NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 81 (April 28, 2017)

Page Range19754-19755
FR Document2017-08633

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 70 to Combined Licenses (COLs), NPF-93 and NPF- 94. The COLs were issued to South Carolina Electric & Gas Company and the South Carolina Public Service Authority, (together referred to as the licensee); for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 82 Issue 81 (Friday, April 28, 2017)
[Federal Register Volume 82, Number 81 (Friday, April 28, 2017)]
[Notices]
[Pages 19754-19755]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-08633]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; 
Design Reliability Assurance Program (D-RAP) Changes

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment No. 70 to Combined Licenses (COLs), NPF-93 and NPF-
94. The COLs were issued to South Carolina Electric & Gas Company and 
the South Carolina Public Service Authority, (together referred to as 
the licensee); for construction and operation of the Virgil C. Summer 
Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, 
South Carolina.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on April 11, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated September 22, 2016 and is available in ADAMS under 
Accession No. ML16270A582.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from Paragraph B of Section III, 
``Scope and Contents,'' of Appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment No. 70 to COLs, NPF-93 and NPF-
94, to the licensee. The exemption is required by Paragraph A.4 of 
Section VIII, ``Processes for Changes and Departures,'' Appendix D, to 
10 CFR part 52 to allow the licensee to depart from Tier 1 information. 
With the requested amendment, the licensee sought proposed changes that 
would revise the Updated Final Safety Analysis Report (UFSAR) in the 
form of departures from the incorporated plant-specific DCD Tier 2 
information. The proposed amendment also involves related changes to 
plant-specific Tier 1 information, with corresponding changes to the 
associated COL Appendix C information. Specifically, the LAR revises 
the Design Reliability Assurance Program (D-RAP) to identify the covers 
for the in-containment refueling water storage tank (IRWST) vents and 
overflow weirs as the risk-significant components included in the D-RAP 
and to identify that the field control relays of each rod drive motor-
generator (MG) sets are a part of the rod drive power supply control 
cabinets in which the relays are located.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in Sec. Sec.  50.12, 52.7, and Section VIII.A.4 of Appendix D to 
10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML17048A143.
    Similar exemption documents were issued to the licensee for VCSNS 
Units 2 and 3 (COLs NPF-93 and NPF-94). The exemption documents for 
VCSNS Units 2 and 3 can be found in ADAMS under Accession Nos. 
ML17048A144 and ML17048A147, respectively. The exemption is reproduced 
(with the exception of abbreviated titles and additional citations) in 
Section II of this document. The similar amendment documents for COLs 
NPF-93 and NPF-94 are available in ADAMS under Accession Nos. 
ML17048A145 and ML17048A148, respectively. A summary of the amendment 
documents is provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VCSNS Units 2 
and Unit 3. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In an application dated September 22, 2016, the licensee 
requested from the Commission an exemption to allow departures from 
Tier 1 information in the certified DCD incorporated by reference in 10 
CFR part 52, Appendix

[[Page 19755]]

D, as part of license amendment request 16-14, ``Design Reliability 
Assurance Program (D-RAP) Changes.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML17048A143, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information related to the in-containment 
refueling water storage tank vents and overflow weirs, the rod drive 
motor-generator sets field control relays, and the rod drive power 
supply control cabinets, as described in the licensee's request dated 
September 22, 2016. This exemption is related to, and necessary for the 
granting of License Amendment No. 70, which is being issued 
concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML17048A143), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated September 22, 2016 (ADAMS Accession No. 
ML16270A582), the licensee requested that the NRC amend the COLs for 
VCSNS, Units 2 and 3, COLs NPF-93 and NPF-94. The proposed amendment is 
described in Section I of this Federal Register Notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed no 
significant hazards consideration determination, and opportunity for a 
hearing in connection with these actions, was published in the Federal 
Register on November 8, 2016 (81 FR 78652). No comments were received 
during the 30-day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on September 22, 2016.
    The exemption and amendment were issued on April 11, 2017, as part 
of a combined package to the licensee (ADAMS Accession No. 
ML17048A142).

    Dated at Rockville, Maryland, this 14th day of April 2017.

    For the Nuclear Regulatory Commission.
Brian Hughes,
Acting Branch Chief, Licensing Branch 4, Division of New Reactor 
Licensing, Office of New Reactors.
[FR Doc. 2017-08633 Filed 4-27-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                    19754                            Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices

                                                      OMB Control Number: 1225–0087.                        You may obtain publicly-available                     specific DCD Tier 2 information. The
                                                      Affected Public: Private Sector—not                   information related to this document                  proposed amendment also involves
                                                    for-profit institutions.                                using any of the following methods:                   related changes to plant-specific Tier 1
                                                      Estimated Number of Respondents: 5.                      • Federal Rulemaking Web site: Go to               information, with corresponding
                                                      Frequency: On occasion.                               http://www.regulations.gov and search                 changes to the associated COL
                                                      Total Estimated Annual Responses: 5.                  for Docket ID NRC–2008–0441. Address                  Appendix C information. Specifically,
                                                      Estimated Average Time per                            questions about NRC dockets to Carol                  the LAR revises the Design Reliability
                                                    Response: 5 minutes.                                    Gallagher; telephone: 301–415–3463;                   Assurance Program (D–RAP) to identify
                                                      Estimated Total Annual Burden                         email: Carol.Gallagher@nrc.gov. For                   the covers for the in-containment
                                                    Hours: 1 hour.                                          technical questions, contact the                      refueling water storage tank (IRWST)
                                                      Total Estimated Annual Other Cost                     individual listed in the FOR FURTHER                  vents and overflow weirs as the risk-
                                                    Burden: $0.                                             INFORMATION CONTACT section of this                   significant components included in the
                                                       Authority: 44 U.S.C. 3506(c)(2)(A).                  document.                                             D–RAP and to identify that the field
                                                                                                               • NRC’s Agencywide Documents                       control relays of each rod drive motor-
                                                      Dated: April 24, 2017.                                                                                      generator (MG) sets are a part of the rod
                                                                                                            Access and Management System
                                                    Michel Smyth,                                           (ADAMS): You may obtain publicly-                     drive power supply control cabinets in
                                                    Departmental Clearance Officer.                         available documents online in the                     which the relays are located.
                                                    [FR Doc. 2017–08612 Filed 4–27–17; 8:45 am]             ADAMS Public Documents collection at                     Part of the justification for granting
                                                    BILLING CODE 4510–23–P                                  http://www.nrc.gov/reading-rm/                        the exemption was provided by the
                                                                                                            adams.html. To begin the search, select               review of the amendment. Because the
                                                                                                            ‘‘ADAMS Public Documents’’ and then                   exemption is necessary in order to issue
                                                    NUCLEAR REGULATORY                                      select ‘‘Begin Web-based ADAMS                        the requested license amendment, the
                                                    COMMISSION                                              Search.’’ For problems with ADAMS,                    NRC granted the exemption and issued
                                                                                                            please contact the NRC’s Public                       the amendment concurrently, rather
                                                    [Docket Nos. 52–027 and 52–028; NRC–                                                                          than in sequence. This included issuing
                                                    2008–0441]
                                                                                                            Document Room (PDR) reference staff at
                                                                                                            1–800–397–4209, 301–415–4737, or by                   a combined safety evaluation containing
                                                                                                            email to pdr.resource@nrc.gov. The                    the NRC staff’s review of both the
                                                    South Carolina Electric & Gas
                                                                                                            ADAMS accession number for each                       exemption request and the license
                                                    Company, South Carolina Public
                                                                                                            document referenced (if it is available in            amendment. The exemption met all
                                                    Service Authority; Virgil C. Summer
                                                                                                            ADAMS) is provided the first time that                applicable regulatory criteria set forth in
                                                    Nuclear Station, Units 2 and 3; Design
                                                                                                            it is mentioned in this document. The                 §§ 50.12, 52.7, and Section VIII.A.4 of
                                                    Reliability Assurance Program (D–
                                                                                                            request for the amendment and                         Appendix D to 10 CFR part 52. The
                                                    RAP) Changes
                                                                                                            exemption was submitted by letter                     license amendment was found to be
                                                    AGENCY:  Nuclear Regulatory                             dated September 22, 2016 and is                       acceptable as well. The combined safety
