82_FR_33626 82 FR 33488 - Texas Eastern Transmission, LP; Notice of Application for Certificate of Public Convenience and Necessity

82 FR 33488 - Texas Eastern Transmission, LP; Notice of Application for Certificate of Public Convenience and Necessity

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 138 (July 20, 2017)

Page Range33488-33489
FR Document2017-15242

Federal Register, Volume 82 Issue 138 (Thursday, July 20, 2017)
[Federal Register Volume 82, Number 138 (Thursday, July 20, 2017)]
[Notices]
[Pages 33488-33489]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15242]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-468-000]


Texas Eastern Transmission, LP; Notice of Application for 
Certificate of Public Convenience and Necessity

    Take notice that on June 30, 2017, Texas Eastern Transmission, LP 
(Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed 
with the Federal Energy Regulatory Commission an abbreviated 
application under section 7 of the Natural Gas Act requesting a 
Certificate of Public Convenience and Necessity authorizing Texas 
Eastern to excavate, elevate, and replace four different sections of 
pipelines and appurtenant facilities located in Marshall County, West 
Virginia due to planned long-wall mining activities in October 2018 
known as the Marshall County Mine Panel 18W Project. Texas Eastern 
seeks authorization to perform work due to the anticipated long-wall 
mining activities of Marshall County Coal Company in Panel 18W of its 
Marshall County Mine, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``e-Library'' link. Enter the docket number excluding the 
last three digits in the docket number field to access the document. 
For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions regarding this application may be directed to Lisa A. 
Connolly, Director, Rates and Certificates, Texas Eastern Transmission, 
LP, P.O. Box 1642, Houston, Texas 77251-1642; Phone: (713) 627-4102, or 
Fax: (713) 627-5947, or email: [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888

[[Page 33489]]

First Street NE., Washington, DC 20426, a motion to intervene in 
accordance with the requirements of the Commission's Rules of Practice 
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the 
NGA (18 CFR 157.10). A person obtaining party status will be placed on 
the service list maintained by the Secretary of the Commission and will 
receive copies of all documents filed by the applicant and by all other 
parties. A party must submit five copies of filings made with the 
Commission and must mail a copy to the applicant and to every other 
party in the proceeding. Only parties to the proceeding can ask for 
court review of Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit original and five copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on August 3, 2017.

    Dated: July 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-15242 Filed 7-19-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                    33488                          Federal Register / Vol. 82, No. 138 / Thursday, July 20, 2017 / Notices

                                                    2017–ICCD–0106. Comments submitted                         Total Estimated Number of Annual                    section 7 of the Natural Gas Act
                                                    in response to this notice should be                     Responses: 104,004.                                   requesting a Certificate of Public
                                                    submitted electronically through the                       Total Estimated Number of Annual                    Convenience and Necessity authorizing
                                                    Federal eRulemaking Portal at http://                    Burden Hours: 31,704.                                 Texas Eastern to excavate, elevate, and
                                                    www.regulations.gov by selecting the                       Abstract: The National Center for                   replace four different sections of
                                                    Docket ID number or via postal mail,                     Education Statistics (NCES) Quick                     pipelines and appurtenant facilities
                                                    commercial delivery, or hand delivery.                   Response Information System (QRIS)                    located in Marshall County, West
                                                    Please note that comments submitted by                   consists of the Fast Response Survey                  Virginia due to planned long-wall
                                                    fax or email and those submitted after                   System (FRSS) and the Postsecondary                   mining activities in October 2018
                                                    the comment period will not be                           Education Quick Information System                    known as the Marshall County Mine
                                                    accepted. Written requests for                           (PEQIS). The QRIS currently conducts                  Panel 18W Project. Texas Eastern seeks
                                                    information or comments submitted by                     surveys under OMB generic clearance                   authorization to perform work due to
                                                    postal mail or delivery should be                        1850–0733, which expires in February                  the anticipated long-wall mining
                                                    addressed to the Director of the                         2018. This submission requests                        activities of Marshall County Coal
                                                    Information Collection Clearance                         approval to continue the current                      Company in Panel 18W of its Marshall
                                                    Division, U.S. Department of Education,                  clearance conditions through the end of               County Mine, all as more fully set forth
                                                    400 Maryland Avenue SW., LBJ, Room                       2020. FRSS primarily conducts surveys                 in the application which is on file with
                                                    216–34, Washington, DC 20202–4537.                       of the elementary/secondary sector                    the Commission and open to public
                                                                                                             (districts, schools) and public libraries.            inspection.
                                                    FOR FURTHER INFORMATION CONTACT: For
                                                                                                             PEQIS conducts surveys of the                            The filing may also be viewed on the
                                                    specific questions related to collection                                                                       web at http://www.ferc.gov using the ‘‘e-
                                                    activities, please contact NCES                          postsecondary education sector. FRSS
                                                                                                             and PEQIS surveys are cleared under                   Library’’ link. Enter the docket number
                                                    Information Collections at                                                                                     excluding the last three digits in the
                                                    NCES.Information.Collections@ed.gov.                     the QRIS generic clearance. The QRIS
                                                                                                             clearance is subject to the regular                   docket number field to access the
                                                    SUPPLEMENTARY INFORMATION: The                           clearance process at OMB with a 60-day                document. For assistance, please contact
                                                    Department of Education (ED), in                         notice and a 30-day notice as part of the             FERC Online Support at
                                                    accordance with the Paperwork                            120-day review period. Each individual                FERCOnlineSupport@ferc.gov or toll
                                                    Reduction Act of 1995 (PRA) (44 U.S.C.                   FRSS or PEQIS survey is then subject to               free at (866) 208–3676, or TTY, contact
                                                    3506(c)(2)(A)), provides the general                     clearance process with an abbreviated                 (202) 502–8659.
                                                    public and Federal agencies with an                      clearance package, justifying the                        Any questions regarding this
                                                    opportunity to comment on proposed,                      particular content of the survey,                     application may be directed to Lisa A.
                                                    revised, and continuing collections of                   describing the sample design, the                     Connolly, Director, Rates and
                                                    information. This helps the Department                   timeline for the survey activities, and               Certificates, Texas Eastern
                                                    assess the impact of its information                     the questionnaire. The review period for              Transmission, LP, P.O. Box 1642,
                                                    collection requirements and minimize                                                                           Houston, Texas 77251–1642; Phone:
                                                                                                             each individual survey is 45 days,
                                                    the public’s reporting burden. It also                                                                         (713) 627–4102, or Fax: (713) 627–5947,
                                                                                                             including a 30-day Federal Register
                                                    helps the public understand the                                                                                or email: lisa.connolly@enbridge.com.
                                                                                                             notice period. OMB will provide                          Pursuant to section 157.9 of the
                                                    Department’s information collection                      comments as soon after the end of the
                                                    requirements and provide the requested                                                                         Commission’s rules, 18 CFR 157.9,
                                                                                                             30-day notice period as possible. This                within 90 days of this Notice the
                                                    data in the desired format. ED is                        generic clearance request is for surveys
                                                    soliciting comments on the proposed                                                                            Commission staff will either: Complete
                                                                                                             of state education agencies, school                   its environmental assessment (EA) and
                                                    information collection request (ICR) that                districts, schools, postsecondary
                                                    is described below. The Department of                                                                          place it into the Commission’s public
                                                                                                             institutions, and libraries.                          record (eLibrary) for this proceeding; or
                                                    Education is especially interested in
                                                    public comment addressing the                              Dated: July 17, 2017.                               issue a Notice of Schedule for
                                                    following issues: (1) Is this collection                 Kate Mullan,                                          Environmental Review. If a Notice of
                                                    necessary to the proper functions of the                 Acting Director, Information Collection               Schedule for Environmental Review is
                                                    Department; (2) will this information be                 Clearance Division, Office of the Chief Privacy       issued, it will indicate, among other
                                                    processed and used in a timely manner;                   Officer, Office of Management.                        milestones, the anticipated date for the
                                                    (3) is the estimate of burden accurate;                  [FR Doc. 2017–15271 Filed 7–19–17; 8:45 am]           Commission staff’s issuance of the EA
                                                    (4) how might the Department enhance                     BILLING CODE 4000–01–P                                for this proposal. The filing of the EA
                                                    the quality, utility, and clarity of the                                                                       in the Commission’s public record for
                                                    information to be collected; and (5) how                                                                       this proceeding or the issuance of a
                                                    might the Department minimize the                        DEPARTMENT OF ENERGY                                  Notice of Schedule for Environmental
                                                    burden of this collection on the                                                                               Review will serve to notify federal and
                                                    respondents, including through the use                   Federal Energy Regulatory                             state agencies of the timing for the
                                                    of information technology. Please note                   Commission                                            completion of all necessary reviews, and
                                                    that written comments received in                                                                              the subsequent need to complete all
                                                                                                             [Docket No. CP17–468–000]
                                                    response to this notice will be                                                                                federal authorizations within 90 days of
                                                    considered public records.                               Texas Eastern Transmission, LP;                       the date of issuance of the Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                             Notice of Application for Certificate of              staff’s EA.
                                                       Title of Collection: Quick Response                                                                            There are two ways to become
                                                    Information System (QRIS) 2017–2020                      Public Convenience and Necessity
                                                                                                                                                                   involved in the Commission’s review of
                                                    System Clearance.                                          Take notice that on June 30, 2017,                  this project. First, any person wishing to
                                                       OMB Control Number: 1850–0733.                        Texas Eastern Transmission, LP (Texas                 obtain legal status by becoming a party
                                                       Type of Review: An extension of an                    Eastern), 5400 Westheimer Court,                      to the proceedings for this project
                                                    existing information collection.                         Houston, Texas 77056, filed with the                  should, on or before the comment date
                                                       Respondents/Affected Public: State,                   Federal Energy Regulatory Commission                  stated below, file with the Federal
                                                    Local, and Tribal Governments.                           an abbreviated application under                      Energy Regulatory Commission, 888


                                               VerDate Sep<11>2014   18:50 Jul 19, 2017   Jkt 241001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1


                                                                                   Federal Register / Vol. 82, No. 138 / Thursday, July 20, 2017 / Notices                                                 33489

                                                    First Street NE., Washington, DC 20426,                    Comment Date: 5:00 p.m. Eastern                     County and modifications to an existing
                                                    a motion to intervene in accordance                      Time on August 3, 2017.                               compressor station in Wharton County.
                                                    with the requirements of the                               Dated: July 13, 2017.                               Transco would also decommission a
                                                    Commission’s Rules of Practice and                       Kimberly D. Bose,                                     compressor station in Refugio County,
                                                    Procedure (18 CFR 385.214 or 385.211)                                                                          use the site as a construction storage
                                                                                                             Secretary.
                                                    and the Regulations under the NGA (18                                                                          yard, and construct a new
                                                    CFR 157.10). A person obtaining party                    [FR Doc. 2017–15242 Filed 7–19–17; 8:45 am]
                                                                                                                                                                   interconnection in San Patricio County.
                                                    status will be placed on the service list                BILLING CODE 6717–01–P

                                                    maintained by the Secretary of the                                                                             Background
                                                    Commission and will receive copies of
                                                    all documents filed by the applicant and                 DEPARTMENT OF ENERGY                                    On September 22, 2016, the
                                                    by all other parties. A party must submit                                                                      Commission issued a Notice of Intent to
                                                                                                             Federal Energy Regulatory                             Prepare an Environmental Assessment
                                                    five copies of filings made with the                     Commission
                                                    Commission and must mail a copy to                                                                             for the Proposed Gulf Connector
                                                    the applicant and to every other party in                [Docket No. CP16–494–000]                             Expansion Project and Request for
                                                    the proceeding. Only parties to the                                                                            Comments on Environmental Issues
                                                    proceeding can ask for court review of                   Transcontinental Gas Pipe Line                        (NOI). The NOI was sent to affected
                                                    Commission orders in the proceeding.                     Company, LLC; Notice of Schedule for                  landowners; federal, state, and local
                                                       However, a person does not have to                    Environmental Review of the Gulf                      government agencies; elected officials;
                                                    intervene in order to have comments                      Connector Expansion Project                           environmental and public interest
                                                    considered. The second way to                                                                                  groups; Native American tribes; other
                                                                                                                On August 16, 2016, Transcontinental
                                                    participate is by filing with the                                                                              interested parties; and local libraries
                                                                                                             Gas Pipe Line Company, LLC (Transco)
                                                    Secretary of the Commission, as soon as                                                                        and newspapers. In response to the NOI,
                                                                                                             filed an application in Docket No.
                                                    possible, an original and two copies of                                                                        the Commission received a letter from
                                                                                                             CP16–494–000 requesting a Certificate
                                                    comments in support of or in opposition                                                                        the Texas Parks and Wildlife
                                                                                                             of Public Convenience and Necessity
                                                    to this project. The Commission will                                                                           Department that included several
                                                                                                             pursuant to section 7(c) of the Natural
                                                    consider these comments in                                                                                     recommendations for mitigating impacts
                                                                                                             Gas Act to construct and operate certain
                                                    determining the appropriate action to be                                                                       on migratory birds, wildlife, and
                                                                                                             natural gas pipeline facilities in
                                                    taken, but the filing of a comment alone                                                                       vegetation.
                                                    will not serve to make the filer a party                 Wharton, Hardin, San Patricio and
                                                    to the proceeding. The Commission’s                      Victoria Counties, Texas. The Gulf                    Additional Information
                                                    rules require that persons filing                        Connector Expansion Project (Project)
                                                    comments in opposition to the project                    would enable 475,000 dekatherms per                      In order to receive notification of the
                                                    provide copies of their protests only to                 day of incremental firm natural gas                   issuance of the EA and to keep track of
                                                    the party or parties directly involved in                transportation.                                       all formal issuances and submittals in
                                                    the protest.                                                On August 25, 2016, the Federal                    specific dockets, the Commission offers
                                                       Persons who wish to comment only                      Energy Regulatory Commission                          a free service called eSubscription. This
                                                    on the environmental review of this                      (Commission or FERC) issued its Notice                can reduce the amount of time you
                                                    project should submit an original and                    of Application for the Project. Among                 spend researching proceedings by
                                                    two copies of their comments to the                      other things, that notice alerted agencies            automatically providing you with
                                                    Secretary of the Commission.                             issuing federal authorizations of the                 notification of these filings, document
                                                    Environmental commentors will be                         requirement to complete all necessary                 summaries, and direct links to the
                                                    placed on the Commission’s                               reviews and to reach a final decision on              documents. Go to www.ferc.gov/docs-
                                                    environmental mailing list, will receive                 a request for a federal authorization                 filing/esubscription.asp.
                                                    copies of the environmental documents,                   within 90 days of the date of issuance
                                                                                                             of the Commission staff’s Environmental                  Additional information about the
                                                    and will be notified of meetings                                                                               Project is available from the
                                                    associated with the Commission’s                         Assessment (EA) for the Project. This
                                                                                                             instant notice identifies the FERC staff’s            Commission’s Office of External Affairs
                                                    environmental review process.
                                                                                                             planned schedule for the completion of                at (866) 208–FERC or on the FERC Web
                                                    Environmental commentors will not be
                                                                                                             the EA for the Project.                               site (www.ferc.gov). Using the eLibrary
                                                    required to serve copies of filed
                                                    documents on all other parties.                                                                                link, select General Search from the
                                                                                                             Schedule for Environmental Review                     eLibrary menu, enter the selected date
                                                    However, the non-party commentors
                                                    will not receive copies of all documents                 Issuance of EA, September 21, 2017                    range and Docket Number excluding the
                                                    filed by other parties or issued by the                  90-day Federal Authorization Decision                 last three digits (i.e., CP16–494), and
                                                    Commission (except for the mailing of                       Deadline, December 20, 2017                        follow the instructions. For assistance
                                                    environmental documents issued by the                       If a schedule change becomes                       with access to eLibrary, the helpline can
                                                    Commission) and will not have the right                  necessary, additional notice will be                  be reached at (866) 208–3676, TTY (202)
                                                    to seek court review of the                              provided so that the relevant agencies                502–8659, or at FERCOnlineSupport@
                                                    Commission’s final order.                                are kept informed of the Project’s                    ferc.gov. The eLibrary link on the FERC
                                                       The Commission strongly encourages                    progress.                                             Web site also provides access to the
                                                                                                                                                                   texts of formal documents issued by the
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    electronic filings of comments, protests
                                                    and interventions in lieu of paper using                 Project Description                                   Commission, such as orders, notices,
                                                    the ‘‘eFiling’’ link at http://                            Transco proposes to construct new                   and rule makings.
                                                    www.ferc.gov. Persons unable to file                     compressor stations in San Patricio,                    Dated: July 14, 2017.
                                                    electronically should submit original                    Victoria, and Wharton Counties. The
                                                                                                                                                                   Kimberly D. Bose,
                                                    and five copies of the protest or                        three new compressor stations would
                                                    intervention to the Federal Energy                       total 30,650 horsepower. In addition,                 Secretary.
                                                    Regulatory Commission, 888 First Street                  there would be modifications to an                    [FR Doc. 2017–15244 Filed 7–19–17; 8:45 am]
                                                    NE., Washington, DC 20426.                               existing compressor station in Hardin                 BILLING CODE 6717–01–P




                                               VerDate Sep<11>2014   18:50 Jul 19, 2017   Jkt 241001   PO 00000   Frm 00014   Fmt 4703   Sfmt 9990   E:\FR\FM\20JYN1.SGM   20JYN1



Document Created: 2017-07-20 06:57:59
Document Modified: 2017-07-20 06:57:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on August 3, 2017.
FR Citation82 FR 33488 