82_FR_26883 82 FR 26773 - Bitterroot National Forest, Stevensville Ranger District, Montana; Gold Butterfly Project

82 FR 26773 - Bitterroot National Forest, Stevensville Ranger District, Montana; Gold Butterfly Project

DEPARTMENT OF AGRICULTURE
Forest Service

Federal Register Volume 82, Issue 110 (June 9, 2017)

Page Range26773-26774
FR Document2017-11979

The USDA Forest Service, Bitterroot National Forest will prepare an environmental impact statement (EIS) for the proposed Gold Butterfly project under the authorities in the Healthy Forest Restoration Act (HFRA) as amended by the Agricultural Act of 2014. The Gold Butterfly EIS will analyze and disclose the effects of treatments proposed on about 10,495 acres of national forest land in the Sapphire Mountains between the confluence of Gold Creek and Burnt Fork of the Bitterroot River to the north and Saint Clair Creek to the south. The Gold Butterfly project area is bounded on the west by the National Forest boundary with private land and on the east by the Stoney Mountain Inventoried Roadless Area (IRA). The Gold Butterfly project area is located about 10 miles southeast of Stevensville and seven miles east of Corvallis, Montana, in Ravalli County.

Federal Register, Volume 82 Issue 110 (Friday, June 9, 2017)
[Federal Register Volume 82, Number 110 (Friday, June 9, 2017)]
[Notices]
[Pages 26773-26774]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-11979]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Forest Service


Bitterroot National Forest, Stevensville Ranger District, 
Montana; Gold Butterfly Project

AGENCY: Forest Service, USDA.

ACTION: Notice of intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The USDA Forest Service, Bitterroot National Forest will 
prepare an environmental impact statement (EIS) for the proposed Gold 
Butterfly project under the authorities in the Healthy Forest 
Restoration Act (HFRA) as amended by the Agricultural Act of 2014. The 
Gold Butterfly EIS will analyze and disclose the effects of treatments 
proposed on about 10,495 acres of national forest land in the Sapphire 
Mountains between the confluence of Gold Creek and Burnt Fork of the 
Bitterroot River to the north and Saint Clair Creek to the south. The 
Gold Butterfly project area is bounded on the west by the National 
Forest boundary with private land and on the east by the Stoney 
Mountain Inventoried Roadless Area (IRA). The Gold Butterfly project 
area is located about 10 miles southeast of Stevensville and seven 
miles east of Corvallis, Montana, in Ravalli County.

DATES: Comments concerning the scope of the analysis must be received 
by July 10, 2017. The draft environmental impact statement is expected 
March 2018 and the final environmental impact statement is expected 
July 2018.

ADDRESSES: Send written comments to Tami Sabol, Stevensville District 
Ranger, 88 Main St., Stevensville, MT 59870. Comments may also be sent 
via email to comments-northern-bitterroot-stevensville@fs.fed.us or via 
facsimile to 406-777-7423.

FOR FURTHER INFORMATION CONTACT: Sara Grove, South Zone 
Interdisciplinary Team Leader, phone number 406-375-2608 or email: 
sgrove@fs.fed.us or Marilyn Wildey, Hydrology Technician, phone number 
406-363-7101 or email: mwildey@fs.fed.us. Their mailing address is: 
1801 North 1st Street, Hamilton, MT 59840-3114.
    Individuals who use telecommunication devices for the deaf (TDD) 
may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.

SUPPLEMENTARY INFORMATION: The Stevensville District Ranger proposes 
forest management on approximately 10,495 acres in the Gold Butterfly 
project area. The project is in the Sapphire Mountains on the 
Bitterroot National Forest (T.6N.R.18W. sec. 1-12, 16-20, 29, 30; 
T.6N.R.19W. sec. 1, 2, 10-15, 22-27; T.7N.R18W. sec. 2-36,T.7; N.R.19W. 
sec. 1, 2, 11-14, 22-27, 34-36; T.8N.R.18W. sec. 20, 21, 28-34) about 
seven miles east of Corvallis, Montana in Ravalli County.

Purpose and Need for Action

    Most of the project area considered for treatment is designated as 
part of the insect and disease treatment program (HFRA Title VI sec. 
602). Forests in the project area are at moderate to high hazard for 
insects and diseases, such as western spruce budworm, Douglas-fir bark 
beetle, mountain pine beetle, and dwarf mistletoe. Current forest 
conditions provide opportunities to regenerate forest stands, modify 
forest structures to reduce insect and disease hazard, and research 
management strategies that perpetuate whitebark pine. In addition to 
improving forest resilience to disturbances, these treatments would 
provide a sustainable supply of timber and provide related employment 
opportunities.
    Terrain and road development in parts of the project area have 
created areas that contribute sediment to adjacent streams. These road 
sections typically end at a trailhead. Moving the trailhead to 
locations further from the streams and converting the roads to walking 
trails would reduce sediment in the streams and improve bull trout 
habitat.
    The purpose and need for the Gold Butterfly project is to: (1) 
Improve landscape resilience to disturbances (such as insects, 
diseases, and fire) by modifying forest structure and composition, and 
fuels; (2) provide timber products and related jobs; (3) reduce erosion 
sources in Willow Creek and Burnt Fork of the Bitterroot River 
watersheds to improve water quality and bull trout habitat; (4) restore 
or improve key habitat areas such as, meadows, aspen, and whitebark 
pine.

Proposed Action

    Commercial timber harvest is proposed on about 7,711 acres, and 
non-commercial thinning on about 2,784 acres. In addition, most 
treatment units

[[Page 26774]]

would be followed by some form of prescribed fire (pile burning, 
underburn). Approximately seven miles of permanent, national forest 
system road (NFSR) and 27 miles of temporary road will be needed to 
support timber haul from the project area. The new system roads would 
be closed and the temporary roads would be rehabilitated after harvest.
    The Stoney Mountain IRA is adjacent to the project area. No road 
construction is proposed in the IRA, however, prescribed burning and 
some timber harvest may occur.
    A plan amendment to the Bitterroot National Forest Plan may be 
required to provide a project-specific variance for four standards. The 
2012 Planning Rule (36 CFR 219) requires notice of which substantive 
requirements of Sec. Sec.  219.8 through 219.11 are likely to be 
related to the amendment. Suspension of the coarse woody debris 
amendment is likely related to the requirements for soils and soil 
productivity at Sec.  219.8(a)(2)(ii). Suspension of the old growth 
standard is likely related to the requirement to maintain or restore 
key ecosystem characteristics a Sec.  219.9(a)(2)(i). Suspension of the 
winter range thermal cover and elk habitat effectiveness standards are 
likely related to the consideration of habitat conditions for wildlife 
commonly used and enjoyed by the public at Sec.  219.10(a)(5).
    The Forest Service proposes the following actions in the Gold 
Butterfly project area: (1) Harvest, thin, and prescribe burn units 
with Douglas-fir beetle, mountain pine beetle, western spruce budworm, 
or dwarf mistletoe, (2) harvest, thin, and prescribe burn natural 
meadows that are being colonized by trees, (3) harvest or thin conifers 
from declining aspen clones, (4) harvest, thin, or prescribe burn areas 
to improve conditions for whitebark pine, (5) close Burnt Fork Rd. at 
the Gold Creek campground and move the Gold Creek trailhead to the Gold 
Creek campground, (6) close NFSR 969A at the junction with NFSR 969 
(Willow Creek Rd.), move the trailhead to the junction, and develop 
trailhead facilities, (7) construct specified and temporary roads to 
support timber removal from the forest, (8) upgrade road conditions on 
NFSR 364 and 969 with the application of best management practices, (9) 
build a crossing (temporary/permanent) where NFSR 13131 crosses North 
Fork of Willow Creek, (10) decommission NFSR 13111 from the junction 
with NFSR 364 where the road encroaches on Butterfly Creek and 
construct an alternative route away from the stream, and (11) 
decommission or store upland roads in the Willow Creek watershed as 
decided in the Travel Plan, especially those roads that encroach on 
streams.

Responsible Official

    Julie K. King, Bitterroot National Forest Supervisor, 1801 N. 
First, Hamilton, Montana 59840-3114 is the Forest Service official who 
will make the decision on the Gold Butterfly project.

Nature of Decision To Be Made

    The Responsible Official will select the proposed action, an 
alternative to the proposed action (including the no action 
alternative), or modify the proposed action or alternatives to the 
proposed action. The decision may include an amendment to the 
Bitterroot National Forest Plan to provide a project-specific variance 
to four standards for coarse woody debris, winter range thermal cover, 
elk habitat effectiveness, and old growth.

Preliminary Issues

    The number of crossings over streams and road segments directly 
adjacent to streams are preliminary issues the Forest Service 
identified in the project area. Timber haul on roads in these 
situations have the potential to increase the sediment load in the 
adjacent streams that may negatively affect sediment levels and bull 
trout habitat.

Scoping Process

    This notice of intent initiates the scoping process, which guides 
the development of the environmental impact statement. Other 
opportunities for public comment will occur through the scoping process 
at public meetings and field trips that will be announced in local 
newspapers, radio stations, and social media. A comment period will 
also be available on the draft EIS. Scoping comments that are helpful 
to the project analysis focus on resource conditions or potential 
resource conflicts specific to the project area.
    It is important that reviewers provide their comments at such times 
and in such manner that they are useful to the agency's preparation of 
the environmental impact statement. Therefore, comments should be 
provided prior to the close of the comment period and should clearly 
articulate the reviewer's concerns and contentions.
    Comments received in response to this solicitation, including names 
and addresses of those who comment, will be part of the public record 
for this proposed action. Comments submitted anonymously will be 
accepted and considered, however.

    Dated: April 25, 2017.
Jeanne M. Higgins,
Acting Associate Deputy Chief, National Forest System.
[FR Doc. 2017-11979 Filed 6-8-17; 8:45 am]
 BILLING CODE 3411-15-P



                                                                                   Federal Register / Vol. 82, No. 110 / Friday, June 9, 2017 / Notices                                            26773

                                                  would also provide the commenter with                   with the ability to provide the                           Individuals who use
                                                  eligibility to object.                                  respondent with subsequent                             telecommunication devices for the deaf
                                                                                                          environmental documents.                               (TDD) may call the Federal Information
                                                  Responsible Official
                                                                                                            Dated: May 26, 2017.                                 Relay Service (FIRS) at 1–800–877–8339
                                                    Forest Supervisor, Superior National                                                                         between 8 a.m. and 8 p.m., Eastern
                                                                                                          Glenn P. Casamassa,
                                                  Forest.                                                                                                        Time, Monday through Friday.
                                                                                                          Associate Deputy Chief, National Forest
                                                  Nature of Decision To Be Made                           System.                                                SUPPLEMENTARY INFORMATION: The
                                                                                                          [FR Doc. 2017–11980 Filed 6–8–17; 8:45 am]             Stevensville District Ranger proposes
                                                     An Environmental Impact Statement                                                                           forest management on approximately
                                                  for the Hi Lo Project will evaluate site-               BILLING CODE 3411–15–P
                                                                                                                                                                 10,495 acres in the Gold Butterfly
                                                  specific issues, consider management                                                                           project area. The project is in the
                                                  alternatives, and analyze potential                                                                            Sapphire Mountains on the Bitterroot
                                                  effects of the proposed action and                      DEPARTMENT OF AGRICULTURE
                                                                                                                                                                 National Forest (T.6N.R.18W. sec. 1–12,
                                                  alternatives. This analysis will include                Forest Service                                         16–20, 29, 30; T.6N.R.19W. sec. 1, 2,
                                                  the project specific Forest Plan                                                                               10–15, 22–27; T.7N.R18W. sec. 2–
                                                  Amendment needed to conduct                             Bitterroot National Forest, Stevensville               36,T.7; N.R.19W. sec. 1, 2, 11–14, 22–
                                                  prescribed burning in the Wilderness.                   Ranger District, Montana; Gold                         27, 34–36; T.8N.R.18W. sec. 20, 21, 28–
                                                  The scope of the project is limited to                  Butterfly Project                                      34) about seven miles east of Corvallis,
                                                  decisions concerning activities within                                                                         Montana in Ravalli County.
                                                  the Hi Lo Project Area that meet the                    AGENCY: Forest Service, USDA.
                                                  purpose and need. An Environmental                      ACTION:Notice of intent to prepare an                  Purpose and Need for Action
                                                  Impact Statement will provide the                       environmental impact statement.                           Most of the project area considered for
                                                  responsible official with the information               SUMMARY:    The USDA Forest Service,                   treatment is designated as part of the
                                                  needed to decide which actions, if any,                 Bitterroot National Forest will prepare                insect and disease treatment program
                                                  to approve.                                             an environmental impact statement                      (HFRA Title VI sec. 602). Forests in the
                                                                                                          (EIS) for the proposed Gold Butterfly                  project area are at moderate to high
                                                  Preliminary Issues
                                                                                                          project under the authorities in the                   hazard for insects and diseases, such as
                                                    Issues identified during the original                                                                        western spruce budworm, Douglas-fir
                                                                                                          Healthy Forest Restoration Act (HFRA)
                                                  scoping period (August 2016) included                                                                          bark beetle, mountain pine beetle, and
                                                                                                          as amended by the Agricultural Act of
                                                  prescribed burning in the Wilderness,                                                                          dwarf mistletoe. Current forest
                                                                                                          2014. The Gold Butterfly EIS will
                                                  harvesting within Forest Plan IRAs,                                                                            conditions provide opportunities to
                                                                                                          analyze and disclose the effects of
                                                  blowdown, site-specific vegetation                                                                             regenerate forest stands, modify forest
                                                                                                          treatments proposed on about 10,495
                                                  management, and associated temporary                    acres of national forest land in the                   structures to reduce insect and disease
                                                  road construction.                                      Sapphire Mountains between the                         hazard, and research management
                                                  Permits or Licenses Required                            confluence of Gold Creek and Burnt                     strategies that perpetuate whitebark
                                                                                                          Fork of the Bitterroot River to the north              pine. In addition to improving forest
                                                    Easement or permission to cross                                                                              resilience to disturbances, these
                                                                                                          and Saint Clair Creek to the south. The
                                                  nonfederal property may be needed to                                                                           treatments would provide a sustainable
                                                                                                          Gold Butterfly project area is bounded
                                                  access some treatment units to                                                                                 supply of timber and provide related
                                                                                                          on the west by the National Forest
                                                  implement Forest Service activities.                                                                           employment opportunities.
                                                                                                          boundary with private land and on the
                                                  Scoping Process                                         east by the Stoney Mountain                               Terrain and road development in
                                                                                                          Inventoried Roadless Area (IRA). The                   parts of the project area have created
                                                    This notice of intent initiates the                                                                          areas that contribute sediment to
                                                  scoping process, which guides the                       Gold Butterfly project area is located
                                                                                                          about 10 miles southeast of Stevensville               adjacent streams. These road sections
                                                  development of the Environmental                                                                               typically end at a trailhead. Moving the
                                                  Impact Statement. This will be the                      and seven miles east of Corvallis,
                                                                                                          Montana, in Ravalli County.                            trailhead to locations further from the
                                                  initial scoping to include a project-level                                                                     streams and converting the roads to
                                                  Forest Plan Amendment in the EIS. The                   DATES: Comments concerning the scope
                                                                                                                                                                 walking trails would reduce sediment in
                                                  previously scoped proposed action                       of the analysis must be received by July
                                                                                                                                                                 the streams and improve bull trout
                                                  (August 2016) guided us to initiate an                  10, 2017. The draft environmental
                                                                                                                                                                 habitat.
                                                  EIS and Forest Plan Amendment.                          impact statement is expected March                        The purpose and need for the Gold
                                                    It is important that reviewers provide                2018 and the final environmental                       Butterfly project is to: (1) Improve
                                                  their comments at such times and in                     impact statement is expected July 2018.                landscape resilience to disturbances
                                                  such manner that they are useful to the                 ADDRESSES: Send written comments to                    (such as insects, diseases, and fire) by
                                                  agency’s preparation of the                             Tami Sabol, Stevensville District                      modifying forest structure and
                                                  Environmental Impact Statement.                         Ranger, 88 Main St., Stevensville, MT                  composition, and fuels; (2) provide
                                                  Therefore, comments should be                           59870. Comments may also be sent via                   timber products and related jobs; (3)
                                                  provided prior to the close of the                      email to comments-northern-bitterroot-                 reduce erosion sources in Willow Creek
                                                  comment period and should clearly                       stevensville@fs.fed.us or via facsimile to             and Burnt Fork of the Bitterroot River
                                                  articulate the reviewer’s concerns and                  406–777–7423.                                          watersheds to improve water quality
                                                  contentions.                                            FOR FURTHER INFORMATION CONTACT: Sara                  and bull trout habitat; (4) restore or
                                                    Comments received in response to                      Grove, South Zone Interdisciplinary                    improve key habitat areas such as,
mstockstill on DSK30JT082PROD with NOTICES




                                                  this solicitation, including names and                  Team Leader, phone number 406–375–                     meadows, aspen, and whitebark pine.
                                                  addresses of those who comment, will                    2608 or email: sgrove@fs.fed.us or
                                                  be part of the public record for this                   Marilyn Wildey, Hydrology Technician,                  Proposed Action
                                                  proposed action. Comments submitted                     phone number 406–363–7101 or email:                      Commercial timber harvest is
                                                  anonymously will be accepted and                        mwildey@fs.fed.us. Their mailing                       proposed on about 7,711 acres, and non-
                                                  considered; however, anonymous                          address is: 1801 North 1st Street,                     commercial thinning on about 2,784
                                                  comments will not provide the Agency                    Hamilton, MT 59840–3114.                               acres. In addition, most treatment units


                                             VerDate Sep<11>2014   19:25 Jun 08, 2017   Jkt 241001   PO 00000   Frm 00002   Fmt 4703   Sfmt 4703   E:\FR\FM\09JNN1.SGM   09JNN1


                                                  26774                            Federal Register / Vol. 82, No. 110 / Friday, June 9, 2017 / Notices

                                                  would be followed by some form of                       the Willow Creek watershed as decided                    Dated: April 25, 2017.
                                                  prescribed fire (pile burning,                          in the Travel Plan, especially those                   Jeanne M. Higgins,
                                                  underburn). Approximately seven miles                   roads that encroach on streams.                        Acting Associate Deputy Chief, National
                                                  of permanent, national forest system                                                                           Forest System.
                                                                                                          Responsible Official
                                                  road (NFSR) and 27 miles of temporary                                                                          [FR Doc. 2017–11979 Filed 6–8–17; 8:45 am]
                                                  road will be needed to support timber                     Julie K. King, Bitterroot National                   BILLING CODE 3411–15–P
                                                  haul from the project area. The new                     Forest Supervisor, 1801 N. First,
                                                  system roads would be closed and the                    Hamilton, Montana 59840–3114 is the
                                                  temporary roads would be rehabilitated                  Forest Service official who will make
                                                                                                                                                                 COMMISSION ON CIVIL RIGHTS
                                                  after harvest.                                          the decision on the Gold Butterfly
                                                     The Stoney Mountain IRA is adjacent                  project.                                               Sunshine Act Meeting Notice
                                                  to the project area. No road construction
                                                                                                          Nature of Decision To Be Made                          AGENCY:  United States Commission on
                                                  is proposed in the IRA, however,
                                                  prescribed burning and some timber                         The Responsible Official will select                Civil Rights.
                                                  harvest may occur.                                      the proposed action, an alternative to                 ACTION: Notice of Commission briefing
                                                     A plan amendment to the Bitterroot                   the proposed action (including the no                  and business meeting.
                                                  National Forest Plan may be required to                 action alternative), or modify the
                                                  provide a project-specific variance for                 proposed action or alternatives to the                 DATES:  Friday, June 16, 2017, at 9:30
                                                  four standards. The 2012 Planning Rule                  proposed action. The decision may                      a.m. EST.
                                                  (36 CFR 219) requires notice of which                   include an amendment to the Bitterroot                 ADDRESSES: Place: National Place
                                                  substantive requirements of §§ 219.8                    National Forest Plan to provide a                      Building, 1331 Pennsylvania Ave. NW.,
                                                  through 219.11 are likely to be related                 project-specific variance to four                      11th Floor, Suite 1150, Washington, DC
                                                  to the amendment. Suspension of the                     standards for coarse woody debris,                     20245 (Entrance on F Street NW.).
                                                  coarse woody debris amendment is                        winter range thermal cover, elk habitat
                                                                                                                                                                 FOR FURTHER INFORMATION CONTACT:
                                                  likely related to the requirements for                  effectiveness, and old growth.
                                                  soils and soil productivity at                                                                                 Brian Walch, phone: (202) 376–8371;
                                                  § 219.8(a)(2)(ii). Suspension of the old                Preliminary Issues                                     TTY: (202) 376–8116; email:
                                                  growth standard is likely related to the                   The number of crossings over streams                publicaffairs@usccr.gov.
                                                  requirement to maintain or restore key                  and road segments directly adjacent to                 SUPPLEMENTARY INFORMATION: This
                                                  ecosystem characteristics a                             streams are preliminary issues the                     business meeting is open to the public.
                                                  § 219.9(a)(2)(i). Suspension of the winter              Forest Service identified in the project               There will also be a call-in line for
                                                  range thermal cover and elk habitat                     area. Timber haul on roads in these                    individuals who desire to listen to the
                                                  effectiveness standards are likely related              situations have the potential to increase              presentations. Call-in (listen only)
                                                  to the consideration of habitat                         the sediment load in the adjacent                      information will be published closer to
                                                  conditions for wildlife commonly used                   streams that may negatively affect                     the meeting date, on the Commission’s
                                                  and enjoyed by the public at                            sediment levels and bull trout habitat.                Web site and social media pages.
                                                  § 219.10(a)(5).                                                                                                Hearing-impaired persons who will
                                                     The Forest Service proposes the                      Scoping Process                                        attend the briefing and require the
                                                  following actions in the Gold Butterfly                   This notice of intent initiates the                  services of a sign language interpreter
                                                  project area: (1) Harvest, thin, and                    scoping process, which guides the                      should contact Pamela Dunston at (202)
                                                  prescribe burn units with Douglas-fir                   development of the environmental                       376–8105 or at signlanguage@usccr.gov
                                                  beetle, mountain pine beetle, western                   impact statement. Other opportunities                  at least three business days before the
                                                  spruce budworm, or dwarf mistletoe, (2)                 for public comment will occur through                  scheduled date of the meeting.
                                                  harvest, thin, and prescribe burn natural               the scoping process at public meetings
                                                                                                                                                                 Meeting Agenda
                                                  meadows that are being colonized by                     and field trips that will be announced
                                                  trees, (3) harvest or thin conifers from                in local newspapers, radio stations, and               I. Approval of Agenda
                                                  declining aspen clones, (4) harvest, thin,              social media. A comment period will                    II. Business Meeting
                                                  or prescribe burn areas to improve                      also be available on the draft EIS.                       A. Discussion and Vote on FY 2018
                                                  conditions for whitebark pine, (5) close                Scoping comments that are helpful to                         Project Proposals
                                                  Burnt Fork Rd. at the Gold Creek                        the project analysis focus on resource                    • FY 2018 Statutory Enforcement
                                                  campground and move the Gold Creek                      conditions or potential resource                             Report
                                                  trailhead to the Gold Creek                             conflicts specific to the project area.                   • Other project proposals
                                                  campground, (6) close NFSR 969A at the                    It is important that reviewers provide                  B. Discussion and Vote on FY 2019
                                                  junction with NFSR 969 (Willow Creek                    their comments at such times and in                          Statutory Enforcement Report
                                                  Rd.), move the trailhead to the junction,               such manner that they are useful to the                   C. Discussion and Vote on Revised
                                                  and develop trailhead facilities, (7)                   agency’s preparation of the                                  Schedule regarding the FY 2017
                                                  construct specified and temporary roads                 environmental impact statement.                              Statutory Enforcement Report on
                                                  to support timber removal from the                      Therefore, comments should be                                Municipal Fees
                                                  forest, (8) upgrade road conditions on                  provided prior to the close of the                        D. Discussion and Vote on holding a
                                                  NFSR 364 and 969 with the application                   comment period and should clearly                            telephonic business meeting on
                                                  of best management practices, (9) build                 articulate the reviewer’s concerns and                       Friday June 23, 2017 on the
                                                  a crossing (temporary/permanent) where                  contentions.                                                 following items:
mstockstill on DSK30JT082PROD with NOTICES




                                                  NFSR 13131 crosses North Fork of                          Comments received in response to                        a. Discussion and Vote on the
                                                  Willow Creek, (10) decommission NFSR                    this solicitation, including names and                       Municipal Fees report
                                                  13111 from the junction with NFSR 364                   addresses of those who comment, will                      b. Discussion and Vote on the LGBT
                                                  where the road encroaches on Butterfly                  be part of the public record for this                        Workplace Discrimination report
                                                  Creek and construct an alternative route                proposed action. Comments submitted                       E. Discussion and Vote on Changing
                                                  away from the stream, and (11)                          anonymously will be accepted and                             the November and December
                                                  decommission or store upland roads in                   considered, however.                                         Commission Business Meeting


                                             VerDate Sep<11>2014   19:25 Jun 08, 2017   Jkt 241001   PO 00000   Frm 00003   Fmt 4703   Sfmt 4703   E:\FR\FM\09JNN1.SGM   09JNN1



Document Created: 2017-06-09 01:11:34
Document Modified: 2017-06-09 01:11:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent to prepare an environmental impact statement.
DatesComments concerning the scope of the analysis must be received by July 10, 2017. The draft environmental impact statement is expected March 2018 and the final environmental impact statement is expected July 2018.
ContactSara Grove, South Zone Interdisciplinary Team Leader, phone number 406-375-2608 or email: [email protected] or Marilyn Wildey, Hydrology Technician, phone number
FR Citation82 FR 26773 