The Susquehanna River Basin Commission will hold a public hearing on May 11, 2017, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. The Commission will also hear testimony on a request for waiver by EOG Resources, Inc., as well as proposals to amend its Regulatory Program Fee Schedule and the Comprehensive Plan for the Water Resources of the Susquehanna River Basin. Such projects, request and proposals are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for June 16, 2017, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects, request and proposals. The deadline for the submission of written comments is May 22, 2017.

Federal Register, Volume 82 Issue 68 (Tuesday, April 11, 2017)
[Federal Register Volume 82, Number 68 (Tuesday, April 11, 2017)]
[Notices]
[Pages 17497-17498]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07274]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on May 11, 2017, in Harrisburg, Pennsylvania. At this public 
hearing, the Commission will hear testimony on the projects listed in 
the Supplementary Information section of this notice. The Commission 
will also hear testimony on a request for waiver by EOG Resources, 
Inc., as well as proposals to amend its Regulatory Program Fee Schedule 
and the Comprehensive Plan for the Water Resources of the Susquehanna 
River Basin. Such projects, request and proposals are intended to be 
scheduled for Commission action at its next business meeting, 
tentatively scheduled for June 16, 2017, which will be noticed 
separately. The public should take note that this public hearing will 
be the only opportunity to offer oral comment to the Commission for the 
listed projects, request and proposals. The deadline for the submission 
of written comments is May 22, 2017.

DATES: The public hearing will convene on May 11, 2017, at 2:30 p.m. 
The public hearing will end at 5:00 p.m. or at the conclusion of public 
testimony, whichever is sooner. The deadline for the submission of 
written comments is May 22, 2017.

ADDRESSES: The public hearing will be conducted at the Pennsylvania 
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg, 
Pa.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436.
    Information concerning the applications for these projects is 
available at the SRBC Water Resource Portal at www.srbc.net/wrp. 
Additional supporting documents are available to inspect and copy in 
accordance with the Commission's Access to Records Policy at 
www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover a request for 
waiver of 18 CFR 806.3 AND 806.4 by EOG Resources, Inc., as well as 
proposed amendments to the Commission's Regulatory Program Fee Schedule 
and the Comprehensive Plan for the Water Resources of the Susquehanna 
River Basin, as posted on the SRBC Public Participation Center Web page 
at www.srbc.net/pubinfo/publicparticipation.htm. The public hearing 
will also cover the following projects:
    Projects Scheduled for Action:
    1. Project Sponsor and Facility: Town of Big Flats, Chemung County, 
N.Y. Application for groundwater withdrawal of up to 0.792 mgd (30-day 
average) from Well 1-1.
    2. Project Sponsor and Facility: Michael and Sandra Buhler (Bennett 
Branch Sinnemahoning Creek), Huston Township, Clearfield County, Pa. 
Application for renewal of surface water withdrawal of up to 0.999 mgd 
(peak day) (Docket No. 20130603).
    3. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Susquehanna River), Mehoopany Township, Wyoming County, Pa. 
Application for renewal of surface water withdrawal of up to 0.999 mgd 
(peak day) (Docket No. 20130303).
    4. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Susquehanna River), Wysox Township, Bradford County, Pa. Application 
for renewal of surface water withdrawal of up to 0.999 mgd (peak day) 
(Docket No. 20130304).
    5. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Wyalusing Creek), Rush Township, Susquehanna County, Pa. Application 
for surface water withdrawal of up to 0.715 mgd (peak day).
    6. Project Sponsor and Facility: DS Services of America, Inc., Clay 
Township, Lancaster County, Pa. Application for groundwater withdrawal 
of up to 0.028 mgd (30-day average) from existing Well 4.
    7. Project Sponsor and Facility: DS Services of America, Inc., Clay 
Township, Lancaster County, Pa. Application for groundwater withdrawal 
of up to 0.042 mgd (30-day average) from existing Well 5.
    8. Project Sponsor and Facility: Ephrata Area Joint Authority, 
Ephrata Borough, Lancaster County, Pa. Application for modification to 
request a combined withdrawal limit for Well 1, Cocalico Creek, and 
Mountain Home Springs of 2.310 mgd (30-day average) (Docket No. 
20110902).
    9. Project Sponsor and Facility: Equipment Transport, LLC 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 1.000 mgd 
(peak day) (Docket No. 20130613).
    10. Project Sponsor and Facility: Kraft Heinz Foods Company, Town 
of Campbell, Steuben County, N.Y. Application for renewal of 
groundwater withdrawal of up to 0.432 mgd (30-day average) from Well 3 
(Docket No. 19860203).
    11. Project Sponsor and Facility: Mount Joy Borough Authority, 
Mount Joy Borough, Lancaster County, Pa. Application for modification 
to request a reduction of the maximum instantaneous rate for Well 3 
from the previously approved rate of 1,403 gpm to 778 gpm and revise 
the passby to be consistent with current Commission policy (Docket No. 
20070607). The previously approved withdrawal rate of 1.020 mgd (30-day 
average) will remain unchanged.
    12. Project Sponsor: P.H. Glatfelter Company. Project Facility: 
Paper/Pulp Mill and Cogen Operations (Codorus Creek), Spring Grove 
Borough, York County, Pa. Application for renewal of surface water 
withdrawal of up to 16.000 mgd (peak day) (Docket No. 19860602).
    13. Project Sponsor: P.H. Glatfelter Company. Project Facility: 
Paper/Pulp Mill and Cogen Operations, Spring Grove Borough, York 
County, Pa. Application for renewal of consumptive water use of up to 
0.900 mgd (peak day) (Docket No. 19860602).
    14. Project Sponsor and Facility: Rausch Creek Land, L.P., Porter 
Township, Schuylkill County, Pa.

[[Page 17498]]

Application for renewal of groundwater withdrawal of up to 0.100 mgd 
(30-day average) from Pit #21 (Docket No. 20120612).
    15. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC 
(Towanda Creek), Franklin Township, Bradford County, Pa. Application 
for renewal of surface water withdrawal of up to 1.000 mgd (peak day) 
(Docket No. 20130311).
    16. Project Sponsor and Facility: Spring Township Water Authority, 
Spring Township, Centre County, Pa. Application for groundwater 
withdrawal of up to 0.499 mgd (30-day average) from Cerro Well.
    17. Project Sponsor: Talen Energy Corporation. Project Facility: 
Royal Manchester Golf Links, East Manchester Township, York County, Pa. 
Minor modification to add new sources (Wells PW-1 and PW-6) to existing 
consumptive use approval (Docket No. 20060604). The previously approved 
consumptive use quantity of 0.360 mgd (peak day) will remain unchanged.
    18. Project Sponsor: Talen Energy Corporation. Project Facility: 
Royal Manchester Golf Links, East Manchester Township, York County, Pa. 
Application for groundwater withdrawal of up to 0.145 mgd (30-day 
average) from Well PW-1.
    19. Project Sponsor: Talen Energy Corporation. Project Facility: 
Royal Manchester Golf Links, East Manchester Township, York County, Pa. 
Application for groundwater withdrawal of up to 0.298 mgd (30-day 
average) from Well PW-6.
    20. Project Sponsor and Facility: Warren Marcellus LLC (Susquehanna 
River), Washington Township, Wyoming County, Pa. Application for 
renewal of surface water withdrawal of up to 0.999 mgd (peak day) 
(Docket No. 20130305).
    21. Project Sponsor and Facility: Village of Waverly, Tioga County, 
N.Y. Application for groundwater withdrawal of up to 0.320 mgd (30-day 
average) from Well 1.
    22. Project Sponsor and Facility: Village of Waverly, Tioga County, 
N.Y. Application for groundwater withdrawal of up to 0.480 mgd (30-day 
average) from Well 2.
    23. Project Sponsor and Facility: Village of Waverly, Tioga County, 
N.Y. Application for groundwater withdrawal of up to 0.470 mgd (30-day 
average) from Well 3.
    Projects Scheduled for Action Involving a Diversion:
    1. Project Sponsor and Facility: City of DuBois, Union Township, 
Clearfield County, Pa. Application for modification to the diversion 
from Anderson Creek Reservoir by expansion of the existing service area 
as a result of interconnection and bulk water supply to Falls Creek 
Borough Municipal Authority (Docket No. 20060304).
    2. Project Sponsor: Seneca Resources Corporation. Project Facility: 
Impoundment 1, receiving groundwater from Seneca Resources Corporation 
Wells 5H and 6H and Clermont Wells 1, 2, North 2, 3, and 4, Norwich and 
Sergeant Townships, McKean County, Pa. Application for modification to 
add four additional sources (Clermont North Well 1, Clermont North Well 
3, Clermont South Well 7, and Clermont South Well 10) and increase the 
into-basin diversion from the Ohio River Basin by an additional 1.044 
mgd (peak day), for a total of up to 3.021 mgd (peak day) (Docket No. 
20141216).
    Opportunity to Appear and Comment: Interested parties may appear at 
the hearing to offer comments to the Commission on any project, request 
or proposal listed above. The presiding officer reserves the right to 
limit oral statements in the interest of time and to otherwise control 
the course of the hearing. Guidelines for the public hearing will be 
posted on the Commission's Web site, www.srbc.net, prior to the hearing 
for review. The presiding officer reserves the right to modify or 
supplement such guidelines at the hearing. Written comments on any 
project, request or proposal listed above may also be mailed to Mr. 
Jason Oyler, General Counsel, Susquehanna River Basin Commission, 4423 
North Front Street, Harrisburg, Pa. 17110-1788, or submitted 
electronically through www.srbc.net/pubinfo/publicparticipation.htm. 
Comments mailed or electronically submitted must be received by the 
Commission on or before May 22, 2017, to be considered.

    Authority:  Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: April 6, 2017.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2017-07274 Filed 4-10-17; 8:45 am]
 BILLING CODE 7040-01-P



                                                                               Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices                                           17497

                                                sexual behavior and attitudes, religious                DATES:  The public hearing will convene               (Wyalusing Creek), Rush Township,
                                                beliefs, and other matters commonly                     on May 11, 2017, at 2:30 p.m. The                     Susquehanna County, Pa. Application
                                                considered private.                                     public hearing will end at 5:00 p.m. or               for surface water withdrawal of up to
                                                  The respondents are recipients of SSA                 at the conclusion of public testimony,                0.715 mgd (peak day).
                                                services (including most members of the                 whichever is sooner. The deadline for                    6. Project Sponsor and Facility: DS
                                                public), professionals, and individuals                 the submission of written comments is                 Services of America, Inc., Clay
                                                who work on behalf of SSA                               May 22, 2017.                                         Township, Lancaster County, Pa.
                                                beneficiaries.                                          ADDRESSES: The public hearing will be                 Application for groundwater
                                                  Type of Request: Revision of an OMB-                  conducted at the Pennsylvania State                   withdrawal of up to 0.028 mgd (30-day
                                                approved information collection.                        Capitol, Room 8E–B, East Wing,                        average) from existing Well 4.
                                                  Affected Public: Individuals and                      Commonwealth Avenue, Harrisburg, Pa.                     7. Project Sponsor and Facility: DS
                                                households, businesses and                                                                                    Services of America, Inc., Clay
                                                                                                        FOR FURTHER INFORMATION CONTACT:
                                                organizations, State, Local or Tribal                                                                         Township, Lancaster County, Pa.
                                                                                                        Jason Oyler, General Counsel,
                                                government.                                                                                                   Application for groundwater
                                                                                                        telephone: (717) 238–0423, ext. 1312;
                                                  Total Estimated Number of                                                                                   withdrawal of up to 0.042 mgd (30-day
                                                                                                        fax: (717) 238–2436.
                                                Respondents: 205,485.                                                                                         average) from existing Well 5.
                                                                                                           Information concerning the
                                                  Below we provide projected average                                                                             8. Project Sponsor and Facility:
                                                                                                        applications for these projects is
                                                estimates for the next three years:                                                                           Ephrata Area Joint Authority, Ephrata
                                                                                                        available at the SRBC Water Resource
                                                  Annual Respondents: 68,495.                                                                                 Borough, Lancaster County, Pa.
                                                                                                        Portal at www.srbc.net/wrp. Additional
                                                  Annual Responses: 68,495.                                                                                   Application for modification to request
                                                                                                        supporting documents are available to
                                                  Frequency of Response: Once per                                                                             a combined withdrawal limit for Well 1,
                                                                                                        inspect and copy in accordance with the
                                                request.                                                                                                      Cocalico Creek, and Mountain Home
                                                                                                        Commission’s Access to Records Policy
                                                  Average minutes per response: 18                                                                            Springs of 2.310 mgd (30-day average)
                                                                                                        at www.srbc.net/pubinfo/docs/2009-
                                                minutes.                                                                                                      (Docket No. 20110902).
                                                                                                        02_Access_to_Records_                                    9. Project Sponsor and Facility:
                                                  Estimated Annual Burden: 205,549                      Policy_20140115.pdf.
