The U.S. Department of Energy (DOE), Western Area Power Administration (WAPA) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by NextEra Energy Resources, LLC (NextEra).

Federal Register, Volume 82 Issue 69 (Wednesday, April 12, 2017)
[Federal Register Volume 82, Number 69 (Wednesday, April 12, 2017)]
[Notices]
[Pages 17657-17658]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07386]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration

[DOE/EIS-0469-S1]


Notice of Cancellation of Environmental Impact Statement for the 
Proposed Wilton IV Wind Energy Center, Burleigh County, North Dakota

AGENCY: Western Area Power Administration, DOE.

[[Page 17658]]


ACTION: Notice of cancellation of Environmental Impact Statement.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Energy (DOE), Western Area Power 
Administration (WAPA) is issuing this notice to advise the public that 
it is cancelling the preparation of an environmental impact statement 
(EIS) under the National Environmental Policy Act (NEPA) on an 
interconnection request by NextEra Energy Resources, LLC (NextEra).

DATES: This cancellation is effective on April 12, 2017.

FOR FURTHER INFORMATION CONTACT: For additional information on the 
cancellation of this EIS process, contact Mark Wieringa, NEPA Document 
Manager, Western Area Power Administration, P.O. Box 281213, Lakewood, 
CO 80228-8213, email [email protected], telephone (720) 962-7448. For 
general information on DOE's NEPA review process, contact Brian 
Costner, Acting Director of NEPA Policy and Compliance, GC-54, 
Department of Energy, 1000 Independence Avenue SW., Washington, DC 
20585-0119, telephone (202) 586-4600 or (800) 472-2756, facsimile (202) 
586-7031.

SUPPLEMENTARY INFORMATION: NextEra, through its subsidiary Wilton Wind 
IV, LLC proposed to design, construct, operate, and maintain an up to 
99-megawatt Wilton IV Wind Energy Center (Project) in Burleigh County, 
North Dakota, and interconnect that Project with WAPA's transmission 
system. NextEra's interconnection request caused WAPA to initiate a 
NEPA review of its Federal action to allow the interconnection. WAPA 
published a Notice of Intent to prepare an EIS in the Federal Register 
on July 20, 2011 (76 FR 43324), and started the EIS process. A public 
scoping meeting was held in Wilton, North Dakota, on July 26, 2011, and 
a Draft EIS was approved by WAPA's acting Administrator for public 
review and comment on March 5, 2013. The Environmental Protection 
Agency's Notice of Availability for the Draft EIS was published in the 
Federal Register on March 22, 2013 (78 FR 17662). A public hearing on 
the Draft EIS was held on April 10, 2013, in Wilton, North Dakota.
    Subsequent to the issuance of the Draft EIS, NextEra proposed major 
changes to its proposed Project, including expanding the boundaries of 
the Project beyond those analyzed in the Draft EIS. Although WAPA's 
Federal action did not change, WAPA determined that the Project changes 
proposed by NextEra were substantial changes relevant to environmental 
concerns. In response to these Project changes, WAPA determined that 
preparation of a Supplemental Draft EIS was appropriate, and published 
a Notice of Intent to prepare this NEPA document in the Federal 
Register on November 20, 2013 (78 FR 69664). A public scoping meeting 
was held in Wilton, North Dakota, on December 11, 2013, to present 
Project changes and solicit public input on the modified proposed 
Project. Work on the preparation of the Supplemental Draft EIS has 
continued since that date, during which additional Project changes were 
proposed, including identification of necessary upgrades to WAPA's 
Bismarck-Hilken 115-kilovolt transmission line.
    NextEra has since decided to suspend further action on its proposed 
Project, and verbally notified WAPA of its decision to withdraw its 
interconnection request on January 12, 2017. A letter dated February 
22, 2017, formally terminated the interconnection agreement. NextEra's 
decision removes the need for Federal action, and WAPA is now formally 
terminating the NEPA review process on its interconnection decision and 
NextEra's proposed Project. No Supplemental Draft EIS, Final EIS, or 
Record of Decision will be issued for the Wilton IV Wind Energy Center. 
NextEra could decide to reinitiate the proposed Project or a similar 
project at some future date. In that event WAPA would initiate a new 
NEPA process with the issuance of a new Notice of Intent.
    On November 16, 2011, the DOE General Counsel re-delegated all EIS 
authorities to WAPA's Administrator. Under the authority granted by 
that memorandum, I hereby terminate the EIS process for NextEra's 
proposed Wilton IV Wind Energy Center with the publication of this 
notice.

    Dated: March 28, 2017.
Mark A. Gabriel,
Administrator.
[FR Doc. 2017-07386 Filed 4-11-17; 8:45 am]
BILLING CODE 6450-01-P



                                                                               Federal Register / Vol. 82, No. 69 / Wednesday, April 12, 2017 / Notices                                                 17657

                                                  Agreement No. 3737, Queue No. Y3–026                      Dated: April 6, 2017.                               Advisory Council on Historic
                                                  to be effective 3/29/2017.                              Kimberly D. Bose,                                     Preservation at 36 CFR 800.2.
                                                     Filed Date: 4/6/17.                                  Secretary.                                               l. With this notice, we are designating
                                                     Accession Number: 20170406–5102.                     [FR Doc. 2017–07352 Filed 4–11–17; 8:45 am]           Idaho Aviation as the Commission’s
                                                     Comments Due: 5 p.m. ET 4/27/17.                     BILLING CODE 6717–01–P
                                                                                                                                                                non-federal representative for carrying
                                                                                                                                                                out informal consultation, pursuant to
                                                     Docket Numbers: ER17–1386–000.                                                                             section 7 of the Endangered Species Act,
                                                     Applicants: Bishop Hill Energy LLC.                                                                        section 305 of the Magnuson-Stevens
                                                                                                          DEPARTMENT OF ENERGY
                                                     Description: § 205(d) Rate Filing:                                                                         Fishery Conservation and Management
                                                  Revised Rate Schedule to be effective 4/                Federal Energy Regulatory                             Act, and section 106 of the National
                                                  5/2017.                                                 Commission                                            Historic Preservation Act.
                                                     Filed Date: 4/6/17.                                                                                           m. Idaho Aviation filed a Pre-
                                                     Accession Number: 20170406–5303.                     [Project No. 10721–031]                               Application Document (PAD; including
                                                     Comments Due: 5 p.m. ET 4/27/17.                                                                           a proposed process plan and schedule)
                                                                                                          Idaho Aviation Foundation; Notice of                  with the Commission, pursuant to 18
                                                     Docket Numbers: ER17–1387–000.                       Intent To File License Application,                   CFR 5.6 of the Commission’s
                                                     Applicants: PJM Interconnection,                     Filing of Pre-Application Document,                   regulations.
                                                  L.L.C.                                                  and Approving Use of the Traditional                     n. A copy of the PAD is available for
                                                     Description: Tariff Cancellation:                    Licensing Process                                     review at the Commission in the Public
                                                  Notice of Cancellation of Service                                                                             Reference Room or may be viewed on
                                                  Agreement No. 4652, Queue No. AB1–                         a. Type of Filing: Notice of Intent To             the Commission’s Web site (http://
                                                  152 to be effective 5/26/2017.                          File License Application and Request                  www.ferc.gov), using the ‘‘eLibrary’’
                                                     Filed Date: 4/6/17.                                  To Use the Traditional Licensing                      link. Enter the docket number,
                                                     Accession Number: 20170406–5311.                     Procedures.                                           excluding the last three digits in the
                                                     Comments Due: 5 p.m. ET 4/27/17.                        b. Project No.: 10721–031                          docket number field to access the
                                                                                                             c. Date Filed: February 28, 2017                   document. For assistance, contact FERC
                                                     Docket Numbers: ER17–1388–000.                          d. Submitted By: Idaho Aviation
                                                     Applicants: Southern California                                                                            Online Support at
                                                                                                          Foundation (Idaho Aviation)                           FERCONlineSupport@ferc.gov or toll
                                                  Edison Company.                                            e. Name of Project: Big Creek                      free at 1–866–208–3676, or for TTY,
                                                     Description: § 205(d) Rate Filing:                   Hydroelectric Project                                 (202) 502–8659. A copy is also available
                                                  LGIA Luz Solar Partners LTD IV Kramer                      f. Location: On McCorkle Creek, in                 for inspection and reproduction at the
                                                  Junction 4 Project to be effective 4/1/                 Valley County, Idaho near the town of                 address in paragraph h.
                                                  2017.                                                   Yellow Pine. The project is located                      o. The licensee states its unequivocal
                                                     Filed Date: 4/6/17.                                  entirely within the Payette National                  intent to submit an application for a
                                                     Accession Number: 20170406–5320.                     Forest.                                               new license for Project No. 10721–031.
                                                     Comments Due: 5 p.m. ET 4/27/17.                        g. Filed Pursuant to: 18 CFR 5.3 of the            Pursuant to 18 CFR 16.8, 16.9, and 16.10
                                                     Docket Numbers: ER17–1389–000.                       Commission’s regulations                              each application for a new license and
                                                     Applicants: Southern California                         h. Potential Applicant Contact: Vic                any competing license applications
                                                  Edison Company.                                         Jaro, Board Member, Idaho Aviation                    must be filed with the Commission at
                                                     Description: § 205(d) Rate Filing:                   Foundation, P.O. Box 2016, Eagle, Idaho               least 24 months prior to the expiration
                                                  LGIA Luz Solar Partners LTD III Kramer                  83616; 208–404–9627; email vjaro@                     of the existing license. All applications
                                                  Junction 3 Project to be effective 4/1/                 filertel.com.                                         for license for this project must be filed
                                                  2017.                                                      i. Contact: Suzanne Novak at (202)                 by February 28, 2020.
                                                                                                          502–6665; or email at suzanne.novak@                     p. Register online at http://
                                                     Filed Date: 4/6/17.
                                                                                                          ferc.gov.                                             www.ferc.gov/docs-filing/
                                                     Accession Number: 20170406–5325.
                                                                                                             j. Idaho Aviation filed its request to             esubscription.asp to be notified via
                                                     Comments Due: 5 p.m. ET 4/27/17.                     use the Traditional Licensing Process on              email of new filing and issuances
                                                     The filings are accessible in the                    February 28, 2017. Idaho Aviation                     related to this or other pending projects.
                                                  Commission’s eLibrary system by                         provided public notice of its request on              For assistance, contact FERC Online
                                                  clicking on the links or querying the                   March 7, 2017. In a letter dated April 6,             Support.
                                                  docket number.                                          2017, the Director of the Division of                   Dated: April 6, 2017.
                                                     Any person desiring to intervene or                  Hydropower Licensing approved                         Kimberly D. Bose,
                                                  protest in any of the above proceedings                 AEL&P’s request to use the Traditional
                                                                                                                                                                Secretary.
                                                  must file in accordance with Rules 211                  Licensing Process.
                                                  and 214 of the Commission’s                                                                                   [FR Doc. 2017–07358 Filed 4–11–17; 8:45 am]
                                                                                                             k. With this notice, we are initiating
                                                  Regulations (18 CFR 385.211 and                                                                               BILLING CODE 6717–01–P
                                                                                                          informal consultation with: (a) The U.S.
                                                  385.214) on or before 5:00 p.m. Eastern                 Fish and Wildlife Service and NOAA
                                                  time on the specified comment date.                     Fisheries under section 7 of the
                                                  Protests may be considered, but                                                                               DEPARTMENT OF ENERGY
                                                                                                          Endangered Species Act and the joint
                                                  intervention is necessary to become a                   agency regulations thereunder at 50                   Western Area Power Administration
                                                  party to the proceeding.                                CFR, part 402; (b) NOAA Fisheries
                                                     eFiling is encouraged. More detailed                 under section 305(b) of the Magnuson-                 [DOE/EIS–0469–S1]
mstockstill on DSK30JT082PROD with NOTICES




                                                  information relating to filing                          Stevens Fishery Conservation and
                                                                                                                                                                Notice of Cancellation of
                                                  requirements, interventions, protests,                  Management Act and implementing
                                                                                                                                                                Environmental Impact Statement for
                                                  service, and qualifying facilities filings              regulations at 50 CFR 600.920; and (c)
                                                                                                                                                                the Proposed Wilton IV Wind Energy
                                                  can be found at: http://www.ferc.gov/                   the Idaho State Historic Preservation
                                                                                                                                                                Center, Burleigh County, North Dakota
                                                  docs-filing/efiling/filing-req.pdf. For                 Officer, as required by section 106,
                                                  other information, call (866) 208–3676                  National Historical Preservation Act,                 AGENCY:Western Area Power
                                                  (toll free). For TTY, call (202) 502–8659.              and the implementing regulations of the               Administration, DOE.


                                             VerDate Sep<11>2014   18:45 Apr 11, 2017   Jkt 241001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\12APN1.SGM   12APN1


                                                  17658                        Federal Register / Vol. 82, No. 69 / Wednesday, April 12, 2017 / Notices

                                                  ACTION:Notice of cancellation of                        proposed by NextEra were substantial                  SUMMARY:   The Environmental Protection
                                                  Environmental Impact Statement.                         changes relevant to environmental                     Agency (EPA), Office of the Science
                                                                                                          concerns. In response to these Project                Advisor announces two separate public
                                                  SUMMARY:   The U.S. Department of                       changes, WAPA determined that                         meetings of the Human Studies Review
                                                  Energy (DOE), Western Area Power                        preparation of a Supplemental Draft EIS               Board (HSRB) to advise the Agency on
                                                  Administration (WAPA) is issuing this                   was appropriate, and published a Notice               the ethical and scientific review of
                                                  notice to advise the public that it is                  of Intent to prepare this NEPA                        research involving human subjects.
                                                  cancelling the preparation of an                        document in the Federal Register on                   DATES: A virtual public meeting will be
                                                  environmental impact statement (EIS)                    November 20, 2013 (78 FR 69664). A                    held on Thursday, April 27, 2017, from
                                                  under the National Environmental                        public scoping meeting was held in                    1:00 p.m. to approximately 4:00 p.m.
                                                  Policy Act (NEPA) on an                                 Wilton, North Dakota, on December 11,                 Eastern Time. A separate, subsequent
                                                  interconnection request by NextEra                      2013, to present Project changes and                  teleconference meeting is planned for
                                                  Energy Resources, LLC (NextEra).                        solicit public input on the modified                  Friday, June 9, 2017, from 2:00 p.m. to
                                                  DATES: This cancellation is effective on                proposed Project. Work on the                         approximately 3:30 p.m. Eastern Time
                                                  April 12, 2017.                                         preparation of the Supplemental Draft                 for the HSRB to finalize its Final Report
                                                  FOR FURTHER INFORMATION CONTACT: For                    EIS has continued since that date,                    of the April 27, 2017 meeting and
                                                  additional information on the                           during which additional Project changes               review other possible topics.
                                                  cancellation of this EIS process, contact               were proposed, including identification               ADDRESSES: Both of these meetings will
                                                  Mark Wieringa, NEPA Document                            of necessary upgrades to WAPA’s                       be conducted entirely by telephone and
                                                  Manager, Western Area Power                             Bismarck-Hilken 115-kilovolt                          on the Internet using Adobe Connect.
                                                  Administration, P.O. Box 281213,                        transmission line.                                    For detailed access information visit the
                                                  Lakewood, CO 80228–8213, email                             NextEra has since decided to suspend               HSRB Web site: http://www2.epa.gov/
                                                  wieringa@wapa.gov, telephone (720)                      further action on its proposed Project,               osa/human-studies-review-board.
                                                  962–7448. For general information on                    and verbally notified WAPA of its                     FOR FURTHER INFORMATION CONTACT: Any
                                                  DOE’s NEPA review process, contact                      decision to withdraw its                              member of the public who wishes to
                                                  Brian Costner, Acting Director of NEPA                  interconnection request on January 12,                receive further information should
                                                  Policy and Compliance, GC–54,                           2017. A letter dated February 22, 2017,               contact the HSRB Designated Federal
                                                  Department of Energy, 1000                              formally terminated the interconnection               Official (DFO), Jim Downing on
                                                  Independence Avenue SW.,                                agreement. NextEra’s decision removes                 telephone number (202) 564–2468; fax
                                                  Washington, DC 20585–0119, telephone                    the need for Federal action, and WAPA                 number: (202) 564–2070; email address:
                                                  (202) 586–4600 or (800) 472–2756,                       is now formally terminating the NEPA                  downing.jim@epa.gov; or mailing
                                                  facsimile (202) 586–7031.                               review process on its interconnection                 address: Environmental Protection
                                                  SUPPLEMENTARY INFORMATION: NextEra,                     decision and NextEra’s proposed                       Agency, Office of the Science Advisor,
                                                  through its subsidiary Wilton Wind IV,                  Project. No Supplemental Draft EIS,                   Mail code 8105R, 1200 Pennsylvania
                                                  LLC proposed to design, construct,                      Final EIS, or Record of Decision will be              Avenue NW., Washington, DC 20460.
                                                  operate, and maintain an up to 99-                      issued for the Wilton IV Wind Energy
                                                                                                                                                                SUPPLEMENTARY INFORMATION:
                                                  megawatt Wilton IV Wind Energy                          Center. NextEra could decide to
                                                                                                                                                                   Meeting access: These meetings are
                                                  Center (Project) in Burleigh County,                    reinitiate the proposed Project or a
                                                                                                                                                                open to the public. The full Agenda and
                                                  North Dakota, and interconnect that                     similar project at some future date. In
                                                                                                                                                                meeting materials are available at the
                                                  Project with WAPA’s transmission                        that event WAPA would initiate a new
                                                                                                                                                                HSRB Web site: http://www2.epa.gov/
                                                  system. NextEra’s interconnection                       NEPA process with the issuance of a
                                                                                                                                                                osa/human-studies-review-board. For
                                                  request caused WAPA to initiate a                       new Notice of Intent.
                                                                                                             On November 16, 2011, the DOE                      questions on document availability, or if
                                                  NEPA review of its Federal action to                                                                          you do not have access to the Internet,
                                                  allow the interconnection. WAPA                         General Counsel re-delegated all EIS
                                                                                                          authorities to WAPA’s Administrator.                  consult with the DFO, Jim Downing
                                                  published a Notice of Intent to prepare                                                                       listed under FOR FURTHER INFORMATION
                                                  an EIS in the Federal Register on July                  Under the authority granted by that
                                                                                                                                                                CONTACT.
                                                  20, 2011 (76 FR 43324), and started the                 memorandum, I hereby terminate the
                                                                                                                                                                   Special accommodations. For
                                                  EIS process. A public scoping meeting                   EIS process for NextEra’s proposed
                                                                                                                                                                information on access or services for
                                                  was held in Wilton, North Dakota, on                    Wilton IV Wind Energy Center with the
                                                                                                                                                                individuals with disabilities, or to
                                                  July 26, 2011, and a Draft EIS was                      publication of this notice.
                                                                                                                                                                request accommodation of a disability,
                                                  approved by WAPA’s acting                                Dated: March 28, 2017.                               please contact the DFO listed under FOR
                                                  Administrator for public review and                     Mark A. Gabriel,                                      FURTHER INFORMATION CONTACT at least
                                                  comment on March 5, 2013. The                           Administrator.                                        10 days prior to the meeting to give EPA
                                                  Environmental Protection Agency’s                       [FR Doc. 2017–07386 Filed 4–11–17; 8:45 am]           as much time as possible to process
                                                  Notice of Availability for the Draft EIS                BILLING CODE 6450–01–P                                your request.
                                                  was published in the Federal Register
                                                  on March 22, 2013 (78 FR 17662). A                                                                            How may I participate in this meeting?
                                                  public hearing on the Draft EIS was held                                                                        The HSRB encourages the public’s
                                                                                                          ENVIRONMENTAL PROTECTION
                                                  on April 10, 2013, in Wilton, North                                                                           input. You may participate in these
                                                                                                          AGENCY
                                                  Dakota.                                                                                                       meetings by following the instructions
                                                     Subsequent to the issuance of the                    [FRL–9960–98–ORD]                                     in this section.
mstockstill on DSK30JT082PROD with NOTICES




                                                  Draft EIS, NextEra proposed major                                                                               1. Oral comments. Requests to present
                                                  changes to its proposed Project,                        Human Studies Review Board;                           oral comments during either meeting
                                                  including expanding the boundaries of                   Notification of Public Meetings                       will be accepted up to Noon Eastern
                                                  the Project beyond those analyzed in the                AGENCY: Environmental Protection                      Time on Thursday, April 20, 2017, for
                                                  Draft EIS. Although WAPA’s Federal                      Agency (EPA).                                         the April 27, 2017 meeting and up to
                                                  action did not change, WAPA                                                                                   Noon Eastern Time on Friday, June 2,
                                                                                                          ACTION: Notice.
                                                  determined that the Project changes                                                                           2017 for the June 9, 2017 teleconference.


                                             VerDate Sep<11>2014   18:45 Apr 11, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\12APN1.SGM   12APN1



Document Created: 2017-04-12 00:23:07
Document Modified: 2017-04-12 00:23:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of cancellation of Environmental Impact Statement.
DatesThis cancellation is effective on April 12, 2017.
ContactFor additional information on the cancellation of this EIS process, contact Mark Wieringa, NEPA Document Manager, Western Area Power Administration, P.O. Box 281213, Lakewood, CO 80228-8213, email [email protected], telephone (720) 962-7448. For general information on DOE's NEPA review process, contact Brian Costner, Acting Director of NEPA Policy and Compliance, GC-54, Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-0119, telephone (202) 586-4600 or (800) 472-2756, facsimile (202) 586-7031.