82_FR_23335 82 FR 23238 - Union Electric Company, dba Ameren Missouri; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

82 FR 23238 - Union Electric Company, dba Ameren Missouri; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 97 (May 22, 2017)

Page Range23238-23238
FR Document2017-10374

Federal Register, Volume 82 Issue 97 (Monday, May 22, 2017)
[Federal Register Volume 82, Number 97 (Monday, May 22, 2017)]
[Notices]
[Page 23238]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-10374]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 459-335]


Union Electric Company, dba Ameren Missouri; Notice of 
Application Accepted for Filing, Soliciting Comments, Motions To 
Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Federal Energy Regulatory Commission and is available 
for public inspection:
    a. Type of Application: Shoreline Management Plan Update (SMP 
update).
    b. Project No: 459-335.
    c. Date Filed: March 28, 2017.
    d. Applicant: Union Electric Company, dba Ameren Missouri 
(licensee).
    e. Name of Project: Osage Hydroelectric Project.
    f. Location: The project is located on the Osage River in Benton, 
Camden, Miller, and Morgan counties, Missouri.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Jeff Green, Supervisor Shoreline Management, 
Union Electric Company, dba Ameren Missouri, 3000 S. Lindbergh Blvd., 
St. Louis, MO 63127; phone (573) 365-9214.
    i. FERC Contact: Shana High at 202-502-8674, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: June 15, 2017.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, and comments using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-459-335. Comments emailed to 
Commission staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee filed an (SMP update) 
pursuant to ordering paragraph (I) of the July 26, 2011 Order Modifying 
and Approving Shoreline Management Plan, which required an SMP update 
no later than March 31, 2017, and every 10 years thereafter. The SMP 
update details: Revisions to the Non-Conforming Structures sections to 
reflect the current status of the program; permitting guidance for 
proposed shoreline development on islands not owned by Ameren Missouri; 
permitting guidance for limited authorization of walkways, patios, and 
decks; a description of the current Dock Electrical Safety program; 
updates to Appendix B--Lake of the Ozarks Permit Requirements to 
reflect current permitting practices conforming to SMP policies; and 
removal of the consultation record supporting development of the prior 
versions of the SMP, and Appendix H that included the project's 
license.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling 202-502-8371. This filing may also be viewed on 
the Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 866-208-3676 or email 
[email protected], for TTY, call 202-502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above. Agencies may obtain copies of the application directly from the 
applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS; PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: May 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-10374 Filed 5-19-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  23238                           Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices

                                                    Dated: May 16, 2017.                                  The first page of any filing should                      m. Individuals desiring to be included
                                                  Kimberly D. Bose,                                       include docket number P–459–335.                      on the Commission’s mailing list should
                                                  Secretary.                                              Comments emailed to Commission staff                  so indicate by writing to the Secretary
                                                  [FR Doc. 2017–10375 Filed 5–19–17; 8:45 am]             are not considered part of the                        of the Commission.
                                                  BILLING CODE 6717–01–P
                                                                                                          Commission record.                                       n. Comments, Protests, or Motions to
                                                                                                             The Commission’s Rules of Practice                 Intervene: Anyone may submit
                                                                                                          and Procedure require all intervenors                 comments, a protest, or a motion to
                                                  DEPARTMENT OF ENERGY                                    filing documents with the Commission                  intervene in accordance with the
                                                                                                          to serve a copy of that document on                   requirements of Rules of Practice and
                                                  Federal Energy Regulatory                               each person whose name appears on the                 Procedure, 18 CFR 385.210, .211, .214,
                                                  Commission                                              official service list for the project.                respectively. In determining the
                                                                                                          Further, if an intervenor files comments              appropriate action to take, the
                                                  [Project No. 459–335]
                                                                                                          or documents with the Commission                      Commission will consider all protests or
                                                  Union Electric Company, dba Ameren                      relating to the merits of an issue that               other comments filed, but only those
                                                  Missouri; Notice of Application                         may affect the responsibilities of a                  who file a motion to intervene in
                                                  Accepted for Filing, Soliciting                         particular resource agency, they must                 accordance with the Commission’s
                                                  Comments, Motions To Intervene, and                     also serve a copy of the document on                  Rules may become a party to the
                                                  Protests                                                that resource agency.                                 proceeding. Any comments, protests, or
                                                                                                             k. Description of Request: The                     motions to intervene must be received
                                                     Take notice that the following                       licensee filed an (SMP update) pursuant               on or before the specified comment date
                                                  hydroelectric application has been filed                to ordering paragraph (I) of the July 26,             for the particular application.
                                                  with the Federal Energy Regulatory                                                                               o. Filing and Service of Documents:
                                                                                                          2011 Order Modifying and Approving
                                                  Commission and is available for public                                                                        Any filing must (1) bear in all capital
                                                                                                          Shoreline Management Plan, which
                                                  inspection:                                                                                                   letters the title COMMENTS; PROTEST,
                                                                                                          required an SMP update no later than
                                                     a. Type of Application: Shoreline                                                                          or MOTION TO INTERVENE as
                                                                                                          March 31, 2017, and every 10 years
                                                  Management Plan Update (SMP update).                                                                          applicable; (2) set forth in the heading
                                                                                                          thereafter. The SMP update details:
                                                     b. Project No: 459–335.                                                                                    the name of the applicant and the
                                                     c. Date Filed: March 28, 2017.                       Revisions to the Non-Conforming
                                                                                                                                                                project number of the application to
                                                     d. Applicant: Union Electric                         Structures sections to reflect the current
                                                                                                                                                                which the filing responds; (3) furnish
                                                  Company, dba Ameren Missouri                            status of the program; permitting
                                                                                                                                                                the name, address, and telephone
                                                  (licensee).                                             guidance for proposed shoreline
                                                                                                                                                                number of the person commenting,
                                                     e. Name of Project: Osage                            development on islands not owned by
                                                                                                                                                                protesting or intervening; and (4)
                                                  Hydroelectric Project.                                  Ameren Missouri; permitting guidance
                                                                                                                                                                otherwise comply with the requirements
                                                     f. Location: The project is located on               for limited authorization of walkways,
                                                                                                                                                                of 18 CFR 385.2001 through 385.2005.
                                                  the Osage River in Benton, Camden,                      patios, and decks; a description of the
                                                                                                                                                                All comments, motions to intervene, or
                                                  Miller, and Morgan counties, Missouri.                  current Dock Electrical Safety program;
                                                                                                                                                                protests must set forth their evidentiary
                                                     g. Filed Pursuant to: Federal Power                  updates to Appendix B—Lake of the
                                                                                                                                                                basis. Any filing made by an intervenor
                                                  Act, 16 U.S.C. 791a–825r.                               Ozarks Permit Requirements to reflect
                                                                                                                                                                must be accompanied by proof of
                                                     h. Applicant Contact: Jeff Green,                    current permitting practices conforming
                                                                                                                                                                service on all persons listed in the
                                                  Supervisor Shoreline Management,                        to SMP policies; and removal of the
                                                                                                                                                                service list prepared by the Commission
                                                  Union Electric Company, dba Ameren                      consultation record supporting
                                                                                                                                                                in this proceeding, in accordance with
                                                  Missouri, 3000 S. Lindbergh Blvd., St.                  development of the prior versions of the
                                                                                                                                                                18 CFR 385.2010.
                                                  Louis, MO 63127; phone (573) 365–                       SMP, and Appendix H that included the
                                                  9214.                                                   project’s license.                                      Dated: May 16, 2017.
                                                     i. FERC Contact: Shana High at 202–                     l. Locations of the Application: A                 Kimberly D. Bose,
                                                  502–8674, or shana.high@ferc.gov.                       copy of the application is available for              Secretary.
                                                     j. Deadline for filing comments,                     inspection and reproduction at the                    [FR Doc. 2017–10374 Filed 5–19–17; 8:45 am]
                                                  motions to intervene, and protests: June                Commission’s Public Reference Room,                   BILLING CODE 6717–01–P
                                                  15, 2017.                                               located at 888 First Street NE., Room
                                                     The Commission strongly encourages                   2A, Washington, DC 20426, or by calling
                                                  electronic filing. Please file motions to               202–502–8371. This filing may also be                 DEPARTMENT OF ENERGY
                                                  intervene, protests, and comments using                 viewed on the Commission’s Web site at
                                                  the Commission’s eFiling system at                      http://www.ferc.gov using the                         Federal Energy Regulatory
                                                  http://www.ferc.gov/docs-filing/                        ‘‘eLibrary’’ link. Enter the docket                   Commission
                                                  efiling.asp. Commenters can submit                      number excluding the last three digits in
                                                                                                                                                                Merchant Hydro Developers, LLC;
                                                  brief comments up to 6,000 characters,                  the docket number field to access the
                                                                                                                                                                Notice of Preliminary Permit
                                                  without prior registration, using the                   document. You may also register online
                                                                                                                                                                Application Accepted for Filing and
                                                  eComment system at http://                              at http://www.ferc.gov/docs-filing/
                                                                                                                                                                Soliciting Comments, Motions To
                                                  www.ferc.gov/docs-filing/                               esubscription.asp to be notified via
                                                                                                                                                                Intervene, and Competing Applications
                                                  ecomment.asp. You must include your                     email of new filings and issuances
                                                  name and contact information at the end                 related to this or other pending projects.              On January 18, 2017, Merchant Hydro
                                                  of your comments. For assistance,                       For assistance, call 866–208–3676 or                  Developers, LLC, filed an application for
mstockstill on DSK30JT082PROD with NOTICES




                                                  please contact FERC Online Support at                   email FERCOnlineSupport@ferc.gov, for                 a preliminary permit, pursuant to
                                                  FERCOnlineSupport@ferc.gov, (866)                       TTY, call 202–502–8659. A copy is also                section 4(f) of the Federal Power Act
                                                  208–3676 (toll free), or (202) 502–8659                 available for inspection and                          (FPA), proposing to study the feasibility
                                                  (TTY). In lieu of electronic filing, please             reproduction at the address in item (h)               of the Shaffer Mountain Pumped
                                                  send a paper copy to: Secretary, Federal                above. Agencies may obtain copies of                  Storage Hydroelectric Project to be
                                                  Energy Regulatory Commission, 888                       the application directly from the                     located in Bedford County,
                                                  First Street NE., Washington, DC 20426.                 applicant.                                            Pennsylvania. The sole purpose of a


                                             VerDate Sep<11>2014   23:17 May 19, 2017   Jkt 241001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\22MYN1.SGM   22MYN1



Document Created: 2018-11-08 08:49:52
Document Modified: 2018-11-08 08:49:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 23238 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR