82_FR_21300 82 FR 21214 - Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed B-System Project

82 FR 21214 - Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed B-System Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 86 (May 5, 2017)

Page Range21214-21215
FR Document2017-09110

Federal Register, Volume 82 Issue 86 (Friday, May 5, 2017)
[Federal Register Volume 82, Number 86 (Friday, May 5, 2017)]
[Notices]
[Pages 21214-21215]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09110]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-498-000]


Columbia Gas Transmission, LLC; Notice of Availability of the 
Environmental Assessment for the Proposed B-System Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the B-
System Project, proposed by Columbia Gas Transmission, LLC (Columbia) 
in the above-referenced docket. Columbia requests authorization to 
modernize and upgrade Columbia's B-System pipelines by replacing and 
abandoning existing pipeline as well as constructing new pipeline and 
appurtenant facilities in Fairfield and Franklin Counties, Ohio.
    The EA assesses the potential environmental effects of the 
construction and operation of the B-System Project in accordance with 
the requirements of the National Environmental Policy Act (NEPA). The 
FERC staff concludes that approval of the proposed project, with 
appropriate mitigating measures, would not constitute a major federal 
action significantly affecting the quality of the human environment.
    The U.S. Army Corps of Engineers and Ohio Department of Natural 
Resources participated as cooperating agencies in the preparation of 
the EA. Cooperating agencies have jurisdiction by law or special 
expertise with respect to resources potentially affected by the 
proposal and participate in the NEPA analysis.
    As part of its proposed B-System Project, Columbia would:
     Abandon in place approximately 17.5 miles of 20-inch-
diameter pipeline, remove two associated mainline valves (mileposts 7.7 
and 10.9), install two gas heaters, and remove various exposed pipe 
segments on Columbia's Line B-105;
     construct approximately 14.0 miles of 20-inch-diameter 
replacement pipeline on Columbia's Line B-111;
     construct approximately 0.1 mile of 4-inch-diameter 
replacement pipeline on Columbia's Line B-121;
     construct approximately 0.5 mile of 4-inch-diameter 
replacement pipeline on Columbia's Line B-130;
     construct approximately 7.6 miles of new 20-inch-diameter 
pipeline (``Line K-270'') connecting Columbia's K-System and B-System; 
and
     remove, replace, restore, and install various 
appurtenances including connections, valves, aboveground piping, one 
regulation facility, and pig \1\ launchers and receivers.
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. In addition, 
the EA is available for public viewing on the FERC's Web site 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this project, it is important 
that we receive your comments in Washington, DC on or before May 30, 
2017.
    For your convenience, there are three methods you can use to file 
your comments with the Commission. In all instances please reference 
the project docket number (CP16-498-000) with your submission. The 
Commission

[[Page 21215]]

encourages electronic filing of comments and has expert staff available 
to assist you at 202-502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. This is an easy method for submitting 
brief, text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\2\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \2\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP16-
498). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: April 28, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-09110 Filed 5-4-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                21214                              Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices

                                                   5.   MCF stands for 1,000 cubic feet.
                                                   6.   For the purposes of this table, one   cubic foot of natural gas has an energy equivalence of 1,032 Btu.
                                                   7.   For the purposes of this table, one   gallon of No. 2 heating oil has an energy equivalence of 137,561 Btu.
                                                   8.   For the purposes of this table, one   gallon of liquid propane has an energy equivalence of 91,333 Btu.
                                                   9.   For the purposes of this table, one   gallon of kerosene has an energy equivalence of 135,000 Btu.


                                                [FR Doc. 2017–09128 Filed 5–4–17; 8:45 am]                Comments: 5:00 p.m. Eastern Time on                  pipe segments on Columbia’s Line B–
                                                BILLING CODE 6450–01–P                                   May 18, 2017.                                         105;
                                                                                                           Dated: April 28, 2017.                                 • construct approximately 14.0 miles
                                                                                                                                                               of 20-inch-diameter replacement
                                                                                                         Kimberly D. Bose,
                                                DEPARTMENT OF ENERGY                                                                                           pipeline on Columbia’s Line B–111;
                                                                                                         Secretary.                                               • construct approximately 0.1 mile of
                                                Federal Energy Regulatory                                [FR Doc. 2017–09105 Filed 5–4–17; 8:45 am]            4-inch-diameter replacement pipeline
                                                Commission                                               BILLING CODE 6717–01–P                                on Columbia’s Line B–121;
                                                                                                                                                                  • construct approximately 0.5 mile of
                                                [Docket No. AC17–127–000]                                                                                      4-inch-diameter replacement pipeline
                                                                                                         DEPARTMENT OF ENERGY                                  on Columbia’s Line B–130;
                                                South Central MCN LLC; Notice of                                                                                  • construct approximately 7.6 miles
                                                Petition for Waiver                                      Federal Energy Regulatory                             of new 20-inch-diameter pipeline (‘‘Line
                                                                                                         Commission                                            K–270’’) connecting Columbia’s K-
                                                   Take notice that on April 27, 2017,                                                                         System and B-System; and
                                                                                                         [Docket No. CP16–498–000]
                                                South Central MCN LLC filed a petition                                                                            • remove, replace, restore, and install
                                                for waiver of the requirement to file a                  Columbia Gas Transmission, LLC;                       various appurtenances including
                                                FERC Form 3–Q for the periods of                         Notice of Availability of the                         connections, valves, aboveground
                                                January 1, 2017 through March 31, 2017,                  Environmental Assessment for the                      piping, one regulation facility, and pig 1
                                                and April 1, 2017 through June 30,                       Proposed B-System Project                             launchers and receivers.
                                                2017, as required by 18 CFR 141.400, all                                                                          The FERC staff mailed copies of the
                                                as more fully explained in the petition.                   The staff of the Federal Energy                     EA to federal, state, and local
                                                   Any person desiring to intervene or to                Regulatory Commission (FERC or                        government representatives and
                                                protest this filing must file in                         Commission) has prepared an                           agencies; elected officials;
                                                accordance with Rules 211 and 214 of                     environmental assessment (EA) for the                 environmental and public interest
                                                the Commission’s Rules of Practice and                   B-System Project, proposed by                         groups; Native American tribes;
                                                Procedure (18 CFR 385.211, 385.214).                     Columbia Gas Transmission, LLC                        potentially affected landowners and
                                                Protests will be considered by the                       (Columbia) in the above-referenced                    other interested individuals and groups;
                                                Commission in determining the                            docket. Columbia requests authorization               and newspapers and libraries in the
                                                appropriate action to be taken, but will                 to modernize and upgrade Columbia’s                   project area. In addition, the EA is
                                                not serve to make protestants parties to                 B-System pipelines by replacing and                   available for public viewing on the
                                                the proceeding. Any person wishing to                    abandoning existing pipeline as well as               FERC’s Web site (www.ferc.gov) using
                                                become a party must file a notice of                     constructing new pipeline and                         the eLibrary link. A limited number of
                                                intervention or motion to intervene, as                  appurtenant facilities in Fairfield and               copies of the EA are available for
                                                appropriate. Such notices, motions, or                   Franklin Counties, Ohio.                              distribution and public inspection at:
                                                protests must be filed on or before the                    The EA assesses the potential                       Federal Energy Regulatory Commission,
                                                comment date. Anyone filing a motion                     environmental effects of the                          Public Reference Room, 888 First Street
                                                to intervene or protest must serve a copy                construction and operation of the B-                  NE., Room 2A, Washington, DC 20426,
                                                of that document on the Petitioner.                      System Project in accordance with the                 (202) 502–8371.
                                                   The Commission encourages                             requirements of the National                             Any person wishing to comment on
                                                electronic submission of protests and                    Environmental Policy Act (NEPA). The                  the EA may do so. Your comments
                                                interventions in lieu of paper using the                 FERC staff concludes that approval of                 should focus on the potential
                                                ‘‘eFiling’’ link at http://www.ferc.gov.                 the proposed project, with appropriate                environmental effects, reasonable
                                                Persons unable to file electronically                    mitigating measures, would not                        alternatives, and measures to avoid or
                                                should submit an original and 5 copies                   constitute a major federal action                     lessen environmental impacts. The more
                                                of the protest or intervention to the                    significantly affecting the quality of the            specific your comments, the more useful
                                                Federal Energy Regulatory Commission,                    human environment.                                    they will be. To ensure that the
                                                888 First Street NE., Washington, DC                       The U.S. Army Corps of Engineers                    Commission has the opportunity to
                                                20426.                                                   and Ohio Department of Natural                        consider your comments prior to
                                                   This filing is accessible on-line at                  Resources participated as cooperating                 making its decision on this project, it is
                                                http://www.ferc.gov, using the                           agencies in the preparation of the EA.                important that we receive your
                                                ‘‘eLibrary’’ link and is available for                   Cooperating agencies have jurisdiction                comments in Washington, DC on or
                                                review in the Commission’s Public                        by law or special expertise with respect              before May 30, 2017.
                                                Reference Room in Washington, DC.                        to resources potentially affected by the                 For your convenience, there are three
                                                There is an ‘‘eSubscription’’ link on the                proposal and participate in the NEPA                  methods you can use to file your
SRADOVICH on DSK3GMQ082PROD with NOTICES




                                                Web site that enables subscribers to                     analysis.                                             comments with the Commission. In all
                                                receive email notification when a                          As part of its proposed B-System                    instances please reference the project
                                                document is added to a subscribed                        Project, Columbia would:                              docket number (CP16–498–000) with
                                                docket(s). For assistance with any FERC                    • Abandon in place approximately                    your submission. The Commission
                                                Online service, please email                             17.5 miles of 20-inch-diameter pipeline,                1 A ‘‘pig’’ is a tool that the pipeline company
                                                FERCOnlineSupport@ferc.gov, or call                      remove two associated mainline valves                 inserts into and pushes through the pipeline for
                                                (866) 208–3676 (toll free). For TTY, call                (mileposts 7.7 and 10.9), install two gas             cleaning the pipeline, conducting internal
                                                (202) 502–8659.                                          heaters, and remove various exposed                   inspections, or other purposes.



                                           VerDate Sep<11>2014    17:43 May 04, 2017   Jkt 241001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\05MYN1.SGM   05MYN1


                                                                                  Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices                                            21215

                                                encourages electronic filing of                         such as orders, notices, and                          the docket number field to access the
                                                comments and has expert staff available                 rulemakings.                                          document. For assistance, contact FERC
                                                to assist you at 202–502–8258 or                           In addition, the Commission offers a               at FERCOnlineSupport@ferc.gov or call
                                                FercOnlineSupport@ferc.gov.                             free service called eSubscription which               toll-free, (886) 208–3676 or TYY, (202)
                                                   (1) You can file your comments                       allows you to keep track of all formal                502–8659.
                                                electronically using the eComment                       issuances and submittals in specific                     Any questions regarding this
                                                feature located on the Commission’s                     dockets. This can reduce the amount of                application should be directed to Nick
                                                Web site (www.ferc.gov) under the link                  time you spend researching proceedings                Nicodemus, Director, Land and
                                                to Documents and Filings. This is an                    by automatically providing you with                   Regulatory Affairs, Enstor Gas, LLC,
                                                easy method for submitting brief, text-                 notification of these filings, document               20329 State Highway 249, Suite 500,
                                                only comments on a project;                             summaries, and direct links to the                    Houston, Texas 77070, or by calling
                                                   (2) You can also file your comments                  documents. Go to www.ferc.gov/docs-                   (281) 374–3089 (telephone),
                                                electronically using the eFiling feature                filing/esubscription.asp.                             nick.nicodemus@enstorinc.com.
                                                on the Commission’s Web site                                                                                     Any person or the Commission’s Staff
                                                                                                          Dated: April 28, 2017.
                                                (www.ferc.gov) under the link to                                                                              may, within 60 days after the issuance
                                                Documents and Filings. With eFiling,                    Kimberly D. Bose,                                     of the instant notice by the Commission,
                                                you can provide comments in a variety                   Secretary.                                            file pursuant to Rule 214 of the
                                                of formats by attaching them as a file                  [FR Doc. 2017–09110 Filed 5–4–17; 8:45 am]            Commission’s Procedural Rules (18 CFR
                                                with your submission. New eFiling                       BILLING CODE 6717–01–P                                385.214) a motion to intervene or notice
                                                users must first create an account by                                                                         of intervention and, pursuant to section
                                                clicking on ‘‘eRegister.’’ You must select                                                                    157.205 of the Commission’s
                                                the type of filing you are making. If you               DEPARTMENT OF ENERGY                                  Regulations under the NGA (18 CFR
                                                are filing a comment on a particular                                                                          157.205) a protest to the request. If no
                                                project, please select ‘‘Comment on a                   Federal Energy Regulatory                             protest is filed within the time allowed
                                                Filing’’; or                                            Commission                                            therefore, the proposed activity shall be
                                                   (3) You can file a paper copy of your                [Docket No. CP17–211–000]                             deemed to be authorized effective the
                                                comments by mailing them to the                                                                               day after the time allowed for protest. If
                                                following address: Kimberly D. Bose,                    Caledonia Energy Partners, LLC;                       a protest is filed and not withdrawn
                                                Secretary, Federal Energy Regulatory                    Notice of Request Under Blanket                       within 30 days after the time allowed
                                                Commission, 888 First Street NE., Room                  Authorization                                         for filing a protest, the instant request
