82 FR 19757 - South Carolina Electric & Gas Company, South Carolina Public Service Authority, Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 81 (April 28, 2017)

Page Range19757-19758
FR Document2017-08618

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for multiple inspections, tests, analyses, and acceptance criteria (ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

Federal Register, Volume 82 Issue 81 (Friday, April 28, 2017)
[Federal Register Volume 82, Number 81 (Friday, April 28, 2017)]
[Notices]
[Pages 19757-19758]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-08618]



[[Page 19757]]

-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority, Virgil C. Summer Nuclear Station, Units 2 and 3, 
Inspections, Tests, Analyses, and Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the inspections, tests, and analyses have been 
successfully completed, and that the specified acceptance criteria are 
met for multiple inspections, tests, analyses, and acceptance criteria 
(ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 
3.

DATES: The determination of the successful completion of inspections, 
tests, and analyses for these ITAAC for VCSNS, Units 2 and 3 is 
effective April 28, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Licensee Notification of Completion of ITAAC

    South Carolina Electric & Gas (SCE&G), on behalf of itself and the 
South Carolina Public Service Authority, (both hereafter called the 
licensee) has submitted ITAAC closure notifications (ICNs) under title 
10 of the Code of Federal Regulations (10 CFR) 52.99(c)(1), informing 
the NRC that the licensee has successfully performed the required 
inspections, tests, and analyses, and that the acceptance criteria are 
met for:

VCSNS Unit 2 ITAAC
    2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.5.01.03c (513), and 
C.3.8.01.02.03 (845)
VCSNS Unit 3 ITAAC
    2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.5.01.03c (513), 3.3.00.09 
(814), and C.3.8.01.02.03 (845)

    The ITAAC for VCSNS Unit 2 are in Appendix C of the VCSNS Unit 2 
combined license (ADAMS Accession No. ML14100A092). The ITAAC for VCSNS 
Unit 3 are in Appendix C of VCSNS Unit 3 combined license (ADAMS 
Accession No. ML14100A101).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the staff receives new information that suggests 
the staff's determination on any of these ITAAC is incorrect, then the 
staff will determine whether to reopen that ITAAC (including 
withdrawing the staff's determination on that ITAAC). The NRC staff's 
determination will be used to support a subsequent finding, pursuant to 
10 CFR 52.103(g), at the end of construction that all acceptance 
criteria in the combined license are met. The ITAAC closure process is 
not finalized for these ITAAC until the NRC makes an affirmative 
finding under 10 CFR 52.103(g). Any future updates to the status of 
these ITAAC will be reflected on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests, and analyses.

Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027

    A complete list of the review status for VCSNS Unit 2 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum2-icnsr.pdf.

Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028

    A complete list of the review status for VCSNS Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum3-icnsr.pdf.

    Dated at Rockville, Maryland, this 17th day of April 2017.


[[Page 19758]]


    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-08618 Filed 4-27-17; 8:45 am]
BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe determination of the successful completion of inspections, tests, and analyses for these ITAAC for VCSNS, Units 2 and 3 is effective April 28, 2017.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 19757 

2024 Federal Register | Disclaimer | Privacy Policy