82 FR 21214 - Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed B-System Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 86 (May 5, 2017)

Page Range21214-21215
FR Document2017-09110

Federal Register, Volume 82 Issue 86 (Friday, May 5, 2017)
[Federal Register Volume 82, Number 86 (Friday, May 5, 2017)]
[Notices]
[Pages 21214-21215]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09110]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-498-000]


Columbia Gas Transmission, LLC; Notice of Availability of the 
Environmental Assessment for the Proposed B-System Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the B-
System Project, proposed by Columbia Gas Transmission, LLC (Columbia) 
in the above-referenced docket. Columbia requests authorization to 
modernize and upgrade Columbia's B-System pipelines by replacing and 
abandoning existing pipeline as well as constructing new pipeline and 
appurtenant facilities in Fairfield and Franklin Counties, Ohio.
    The EA assesses the potential environmental effects of the 
construction and operation of the B-System Project in accordance with 
the requirements of the National Environmental Policy Act (NEPA). The 
FERC staff concludes that approval of the proposed project, with 
appropriate mitigating measures, would not constitute a major federal 
action significantly affecting the quality of the human environment.
    The U.S. Army Corps of Engineers and Ohio Department of Natural 
Resources participated as cooperating agencies in the preparation of 
the EA. Cooperating agencies have jurisdiction by law or special 
expertise with respect to resources potentially affected by the 
proposal and participate in the NEPA analysis.
    As part of its proposed B-System Project, Columbia would:
     Abandon in place approximately 17.5 miles of 20-inch-
diameter pipeline, remove two associated mainline valves (mileposts 7.7 
and 10.9), install two gas heaters, and remove various exposed pipe 
segments on Columbia's Line B-105;
     construct approximately 14.0 miles of 20-inch-diameter 
replacement pipeline on Columbia's Line B-111;
     construct approximately 0.1 mile of 4-inch-diameter 
replacement pipeline on Columbia's Line B-121;
     construct approximately 0.5 mile of 4-inch-diameter 
replacement pipeline on Columbia's Line B-130;
     construct approximately 7.6 miles of new 20-inch-diameter 
pipeline (``Line K-270'') connecting Columbia's K-System and B-System; 
and
     remove, replace, restore, and install various 
appurtenances including connections, valves, aboveground piping, one 
regulation facility, and pig \1\ launchers and receivers.
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. In addition, 
the EA is available for public viewing on the FERC's Web site 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this project, it is important 
that we receive your comments in Washington, DC on or before May 30, 
2017.
    For your convenience, there are three methods you can use to file 
your comments with the Commission. In all instances please reference 
the project docket number (CP16-498-000) with your submission. The 
Commission

[[Page 21215]]

encourages electronic filing of comments and has expert staff available 
to assist you at 202-502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. This is an easy method for submitting 
brief, text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\2\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \2\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP16-
498). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: April 28, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-09110 Filed 5-4-17; 8:45 am]
 BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 21214 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR