82_FR_21355 82 FR 21269 - Proposed Revisions to Conduct of Operations

82 FR 21269 - Proposed Revisions to Conduct of Operations

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 86 (May 5, 2017)

Page Range21269-21270
FR Document2017-09068

The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 13.6.1, ``Physical Security--Combined License and Operating Reactors.'' The NRC seeks comments on the proposed draft section revision of the Standard Review Plan (SRP) concerning guidance for the review of combined construction and operating license (COL) and operating license (OL) applications and amendments for physical security.

Federal Register, Volume 82 Issue 86 (Friday, May 5, 2017)
[Federal Register Volume 82, Number 86 (Friday, May 5, 2017)]
[Notices]
[Pages 21269-21270]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09068]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0111]


Proposed Revisions to Conduct of Operations

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard Review Plan--draft section revision; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting 
public comment on draft NUREG-0800, ``Standard Review Plan for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition,'' Section 13.6.1, ``Physical Security--Combined License and 
Operating Reactors.'' The NRC seeks comments on the proposed draft 
section revision of the Standard Review Plan (SRP) concerning guidance 
for the review of combined construction and operating license (COL) and 
operating license (OL) applications and amendments for physical 
security.

DATES: Comments must be filed no later than July 5, 2017. Comments 
received after this date will be considered, if it is practical to do 
so, but the Commission is able to ensure consideration only for 
comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0111. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: TWFN-08-D36, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on accessing information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Mark D. Notich, Office of New 
Reactors, telephone: 301-415-3053; email [email protected]; U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0111 when contacting the NRC 
about the availability of information regarding this action. You may 
obtain publicly-available information related to this document by any 
of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0111.
     NRC's Agencywide Documents Access and Management System 
(ADAMS):
    You may obtain publicly-available documents online in the ADAMS 
Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft revision and current revision to NUREG-0800, Section 13.6.1, 
``Physical Security--Combined License and Operating Reactors,'' are 
available in ADAMS under Accession Nos. ML17101A741 and ML102230082. 
The redline strikeout comparing the current version and draft revision 
is available in ADAMS under Accession No. ML 14295A061.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0111 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly

[[Page 21270]]

disclosed in your comment submission. The NRC will post all comment 
submissions at http://www.regulations.gov as well as enter the comment 
submissions into ADAMS. The NRC does not routinely edit comment 
submissions to remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Further Information

    The NRC seeks public comment on the proposed draft section revision 
of SRP Section 13.6.1. The changes to SRP Chapter 13 reflect the 
current staff reviews, methods and practices based on lessons learned 
from the NRC's reviews of design certification and combined license 
applications completed since the last revision of this chapter. The 
draft SRP section would also provide guidance for reviewing an 
application for a combined license under part 52 of title 10 of the 
Code of Federal Regulations (10 CFR).
    Following NRC staff evaluation of public comments, the NRC intends 
to incorporate the approved revisions into the next revision of NUREG-
0800. The SRP is guidance for the NRC staff. The SRP is not a 
substitute for the NRC regulations, and compliance with the SRP is not 
required.

III. Backfitting and Issue Finality

    Issuance of this draft SRP section, if finalized, would not 
constitute backfitting as defined in 10 CFR 50.109 of 10 CFR, (the 
Backfit Rule) or otherwise be inconsistent with the issue finality 
provisions in 10 CFR part 52. The NRC's position is based upon the 
following considerations.
    1. The draft SRP positions, if finalized, would not constitute 
backfitting, inasmuch as the SRP is internal guidance to NRC staff 
directed at the NRC staff with respect to their regulatory 
responsibilities.
    The SRP provides guidance to the NRC staff on how to review an 
application for NRC regulatory approval in the form of licensing. 
Changes in internal staff guidance are not matters for which either 
nuclear power plant applicants or licensees are protected under either 
the Backfit Rule or the issue finality provisions of 10 CFR part 52.
    2. The NRC staff has no intentions to impose the SRP positions on 
current licensees or already-issued regulatory approvals either now or 
in the future.
    The NRC staff does not intend to impose or apply the positions 
described in the draft SRP to existing (already issued) licenses and 
regulatory approvals. Hence, the issuance of a final SRP--even if 
considered guidance which is within the purview of the issue finality 
provisions in 10 CFR part 52--need not be evaluated as if it were a 
backfit or as being inconsistent with issue finality provisions. If, in 
the future, the NRC staff seeks to impose a position in the SRP on 
holders of already issued licenses in a manner which does not provide 
issue finality as described in the applicable issue finality provision, 
then the NRC staff must make the showing as set forth in the Backfit 
Rule or address the criteria for avoiding issue finality as described 
in the applicable issue finality provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed below--were intended to apply to every NRC 
action which substantially changes the expectations of current and 
future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The NRC staff does not, 
at this time, intend to impose the positions represented in the draft 
SRP in a manner that is inconsistent with any issue finality 
provisions. If, in the future, the NRC staff seeks to impose a position 
in the draft SRP in a manner which does not provide issue finality as 
described in the applicable issue finality provisions, then the NRC 
staff must address the criteria for avoiding issue finality provisions.


    Dated at Rockville, Maryland, this 1st day of May, 2017.

    For the Nuclear Regulatory Commission.

Joseph Colaccino,
Chief, New Reactor Rulemaking and Guidance Branch, Division of 
Engineering and Infrastructure, Office of New Reactors.
[FR Doc. 2017-09068 Filed 5-4-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                  Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices                                           21269

                                                information related to this document                    addition, the licensee has supplemented                  • Mail comments to: Cindy Bladey,
                                                using any of the following methods:                     the application with a response to a                  Office of Administration, Mail Stop:
                                                   • Federal Rulemaking Web site: Go to                 Request for Additional Information                    TWFN–08–D36, U.S. Nuclear
                                                http://www.regulations.gov and search                   dated January 26, 2017 (ADAMS                         Regulatory Commission, Washington,
                                                for Docket ID NRC–2016–0239. Address                    accession no. ML17039A909), and a                     DC 20555–0001.
                                                questions about NRC dockets to Carol                    second supplement dated February 27,                     For additional direction on accessing
                                                Gallagher; telephone: 301–415–3463;                     2017 (ADAMS accession no.                             information and submitting comments,
                                                email: Carol.Gallagher@nrc.gov. For                     ML17058A460). By letter dated March                   see ‘‘Obtaining Information and
                                                technical questions, contact the                        22, 2017 (ADAMS accession no.                         Submitting Comments’’ in the
                                                individual listed in the FOR FURTHER                    ML17082A459), the licensee requested                  SUPPLEMENTARY INFORMATION section of
                                                INFORMATION CONTACT section of this                     to withdraw the proposed amendment.                   this document.
                                                document.                                                 Dated at Rockville, Maryland, this 25th day         FOR FURTHER INFORMATION CONTACT:
                                                   • NRC’s Agencywide Documents                         of April, 2017.                                       Mark D. Notich, Office of New Reactors,
                                                Access and Management System                              For the Nuclear Regulatory Commission.              telephone: 301–415–3053; email
                                                (ADAMS): You may obtain publicly                                                                              Mark.Notich@nrc.gov; U.S. Nuclear
                                                available documents online in the                       April L Pulvirenti,
                                                                                                                                                              Regulatory Commission, Washington,
                                                ADAMS Public Documents collection at                    Project Manager, Plant Licensing Branch 4,
                                                                                                                                                              DC 20555–0001.
                                                http://www.nrc.gov/reading-rm/                          Division of Operator Reactor Licensing, Office
                                                                                                        of Nuclear Reactor Regulation.                        SUPPLEMENTARY INFORMATION:
                                                adams.html. To begin the search, select
                                                ‘‘ADAMS Public Documents’’ and then                     [FR Doc. 2017–09154 Filed 5–4–17; 8:45 am]            I. Obtaining Information and
                                                select ‘‘Begin Web-based ADAMS                          BILLING CODE 7590–01–P                                Submitting Comments
                                                Search.’’ For problems with ADAMS,                                                                            A. Obtaining Information
                                                please contact the NRC’s Public
                                                Document Room (PDR) reference staff at                  NUCLEAR REGULATORY                                       Please refer to Docket ID NRC–2017–
                                                1–800–397–4209, 301–415–4737, or by                     COMMISSION                                            0111 when contacting the NRC about
                                                email to pdr.resource@nrc.gov. The                      [NRC–2017–0111]                                       the availability of information regarding
                                                ADAMS accession number for each                                                                               this action. You may obtain publicly-
                                                document referenced in this document                    Proposed Revisions to Conduct of                      available information related to this
                                                (if that document is available in                       Operations                                            document by any of the following
                                                ADAMS) is provided the first time that                                                                        methods:
                                                                                                        AGENCY:  Nuclear Regulatory                              • Federal Rulemaking Web site: Go to
                                                a document is referenced.                               Commission.
                                                   • NRC’s PDR: You may examine and                                                                           http://www.regulations.gov and search
                                                                                                        ACTION: Standard Review Plan—draft                    for Docket ID NRC–2017–0111.
                                                purchase copies of public documents at
                                                the NRC’s PDR, Room O1–F21, One
                                                                                                        section revision; request for comment.                   • NRC’s Agencywide Documents
                                                White Flint North, 11555 Rockville                                                                            Access and Management System
                                                                                                        SUMMARY:    The U.S. Nuclear Regulatory
                                                Pike, Rockville, Maryland 20852.                                                                              (ADAMS):
                                                                                                        Commission (NRC) is soliciting public                    You may obtain publicly-available
                                                FOR FURTHER INFORMATION CONTACT:                        comment on draft NUREG–0800,                          documents online in the ADAMS Public
                                                April Pulvirenti, Office of Nuclear                     ‘‘Standard Review Plan for the Review                 Documents collection at http://
                                                Reactor Regulation, U.S. Nuclear                        of Safety Analysis Reports for Nuclear                www.nrc.gov/reading-rm/adams.html.
                                                Regulatory Commission, Washington,                      Power Plants: LWR Edition,’’ Section                  To begin the search, select ‘‘ADAMS
                                                DC 20555–0001; telephone: 301–415–                      13.6.1, ‘‘Physical Security—Combined                  Public Documents’’ and then select
                                                1390, email: April.Pulvirenti@nrc.gov.                  License and Operating Reactors.’’ The                 ‘‘Begin Web-based ADAMS Search.’’ For
                                                SUPPLEMENTARY INFORMATION: The NRC                      NRC seeks comments on the proposed                    problems with ADAMS, please contact
                                                has granted the request of Entergy to                   draft section revision of the Standard                the NRC’s Public Document Room (PDR)
                                                withdraw its September 1, 2016,                         Review Plan (SRP) concerning guidance                 reference staff at 1–800–397–4209, 301–
                                                application (ADAMS accession no.                        for the review of combined construction               415–4737, or by email to pdr.resource@
                                                ML16245A359) for a proposed                             and operating license (COL) and                       nrc.gov. The draft revision and current
                                                amendment to Facility Operating                         operating license (OL) applications and               revision to NUREG–0800, Section
                                                License No. NPF–38 for Waterford 3,                     amendments for physical security.                     13.6.1, ‘‘Physical Security—Combined
                                                located in St. Charles Parish, Louisiana.               DATES: Comments must be filed no later                License and Operating Reactors,’’ are
                                                   The amendment would have revised                     than July 5, 2017. Comments received                  available in ADAMS under Accession
                                                the Waterford 3 TSs to relocate the                     after this date will be considered, if it             Nos. ML17101A741 and ML102230082.
                                                surveillance frequency requirements for                 is practical to do so, but the                        The redline strikeout comparing the
                                                selected ESFAS Subgroup relays to a                     Commission is able to ensure                          current version and draft revision is
                                                licensee-controlled program.                            consideration only for comments                       available in ADAMS under Accession
                                                Specifically, the license amendment                     received on or before this date.                      No. ML 14295A061.
                                                would have revised the Table Notation                   ADDRESSES: You may submit comments                       • NRC’s PDR: You may examine and
                                                for TS Table 4.3–2, ‘‘Engineered Safety                 by any of the following methods:                      purchase copies of public documents at
                                                Features Actuation System                                  • Federal Rulemaking Web site: Go to               the NRC’s PDR, Room O1–F21, One
                                                Instrumentation Surveillance                            http://www.regulations.gov and search
SRADOVICH on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              White Flint North, 11555 Rockville
                                                Requirements,’’ to relocate the                         for Docket ID NRC–2017–0111. Address                  Pike, Rockville, Maryland 20852.
                                                surveillance frequency of additional                    questions about NRC dockets to Carol
                                                relays to the Waterford 3 SFCP. The                     Gallagher; telephone: 301–415–3463;                   B. Submitting Comments
                                                Commission previously published a                       email: Carol.Gallagher@nrc.gov. For                     Please include Docket ID NRC–2017–
                                                proposed finding in the Federal                         technical questions, contact the                      0111 in your comment submission.
                                                Register on November 22, 2016 (81 FR                    individual listed in the FOR FURTHER                    The NRC cautions you not to include
                                                83875), that the amendment involves no                  INFORMATION CONTACT section of this                   identifying or contact information that
                                                significant hazards consideration. In                   document.                                             you do not want to be publicly


                                           VerDate Sep<11>2014   17:43 May 04, 2017   Jkt 241001   PO 00000   Frm 00084   Fmt 4703   Sfmt 4703   E:\FR\FM\05MYN1.SGM   05MYN1


                                                21270                             Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices

                                                disclosed in your comment submission.                   issue finality provisions of 10 CFR part                For the Nuclear Regulatory Commission.
                                                The NRC will post all comment                           52.                                                   Joseph Colaccino,
                                                submissions at http://                                     2. The NRC staff has no intentions to              Chief, New Reactor Rulemaking and
                                                www.regulations.gov as well as enter the                impose the SRP positions on current                   Guidance Branch, Division of Engineering
                                                comment submissions into ADAMS.                                                                               and Infrastructure, Office of New Reactors.
                                                                                                        licensees or already-issued regulatory
                                                The NRC does not routinely edit                                                                               [FR Doc. 2017–09068 Filed 5–4–17; 8:45 am]
                                                                                                        approvals either now or in the future.
                                                comment submissions to remove                                                                                 BILLING CODE 7590–01–P
                                                identifying or contact information.                        The NRC staff does not intend to
                                                  If you are requesting or aggregating                  impose or apply the positions described
                                                comments from other persons for                         in the draft SRP to existing (already                 NUCLEAR REGULATORY
                                                submission to the NRC, then you should                  issued) licenses and regulatory                       COMMISSION
                                                inform those persons not to include                     approvals. Hence, the issuance of a final
                                                identifying or contact information that                                                                       [Docket No. 72–11; NRC–2017–0110]
                                                                                                        SRP—even if considered guidance
                                                they do not want to be publicly                         which is within the purview of the issue              Sacramento Municipal Utility District;
                                                disclosed in their comment submission.                  finality provisions in 10 CFR part 52—                Rancho Seco Independent Spent Fuel
                                                Your request should state that the NRC                  need not be evaluated as if it were a                 Storage Installation
                                                does not routinely edit comment                         backfit or as being inconsistent with
                                                submissions to remove such information                  issue finality provisions. If, in the                 AGENCY:  Nuclear Regulatory
                                                before making the comment                               future, the NRC staff seeks to impose a               Commission.
                                                submissions available to the public or                  position in the SRP on holders of                     ACTION: License amendment application;
                                                entering the comment into ADAMS.                                                                              opportunity to request a hearing and to
                                                                                                        already issued licenses in a manner
                                                II. Further Information                                 which does not provide issue finality as              petition for leave to intervene.
                                                   The NRC seeks public comment on                      described in the applicable issue finality            SUMMARY:   The U.S. Nuclear Regulatory
                                                the proposed draft section revision of                  provision, then the NRC staff must make               Commission (NRC) has received a
                                                SRP Section 13.6.1. The changes to SRP                  the showing as set forth in the Backfit               request from Sacramento Municipal
                                                Chapter 13 reflect the current staff                    Rule or address the criteria for avoiding             Utility District (SMUD) to amend the
                                                reviews, methods and practices based                    issue finality as described in the                    license for the Rancho Seco
                                                on lessons learned from the NRC’s                       applicable issue finality provision.                  Independent Spent Fuel Storage
                                                reviews of design certification and                        3. Backfitting and issue finality do               Installation (ISFSI) to allow the storage
                                                combined license applications                           not—with limited exceptions not                       of byproduct nuclear material. The
                                                completed since the last revision of this               applicable here—protect current or                    amendment would allow SMUD to use
                                                chapter. The draft SRP section would                    future applicants.                                    the byproduct nuclear material to check
                                                also provide guidance for reviewing an                                                                        the functionality of radiation detection
                                                application for a combined license                         Applicants and potential applicants
                                                                                                                                                              instruments. The NRC is evaluating
                                                under part 52 of title 10 of the Code of                are not, with certain exceptions,                     whether approval of this request would
                                                Federal Regulations (10 CFR).                           protected by either the Backfit Rule or               be categorically excluded from the
                                                   Following NRC staff evaluation of                    any issue finality provisions under 10                requirement to prepare an
                                                public comments, the NRC intends to                     CFR part 52. This is because neither the              environmental assessment.
                                                incorporate the approved revisions into                 Backfit Rule nor the issue finality
                                                                                                                                                              DATES: A request for a hearing or
                                                the next revision of NUREG–0800. The                    provisions under 10 CFR part 52—with                  petition for leave to intervene must be
                                                SRP is guidance for the NRC staff. The                  certain exclusions discussed below—                   filed by July 5, 2017.
                                                SRP is not a substitute for the NRC                     were intended to apply to every NRC
                                                regulations, and compliance with the                                                                          ADDRESSES: Please refer to Docket ID
                                                                                                        action which substantially changes the
                                                SRP is not required.                                                                                          NRC–2017–0110 when contacting the
                                                                                                        expectations of current and future
                                                                                                                                                              NRC about the availability of
                                                III. Backfitting and Issue Finality                     applicants.                                           information regarding this document.
                                                   Issuance of this draft SRP section, if                  The exceptions to the general                      You may obtain publicly-available
                                                finalized, would not constitute                         principle are applicable whenever an                  information related to this document
                                                backfitting as defined in 10 CFR 50.109                 applicant references a 10 CFR part 52                 using any of the following methods:
                                                of 10 CFR, (the Backfit Rule) or                        license (e.g., an early site permit) and/                • Federal Rulemaking Web site: Go to
                                                otherwise be inconsistent with the issue                or NRC regulatory approval (e.g., a                   http://www.regulations.gov and search
                                                finality provisions in 10 CFR part 52.                  design certification rule) with specified             for Docket ID NRC–2017–0110. Address
                                                The NRC’s position is based upon the                    issue finality provisions. The NRC staff              questions about NRC dockets to Carol
                                                following considerations.                               does not, at this time, intend to impose              Gallagher; telephone: 301–415–3463;
                                                   1. The draft SRP positions, if                       the positions represented in the draft                email: Carol.Gallagher@nrc.gov. For
                                                finalized, would not constitute                         SRP in a manner that is inconsistent                  technical questions, contact the
                                                backfitting, inasmuch as the SRP is                     with any issue finality provisions. If, in            individual listed in the FOR FURTHER
                                                internal guidance to NRC staff directed                 the future, the NRC staff seeks to impose             INFORMATION CONTACT section of this
                                                at the NRC staff with respect to their                  a position in the draft SRP in a manner               document.
                                                regulatory responsibilities.                                                                                     • NRC’s Agencywide Documents
SRADOVICH on DSK3GMQ082PROD with NOTICES




                                                                                                        which does not provide issue finality as
                                                   The SRP provides guidance to the                                                                           Access and Management System
                                                                                                        described in the applicable issue finality
                                                NRC staff on how to review an                                                                                 (ADAMS): You may obtain publicly-
                                                                                                        provisions, then the NRC staff must
                                                application for NRC regulatory approval                                                                       available documents online in the
                                                in the form of licensing. Changes in                    address the criteria for avoiding issue               ADAMS Public Documents collection at
                                                internal staff guidance are not matters                 finality provisions.                                  http://www.nrc.gov/reading-rm/
                                                for which either nuclear power plant                                                                          adams.html. To begin the search, select
                                                applicants or licensees are protected                     Dated at Rockville, Maryland, this 1st day          ‘‘ADAMS Public Documents’’ and then
                                                under either the Backfit Rule or the                    of May, 2017.                                         select ‘‘Begin Web-based ADAMS


                                           VerDate Sep<11>2014   17:43 May 04, 2017   Jkt 241001   PO 00000   Frm 00085   Fmt 4703   Sfmt 4703   E:\FR\FM\05MYN1.SGM   05MYN1



Document Created: 2018-11-08 08:39:27
Document Modified: 2018-11-08 08:39:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard Review Plan--draft section revision; request for comment.
DatesComments must be filed no later than July 5, 2017. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ContactMark D. Notich, Office of New Reactors, telephone: 301-415-3053; email [email protected]; U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation82 FR 21269 