82_FR_23336 82 FR 23239 - Great River Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

82 FR 23239 - Great River Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 97 (May 22, 2017)

Page Range23239-23240
FR Document2017-10385

Federal Register, Volume 82 Issue 97 (Monday, May 22, 2017)
[Federal Register Volume 82, Number 97 (Monday, May 22, 2017)]
[Notices]
[Pages 23239-23240]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-10385]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1892-030; Project No. 1855-050; Project No. 1904-078]


Great River Hydro, LLC; Notice of Applications Tendered for 
Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection.
    a. Type of Applications: New Major Licenses.
    b. Project Nos.: 1892-030, 1855-050, and 1904-078.
    c. Date Filed: May 1, 2017.
    d. Applicant: Great River Hydro, LLC (Great River Hydro).
    e. Names of Projects: Wilder, Bellows Falls, and Vernon 
Hydroelectric Projects.
    f. Location: The existing projects are located on the Connecticut 
River in Orange, Windsor, and Windham Counties, Vermont, and Grafton, 
Cheshire, and Sullivan Counties, New Hampshire. There are no federal 
lands within the project boundaries.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: John Ragonese, FERC License Manager, Great 
River Hydro, LLC, One Harbour Place, Suite 330, Portsmouth, NH 03801; 
Telephone: (603) 559-5513 or [email protected].
    i. FERC Contact: Brandon Cherry, (202) 502-8328 or 
[email protected].
    j. These applications are not ready for environmental analysis at 
this time.
    k. Project Descriptions:

Wilder Project

    The existing Wilder Project consists of: (1) A 1,546-foot-long, 59-
foot-high, concrete dam that includes: (a) A 400-foot-long non-
overflow, earthen embankment (north embankment); (b) a 232-foot-long 
non-overflow, concrete bulkhead; (c) a 208-foot-long concrete forebay; 
(d) a 526-foot-long concrete, gravity spillway that includes: (i) six 
30-foot-high, 36-foot-long tainter gates; (ii) four 17-foot-high, 50-
foot-wide stanchion flashboards; (iii) a 15-foot-high, 20-foot-long 
skimmer gate (north gate); and (iv) a 10-foot-high, 10-foot-long 
skimmer gate (south gate); and (e) a 180-foot-long non-overflow, 
earthen embankment (south embankment); (2) a 45-mile-long, 3,100-acre 
impoundment with a useable storage volume of 13,350 acre-feet between 
elevations 380 and 385 feet National Geodetic Vertical Datum of 1929 
(NGVD 29); (3) four approximately 25-foot-high, 20-foot-wide trashracks 
with 5-inch clear bar spacing and one approximately 28-foot-high, 20-
foot-wide trashrack with 1.625-inch clear bar spacing; (4) a 181-foot-
long, 50-foot-wide, 50-foot-high steel frame, brick powerhouse 
containing two 16.2-megawatt (MW) adjustable-blade Kaplan turbine-
generator units and one 3.2-MW vertical Francis turbine-generator unit 
for a total project capacity of 35.6 MW; (5) three concrete draft tubes 
ranging from 9.5 to 20.5 feet in diameter; (6) 13.8-kilovolt (kV) 
generator leads that connect the turbine-generator units to two 
substation transformers; (7) an approximately 580-foot-long, 6-foot-
wide fishway; and (8) appurtenant facilities.

Bellows Falls Project

    The existing Bellows Falls Project consists of: (1) A 643-foot-
long, 30-foot-high concrete dam that includes: (a) two 18-foot-high, 
115-foot-wide steel roller gates; (b) two 13-foot-high, 121-foot-wide 
stanchion flashboards; and (c) a 13-foot-high, 100-foot-wide stanchion 
flashboard; (2) a 26-mile-long, 2,804-acre impoundment with a useable 
storage volume of 7,467 acre-feet between elevations 288.63 and 291.63 
feet NGVD 29; (3) a 1,700-foot-long, 36- to 100-foot-wide, 29-foot-deep 
stone-lined power canal; (4) a 130.25-foot-wide concrete forebay that 
includes trashracks with 4-inch clear bar spacing; (5) a 186-foot-long, 
106-foot-wide, 52-foot-high steel frame, brick powerhouse containing 
three 13.6-MW vertical Francis turbine-generator units for a total 
project capacity of 40.8 MW; (6) three approximately 20-foot-high, 31-
foot-wide concrete draft tubes; (7) a 900-

[[Page 23240]]

foot-long tailrace; (8) a 12-foot-wide, 10-foot-high ice sluice; (9) 
three 80-foot-long, 6.6-kV generator leads that connect the turbine-
generator units to two step-up transformers; (10) a 920-foot-long, 8-
foot-wide fishway; (11) a concrete fish barrier dam in the bypassed 
reach; and (12) appurtenant facilities.

Vernon Project

    The existing Vernon Project consists of: (1) a 956-foot-long, 58-
foot-high concrete dam that includes: (a) 356-foot-long section 
integral to the powerhouse; and (b) a 600-foot-long overflow spillway 
section that includes: (i) a 9-foot-high, 6-foot-wide fishway sluice; 
(ii) a 13-foot-high, 13-foot-wide trash/ice sluice; (iii) two 20-foot-
high, 50-foot-wide tainter gates; (iv) four 10-foot-high, 50-foot-wide 
tainter gates; (v) two 10-foot-high, 50-foot-wide hydraulic panel bays; 
(vi) two 10-foot-high, 50-foot-wide stanchion bays; (vii) a 10-foot-
high, 42.5-foot-wide stanchion bay; and (viii) eight 7-foot-high, 9-
foot-wide hydraulic flood gates; (2) a 26-mile-long, 2,550-acre 
impoundment with a useable storage volume of 18,300 acre-feet between 
elevations 212.13 and 220.13 feet NGVD 29; (3) eight approximately 30-
foot-high trashracks with 1.75-inch clear bar spacing and two 
approximately 30-foot-high trashracks with 3.625-inch clear bar 
spacing; (4) a 356-foot-long, 55-foot-wide, 45-foot-high reinforced 
concrete, steel, and brick powerhouse containing four 2-MW vertical 
Francis turbine-generator units, four 4-MW vertical Kaplan turbine-
generator units, and two 4.2-MW vertical Francis turbine-generator 
units for a total project capacity of 32.4 MW; (5) ten concrete draft 
tubes ranging from 16 to 27 feet in diameter; (6) a 500-foot-long, 
13.8-kV underground generator lead that connects the turbine-generator 
units to two step-up transformers; (7) a 984-foot-long, 15-foot-wide 
fishway; (8) downstream fish passage facilities; and (9) appurtenant 
facilities.
    Great River Hydro operates all three projects in coordination and 
in a peaking mode. Average annual generation is approximately 161,739; 
247,373; and 162,557 MW-hours at the Wilder, Bellows Falls, and Vernon 
Projects, respectively. Great River Hydro is not proposing any new 
project facilities or changes to operation of these projects at this 
time.
    l. Locations of the Applications: Copies of the applications are 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). Copies are also available for inspection and reproduction 
at the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to these or other pending projects. For assistance, contact 
FERC Online Support.
    n. Procedural Schedule: In the final license applications, Great 
River Hydro states that it will file amended final license applications 
after it completes additional field work for two studies, conducts 
additional consultation with stakeholders on the study results, and 
models operational alternatives. After Great River Hydro completes and 
files the revised study reports and amended final license applications, 
Commission staff will issue a revised procedural schedule with target 
dates for the post-filing milestones listed below.

------------------------------------------------------------------------
                  Milestone                          Target  date
------------------------------------------------------------------------
Amended Final License Applications..........  TBD.
Notice of Acceptance/Notice of Ready for      TBD.
 Environmental Analysis.
Filing of recommendations, preliminary terms  TBD.
 and conditions, and fishway prescriptions.
Commission issues Draft Environmental Impact  TBD.
 Statement (EIS).
Comments on Draft EIS.......................  TBD.
Modified terms and conditions...............  TBD.
Commission issues Final EIS.................  TBD.
------------------------------------------------------------------------

    o. Final amendments to the applications must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: May 15, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-10385 Filed 5-19-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices                                              23239

