82_FR_28218 82 FR 28101 - Applications for Nuclear Power Plants

82 FR 28101 - Applications for Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 117 (June 20, 2017)

Page Range28101-28102
FR Document2017-12837

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft regulatory guide (DG), DG-1325, ``Applications for Nuclear Power Plants.'' This guidance is proposed Revision 1 to Regulatory Guide (RG) 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' dated June 2007. This proposed revision of RG 1.206 provides revised guidance for prospective applicants regarding the format and content of applications for new nuclear power plants. The proposed revision reflects the lessons learned regarding the review of nuclear power plant applications since 2007. The major change in this revision is the removal of detailed technical information on the format and content of a safety analysis report. Guidance on moving that information to NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' is included in DG-1325.

Federal Register, Volume 82 Issue 117 (Tuesday, June 20, 2017)
[Federal Register Volume 82, Number 117 (Tuesday, June 20, 2017)]
[Notices]
[Pages 28101-28102]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12837]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0145]


Applications for Nuclear Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment a draft regulatory guide (DG), DG-1325, ``Applications 
for Nuclear Power Plants.'' This guidance is proposed Revision 1 to 
Regulatory Guide (RG) 1.206, ``Combined License Applications for 
Nuclear Power Plants (LWR Edition),'' dated June 2007. This proposed 
revision of RG 1.206 provides revised guidance for prospective 
applicants regarding the format and content of applications for new 
nuclear power plants. The proposed revision reflects the lessons 
learned regarding the review of nuclear power plant applications since 
2007. The major change in this revision is the removal of detailed 
technical information on the format and content of a safety analysis 
report. Guidance on moving that information to NUREG-0800, ``Standard 
Review Plan for the Review of Safety Analysis Reports for Nuclear Power 
Plants: LWR Edition,'' is included in DG-1325.

DATES: Submit comments by September 18, 2017. Comments received after 
this date will be considered if it is practical to do so, but the NRC 
is able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specified subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0145. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: TWFN-8D36M, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001. For additional direction on accessing information and 
submitting comments, see ``Obtaining Information and Submitting 
Comments'' in the SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Mark Notich, Office of New Reactors, 
301-415-3053, email: [email protected] U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0145 when contacting the NRC 
about the availability of information regarding this document. You may 
obtain publicly-available information related to this document, by any 
of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0145.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if available in 
ADAMS), is provided the first time that a document is referenced. The 
DG is electronically available in ADAMS under Accession No. 
ML15233A056.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0145 in the subject line of your 
comment submission, in order to ensure that the NRC is able to make 
your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
also state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a DG in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
NRC's regulations, techniques that the staff uses in evaluating 
specific issues or postulated events, and data that the staff needs in 
its review of applications for permits and licenses.
    The DG, entitled ``Applications for Nuclear Power Plants,'' is a 
proposed revision temporarily identified by its task number, DG-1325, 
and is proposed Revision 1 of RG 1.206, currently titled ``Combined 
License Applications for Nuclear Power Plants.'' The guide provides 
revised guidance for prospective applicants regarding the format and 
content of applications for new nuclear power plants under the 
provisions in part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), ``Licenses, Certifications, and Approvals for Nuclear Power 
Plants.''

[[Page 28102]]

    The DG-1325 reflects changes based on lessons learned regarding the 
review of nuclear power plant design certification (DC), early site 
permit (ESP), and combined license (COL) applications under 10 CFR part 
52, since the initial issuance of RG 1.206 in 2007. The scope of the 
proposed revision has been expanded beyond combined license (COL) 
applications to more explicitly address the current application process 
related to applications for DC, ESP, and limited work authorizations 
and the title has been changed accordingly. It provides more integrated 
guidance regarding the overall format and content for COL, DC, and ESP 
applications and additionally reflects the NRC staff's position that, 
although the guidance therein is intended for applicability to power 
reactors with light-water reactor (LWR) technology, the revised RG will 
be generally applicable to other types of power reactors (i.e., non-
LWRs).
    The DG-1325 also satisfies the two remaining action items from the 
NRC's April 2013, Lessons Learned Report (ADAMS Accession No. 
ML13059A240) by (1) revising RG 1.206 to reflect lessons learned and 
(2) incorporating DC/COL ISG11, ``Finalizing Licensing Basis 
Information,'' (ADAMS Accession No. ML092890623) in the revised RG 
1.206.'' This proposed revision also reflects the removal of technical 
information relative to the 2007 version of RG 1.206. The NRC staff 
intends that NUREG-0800, ``Standard Review Plan for the Review of 
Safety Analysis reports for Nuclear Power Plants: LWR Edition,'' be 
used by applicants relative to the technical information and level of 
detail to be included in safety analysis reports for applications for 
COLs, DCs, and ESPs.
    The guidance in DG-1325 is divided into two parts: Section C.1 
provides guidance for the organization, content, and format of an 
application under 10 CFR part 52; and Section C.2 contains information 
and guidance on a number of application regulatory topics related to 
the preparation, submittal, acceptance, and review of applications. The 
application regulatory topics include updated guidance that will allow 
the withdrawal of interim staff guidance. The NRC staff intends to 
withdraw the following four documents upon issuance of the revised RG 
1.206:

     DC/COL-ISG-011, ``Interim Staff Guidance Finalizing 
Licensing Basis Information'' (ADAMS Accession No. ML092890623),
     ESP/DC/COL-ISG-015, ``Interim Staff Guidance on Post 
Combined License Commitments'' (ADAMS Accession No. ML091671355),
     COL/ESP-ISG-04, ``Interim Staff Guidance on the 
Definition of Construction and on Limited Work Authorizations'' 
(ADAMS Accession No. ML082970729), and
     DC/COL ISG-08, ``Final Interim Staff Guidance Necessary 
Content of Plant-Specific Technical Specifications When a Combined 
License is Issued'' (ADAMS Accession No. ML083310259).

    The NRC staff's periodic review of related guidance in RG 1.70, 
Revision 3 (ADAMS Accession No. ML14272A331), ``Standard Format and 
Content of Safety Analysis Reports for Nuclear Power Plants (LWR),'' in 
September 2014, recommended the withdrawal of RG 1.70 once information 
relevant to the licensing of nuclear power plants under 10 CFR part 50 
is included in an update to RG 1.206. The additional scope related to 
construction permits and operating licenses was envisioned for a later 
update to RG 1.206 and is not included in the current proposed 
revision.

III. Backfitting and Issue Finality

    Draft regulatory guide DG-1325, if finalized as a new regulatory 
guide, would provide guidance for applicants regarding the format and 
content of applications for new ESPs, DCs, and COLs under 10 CFR part 
52. Issuance of this DG in final form would not constitute backfitting 
under 10 CFR part 50 and would not otherwise be inconsistent with the 
issue finality provisions in 10 CFR part 52. As discussed in the 
``Implementation'' section of this DG, the NRC has no current intention 
to impose the DG, if finalized, on current holders of ESPs or COLs or a 
DC applicant under 10 CFR part 52.
    The DG, if finalized, could be applied to applications for 10 CFR 
part 52 ESPs, COLs, and DCs. Such action would not constitute 
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) or be 
otherwise inconsistent with the applicable issue finality provision in 
10 CFR part 52, inasmuch as such applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed below--were intended to apply to every NRC 
action that substantially changes the expectations of current and 
future applicants. The exceptions to the general principle are 
applicable whenever an applicant references a 10 CFR part 52 license 
(e.g., an early site permit), the NRC regulatory approval (e.g., a 
design certification rule), or both, with specified issue finality 
provisions. The staff does not, at this time, intend to impose the 
positions represented in DG-1325 (if finalized) in a manner that is 
inconsistent with any issue finality provisions. If, in the future, the 
staff seeks to impose a position in DG-1325 (if finalized) in a manner 
that does not provide issue finality as described in the applicable 
issue finality provision, then the staff must address the criteria for 
avoiding issue finality as described in the applicable issue finality 
provision.

    Dated at Rockville, Maryland, this 15th day of June, 2017.

    For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, New Reactor Rulemaking and Guidance Branch, Division of 
Engineering and Infrastructure, Office of New Reactors.
[FR Doc. 2017-12837 Filed 6-19-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                               Federal Register / Vol. 82, No. 117 / Tuesday, June 20, 2017 / Notices                                           28101

                                                email at Kimberly.Meyer-Chambers@                       improvements in all published guides                     • NRC’s PDR: You may examine and
                                                nrc.gov. Determinations on requests for                 are encouraged at any time.                            purchase copies of public documents at
                                                reasonable accommodation will be                        ADDRESSES: You may submit comments                     the NRC’s PDR, Room O1–F21, One
                                                made on a case-by-case basis.                           by any of the following methods (unless                White Flint North, 11555 Rockville
                                                *     *     *     *    *                                this document describes a different                    Pike, Rockville, Maryland 20852.
                                                   Members of the public may request to                 method for submitting comments on a                    B. Submitting Comments
                                                receive this information electronically.                specified subject):
                                                If you would like to be added to the                      • Federal Rulemaking Web site: Go to                   Please include Docket ID NRC–2017–
                                                distribution, please contact the Nuclear                http://www.regulations.gov and search                  0145 in the subject line of your
                                                Regulatory Commission, Office of the                    for Docket ID NRC–2017–0145. Address                   comment submission, in order to ensure
                                                Secretary, Washington, DC 20555 (301–                   questions about NRC dockets to Carol                   that the NRC is able to make your
                                                415–1969), or email                                     Gallagher; telephone: 301–415–3463;                    comment submission available to the
                                                Brenda.Akstulewicz@nrc.gov or                           email: Carol.Gallagher@nrc.gov. For                    public in this docket.
                                                Patricia.Jimenez@nrc.gov.                               technical questions, contact the                         The NRC cautions you not to include
                                                                                                        individual listed in the FOR FURTHER                   identifying or contact information that
                                                  Dated: June 16, 2017.
                                                                                                        INFORMATION CONTACT section of this                    you do not want to be publicly
                                                Denise L. McGovern,
                                                                                                        document.                                              disclosed in your comment submission.
                                                Policy Coordinator, Office of the Secretary.              • Mail comments to: Cindy Bladey,                    The NRC posts all comment
                                                [FR Doc. 2017–12931 Filed 6–16–17; 4:15 pm]             Office of Administration, Mail Stop:                   submissions at http://
                                                BILLING CODE 7590–01–P                                  TWFN–8D36M, U.S. Nuclear Regulatory                    www.regulations.gov as well as entering
                                                                                                        Commission, Washington, DC 20555–                      the comment submissions into ADAMS.
                                                                                                        0001. For additional direction on                      The NRC does not routinely edit
                                                NUCLEAR REGULATORY                                      accessing information and submitting                   comment submissions to remove
                                                COMMISSION                                              comments, see ‘‘Obtaining Information                  identifying or contact information.
                                                [NRC–2017–0145]                                         and Submitting Comments’’ in the                         If you are requesting or aggregating
                                                                                                        SUPPLEMENTARY INFORMATION section of
                                                                                                                                                               comments from other persons for
                                                Applications for Nuclear Power Plants                   this document.                                         submission to the NRC, then you should
                                                                                                        FOR FURTHER INFORMATION CONTACT:                       inform those persons not to include
                                                AGENCY: Nuclear Regulatory
                                                                                                        Mark Notich, Office of New Reactors,                   identifying or contact information that
                                                Commission.
                                                                                                        301–415–3053, email: Mark.Notich@                      they do not want to be publicly
                                                ACTION: Draft regulatory guide; request
                                                                                                        nrc.gov U.S. Nuclear Regulatory                        disclosed in their comment submission.
                                                for comment.                                            Commission, Washington, DC 20555–                      Your request should also state that the
                                                SUMMARY:   The U.S. Nuclear Regulatory                  0001.                                                  NRC does not routinely edit comment
                                                Commission (NRC) is issuing for public                  SUPPLEMENTARY INFORMATION:                             submissions to remove such information
                                                comment a draft regulatory guide (DG),                                                                         before making the comment
                                                                                                        I. Obtaining Information and
                                                DG–1325, ‘‘Applications for Nuclear                                                                            submissions available to the public or
                                                                                                        Submitting Comments
                                                Power Plants.’’ This guidance is                                                                               entering the comment submissions into
                                                proposed Revision 1 to Regulatory                       A. Obtaining Information                               ADAMS.
                                                Guide (RG) 1.206, ‘‘Combined License                       Please refer to Docket ID NRC–2017–
                                                Applications for Nuclear Power Plants                                                                          II. Additional Information
                                                                                                        0145 when contacting the NRC about
                                                (LWR Edition),’’ dated June 2007. This                  the availability of information regarding                 The NRC is issuing for public
                                                proposed revision of RG 1.206 provides                  this document. You may obtain                          comment a DG in the NRC’s ‘‘Regulatory
                                                revised guidance for prospective                        publicly-available information related to              Guide’’ series. This series was
                                                applicants regarding the format and                     this document, by any of the following                 developed to describe and make
                                                content of applications for new nuclear                 methods:                                               available to the public information
                                                power plants. The proposed revision                        • Federal Rulemaking Web site: Go to                regarding methods that are acceptable to
                                                reflects the lessons learned regarding                  http://www.regulations.gov and search                  the NRC staff for implementing specific
                                                the review of nuclear power plant                       for Docket ID NRC–2017–0145.                           parts of the NRC’s regulations,
                                                applications since 2007. The major                         • NRC’s Agencywide Documents                        techniques that the staff uses in
                                                change in this revision is the removal of               Access and Management System                           evaluating specific issues or postulated
                                                detailed technical information on the                   (ADAMS): You may obtain publicly                       events, and data that the staff needs in
                                                format and content of a safety analysis                 available documents online in the                      its review of applications for permits
                                                report. Guidance on moving that                         ADAMS Public Documents collection at                   and licenses.
                                                information to NUREG–0800, ‘‘Standard                   http://www.nrc.gov/reading-rm/                            The DG, entitled ‘‘Applications for
                                                Review Plan for the Review of Safety                    adams.html. To begin the search, select                Nuclear Power Plants,’’ is a proposed
                                                Analysis Reports for Nuclear Power                      ‘‘ADAMS Public Documents’’ and then                    revision temporarily identified by its
                                                Plants: LWR Edition,’’ is included in                   select ‘‘Begin Web-based ADAMS                         task number, DG–1325, and is proposed
                                                DG–1325.                                                Search.’’ For problems with ADAMS,                     Revision 1 of RG 1.206, currently titled
                                                DATES: Submit comments by September                     please contact the NRC’s Public                        ‘‘Combined License Applications for
                                                18, 2017. Comments received after this                  Document Room (PDR) reference staff at                 Nuclear Power Plants.’’ The guide
                                                date will be considered if it is practical              1–800–397–4209, 301–415–4737, or by                    provides revised guidance for
sradovich on DSK3GMQ082PROD with NOTICES




                                                to do so, but the NRC is able to ensure                 email to pdr.resource@nrc.gov. The                     prospective applicants regarding the
                                                consideration only for comments                         ADAMS accession number for each                        format and content of applications for
                                                received on or before this date.                        document referenced (if available in                   new nuclear power plants under the
                                                Although a time limit is given,                         ADAMS), is provided the first time that                provisions in part 52 of title 10 of the
                                                comments and suggestions in                             a document is referenced. The DG is                    Code of Federal Regulations (10 CFR),
                                                connection with items for inclusion in                  electronically available in ADAMS                      ‘‘Licenses, Certifications, and Approvals
                                                guides currently being developed or                     under Accession No. ML15233A056.                       for Nuclear Power Plants.’’


                                           VerDate Sep<11>2014   18:01 Jun 19, 2017   Jkt 241001   PO 00000   Frm 00059   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM   20JNN1


                                                28102                          Federal Register / Vol. 82, No. 117 / Tuesday, June 20, 2017 / Notices

                                                   The DG–1325 reflects changes based                     • COL/ESP–ISG–04, ‘‘Interim Staff                    finality provisions. The staff does not, at
                                                on lessons learned regarding the review                 Guidance on the Definition of Construction             this time, intend to impose the positions
                                                of nuclear power plant design                           and on Limited Work Authorizations’’                   represented in DG–1325 (if finalized) in
                                                certification (DC), early site permit                   (ADAMS Accession No. ML082970729), and                 a manner that is inconsistent with any
                                                                                                          • DC/COL ISG–08, ‘‘Final Interim Staff
                                                (ESP), and combined license (COL)                       Guidance Necessary Content of Plant-
                                                                                                                                                               issue finality provisions. If, in the
                                                applications under 10 CFR part 52,                      Specific Technical Specifications When a               future, the staff seeks to impose a
                                                since the initial issuance of RG 1.206 in               Combined License is Issued’’ (ADAMS                    position in DG–1325 (if finalized) in a
                                                2007. The scope of the proposed                         Accession No. ML083310259).                            manner that does not provide issue
                                                revision has been expanded beyond                                                                              finality as described in the applicable
                                                                                                           The NRC staff’s periodic review of
                                                combined license (COL) applications to                                                                         issue finality provision, then the staff
                                                                                                        related guidance in RG 1.70, Revision 3
                                                more explicitly address the current                                                                            must address the criteria for avoiding
                                                                                                        (ADAMS Accession No. ML14272A331),
                                                application process related to                                                                                 issue finality as described in the
                                                                                                        ‘‘Standard Format and Content of Safety                applicable issue finality provision.
                                                applications for DC, ESP, and limited
                                                                                                        Analysis Reports for Nuclear Power
                                                work authorizations and the title has                                                                            Dated at Rockville, Maryland, this 15th day
                                                                                                        Plants (LWR),’’ in September 2014,
                                                been changed accordingly. It provides                                                                          of June, 2017.
                                                                                                        recommended the withdrawal of RG
                                                more integrated guidance regarding the                                                                           For the Nuclear Regulatory Commission.
                                                                                                        1.70 once information relevant to the
                                                overall format and content for COL, DC,                                                                        Joseph Colaccino,
                                                                                                        licensing of nuclear power plants under
                                                and ESP applications and additionally                                                                          Chief, New Reactor Rulemaking and
                                                                                                        10 CFR part 50 is included in an update
                                                reflects the NRC staff’s position that,                                                                        Guidance Branch, Division of Engineering
                                                                                                        to RG 1.206. The additional scope
                                                although the guidance therein is                                                                               and Infrastructure, Office of New Reactors.
                                                                                                        related to construction permits and
                                                intended for applicability to power                                                                            [FR Doc. 2017–12837 Filed 6–19–17; 8:45 am]
                                                                                                        operating licenses was envisioned for a
                                                reactors with light-water reactor (LWR)
                                                                                                        later update to RG 1.206 and is not                    BILLING CODE 7590–01–P
                                                technology, the revised RG will be
                                                                                                        included in the current proposed
                                                generally applicable to other types of
                                                                                                        revision.
                                                power reactors (i.e., non-LWRs).                                                                               SECURITIES AND EXCHANGE
                                                   The DG–1325 also satisfies the two                   III. Backfitting and Issue Finality                    COMMISSION
                                                remaining action items from the NRC’s                      Draft regulatory guide DG–1325, if
                                                April 2013, Lessons Learned Report                                                                             [Release No. 34–80923; File No. SR–ISE–
                                                                                                        finalized as a new regulatory guide,                   2017–32]
                                                (ADAMS Accession No. ML13059A240)                       would provide guidance for applicants
                                                by (1) revising RG 1.206 to reflect                     regarding the format and content of
                                                lessons learned and (2) incorporating                                                                          Self-Regulatory Organizations; Nasdaq
                                                                                                        applications for new ESPs, DCs, and                    ISE, LLC; Notice of Designation of
                                                DC/COL ISG11, ‘‘Finalizing Licensing                    COLs under 10 CFR part 52. Issuance of                 Longer Period for Commission Action
                                                Basis Information,’’ (ADAMS Accession                   this DG in final form would not                        on Proposed Rule Change To
                                                No. ML092890623) in the revised RG                      constitute backfitting under 10 CFR part               Harmonize the Corporate Governance
                                                1.206.’’ This proposed revision also                    50 and would not otherwise be                          Framework With That of the NASDAQ
                                                reflects the removal of technical                       inconsistent with the issue finality                   Stock Market LLC, NASDAQ PHLX
                                                information relative to the 2007 version                provisions in 10 CFR part 52. As                       LLC, and NASDAQ BX, Inc.
                                                of RG 1.206. The NRC staff intends that                 discussed in the ‘‘Implementation’’
                                                NUREG–0800, ‘‘Standard Review Plan                      section of this DG, the NRC has no                     June 14, 2017
                                                for the Review of Safety Analysis                       current intention to impose the DG, if                    On April 11, 2017, Nasdaq ISE, LLC
                                                reports for Nuclear Power Plants: LWR                   finalized, on current holders of ESPs or               (‘‘ISE’’ or ‘‘Exchange’’) filed with the
                                                Edition,’’ be used by applicants relative               COLs or a DC applicant under 10 CFR                    Securities and Exchange Commission
                                                to the technical information and level of               part 52.                                               (‘‘Commission’’), pursuant to Section
                                                detail to be included in safety analysis                   The DG, if finalized, could be applied              19(b)(1) of the Securities Exchange Act
                                                reports for applications for COLs, DCs,                 to applications for 10 CFR part 52 ESPs,               of 1934 (‘‘Act’’) 1 and Rule 19b–4
                                                and ESPs.                                               COLs, and DCs. Such action would not                   thereunder,2 a proposed rule change to
                                                   The guidance in DG–1325 is divided                   constitute backfitting as defined in 10                harmonize its board and committee
                                                into two parts: Section C.1 provides                    CFR 50.109 (the Backfit Rule) or be                    structure, and all related corporate
                                                guidance for the organization, content,                 otherwise inconsistent with the                        governance processes, with that of the
                                                and format of an application under 10                   applicable issue finality provision in 10              three other registered national securities
                                                CFR part 52; and Section C.2 contains                   CFR part 52, inasmuch as such                          exchanges and self-regulatory
                                                information and guidance on a number                    applicants are not, with certain                       organizations owned by the Exchange’s
                                                of application regulatory topics related                exceptions, protected by either the                    indirect parent company, Nasdaq, Inc.,
                                                to the preparation, submittal,                          Backfit Rule or any issue finality                     namely: The NASDAQ Stock Market
                                                acceptance, and review of applications.                 provisions under 10 CFR part 52. This                  LLC, NASDAQ PHLX LLC, and
                                                The application regulatory topics                       is because neither the Backfit Rule nor                NASDAQ BX, Inc. The proposed rule
                                                include updated guidance that will                      the issue finality provisions under 10                 change was published for comment in
                                                allow the withdrawal of interim staff                   CFR part 52—with certain exclusions                    the Federal Register on May 2, 2017.3
                                                guidance. The NRC staff intends to                      discussed below—were intended to                       The Commission has received no
                                                withdraw the following four documents                   apply to every NRC action that                         comment letters on the proposal.
                                                upon issuance of the revised RG 1.206:                  substantially changes the expectations                    Section 19(b)(2) of the Act 4 provides
sradovich on DSK3GMQ082PROD with NOTICES




                                                  • DC/COL–ISG–011, ‘‘Interim Staff                     of current and future applicants. The                  that within 45 days of the publication of
                                                Guidance Finalizing Licensing Basis                     exceptions to the general principle are                notice of the filing of a proposed rule
                                                Information’’ (ADAMS Accession No.                      applicable whenever an applicant
                                                ML092890623),                                                                                                    1 15 U.S.C. 78s(b)(1).
                                                  • ESP/DC/COL–ISG–015, ‘‘Interim Staff                 references a 10 CFR part 52 license (e.g.,               2 17 CFR 240.19b–4.
                                                Guidance on Post Combined License                       an early site permit), the NRC regulatory                3 See Securities Exchange Act Release No. 80530

                                                Commitments’’ (ADAMS Accession No.                      approval (e.g., a design certification                 (April 26, 2017), 82 FR 20508.
                                                ML091671355),                                           rule), or both, with specified issue                     4 15 U.S.C. 78s(b)(2).




                                           VerDate Sep<11>2014   18:01 Jun 19, 2017   Jkt 241001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM    20JNN1



Document Created: 2017-06-20 02:21:09
Document Modified: 2017-06-20 02:21:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft regulatory guide; request for comment.
DatesSubmit comments by September 18, 2017. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time.
ContactMark Notich, Office of New Reactors, 301-415-3053, email: [email protected] U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation82 FR 28101 