82_FR_30972 82 FR 30846 - Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

82 FR 30846 - Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 126 (July 3, 2017)

Page Range30846-30847
FR Document2017-13956

Federal Register, Volume 82 Issue 126 (Monday, July 3, 2017)
[Federal Register Volume 82, Number 126 (Monday, July 3, 2017)]
[Notices]
[Pages 30846-30847]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-13956]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-14-000]


Three Sisters Irrigation District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On June 22, 2017, Three Sisters Irrigation District filed a notice 
of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed McKenzie Reservoir Hydroelectric Facility Project would 
have an installed capacity of 300 kilowatts (kW), and would be located 
on the proposed 5.5-miles-long irrigation pipeline. The project would 
be located in the town of Sisters, Deschutes County, Oregon.
    Applicant Contact: Marc Thalacker, P.O. Box 2230, Sisters, OR 
97759, Phone No. (541) 549-8815.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new powerhouse, at the end of the 
proposed 42-inch-diameter irrigation pipe; (2) one new turbine/
generating unit with a total installed capacity of 300 kW; (3) a short 
tailrace emptying into McKenzie Reservoir, from which irrigation 
channels provide water to nearby farms; and (4) appurtenant facilities.
    The proposed project would have an annual generation capacity of 
1,300,000 kWh.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

[[Page 30847]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed hydroelectric project will 
be constructed along a penstock pipeline, which is being built to pass 
water from one reservoir to another for irrigation purposes. The 
construction of the hydroelectric facility will not alter the 
pipeline's primary purpose. Therefore, based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A 
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) 
state in the heading the name of the applicant and the project number 
of the application to which the filing responds; (3) state the name, 
address, and telephone number of the person filing; and (4) otherwise 
comply with the requirements of sections 385.2001 through 385.2005 of 
the Commission's regulations.\1\ All comments contesting Commission 
staff's preliminary determination that the facility meets the 
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2016).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD17-14) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: June 27, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-13956 Filed 6-30-17; 8:45 am]
BILLING CODE 6717-01-P



                                                30846                           Federal Register / Vol. 82, No. 126 / Monday, July 3, 2017 / Notices

                                                   Due to the REAL ID Act implemented                   Conduct of Public Meeting                                Issued in Washington, DC, on June 23,
                                                by the Department of Homeland                                                                                  2017.
                                                Security (DHS), there have been recent                     DOE will designate a DOE official to                Kathleen B. Hogan,
                                                changes regarding ID requirements for                   preside at the public meeting and may                  Deputy Assistant Secretary for Energy
                                                individuals wishing to enter Federal                    also use a professional facilitator to aid             Efficiency, Energy Efficiency and Renewable
                                                buildings from specific States and U.S.                 discussion. The meeting will not be a                  Energy.
                                                territories. DHS maintains an updated                   judicial or evidentiary-type public                    [FR Doc. 2017–13928 Filed 6–30–17; 8:45 am]
                                                Web site identifying the State and                      hearing, but DOE will conduct it in                    BILLING CODE 6450–01–P
                                                territory driver’s licenses that currently              accordance with section 336 of EPCA
                                                are acceptable for entry into DOE                       (42 U.S.C. 6306). A court reporter will
                                                facilities at https://www.dhs.gov/real-id-              be present to record the proceedings and               DEPARTMENT OF ENERGY
                                                enforcement-brief. A driver’s license                   prepare a transcript. DOE reserves the
                                                from a State or territory identified as not                                                                    Federal Energy Regulatory
                                                                                                        right to schedule the order of
                                                compliant by DHS will not be accepted                                                                          Commission
                                                                                                        presentations and to establish the
                                                for building entry and one of the                       procedures governing the conduct of the                [Docket No. CD17–14–000]
                                                alternate forms of ID listed below will                 public meeting.
                                                be required. Acceptable alternate forms                                                                        Three Sisters Irrigation District; Notice
                                                of Photo-ID include U.S. Passport or                       The public meeting will be conducted
                                                                                                                                                               of Preliminary Determination of a
                                                Passport Card; an Enhanced Driver’s                     in an informal, conference style. DOE
                                                                                                                                                               Qualifying Conduit Hydropower
                                                License or Enhanced ID-Card issued by                   will present summaries of comments
                                                                                                                                                               Facility and Soliciting Comments and
                                                States and territories as identified on the             received before the public meeting,                    Motions To Intervene
                                                DHS Web site (Enhanced licenses issued                  allow time for prepared general
                                                by these States and territories are clearly             statements by participants, and                           On June 22, 2017, Three Sisters
                                                marked Enhanced or Enhanced Driver’s                    encourage all interested parties to share              Irrigation District filed a notice of intent
                                                License); a military ID or other Federal                their views. Each participant will be                  to construct a qualifying conduit
                                                government-issued Photo-ID card.                        allowed to make a general statement                    hydropower facility, pursuant to section
                                                   In addition, you can attend the public               (within time limits determined by DOE),                30 of the Federal Power Act (FPA), as
                                                meeting via webinar. Webinar                            before the discussion of specific topics.              amended by section 4 of the
                                                registration information, participant                   DOE will permit, as time permits, other                Hydropower Regulatory Efficiency Act
                                                instructions, and information about the                 participants to comment briefly on any                 of 2013 (HREA). The proposed
                                                capabilities available to webinar                       general statements.                                    McKenzie Reservoir Hydroelectric
                                                participants will be published on DOE’s                                                                        Facility Project would have an installed
                                                                                                           At the end of all prepared statements               capacity of 300 kilowatts (kW), and
                                                Web site: https://www1.eere.energy.gov/
                                                buildings/appliance_standards/                          on a topic, DOE will permit participants               would be located on the proposed 5.5-
                                                standards.aspx?productid=6.                             to clarify their statements briefly and                miles-long irrigation pipeline. The
                                                Participants are responsible for ensuring               comment on statements made by others.                  project would be located in the town of
                                                their systems are compatible with the                   Participants should be prepared to                     Sisters, Deschutes County, Oregon.
                                                webinar software.                                       answer questions by DOE and by other                      Applicant Contact: Marc Thalacker,
                                                                                                        participants concerning these issues.                  P.O. Box 2230, Sisters, OR 97759, Phone
                                                Procedure for Submitting Prepared                       DOE representatives may also ask                       No. (541) 549–8815.
                                                General Statements for Distribution                     questions of participants concerning                      FERC Contact: Robert Bell, Phone No.
                                                   Any person who has plans to present                  other relevant matters. The official                   (202) 502–6062, email: robert.bell@
                                                a prepared general statement may                        conducting the public meeting will                     ferc.gov.
                                                request that copies of his or her                       accept additional comments or                             Qualifying Conduit Hydropower
                                                statement be made available at the                      questions from those attending, as time                Facility Description: The proposed
                                                public meeting. Such persons may                        permits. The presiding official will                   project would consist of: (1) A new
                                                submit requests, along with an advance                  announce any further procedural rules                  powerhouse, at the end of the proposed
                                                electronic copy of their statement in                   or modification of the above procedures                42-inch-diameter irrigation pipe; (2) one
                                                PDF (preferred), Microsoft Word or                      that may be needed for the proper                      new turbine/generating unit with a total
                                                Excel, WordPerfect, or text (ASCII) file                conduct of the public meeting.                         installed capacity of 300 kW; (3) a short
                                                format, to the appropriate address                                                                             tailrace emptying into McKenzie
                                                shown in the ADDRESSES section at the                      A transcript of the public meeting will             Reservoir, from which irrigation
                                                beginning of this notice. The request                   be included on DOE’s Web site: https://                channels provide water to nearby farms;
                                                and advance copy of statements must be                  www1.eere.energy.gov/buildings/                        and (4) appurtenant facilities.
                                                received at least one week before the                   appliance_standards/                                      The proposed project would have an
                                                public meeting and may be emailed,                      standards.aspx?productid=6. In                         annual generation capacity of 1,300,000
                                                hand-delivered, or sent by mail. DOE                    addition, any person may buy a copy of                 kWh.
                                                prefers to receive requests and advance                 the transcript from the transcribing                      A qualifying conduit hydropower
                                                copies via email. Please include a                      reporter.                                              facility is one that is determined or
                                                telephone number to enable DOE staff to                                                                        deemed to meet all of the criteria shown
                                                make a follow-up contact, if needed.                                                                           in the table below.
sradovich on DSK3GMQ082PROD with NOTICES




                                           VerDate Sep<11>2014   17:53 Jun 30, 2017   Jkt 241001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\03JYN1.SGM   03JYN1


                                                                                 Federal Register / Vol. 82, No. 126 / Monday, July 3, 2017 / Notices                                              30847

                                                                                     TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                Satisfies
                                                                     Statutory provision                                                            Description                                  (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ......................       The conduit the facility uses is a tunnel, canal, pipeline, aqueduct,             Y
                                                                                                                   flume, ditch, or similar manmade water conveyance that is operated
                                                                                                                   for the distribution of water for agricultural, municipal, or industrial
                                                                                                                   consumption and not primarily for the generation of electricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA ..................        The facility is constructed, operated, or maintained for the generation           Y
                                                                                                                   of electric power and uses for such generation only the hydroelectric
                                                                                                                   potential of a non-federally owned conduit.
                                                FPA 30(a)(3)(C)(ii), as amended by HREA ..................       The facility has an installed capacity that does not exceed 5 megawatts           Y
                                                FPA 30(a)(3)(C)(iii), as amended by HREA .................       On or before August 9, 2013, the facility is not licensed, or exempted            Y
                                                                                                                   from the licensing requirements of Part I of the FPA.



                                                   Preliminary Determination: The                           The Commission strongly encourages                    DEPARTMENT OF ENERGY
                                                proposed hydroelectric project will be                   electronic filing. Please file motions to
                                                constructed along a penstock pipeline,                   intervene and comments using the                         Federal Energy Regulatory
                                                which is being built to pass water from                  Commission’s eFiling system at http://                   Commission
                                                one reservoir to another for irrigation                  www.ferc.gov/docs-filing/efiling.asp.                    [Docket No. RM98–1–000]
                                                purposes. The construction of the                        Commenters can submit brief comments
                                                hydroelectric facility will not alter the                up to 6,000 characters, without prior                    Records Governing Off-the-Record
                                                pipeline’s primary purpose. Therefore,                   registration, using the eComment system                  Communications; Public Notice
                                                based upon the above criteria,                           at http://www.ferc.gov/docs-filing/
                                                Commission staff preliminarily                                                                                      This constitutes notice, in accordance
                                                                                                         ecomment.asp. You must include your                      with 18 CFR 385.2201(b), of the receipt
                                                determines that the proposal satisfies                   name and contact information at the end
                                                the requirements for a qualifying                                                                                 of prohibited and exempt off-the-record
                                                                                                         of your comments. For assistance,                        communications.
                                                conduit hydropower facility, which is
                                                                                                         please contact FERC Online Support at                      Order No. 607 (64 FR 51222,
                                                not required to be licensed or exempted
                                                                                                         FERCOnlineSupport@ferc.gov, (866)                        September 22, 1999) requires
                                                from licensing.
                                                                                                         208–3676 (toll free), or (202) 502–8659                  Commission decisional employees, who
                                                   Comments and Motions to Intervene:                                                                             make or receive a prohibited or exempt
                                                Deadline for filing comments contesting                  (TTY). In lieu of electronic filing, please
                                                                                                         send a paper copy to: Secretary, Federal                 off-the-record communication relevant
                                                whether the facility meets the qualifying                                                                         to the merits of a contested proceeding,
                                                criteria is 45 days from the issuance                    Energy Regulatory Commission, 888
                                                                                                         First Street NE., Washington, DC 20426.                  to deliver to the Secretary of the
                                                date of this notice.                                                                                              Commission, a copy of the
                                                   Deadline for filing motions to                        A copy of all other filings in reference
                                                                                                         to this application must be accompanied                  communication, if written, or a
                                                intervene is 30 days from the issuance                                                                            summary of the substance of any oral
                                                date of this notice.                                     by proof of service on all persons listed
                                                                                                         in the service list prepared by the                      communication.
                                                   Anyone may submit comments or a                                                                                  Prohibited communications are
                                                motion to intervene in accordance with                   Commission in this proceeding, in                        included in a public, non-decisional file
                                                the requirements of Rules of Practice                    accordance with 18 CFR 4.34(b) and                       associated with, but not a part of, the
                                                and Procedure, 18 CFR 385.210 and                        385.2010.                                                decisional record of the proceeding.
                                                385.214. Any motions to intervene must                      Locations of Notice of Intent: Copies                 Unless the Commission determines that
                                                be received on or before the specified                   of the notice of intent can be obtained                  the prohibited communication and any
                                                deadline date for the particular                         directly from the applicant or such                      responses thereto should become a part
                                                proceeding.                                              copies can be viewed and reproduced at                   of the decisional record, the prohibited
                                                   Filing and Service of Responsive                      the Commission in its Public Reference                   off-the-record communication will not
                                                Documents: All filings must (1) bear in                  Room, Room 2A, 888 First Street NE.,                     be considered by the Commission in
                                                all capital letters the COMMENTS                         Washington, DC 20426. The filing may                     reaching its decision. Parties to a
                                                CONTESTING QUALIFICATION FOR A                           also be viewed on the web at http://                     proceeding may seek the opportunity to
                                                CONDUIT HYDROPOWER FACILITY or                                                                                    respond to any facts or contentions
                                                                                                         www.ferc.gov/docs-filing/elibrary.asp
                                                MOTION TO INTERVENE, as                                                                                           made in a prohibited off-the-record
                                                                                                         using the ‘‘eLibrary’’ link. Enter the
                                                applicable; (2) state in the heading the                                                                          communication, and may request that
                                                name of the applicant and the project                    docket number (i.e., CD17–14) in the
                                                                                                         docket number field to access the                        the Commission place the prohibited
                                                number of the application to which the                                                                            communication and responses thereto
                                                filing responds; (3) state the name,                     document. For assistance, call toll-free
                                                                                                                                                                  in the decisional record. The
                                                address, and telephone number of the                     1–866–208–3676 or email
                                                                                                                                                                  Commission will grant such a request
                                                person filing; and (4) otherwise comply                  FERCOnlineSupport@ferc.gov. For TTY,
                                                                                                                                                                  only when it determines that fairness so
                                                with the requirements of sections                        call (202) 502–8659.                                     requires. Any person identified below as
                                                385.2001 through 385.2005 of the
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                           Dated: June 27, 2017.                                  having made a prohibited off-the-record
                                                Commission’s regulations.1 All                           Kimberly D. Bose,                                        communication shall serve the
                                                comments contesting Commission staff’s                                                                            document on all parties listed on the
                                                                                                         Secretary.
                                                preliminary determination that the                                                                                official service list for the applicable
                                                                                                         [FR Doc. 2017–13956 Filed 6–30–17; 8:45 am]
                                                facility meets the qualifying criteria                                                                            proceeding in accordance with Rule
                                                must set forth their evidentiary basis.                  BILLING CODE 6717–01–P
                                                                                                                                                                  2010, 18 CFR 385.2010.
                                                                                                                                                                    Exempt off-the-record
                                                  1 18   CFR 385.2001–2005 (2016).                                                                                communications are included in the


                                           VerDate Sep<11>2014    17:53 Jun 30, 2017   Jkt 241001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\03JYN1.SGM   03JYN1



Document Created: 2018-11-14 10:19:55
Document Modified: 2018-11-14 10:19:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 30846 

2025 Federal Register | Disclaimer | Privacy Policy