                                                    Commission.                                             available in ADAMS under Accession                    evaluation is available in ADAMS under
                                                    ACTION: Exemption and combined                          No. ML16270A582.                                      Accession No. ML17048A143.
                                                    license amendment; issuance.                               • NRC’s PDR: You may examine and                      Similar exemption documents were
                                                                                                            purchase copies of public documents at                issued to the licensee for VCSNS Units
                                                    SUMMARY:    The U.S. Nuclear Regulatory                 the NRC’s PDR, Room O1–F21, One                       2 and 3 (COLs NPF–93 and NPF–94).
                                                    Commission (NRC) is granting an                         White Flint North, 11555 Rockville                    The exemption documents for VCSNS
                                                    exemption to allow a departure from the                 Pike, Rockville, Maryland 20852.                      Units 2 and 3 can be found in ADAMS
                                                    certification information of Tier 1 of the                                                                    under Accession Nos. ML17048A144
                                                                                                            FOR FURTHER INFORMATION CONTACT:
                                                    generic design control document (DCD)                                                                         and ML17048A147, respectively. The
                                                                                                            Billy Gleaves, Office of New Reactors,
                                                    and is issuing License Amendment No.                                                                          exemption is reproduced (with the
                                                                                                            U.S. Nuclear Regulatory Commission,
                                                    70 to Combined Licenses (COLs), NPF–                                                                          exception of abbreviated titles and
                                                                                                            Washington, DC 20555–0001; telephone:
                                                    93 and NPF–94. The COLs were issued                                                                           additional citations) in Section II of this
                                                                                                            301–415–5848; email: Bill.Gleaves@
                                                    to South Carolina Electric & Gas                                                                              document. The similar amendment
                                                                                                            nrc.gov.
                                                    Company and the South Carolina Public                                                                         documents for COLs NPF–93 and NPF–
                                                    Service Authority, (together referred to                SUPPLEMENTARY INFORMATION:                            94 are available in ADAMS under
                                                    as the licensee); for construction and                  I. Introduction                                       Accession Nos. ML17048A145 and
                                                    operation of the Virgil C. Summer                                                                             ML17048A148, respectively. A
                                                    Nuclear Station (VCSNS) Units 2 and 3,                     The NRC is granting an exemption                   summary of the amendment documents
                                                    located in Fairfield County, South                      from Paragraph B of Section III, ‘‘Scope              is provided in Section III of this
                                                    Carolina.                                               and Contents,’’ of Appendix D, ‘‘Design               document.
                                                      The granting of the exemption allows                  Certification Rule for the AP1000,’’ to
                                                                                                            part 52 of title 10 of the Code of Federal            II. Exemption
                                                    the changes to Tier 1 information asked
                                                    for in the amendment. Because the                       Regulations (10 CFR), and issuing                        Reproduced below is the exemption
                                                    acceptability of the exemption was                      License Amendment No. 70 to COLs,                     document issued to VCSNS Units 2 and
                                                    determined in part by the acceptability                 NPF–93 and NPF–94, to the licensee.                   Unit 3. It makes reference to the
                                                    of the amendment, the exemption and                     The exemption is required by Paragraph                combined safety evaluation that
                                                                                                            A.4 of Section VIII, ‘‘Processes for                  provides the reasoning for the findings
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    amendment are being issued
                                                    concurrently.                                           Changes and Departures,’’ Appendix D,                 made by the NRC (and listed under Item
                                                                                                            to 10 CFR part 52 to allow the licensee               1) in order to grant the exemption:
                                                    DATES: The exemption and amendment                      to depart from Tier 1 information. With                  1. In an application dated September
                                                    were issued on April 11, 2017.                          the requested amendment, the licensee                 22, 2016, the licensee requested from
                                                    ADDRESSES: Please refer to Docket ID                    sought proposed changes that would                    the Commission an exemption to allow
                                                    NRC–2008–0441 when contacting the                       revise the Updated Final Safety                       departures from Tier 1 information in
                                                    NRC about the availability of                           Analysis Report (UFSAR) in the form of                the certified DCD incorporated by
                                                    information regarding this document.                    departures from the incorporated plant-               reference in 10 CFR part 52, Appendix


                                               VerDate Sep<11>2014   17:38 Apr 27, 2017   Jkt 241001   PO 00000   Frm 00103   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                                                     Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices                                          19755

                                                    D, as part of license amendment request                 Commission’s rules and regulations in                 Company and the South Carolina Public
                                                    16–14, ‘‘Design Reliability Assurance                   10 CFR Chapter I, which are set forth in              Service Authority, (both collectively
                                                    Program (D–RAP) Changes.’’                              the license amendment.                                referred to as the licensee) for
                                                       For the reasons set forth in Section 3.1                A notice of consideration of issuance              construction and operation of the Virgil
                                                    of the NRC staff’s Safety Evaluation,                   of amendment to facility operating                    C. Summer Nuclear Station (VCSNS)
                                                    which can be found in ADAMS under                       license or combined license, as                       Units 2 and 3, located in Fairfield
                                                    Accession No. ML17048A143, the                          applicable, proposed no significant                   County, South Carolina.
                                                    Commission finds that:                                  hazards consideration determination,                     The granting of the exemption allows
                                                       A. The exemption is authorized by                    and opportunity for a hearing in                      the changes to Tier 1 information asked
                                                    law;                                                    connection with these actions, was                    for in the amendment. Because the
                                                       B. the exemption presents no undue                   published in the Federal Register on                  acceptability of the exemption was
                                                    risk to public health and safety;                       November 8, 2016 (81 FR 78652). No                    determined in part by the acceptability
                                                       C. the exemption is consistent with                  comments were received during the 30-                 of the amendment, the exemption and
                                                    the common defense and security;                        day comment period.                                   amendment are being issued
                                                       D. special circumstances are present                    The Commission has determined that                 concurrently.
                                                    in that the application of the rule in this             these amendments satisfy the criteria for             DATES: The exemption and amendment
                                                    circumstance is not necessary to serve                  categorical exclusion in accordance                   were issued on March 27, 2017.
                                                    the underlying purpose of the rule;                     with 10 CFR 51.22. Therefore, pursuant                ADDRESSES: Please refer to Docket ID
                                                       E. the special circumstances outweigh                to 10 CFR 51.22(b), no environmental
                                                    any decrease in safety that may result                                                                        NRC–2008–0441 when contacting the
                                                                                                            impact statement or environmental                     NRC about the availability of
                                                    from the reduction in standardization                   assessment need be prepared for these
                                                    caused by the exemption; and                                                                                  information regarding this document.
                                                                                                            amendments.                                           You may obtain publicly-available
                                                       F. the exemption will not result in a
                                                    significant decrease in the level of safety             IV. Conclusion                                        information related to this document
                                                    otherwise provided by the design.                                                                             using any of the following methods:
                                                                                                               Using the reasons set forth in the
                                                       2. Accordingly, the licensee is granted                                                                       • Federal Rulemaking Web site: Go to
                                                                                                            combined safety evaluation, the staff                 http://www.regulations.gov and search
                                                    an exemption from the certified DCD                     granted the exemption and issued the                  for Docket ID NRC–2008–0252. Address
                                                    Tier 1 information related to the in-                   amendment that the licensee requested                 questions about NRC dockets to Carol
                                                    containment refueling water storage                     on September 22, 2016.                                Gallagher; telephone: 301–415–3463;
                                                    tank vents and overflow weirs, the rod                     The exemption and amendment were
                                                                                                                                                                  email: Carol.Gallagher@nrc.gov. For
                                                    drive motor-generator sets field control                issued on April 11, 2017, as part of a
                                                                                                                                                                  technical questions, contact the
                                                    relays, and the rod drive power supply                  combined package to the licensee
                                                                                                                                                                  individual listed in the FOR FURTHER
                                                    control cabinets, as described in the                   (ADAMS Accession No. ML17048A142).
                                                                                                                                                                  INFORMATION CONTACT section of this
                                                    licensee’s request dated September 22,                    Dated at Rockville, Maryland, this 14th day         document.
                                                    2016. This exemption is related to, and                 of April 2017.                                           • NRC’s Agencywide Documents
                                                    necessary for the granting of License                     For the Nuclear Regulatory Commission.              Access and Management System
                                                    Amendment No. 70, which is being                        Brian Hughes,                                         (ADAMS): You may obtain publicly-
                                                    issued concurrently with this                                                                                 available documents online in the
                                                                                                            Acting Branch Chief, Licensing Branch 4,
                                                    exemption.                                              Division of New Reactor Licensing, Office of          ADAMS Public Documents collection at
                                                       3. As explained in Section 5.0 of the                New Reactors.                                         http://www.nrc.gov/reading-rm/
                                                    NRC staff’s Safety Evaluation (ADAMS                    [FR Doc. 2017–08633 Filed 4–27–17; 8:45 am]           adams.html. To begin the search, select
                                                    Accession No. ML17048A143), this                                                                              ‘‘ADAMS Public Documents’’ and then
                                                                                                            BILLING CODE 7590–01–P
                                                    exemption meets the eligibility criteria                                                                      select ‘‘Begin Web-based ADAMS
                                                    for categorical exclusion set forth in 10                                                                     Search.’’ For problems with ADAMS,
                                                    CFR 51.22(c)(9). Therefore, pursuant to                 NUCLEAR REGULATORY                                    please contact the NRC’s Public
                                                    10 CFR 51.22(b), no environmental                       COMMISSION                                            Document Room (PDR) reference staff at
                                                    impact statement or environmental                                                                             1–800–397–4209, 301–415–4737, or by
                                                    assessment needs to be prepared in                      [Docket Nos. 52–027 and 52–028; NRC–
                                                                                                            2008–0441]                                            email to pdr.resource@nrc.gov. The
                                                    connection with the issuance of the                                                                           ADAMS accession number for each
                                                    exemption.                                                                                                    document referenced (if it is available in
                                                                                                            Virgil C. Summer Nuclear Station,
                                                       4. This exemption is effective as of the                                                                   ADAMS) is provided the first time that
                                                                                                            Units 2 and 3; South Carolina Electric
                                                    date of its issuance.                                                                                         it is mentioned in this document. The
                                                                                                            & Gas Company; South Carolina
                                                    III. License Amendment Request                          Public Service Authority Debris Screen                request for the amendment and
                                                       By letter dated September 22, 2016                   Related Dimensions                                    exemption was submitted by letter
                                                    (ADAMS Accession No. ML16270A582),                                                                            dated August 12, 2016 (ADAMS
                                                                                                            AGENCY:  Nuclear Regulatory                           Accession No. ML16225A437).
                                                    the licensee requested that the NRC                     Commission.                                              • NRC’s PDR: You may examine and
                                                    amend the COLs for VCSNS, Units 2                       ACTION: Exemption and combined                        purchase copies of public documents at
                                                    and 3, COLs NPF–93 and NPF–94. The                      license amendment; issuance.                          the NRC’s PDR, Room O1–F21, One
                                                    proposed amendment is described in
                                                                                                            SUMMARY:    The U.S. Nuclear Regulatory               White Flint North, 11555 Rockville
                                                    Section I of this Federal Register Notice.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       The Commission has determined for                    Commission (NRC) is granting an                       Pike, Rockville, Maryland 20852.
                                                    these amendments that the application                   exemption to allow a departure from the               FOR FURTHER INFORMATION CONTACT:
                                                    complies with the standards and                         certification information of Tier 1 of the            Ruth Reyes, Office of New Reactors,
                                                    requirements of the Atomic Energy Act                   generic design control document (DCD)                 U.S. Nuclear Regulatory Commission,
                                                    of 1954, as amended (the Act), and the                  and is issuing License Amendment No.                  Washington, DC 20555–0001; telephone:
                                                    Commission’s rules and regulations.                     66 to Combined Licenses (COL), NPF–                   301–415–3249; email: Ruth.Reyes@
                                                    The Commission has made appropriate                     93 and NPF–94. The COLs were issued                   nrc.gov.
                                                    findings as required by the Act and the                 to South Carolina Electric & Gas                      SUPPLEMENTARY INFORMATION:



                                               VerDate Sep<11>2014   17:38 Apr 27, 2017   Jkt 241001   PO 00000   Frm 00104   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2017-04-28 03:02:41
Document Modified: 2017-04-28 03:02:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on April 11, 2017.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 19754 