                                                hours.                                                                                                        Equipment Transport, LLC
                                                                                                        SUPPLEMENTARY INFORMATION: The                        (Susquehanna River), Great Bend
                                                  Dated: April 5, 2017.                                 public hearing will cover a request for               Township, Susquehanna County, Pa.
                                                Naomi R. Sipple,                                        waiver of 18 CFR 806.3 AND 806.4 by                   Application for renewal of surface water
                                                Reports Clearance Officer, Social Security              EOG Resources, Inc., as well as                       withdrawal of up to 1.000 mgd (peak
                                                Administration.                                         proposed amendments to the                            day) (Docket No. 20130613).
                                                [FR Doc. 2017–07174 Filed 4–10–17; 8:45 am]             Commission’s Regulatory Program Fee                      10. Project Sponsor and Facility: Kraft
                                                BILLING CODE 4191–02–P                                  Schedule and the Comprehensive Plan                   Heinz Foods Company, Town of
                                                                                                        for the Water Resources of the                        Campbell, Steuben County, N.Y.
                                                                                                        Susquehanna River Basin, as posted on                 Application for renewal of groundwater
                                                SUSQUEHANNA RIVER BASIN                                 the SRBC Public Participation Center                  withdrawal of up to 0.432 mgd (30-day
                                                COMMISSION                                              Web page at www.srbc.net/pubinfo/                     average) from Well 3 (Docket No.
                                                                                                        publicparticipation.htm. The public                   19860203).
                                                Public Hearing                                          hearing will also cover the following                    11. Project Sponsor and Facility:
                                                                                                        projects:                                             Mount Joy Borough Authority, Mount
                                                AGENCY: Susquehanna River Basin                            Projects Scheduled for Action:                     Joy Borough, Lancaster County, Pa.
                                                Commission.                                                1. Project Sponsor and Facility: Town              Application for modification to request
                                                ACTION: Notice.                                         of Big Flats, Chemung County, N.Y.                    a reduction of the maximum
                                                                                                        Application for groundwater                           instantaneous rate for Well 3 from the
                                                SUMMARY:   The Susquehanna River Basin                  withdrawal of up to 0.792 mgd (30-day                 previously approved rate of 1,403 gpm
                                                Commission will hold a public hearing                   average) from Well 1–1.                               to 778 gpm and revise the passby to be
                                                on May 11, 2017, in Harrisburg,                            2. Project Sponsor and Facility:                   consistent with current Commission
                                                Pennsylvania. At this public hearing,                   Michael and Sandra Buhler (Bennett                    policy (Docket No. 20070607). The
                                                the Commission will hear testimony on                   Branch Sinnemahoning Creek), Huston                   previously approved withdrawal rate of
                                                the projects listed in the Supplementary                Township, Clearfield County, Pa.                      1.020 mgd (30-day average) will remain
                                                Information section of this notice. The                 Application for renewal of surface water              unchanged.
                                                Commission will also hear testimony on                  withdrawal of up to 0.999 mgd (peak                      12. Project Sponsor: P.H. Glatfelter
                                                a request for waiver by EOG Resources,                  day) (Docket No. 20130603).                           Company. Project Facility: Paper/Pulp
                                                Inc., as well as proposals to amend its                    3. Project Sponsor and Facility:                   Mill and Cogen Operations (Codorus
                                                Regulatory Program Fee Schedule and                     Chesapeake Appalachia, LLC                            Creek), Spring Grove Borough, York
                                                the Comprehensive Plan for the Water                    (Susquehanna River), Mehoopany                        County, Pa. Application for renewal of
                                                Resources of the Susquehanna River                      Township, Wyoming County, Pa.                         surface water withdrawal of up to
                                                Basin. Such projects, request and                       Application for renewal of surface water              16.000 mgd (peak day) (Docket No.
                                                proposals are intended to be scheduled                  withdrawal of up to 0.999 mgd (peak                   19860602).
                                                for Commission action at its next                       day) (Docket No. 20130303).                              13. Project Sponsor: P.H. Glatfelter
                                                business meeting, tentatively scheduled                    4. Project Sponsor and Facility:                   Company. Project Facility: Paper/Pulp
                                                for June 16, 2017, which will be noticed                Chesapeake Appalachia, LLC                            Mill and Cogen Operations, Spring
srobinson on DSK5SPTVN1PROD with NOTICES




                                                separately. The public should take note                 (Susquehanna River), Wysox Township,                  Grove Borough, York County, Pa.
                                                that this public hearing will be the only               Bradford County, Pa. Application for                  Application for renewal of consumptive
                                                opportunity to offer oral comment to the                renewal of surface water withdrawal of                water use of up to 0.900 mgd (peak day)
                                                Commission for the listed projects,                     up to 0.999 mgd (peak day) (Docket No.                (Docket No. 19860602).
                                                request and proposals. The deadline for                 20130304).                                               14. Project Sponsor and Facility:
                                                the submission of written comments is                      5. Project Sponsor and Facility:                   Rausch Creek Land, L.P., Porter
                                                May 22, 2017.                                           Chesapeake Appalachia, LLC                            Township, Schuylkill County, Pa.


                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00091   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1


                                                17498                          Federal Register / Vol. 82, No. 68 / Tuesday, April 11, 2017 / Notices

                                                Application for renewal of groundwater                  of the existing service area as a result of                 Notice and request for
                                                                                                                                                              ACTION:
                                                withdrawal of up to 0.100 mgd (30-day                   interconnection and bulk water supply                 comments.
                                                average) from Pit #21 (Docket No.                       to Falls Creek Borough Municipal
                                                20120612).                                              Authority (Docket No. 20060304).                      SUMMARY:    Under the Paperwork
                                                  15. Project Sponsor and Facility:                        2. Project Sponsor: Seneca Resources               Reduction Act of 1995 (PRA) and its
                                                Repsol Oil & Gas USA, LLC (Towanda                      Corporation. Project Facility:                        implementing regulations, FRA seeks
                                                Creek), Franklin Township, Bradford                     Impoundment 1, receiving groundwater                  approval of the information collection
                                                County, Pa. Application for renewal of                  from Seneca Resources Corporation                     activity listed below. Before submitting
                                                surface water withdrawal of up to 1.000                 Wells 5H and 6H and Clermont Wells 1,                 this information collection request (ICR)
                                                mgd (peak day) (Docket No. 20130311).                   2, North 2, 3, and 4, Norwich and                     to the Office of Management and Budget
                                                  16. Project Sponsor and Facility:                     Sergeant Townships, McKean County,                    (OMB) for approval, FRA is soliciting
                                                Spring Township Water Authority,                        Pa. Application for modification to add               public comment on specific aspects of
                                                Spring Township, Centre County, Pa.                                                                           the activity identified in this notice.
                                                                                                        four additional sources (Clermont North
                                                Application for groundwater                             Well 1, Clermont North Well 3,                        DATES: Comments must be received no
                                                withdrawal of up to 0.499 mgd (30-day                   Clermont South Well 7, and Clermont                   later than June 12, 2017.
                                                average) from Cerro Well.                               South Well 10) and increase the into-                 ADDRESSES: Submit written comments
                                                  17. Project Sponsor: Talen Energy                     basin diversion from the Ohio River                   on any or all of the following proposed
                                                Corporation. Project Facility: Royal                    Basin by an additional 1.044 mgd (peak                activities by mail to either: Mr. Robert
                                                Manchester Golf Links, East Manchester                  day), for a total of up to 3.021 mgd (peak            Brogan, Information Collection
                                                Township, York County, Pa. Minor                        day) (Docket No. 20141216).                           Clearance Officer, Office of Railroad
                                                modification to add new sources (Wells                     Opportunity to Appear and Comment:                 Safety, Regulatory Analysis Division,
                                                PW–1 and PW–6) to existing                              Interested parties may appear at the                  RRS–21, Federal Railroad
                                                consumptive use approval (Docket No.                    hearing to offer comments to the                      Administration, 1200 New Jersey
                                                20060604). The previously approved                      Commission on any project, request or                 Avenue SE., Mail Stop 25, Washington,
                                                consumptive use quantity of 0.360 mgd                   proposal listed above. The presiding                  DC 20590; or Ms. Kim Toone,
                                                (peak day) will remain unchanged.                       officer reserves the right to limit oral              Information Collection Clearance
                                                  18. Project Sponsor: Talen Energy                     statements in the interest of time and to             Officer, Office of Information
                                                Corporation. Project Facility: Royal                    otherwise control the course of the                   Technology, RAD–20, Federal Railroad
                                                Manchester Golf Links, East Manchester                  hearing. Guidelines for the public                    Administration, 1200 New Jersey
                                                Township, York County, Pa.                              hearing will be posted on the                         Avenue SE., Mail Stop 35, Washington,
                                                Application for groundwater                             Commission’s Web site, www.srbc.net,                  DC 20590. Commenters requesting FRA
                                                withdrawal of up to 0.145 mgd (30-day                   prior to the hearing for review. The                  acknowledge receipt of their respective
                                                average) from Well PW–1.                                presiding officer reserves the right to               comments must include a self-addressed
                                                  19. Project Sponsor: Talen Energy                     modify or supplement such guidelines                  stamped postcard stating, ‘‘Comments
                                                Corporation. Project Facility: Royal                    at the hearing. Written comments on                   on OMB Control Number 2130–0617,’’
                                                Manchester Golf Links, East Manchester                  any project, request or proposal listed               and should also include the title of the
                                                Township, York County, Pa.                              above may also be mailed to Mr. Jason                 collection of information. Alternatively,
                                                Application for groundwater                             Oyler, General Counsel, Susquehanna                   comments may be faxed to (202) 493–
                                                withdrawal of up to 0.298 mgd (30-day                   River Basin Commission, 4423 North                    6216 or (202) 493–6497, or emailed to
                                                average) from Well PW–6.                                Front Street, Harrisburg, Pa. 17110–                  Mr. Brogan at Robert.Brogan@dot.gov, or
                                                  20. Project Sponsor and Facility:                     1788, or submitted electronically                     Ms. Toone at Kim.Toone@dot.gov.
                                                Warren Marcellus LLC (Susquehanna                       through www.srbc.net/pubinfo/                         Please refer to the assigned OMB control
                                                River), Washington Township,                            publicparticipation.htm. Comments                     number in any correspondence
                                                Wyoming County, Pa. Application for                     mailed or electronically submitted must               submitted. FRA will summarize
                                                renewal of surface water withdrawal of                  be received by the Commission on or                   comments received in response to this
                                                up to 0.999 mgd (peak day) (Docket No.                  before May 22, 2017, to be considered.                notice in a subsequent notice and
                                                20130305).                                                                                                    include them in its information
                                                  21. Project Sponsor and Facility:                        Authority: Pub. L. 91–575, 84 Stat. 1509
                                                                                                        et seq., 18 CFR parts 806, 807, and 808.
                                                                                                                                                              collection submission to OMB for
                                                Village of Waverly, Tioga County, N.Y.                                                                        approval.
                                                Application for groundwater                               Dated: April 6, 2017.
                                                                                                                                                              FOR FURTHER INFORMATION CONTACT: Mr.
                                                withdrawal of up to 0.320 mgd (30-day                   Stephanie L. Richardson,
                                                average) from Well 1.                                                                                         Robert Brogan, Information Collection
                                                                                                        Secretary to the Commission.                          Clearance Officer, Office of Railroad
                                                  22. Project Sponsor and Facility:                     [FR Doc. 2017–07274 Filed 4–10–17; 8:45 am]
                                                Village of Waverly, Tioga County, N.Y.                                                                        Safety, Regulatory Analysis Division,
                                                Application for groundwater
                                                                                                        BILLING CODE 7040–01–P                                RRS–21, Federal Railroad
                                                withdrawal of up to 0.480 mgd (30-day                                                                         Administration, 1200 New Jersey
                                                average) from Well 2.                                                                                         Avenue SE., Mail Stop 25, Washington,
                                                  23. Project Sponsor and Facility:                     DEPARTMENT OF TRANSPORTATION                          DC 20590 (telephone: (202) 493–6292)
                                                Village of Waverly, Tioga County, N.Y.                                                                        or Ms. Kim Toone, Information
                                                Application for groundwater                             Federal Railroad Administration                       Collection Clearance Officer, Office of
                                                withdrawal of up to 0.470 mgd (30-day                                                                         Information Technology, RAD–20,
                                                                                                        [Docket No. FRA–2017–0002–N–14]                       Federal Railroad Administration, 1200
srobinson on DSK5SPTVN1PROD with NOTICES




                                                average) from Well 3.
                                                  Projects Scheduled for Action                                                                               New Jersey Avenue SE., Mail Stop 35,
                                                                                                        Proposed Agency Information
                                                Involving a Diversion:                                                                                        Washington, DC 20590 (telephone: (202)
                                                                                                        Collection Activities; Comment
                                                  1. Project Sponsor and Facility: City                                                                       493–6132). (These telephone numbers
                                                                                                        Request
                                                of DuBois, Union Township, Clearfield                                                                         are not toll free.)
                                                County, Pa. Application for                             AGENCY: Federal Railroad                              SUPPLEMENTARY INFORMATION: The PRA,
                                                modification to the diversion from                      Administration (FRA), U.S. Department                 44 U.S.C. 3501–3520, and its
                                                Anderson Creek Reservoir by expansion                   of Transportation.                                    implementing regulations, 5 CFR part


                                           VerDate Sep<11>2014   20:18 Apr 10, 2017   Jkt 241001   PO 00000   Frm 00092   Fmt 4703   Sfmt 4703   E:\FR\FM\11APN1.SGM   11APN1



Document Created: 2017-04-11 00:48:43
Document Modified: 2017-04-11 00:48:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesThe public hearing will convene on May 11, 2017, at 2:30 p.m. The public hearing will end at 5:00 p.m. or at the conclusion of public testimony, whichever is sooner. The deadline for the submission of written comments is May 22, 2017.
ContactJason Oyler, General Counsel, telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436.
FR Citation82 FR 17497 