                                                  preliminary permit, if issued, is to grant              Energy Regulatory Commission, 888                       k. Project Descriptions:
                                                  the permit holder priority to file a                    First Street NE., Washington, DC 20426.
                                                                                                                                                                Wilder Project
                                                  license application during the permit                   The first page of any filing should
                                                  term. A preliminary permit does not                     include docket number P–14832–000.                       The existing Wilder Project consists
                                                  authorize the permit holder to perform                     More information about this project,               of: (1) A 1,546-foot-long, 59-foot-high,
                                                  any land-disturbing activities or                       including a copy of the application, can              concrete dam that includes: (a) A 400-
                                                  otherwise enter upon lands or waters                    be viewed or printed on the ‘‘eLibrary’’              foot-long non-overflow, earthen
                                                  owned by others without the owners’                     link of the Commission’s Web site at                  embankment (north embankment); (b) a
                                                  express permission.                                     http://www.ferc.gov/docs-filing/                      232-foot-long non-overflow, concrete
                                                     The proposed project would consist of                elibrary.asp. Enter the docket number                 bulkhead; (c) a 208-foot-long concrete
                                                  the following: (1) A new upper reservoir                (P–14832) in the docket number field to               forebay; (d) a 526-foot-long concrete,
                                                  with a surface area of 100 acres and a                  access the document. For assistance,                  gravity spillway that includes: (i) six 30-
                                                  storage capacity of 1,500 acre-feet at a                contact FERC Online Support.                          foot-high, 36-foot-long tainter gates; (ii)
                                                  surface elevation of approximately 2,960                                                                      four 17-foot-high, 50-foot-wide
                                                                                                            Dated: May 15, 2017.                                stanchion flashboards; (iii) a 15-foot-
                                                  feet above mean sea level (msl) created
                                                  through construction of a new roller-                   Kimberly D. Bose,                                     high, 20-foot-long skimmer gate (north
                                                  compacted concrete or rock-filled dam                   Secretary.                                            gate); and (iv) a 10-foot-high, 10-foot-
                                                  and/or dike; (2) excavating a new lower                 [FR Doc. 2017–10372 Filed 5–19–17; 8:45 am]           long skimmer gate (south gate); and (e)
                                                  reservoir with a surface area of 33 acres               BILLING CODE 6717–01–P                                a 180-foot-long non-overflow, earthen
                                                  and a total storage capacity of 1,800                                                                         embankment (south embankment); (2) a
                                                  acre-feet at a surface elevation of 1,800                                                                     45-mile-long, 3,100-acre impoundment
                                                  feet msl; (3) a new 5,920-foot-long, 48-                DEPARTMENT OF ENERGY                                  with a useable storage volume of 13,350
                                                  inch-diameter penstock connecting the                                                                         acre-feet between elevations 380 and
                                                  upper and lower reservoirs; (4) a new                   Federal Energy Regulatory                             385 feet National Geodetic Vertical
                                                  150-foot-long, 50-foot-wide powerhouse                  Commission                                            Datum of 1929 (NGVD 29); (3) four
                                                  containing two turbine-generator units                  [Project No. 1892–030; Project No. 1855–              approximately 25-foot-high, 20-foot-
                                                  with a total rated capacity of 143                      050; Project No. 1904–078]                            wide trashracks with 5-inch clear bar
                                                  megawatts; (5) a new transmission line                                                                        spacing and one approximately 28-foot-
                                                  connecting the powerhouse to a nearby                   Great River Hydro, LLC; Notice of                     high, 20-foot-wide trashrack with 1.625-
                                                  electric grid interconnection point at the              Applications Tendered for Filing With                 inch clear bar spacing; (4) a 181-foot-
                                                  Shaffer Wind Farm; and (6) appurtenant                  the Commission and Establishing                       long, 50-foot-wide, 50-foot-high steel
                                                  facilities. Possible initial fill water and             Procedural Schedule for Licensing and                 frame, brick powerhouse containing two
                                                  make-up water would come from the                       Deadline for Submission of Final                      16.2-megawatt (MW) adjustable-blade
                                                  nearby Raystown Branch Juniata River,                   Amendments                                            Kaplan turbine-generator units and one
                                                  including groundwater. The proposed                                                                           3.2–MW vertical Francis turbine-
                                                  project would have an annual                               Take notice that the following                     generator unit for a total project capacity
                                                  generation of 520,671 megawatt-hours.                   hydroelectric applications have been                  of 35.6 MW; (5) three concrete draft
                                                     Applicant Contact: Adam Rousselle,                   filed with the Commission and are                     tubes ranging from 9.5 to 20.5 feet in
                                                  Merchant Hydro Developers, LLC, 5710                    available for public inspection.                      diameter; (6) 13.8-kilovolt (kV)
                                                  Oak Crest Drive, Doylestown, PA 18902;                     a. Type of Applications: New Major                 generator leads that connect the turbine-
                                                  phone: 267–254–6107.                                    Licenses.                                             generator units to two substation
                                                     FERC Contact: Monir Chowdhury;                          b. Project Nos.: 1892–030, 1855–050,               transformers; (7) an approximately 580-
                                                  phone: (202) 502–6736.                                  and 1904–078.                                         foot-long, 6-foot-wide fishway; and (8)
                                                     Deadline for filing comments, motions                   c. Date Filed: May 1, 2017.                        appurtenant facilities.
                                                  to intervene, competing applications                       d. Applicant: Great River Hydro, LLC
                                                  (without notices of intent), or notices of              (Great River Hydro).                                  Bellows Falls Project
                                                  intent to file competing applications: 60                  e. Names of Projects: Wilder, Bellows                 The existing Bellows Falls Project
                                                  days from the issuance of this notice.                  Falls, and Vernon Hydroelectric                       consists of: (1) A 643-foot-long, 30-foot-
                                                  Competing applications and notices of                   Projects.                                             high concrete dam that includes: (a) two
                                                  intent must meet the requirements of 18                    f. Location: The existing projects are             18-foot-high, 115-foot-wide steel roller
                                                  CFR 4.36.                                               located on the Connecticut River in                   gates; (b) two 13-foot-high, 121-foot-
                                                     The Commission strongly encourages                   Orange, Windsor, and Windham                          wide stanchion flashboards; and (c) a
                                                  electronic filing. Please file comments,                Counties, Vermont, and Grafton,                       13-foot-high, 100-foot-wide stanchion
                                                  motions to intervene, notices of intent,                Cheshire, and Sullivan Counties, New                  flashboard; (2) a 26-mile-long, 2,804-
                                                  and competing applications using the                    Hampshire. There are no federal lands                 acre impoundment with a useable
                                                  Commission’s eFiling system at http://                  within the project boundaries.                        storage volume of 7,467 acre-feet
                                                  www.ferc.gov/docs-filing/efiling.asp.                      g. Filed Pursuant to: Federal Power                between elevations 288.63 and 291.63
                                                  Commenters can submit brief comments                    Act, 16 U.S.C. 791(a)–825(r).                         feet NGVD 29; (3) a 1,700-foot-long, 36-
                                                  up to 6,000 characters, without prior                      h. Applicant Contact: John Ragonese,               to 100-foot-wide, 29-foot-deep stone-
                                                  registration, using the eComment system                 FERC License Manager, Great River                     lined power canal; (4) a 130.25-foot-
                                                  at http://www.ferc.gov/docs-filing/                     Hydro, LLC, One Harbour Place, Suite                  wide concrete forebay that includes
                                                  ecomment.asp. You must include your                     330, Portsmouth, NH 03801; Telephone:                 trashracks with 4-inch clear bar spacing;
mstockstill on DSK30JT082PROD with NOTICES




                                                  name and contact information at the end                 (603) 559–5513 or jragonese@                          (5) a 186-foot-long, 106-foot-wide, 52-
                                                  of your comments. For assistance,                       greatriverhydro.com.                                  foot-high steel frame, brick powerhouse
                                                  please contact FERC Online Support at                      i. FERC Contact: Brandon Cherry,                   containing three 13.6–MW vertical
                                                  FERCOnlineSupport@ferc.gov, (866)                       (202) 502–8328 or brandon.cherry@                     Francis turbine-generator units for a
                                                  208–3676 (toll free), or (202) 502–8659                 ferc.gov.                                             total project capacity of 40.8 MW; (6)
                                                  (TTY). In lieu of electronic filing, please                j. These applications are not ready for            three approximately 20-foot-high, 31-
                                                  send a paper copy to: Secretary, Federal                environmental analysis at this time.                  foot-wide concrete draft tubes; (7) a 900-


                                             VerDate Sep<11>2014   23:17 May 19, 2017   Jkt 241001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\22MYN1.SGM   22MYN1


                                                  23240                           Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices

                                                  foot-long tailrace; (8) a 12-foot-wide, 10-             number excluding the last three digits in             DEPARTMENT OF ENERGY
                                                  foot-high ice sluice; (9) three 80-foot-                the docket number field to access the
                                                  long, 6.6-kV generator leads that                       document. For assistance, please contact              Federal Energy Regulatory
                                                  connect the turbine-generator units to                  FERC Online Support at                                Commission
                                                  two step-up transformers; (10) a 920-                   FERCOnlineSupport@ferc.gov, (866)                     [Project No. 14831–000]
                                                  foot-long, 8-foot-wide fishway; (11) a                  208–3676 (toll free), or (202) 502–8659
                                                  concrete fish barrier dam in the                        (TTY). Copies are also available for                  Merchant Hydro Developers, LLC;
                                                  bypassed reach; and (12) appurtenant                    inspection and reproduction at the                    Notice of Preliminary Permit
                                                  facilities.                                             address in item (h) above.                            Application Accepted for Filing And
                                                  Vernon Project                                                                                                Soliciting Comments, Motions To
                                                                                                             m. You may also register online at                 Intervene, and Competing Applications
                                                     The existing Vernon Project consists                 http://www.ferc.gov/docs-filing/
                                                  of: (1) a 956-foot-long, 58-foot-high                   esubscription.asp to be notified via                     On January 18, 2017, Merchant Hydro
                                                  concrete dam that includes: (a) 356-foot-               email of new filings and issuances                    Developers, LLC, filed an application for
                                                  long section integral to the powerhouse;                related to these or other pending                     a preliminary permit, pursuant to
                                                  and (b) a 600-foot-long overflow                        projects. For assistance, contact FERC                section 4(f) of the Federal Power Act
                                                  spillway section that includes: (i) a 9-                Online Support.                                       (FPA), proposing to study the feasibility
                                                  foot-high, 6-foot-wide fishway sluice;                                                                        of the Savage Mountain Pumped Storage
                                                  (ii) a 13-foot-high, 13-foot-wide trash/ice                n. Procedural Schedule: In the final               Hydroelectric Project to be located in
                                                  sluice; (iii) two 20-foot-high, 50-foot-                license applications, Great River Hydro               Allegany County, Maryland. The sole
                                                  wide tainter gates; (iv) four 10-foot-high,             states that it will file amended final                purpose of a preliminary permit, if
                                                  50-foot-wide tainter gates; (v) two 10-                 license applications after it completes               issued, is to grant the permit holder
                                                  foot-high, 50-foot-wide hydraulic panel                 additional field work for two studies,                priority to file a license application
                                                  bays; (vi) two 10-foot-high, 50-foot-wide               conducts additional consultation with                 during the permit term. A preliminary
                                                  stanchion bays; (vii) a 10-foot-high,                   stakeholders on the study results, and                permit does not authorize the permit
                                                  42.5-foot-wide stanchion bay; and (viii)                models operational alternatives. After                holder to perform any land-disturbing
                                                  eight 7-foot-high, 9-foot-wide hydraulic                Great River Hydro completes and files                 activities or otherwise enter upon lands
                                                  flood gates; (2) a 26-mile-long, 2,550-                 the revised study reports and amended                 or waters owned by others without the
                                                  acre impoundment with a useable                         final license applications, Commission                owners’ express permission.
                                                  storage volume of 18,300 acre-feet                      staff will issue a revised procedural                    The proposed project would consist of
                                                  between elevations 212.13 and 220.13                    schedule with target dates for the post-              the following: (1) A new upper reservoir
                                                  feet NGVD 29; (3) eight approximately                   filing milestones listed below.                       with a surface area of 75 acres and a
                                                  30-foot-high trashracks with 1.75-inch                                                                        storage capacity of 1,125 acre-feet at a
                                                  clear bar spacing and two approximately                                                             Target    surface elevation of approximately 2,800
                                                                                                                        Milestone                               feet above mean sea level (msl) created
                                                  30-foot-high trashracks with 3.625-inch                                                              date
                                                  clear bar spacing; (4) a 356-foot-long, 55-                                                                   through construction of a new roller-
                                                  foot-wide, 45-foot-high reinforced                      Amended Final License Applica-             TBD.       compacted concrete or rock-filled dam
                                                  concrete, steel, and brick powerhouse                      tions.                                             and/or dike; (2) excavating a new lower
                                                  containing four 2–MW vertical Francis                   Notice of Acceptance/Notice of             TBD.       reservoir with a surface area of 50 acres
                                                  turbine-generator units, four 4–MW                         Ready for Environmental Anal-                      and a total storage capacity of 1,350
                                                                                                             ysis.
                                                  vertical Kaplan turbine-generator units,                                                                      acre-feet at a surface elevation of 1,820
                                                                                                          Filing of recommendations, prelimi-        TBD.
                                                  and two 4.2–MW vertical Francis                            nary terms and conditions, and
                                                                                                                                                                feet msl; (3) a new 6,762-foot-long, 48-
                                                  turbine-generator units for a total project                fishway prescriptions.                             inch-diameter penstock connecting the
                                                  capacity of 32.4 MW; (5) ten concrete                   Commission issues Draft Environ-           TBD.       upper and lower reservoirs; (4) a new
                                                  draft tubes ranging from 16 to 27 feet in                  mental Impact Statement (EIS).                     150-foot-long, 50-foot-wide powerhouse
                                                  diameter; (6) a 500-foot-long, 13.8-kV                  Comments on Draft EIS ..................   TBD.       containing two turbine-generator units
                                                  underground generator lead that                         Modified terms and conditions ........     TBD.       with a total rated capacity of 90
                                                  connects the turbine-generator units to                 Commission issues Final EIS .........      TBD.       megawatts; (5) a new transmission line
                                                  two step-up transformers; (7) a 984-foot-                                                                     connecting the powerhouse to a nearby
                                                  long, 15-foot-wide fishway; (8)                                                                               electric grid interconnection point at the
                                                                                                            o. Final amendments to the
                                                  downstream fish passage facilities; and                                                                       Savage Mountain Wind Farm; and (6)
                                                                                                          applications must be filed with the
                                                  (9) appurtenant facilities.                                                                                   appurtenant facilities. Possible initial
                                                     Great River Hydro operates all three                 Commission no later than 30 days from
                                                                                                                                                                fill water and make-up water would
                                                  projects in coordination and in a                       the issuance date of the notice of ready
                                                                                                                                                                come from the nearby Casselman River,
                                                  peaking mode. Average annual                            for environmental analysis.                           including groundwater. The proposed
                                                  generation is approximately 161,739;                      Dated: May 15, 2017.                                project would have an annual
                                                  247,373; and 162,557 MW-hours at the                    Kimberly D. Bose,                                     generation of 329,908 megawatt-hours.
                                                  Wilder, Bellows Falls, and Vernon                                                                                Applicant Contact: Adam Rousselle,
                                                                                                          Secretary.
                                                  Projects, respectively. Great River Hydro                                                                     Merchant Hydro Developers, LLC, 5710
                                                                                                          [FR Doc. 2017–10385 Filed 5–19–17; 8:45 am]
                                                  is not proposing any new project                                                                              Oak Crest Drive, Doylestown, PA 18902;
                                                  facilities or changes to operation of                   BILLING CODE 6717–01–P
                                                                                                                                                                phone: 267–254–6107.
                                                  these projects at this time.                                                                                     FERC Contact: Monir Chowdhury;
mstockstill on DSK30JT082PROD with NOTICES




                                                     l. Locations of the Applications:                                                                          phone: (202) 502–6736.
                                                  Copies of the applications are available                                                                         Deadline for filing comments, motions
                                                  for review at the Commission in the                                                                           to intervene, competing applications
                                                  Public Reference Room or may be                                                                               (without notices of intent), or notices of
                                                  viewed on the Commission’s Web site at                                                                        intent to file competing applications: 60
                                                  http://www.ferc.gov using the                                                                                 days from the issuance of this notice.
                                                  ‘‘eLibrary’’ link. Enter the docket                                                                           Competing applications and notices of


                                             VerDate Sep<11>2014   23:17 May 19, 2017   Jkt 241001   PO 00000   Frm 00071   Fmt 4703   Sfmt 4703   E:\FR\FM\22MYN1.SGM   22MYN1



Document Created: 2018-11-08 08:51:11
Document Modified: 2018-11-08 08:51:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 23239 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR