82 FR 17654 - Notice of Intent To Prepare an Environmental Assessment for the Proposed Pomelo Connector Pipeline and South Texas Expansion Project; Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 69 (April 12, 2017)

Page Range17654-17656
FR Document2017-07353

Federal Register, Volume 82 Issue 69 (Wednesday, April 12, 2017)
[Federal Register Volume 82, Number 69 (Wednesday, April 12, 2017)]
[Notices]
[Pages 17654-17656]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07353]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Pomelo Connector Pipeline and South Texas Expansion Project; 
Request for Comments on Environmental Issues

------------------------------------------------------------------------
                                                    Docket No.
------------------------------------------------------------------------
Pomelo Connector, LLC..................  CP17-26-000
Texas Eastern Transmission, LP.........  CP15-499-000
                                         CP15-499-001
------------------------------------------------------------------------

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Pomelo Connector Pipeline 
Project (Pomelo Pipeline) and the South Texas Expansion Project (STEP), 
collectively referred to as the Projects. These separate, but 
connected, interstate natural gas transmission projects involve the 
construction and operation of facilities by Pomelo Connector, LLC 
(Pomelo) and Texas Eastern Transmission, LP (Texas Eastern) in Nueces, 
Matagorda, Chambers, Orange and Brazoria Counties, Texas. The 
Commission will use this EA in its decision-making process to determine 
whether the Projects are in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the Projects. You can make a difference by providing us 
with your specific comments or concerns about the Projects. Your 
comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the EA. To ensure that your comments 
are timely and properly recorded, please send your comments so that the 
Commission receives them in Washington, DC, on or before May 8, 2017.
    This notice is being sent to the Commission's current environmental 
mailing list for these Projects. State and local government 
representatives should notify their constituents of these proposed 
projects and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. A company 
representative would seek to negotiate a mutually acceptable agreement. 
However, if the Commission approves the Projects, that approval conveys 
with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings where compensation would be 
determined in accordance with state law.
    The ``For Citizens'' section of the FERC Web site (www.ferc.gov) 
provides more information about the FERC and the environmental review 
process. This section also includes information about getting involved 
in FERC jurisdictional projects, and a citizens' guide entitled ``An 
Interstate Natural Gas Facility On My Land? What Do I Need to Know?'' 
This guide addresses a number of frequently asked questions, including 
the use of eminent domain and how to participate in the Commission's 
proceedings.

Public Participation

    For your convenience, there are three (3) methods you can use to 
submit your comments to the Commission. The Commission will provide 
equal consideration to all comments received. The Commission encourages 
electronic filing of comments and has expert staff available to assist 
you at (202) 502-8258 or [email protected]. Please carefully 
follow these instructions so that your comments are properly recorded.
    1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the appropriate Project 
docket number (CP17-26-000 and/or CP15-499-000) with your submission: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE., Room 1A, Washington, DC 20426.

Summary of the Proposed Projects

    The Pomelo Pipeline is designed to provide up to 400,000 dekatherms 
per day (Dth/d) of firm transportation service from an interconnection 
with Texas Eastern at the proposed Pomelo Petronila Compressor Station 
to an intrastate header system, the Nueces Header. The Nueces Header is 
designed to connect with various pipelines and gathering facilities in 
Nueces County, Texas. Pomelo proposes to construct and operate the 
following facilities:
     Approximately 13.6 miles of new 30-inch-diameter natural 
gas pipeline;
     approximately 0.2 mile of new 30-inch-diameter pipeline;
     a new 5,000 horsepower (hp) compressor station (Pomelo 
Compressor Station); and
     associated aboveground facilities.
    Through the new interconnection with the Pomelo Pipeline, Texas 
Eastern plans to provide approximately 396,000 Dth/d of firm natural 
gas transportation service to an interconnection with the Nueces 
Header. Texas Eastern proposes to install, construct, and operate the 
following facilities, all within existing Texas Eastern compressor 
stations:
     a new 8,400 hp compressor unit, appurtenant facilities, a 
new interconnection with Pomelo Connector Pipeline, and construction of 
a gas

[[Page 17655]]

measurement enclosure at Texas Eastern's existing Petronila Compressor 
Station in Nueces County;
     A new 8,400 hp compressor unit, a new control building, 
new gas coolers and station piping modifications to reverse compression 
at the existing Blessing Compressor Station in Matagorda County;
     upgrades to existing compression facilities to reduce 
emissions, new gas measurement enclosure, and piping modifications to 
the existing launcher/receiver on Line 16 at the existing Mont Belvieu 
Compressor Station in Chambers County;
     piping modifications to the existing launcher/receiver on 
Line 16, and a new gas measurement enclosure within the existing Vidor 
Compressor Station in Orange County; and
     piping modifications to the existing launcher/receiver on 
Line 16 at the existing Angleton Station property in Brazoria County.
    The general locations of the Project facilities are shown in 
Appendix 1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Constructing the proposed facilities would require the use of 
approximately 313.1 acres of land. This includes disturbance of 
approximately 190.9 acres of land for the aboveground facilities and 
the pipeline for Pomelo Pipeline; and approximately 122.2 acres of 
disturbance for STEP. Following construction, Pomelo and Texas Eastern 
would maintain about 136.8 acres for permanent operation of the 
Projects' facilities; the remaining acreage would be restored and 
allowed to revert to former uses.

Related Facilities

    The proposed Valley Crossing System is a new intrastate pipeline 
system consisting of approximately 165 miles of 42- and 48-inch-
diameter pipeline, two compressor stations, multiple meter stations, 
and ancillary facilities extending from the Nueces Header, to a point 
in the Gulf of Mexico in Texas state waters at the international 
boundary between the United States and Mexico. These intrastate 
facilities would be subject to the jurisdiction of the Railroad 
Commission of Texas and would be non-jurisdictional to the FERC. 
Although the Commission has no authority to approve or deny the Valley 
Crossing System, and no ability to require any avoidance or 
minimization of related impacts, we intend to disclose available 
resource impact information for the Valley Crossing System in the EA to 
inform stakeholders and decision makers.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed Projects under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     socioeconomics
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
Projects or portions of the Projects, and make recommendations on how 
to lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through the Commission's 
eLibrary. Depending on the comments received during the scoping 
process, we may also publish and distribute the EA to the public for an 
allotted comment period. We will consider all comments on the EA before 
making our recommendations to the Commission. To ensure we have the 
opportunity to consider and address your comments, please carefully 
follow the instructions in the Public Participation section.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
the Projects to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice. Currently, no agencies 
have expressed their intention to participate as a cooperating agency 
in the preparation of the EA to satisfy their NEPA responsibilities 
related to the Projects.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the Projects' potential effects on 
historic properties.\4\ We will define the Project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the Projects 
develop. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for these Projects will document 
our findings on the impacts on historic properties and summarize the 
status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the

[[Page 17656]]

Projects. We will update the environmental mailing list as the analysis 
proceeds to ensure that we send the information related to this 
environmental review to all individuals, organizations, and government 
entities interested in and/or potentially affected by the proposed 
Projects.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (Appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the Projects are available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the appropriate 
docket number, excluding the last three digits in the Docket Number 
field (i.e., CP17-26 and CP-15-499). Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or toll free at (866) 208-3676, 
or for teletype/TTY, contact (202) 502-8659. The eLibrary link also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, site visits or other staff activities will be posted on 
the Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: April 6, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07353 Filed 4-11-17; 8:45 am]
 BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 17654 

2024 Federal Register | Disclaimer | Privacy Policy