                                                1A, Washington, DC 20426.                                                                                     shall be treated as an application for
                                                   Any person seeking to become a party                    Take notice that on April 20, 2017,                authorization pursuant to section 7 of
                                                to the proceeding must file a motion to                 Caledonia Energy Partners, LLC                        the NGA.
                                                intervene pursuant to Rule 214 of the                   (Caledonia), 20329 State Highway 249,                    Pursuant to Section 157.9 of the
                                                Commission’s Rules of Practice and                      Suite 500, Houston, Texas 77070, filed                Commission’s rules, 18 CFR 157.9,
                                                Procedures (18 CFR 385.214).2 Only                      in Docket No. CP17–211–000, a prior                   within 90 days of this Notice the
                                                intervenors have the right to seek                      notice request pursuant to sections                   Commission staff will either: complete
                                                rehearing of the Commission’s decision.                 157.205 and 157.216 of the                            its environmental assessment (EA) and
                                                The Commission grants affected                          Commission’s regulations under the                    place it into the Commission’s public
                                                landowners and others with                              Natural Gas Act (NGA). Caledonia seeks                record (eLibrary) for this proceeding, or
                                                environmental concerns intervenor                       authorization to abandon Gas Storage                  issue a Notice of Schedule for
                                                status upon showing good cause by                       Wells No. 7 and No. 9, both located at                Environmental Review. If a Notice of
                                                stating that they have a clear and direct               its storage facility (Caledonia Facility) in          Schedule for Environmental Review is
                                                interest in this proceeding which no                    Lowndes and Monroe Counties,                          issued, it will indicate, among other
                                                other party can adequately represent.                   Mississippi.                                          milestones, the anticipated date for the
                                                Simply filing environmental comments                       Caledonia proposes to perform these                Commission staff’s issuance of the final
                                                will not give you intervenor status, but                activities under its blanket certificate              environmental impact statement (FEIS)
                                                you do not need intervenor status to                    authority issued in Docket No. CP05–                  or EA for this proposal. The filing of the
                                                have your comments considered.                          16–000, all as more fully set forth in the            EA in the Commission’s public record
                                                   Additional information about the                     application which is on file with the                 for this proceeding or the issuance of a
                                                project is available from the                           Commission and open to public                         Notice of Schedule for Environmental
                                                Commission’s Office of External Affairs,                inspection.                                           Review will serve to notify federal and
                                                at (866) 208–FERC, or on the FERC Web                      In its application, Caledonia also                 state agencies of the timing for the
                                                site (www.ferc.gov) using the eLibrary                  states that the abandonment of Wells                  completion of all necessary reviews, and
                                                link. Click on the eLibrary link, click on              No. 7 and No. 9 will not have an effect               the subsequent need to complete all
                                                ‘‘General Search,’’ and enter the docket                on Caledonia’s ability to serve its                   federal authorizations within 90 days of
                                                number excluding the last three digits in               storage customers, as there will be                   the date of issuance of the Commission
                                                the Docket Number field (i.e., CP16–                    neither an effect on deliverability, nor              staff’s FEIS or EA.
                                                498). Be sure you have selected an                      an adverse impact to storage volumes.                    Persons who wish to comment only
                                                appropriate date range. For assistance,                 Caledonia also states that the proposed               on the environmental review of this
                                                                                                        abandonment will not affect the existing              project should submit an original and
SRADOVICH on DSK3GMQ082PROD with NOTICES




                                                please contact FERC Online Support at
                                                FercOnlineSupport@ferc.gov or toll free                 boundary, total inventory, reservoir                  two copies of their comments to the
                                                at (866) 208–3676, or for TTY, contact                  pressure, reservoir and buffer                        Secretary of the Commission.
                                                (202) 502–8659. The eLibrary link also                  boundaries, or the certificated capacity              Environmental commenters will be
                                                provides access to the texts of formal                  of the Caledonia Facility.                            placed on the Commission’s
                                                documents issued by the Commission,                        The filing may be viewed on the web                environmental mailing list, will receive
                                                                                                        at http://www.ferc.gov using the                      copies of the environmental documents,
                                                   2 See the previous discussion on the methods for     ‘‘eLibrary’’ link. Enter the docket                   and will be notified of meetings
                                                filing comments.                                        number excluding the last three digits in             associated with the Commission’s


                                           VerDate Sep<11>2014   17:43 May 04, 2017   Jkt 241001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\05MYN1.SGM   05MYN1



Document Created: 2018-11-08 08:40:15
Document Modified: 2018-11-08 08:40:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 21214 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR