      tables. Additionally, the current
                                                                                                        proposes to make flood hazard                         effective FIRM and FIS report for each
                                                ACTION: Notice.
                                                                                                        determinations for each community                     community are accessible online


                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1


                                                                                         Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices                                                           17441

                                                through the FEMA Map Service Center                                       Date: March 21, 2017.
                                                at www.msc.fema.gov for comparison.                                     Roy E. Wright,
                                                (Catalog of Federal Domestic Assistance No.                             Deputy Associate Administrator for Insurance
                                                                                                                        and Mitigation, Department of Homeland
                                                97.022, ‘‘Flood Insurance.’’)
                                                                                                                        Security, Federal Emergency Management
                                                                                                                        Agency.
                                                                                                                            I. Non-watershed-based studies:

                                                                                            Community                                                                           Community map repository address

                                                                                             Brown County, Illinois and Incorporated Areas
                                                Maps Available for Inspection Online at: http://www.fema.gov/preliminaryfloodhazarddata

                                                                                                              Project: 11–05–2492S                 Preliminary Date: August 31, 2016

                                                Unincorporated Areas of Brown County ..................................................                      Brown County Courthouse, 200 West Court Street, Mount Sterling, IL
                                                                                                                                                               62353

                                                                                              Pike County, Illinois and Incorporated Areas
                                                Maps Available for Inspection Online at: http://www.fema.gov/preliminaryfloodhazarddata

                                                                                                              Project: 11–05–2492S                 Preliminary Date: August 31, 2016

                                                Village of Perry .........................................................................................   Perry Village Hall, 210 West Main Street, Perry, IL 62362.
                                                Unincorporated Areas of Pike County ......................................................                   Pike County Government Building, 121 East Washington Street, Pitts-
                                                                                                                                                               field, IL 62363.



                                                [FR Doc. 2017–07277 Filed 4–10–17; 8:45 am]                             agents and others to calculate                                community listed. Notification of these
                                                BILLING CODE 9110–12–P                                                  appropriate flood insurance premium                           changes has been published in
                                                                                                                        rates for buildings and the contents of                       newspapers of local circulation and 90
                                                                                                                        those buildings.                                              days have elapsed since that
                                                DEPARTMENT OF HOMELAND                                                  DATES: The effective date of July 18,                         publication. The Deputy Associate
                                                SECURITY                                                                2017 which has been established for the                       Administrator for Insurance and
                                                                                                                        FIRM and, where applicable, the                               Mitigation has resolved any appeals
                                                Federal Emergency Management                                                                                                          resulting from this notification.
                                                                                                                        supporting FIS report showing the new
                                                Agency
                                                                                                                        or modified flood hazard information                             This final notice is issued in
                                                [Docket ID FEMA–2017–0002]                                              for each community.                                           accordance with section 110 of the
                                                                                                                        ADDRESSES: The FIRM, and if                                   Flood Disaster Protection Act of 1973,
                                                Final Flood Hazard Determinations                                                                                                     42 U.S.C. 4104, and 44 CFR part 67.
                                                                                                                        applicable, the FIS report containing the
                                                AGENCY:  Federal Emergency                                              final flood hazard information for each                       FEMA has developed criteria for
                                                Management Agency, DHS.                                                 community is available for inspection at                      floodplain management in floodprone
                                                ACTION: Final Notice.                                                   the respective Community Map                                  areas in accordance with 44 CFR part
                                                                                                                        Repository address listed in the tables                       60.
                                                SUMMARY:   Flood hazard determinations,                                 below and will be available online                               Interested lessees and owners of real
                                                which may include additions or                                          through the FEMA Map Service Center                           property are encouraged to review the
                                                modifications of Base Flood Elevations                                  at www.msc.fema.gov by the effective                          new or revised FIRM and FIS report
                                                (BFEs), base flood depths, Special Flood                                date indicated above.                                         available at the address cited below for
                                                Hazard Area (SFHA) boundaries or zone                                   FOR FURTHER INFORMATION CONTACT: Rick                         each community or online through the
                                                designations, or regulatory floodways on                                                                                              FEMA Map Service Center at
                                                                                                                        Sacbibit, Chief, Engineering Services
                                                the Flood Insurance Rate Maps (FIRMs)                                                                                                 www.msc.fema.gov.
                                                                                                                        Branch, Federal Insurance and
                                                and where applicable, in the supporting                                                                                                  The flood hazard determinations are
                                                                                                                        Mitigation Administration, FEMA, 400
                                                Flood Insurance Study (FIS) reports                                                                                                   made final in the watersheds and/or
                                                                                                                        C Street SW., Washington, DC 20472,
                                                have been made final for the                                                                                                          communities listed in the table below.
                                                                                                                        (202) 646–7659, or (email)
                                                communities listed in the table below.
                                                   The FIRM and FIS report are the basis                                patrick.sacbibit@fema.dhs.gov; or visit                       (Catalog of Federal Domestic Assistance No.
                                                of the floodplain management measures                                   the FEMA Map Information eXchange                             97.022, ‘‘Flood Insurance.’’)
                                                that a community is required either to                                  (FMIX) online at
                                                                                                                        www.floodmaps.fema.gov/fhm/fmx_                                 Dated March 21, 2017.
                                                adopt or to show evidence of having in
                                                effect in order to qualify or remain                                    main.html.                                                    Roy E. Wright,
                                                qualified for participation in the Federal                              SUPPLEMENTARY INFORMATION:    The                             Deputy Associate Administrator for Insurance
                                                                                                                                                                                      and Mitigation, Department of Homeland
                                                Emergency Management Agency’s                                           Federal Emergency Management Agency
                                                                                                                                                                                      Security, Federal Emergency Management
                                                (FEMA’s) National Flood Insurance                                       (FEMA) makes the final determinations
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                                                                                                      Agency.
                                                Program (NFIP). In addition, the FIRM                                   listed below for the new or modified
                                                and FIS report are used by insurance                                    flood hazard information for each                                I. Non-watershed-based studies:




                                           VerDate Sep<11>2014        20:18 Apr 10, 2017        Jkt 241001      PO 00000       Frm 00035       Fmt 4703      Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1



Document Created: 2017-04-11 00:48:36
Document Modified: 2017-04-11 00:48:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesComments are to be submitted on or before July 10, 2017.
ContactRick Sacbibit, Chief, Engineering Services Branch, Federal Insurance and Mitigation Administration, FEMA, 400 C Street SW., Washington, DC 20472, (202) 646-7659, or (email) [email protected]; or visit the FEMA Map Information eXchange (FMIX) online at www.floodmaps.fema.gov/fhm/fmx_main.html.
FR Citation82 FR 17440 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR