82_FR_34445 82 FR 34305 - Pike Island Energy, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process

82 FR 34305 - Pike Island Energy, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 140 (July 24, 2017)

Page Range34305-34305
FR Document2017-15433

Federal Register, Volume 82 Issue 140 (Monday, July 24, 2017)
[Federal Register Volume 82, Number 140 (Monday, July 24, 2017)]
[Notices]
[Page 34305]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15433]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14590-001]


Pike Island Energy, LLC; Notice of Intent To File License 
Application, Filing of Pre-Application Document, Approving Use of the 
Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 14590-001.
    c. Dates Filed: May 31, 2017 and June 13, 2017.
    d. Submitted By: Pike Island Energy, LLC.
    e. Name of Project: Pike Island Hydroelectric Project.
    f. Location: At the existing U.S. Army Corps of Engineers' Pike 
Island Locks and Dam on the Ohio River, in Belmont and Jefferson 
Counties, Ohio, and Ohio County, West Virginia. The project would 
occupy United States lands administered by the U.S. Army Corps of 
Engineers.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Alan W. Skelly, J.S., CEO; Pike 
Island Energy, LLC, 127 Longwood Boulevard, Mount Orab, Ohio 45154; 
(513) 375-9242; email: [email protected].
    i. FERC Contact: Chelsea Hudock at (202) 502-8448; or email at 
[email protected].
    j. Pike Island Energy, LLC filed its pre-application document on 
May 31, 2017. On June 13, 2017, Pike Island Energy, LLC filed its 
request to use the Traditional Licensing Process, and provided public 
notice of its request on June 2, 2017. In a letter dated July 18, 2017, 
the Director of the Division of Hydropower Licensing approved Pike 
Island Energy, LLC's request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service under section 7 of the Endangered 
Species Act and the joint agency regulations thereunder at 50 CFR, Part 
402. We are also initiating consultation with the Ohio State Historic 
Preservation Officer and West Virginia State Historic Preservation 
Officer, as required by section 106, National Historic Preservation 
Act, and the implementing regulations of the Advisory Council on 
Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Pike Island Energy, LLC as 
the Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act and 
consultation pursuant to section 106 of the National Historic 
Preservation Act.
    m. Pike Island Energy, LLC filed a Pre-Application Document (PAD); 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(http://www.ferc.gov), using the eLibrary link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: July 18, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-15433 Filed 7-21-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 140 / Monday, July 24, 2017 / Notices                                                  34305

                                                  XI. LIST OF MANUFACTURER                                 DEPARTMENT OF ENERGY                                  consultation pursuant to section 7 of the
                                                     A list of manufacturers of all other                                                                        Endangered Species Act and
                                                  basic models distributed in commerce                     Federal Energy Regulatory                             consultation pursuant to section 106 of
                                                  in the United States and known to                        Commission                                            the National Historic Preservation Act.
                                                  Bitland to incorporate design                            [Project No. 14590–001]                                  m. Pike Island Energy, LLC filed a
                                                  characteristic(s) similar to those found                                                                       Pre-Application Document (PAD);
                                                  in the basic models that are the subject                 Pike Island Energy, LLC; Notice of                    including a proposed process plan and
                                                  of the petition is set forth in Appendix                 Intent To File License Application,                   schedule) with the Commission,
                                                  II hereto.                                               Filing of Pre-Application Document,                   pursuant to 18 CFR 5.6 of the
                                                     * * *                                                 Approving Use of the Traditional                      Commission’s regulations.
                                                     Bitland requests expedited treatment                  Licensing Process                                        n. A copy of the PAD is available for
                                                  of the Petition and Application. It is also                                                                    review at the Commission in the Public
                                                                                                              a. Type of Filing: Notice of Intent to             Reference Room or may be viewed on
                                                  willing to provide any additional
                                                                                                           File License Application and Request to               the Commission’s Web site (http://
                                                  information the Department thinks it
                                                                                                           Use the Traditional Licensing Process.                www.ferc.gov), using the eLibrary link.
                                                  needs to act with expedition.                               b. Project No.: 14590–001.                         Enter the docket number, excluding the
                                                  XII. CONCLUSION                                             c. Dates Filed: May 31, 2017 and June              last three digits in the docket number
                                                                                                           13, 2017.                                             field to access the document. For
                                                    DOE should grant Bitland the
                                                                                                              d. Submitted By: Pike Island Energy,
                                                  requested waiver and interim waiver for                                                                        assistance, contact FERC Online
                                                                                                           LLC.
                                                  the models listed in Appendix I hereto.                                                                        Support at FERCONlineSupport@
                                                                                                              e. Name of Project: Pike Island
                                                  Respectfully submitted,                                                                                        ferc.gov, (866) 208–3676 (toll free), or
                                                                                                           Hydroelectric Project.
                                                  Robert Hsiao                                                f. Location: At the existing U.S. Army             (202) 502–8659 (TTY). A copy is also
                                                  June 22, 2017                                            Corps of Engineers’ Pike Island Locks                 available for inspection and
                                                                                                           and Dam on the Ohio River, in Belmont                 reproduction at the address in
                                                  APPENDIX I                                                                                                     paragraph h.
                                                                                                           and Jefferson Counties, Ohio, and Ohio
                                                    The waiver and interim waiver                          County, West Virginia. The project                       o. Register online at http://
                                                  requested herein should apply to testing                 would occupy United States lands                      www.ferc.gov/docs-filing/
                                                  and rating of the following basic                        administered by the U.S. Army Corps of                esubscription.asp to be notified via
                                                  models: A045R053L provided by                            Engineers.                                            email of new filing and issuances
                                                  Chicony Power Technology.                                   g. Filed Pursuant to: 18 CFR 5.3 of the            related to this or other pending projects.
                                                                                                           Commission’s regulations.                             For assistance, contact FERC Online
                                                  APPENDIX II                                                                                                    Support.
                                                                                                              h. Potential Applicant Contact: Alan
                                                    The following are manufacturers of all                 W. Skelly, J.S., CEO; Pike Island Energy,               Dated: July 18, 2017.
                                                  other basic models distributed in                        LLC, 127 Longwood Boulevard, Mount                    Kimberly D. Bose,
                                                  commerce in the United States and                        Orab, Ohio 45154; (513) 375–9242;
                                                  known to Bitland to incorporate design                                                                         Secretary.
                                                                                                           email: awskelly@gmail.com.                            [FR Doc. 2017–15433 Filed 7–21–17; 8:45 am]
                                                  characteristics similar to those found in                   i. FERC Contact: Chelsea Hudock at
                                                  the basic models that are the subject of                 (202) 502–8448; or email at
                                                                                                                                                                 BILLING CODE 6717–01–P
                                                  the petition for waiver:                                 chelsea.hudock@ferc.gov.
                                                  Acbel                                                       j. Pike Island Energy, LLC filed its
                                                  Active-Semi, Inc. Apple, Inc Bitland                                                                           DEPARTMENT OF ENERGY
                                                                                                           pre-application document on May 31,
                                                  Chicony Power Technology Chrontel,                       2017. On June 13, 2017, Pike Island                   Federal Energy Regulatory
                                                    Inc                                                    Energy, LLC filed its request to use the              Commission
                                                  Dell                                                     Traditional Licensing Process, and
                                                  HONOR ELECTRONIC CO.LTD                                  provided public notice of its request on              Combined Notice of Filings
                                                  Huntkey
                                                                                                           June 2, 2017. In a letter dated July 18,
                                                  Ever Win International Corp. Griffin                                                                             Take notice that the Commission has
                                                                                                           2017, the Director of the Division of
                                                    Technology LLC                                                                                               received the following Natural Gas
                                                  LG Electronics USA, Inc Liteon                           Hydropower Licensing approved Pike
                                                                                                                                                                 Pipeline Rate and Refund Report filings:
                                                  Liteon                                                   Island Energy, LLC’s request to use the
                                                  Lucent Trans Electronics Co., Ltd.                       Traditional Licensing Process.                        Filings Instituting Proceedings
                                                    Mobileconn Technology Co., Ltd.                           k. With this notice, we are initiating
                                                                                                                                                                   Docket Numbers: CP16–17–002.
                                                    Phihong Technology Co., Ltd.                           informal consultation with the U.S. Fish
                                                                                                                                                                   Applicants: Millennium Pipeline
                                                  Poin2 Lab.                                               and Wildlife Service under section 7 of
                                                                                                                                                                 Company, L.L.C.
                                                  Renesas Electronics Corp. Salcomp Plc                    the Endangered Species Act and the
                                                                                                                                                                   Description: Abbreviated Application
                                                  Samsung                                                  joint agency regulations thereunder at
                                                                                                                                                                 for a Limited Amendment of Certificate
                                                  STMicroelectronics                                       50 CFR, Part 402. We are also initiating
                                                                                                                                                                 of Public Convenience and Necessity of
                                                  Superior Communications Texas                            consultation with the Ohio State
                                                                                                                                                                 Millennium Pipeline Company, L.L.C.
                                                    Instruments                                            Historic Preservation Officer and West
                                                  Ventev Mobile                                                                                                    Filed Date: 06/02/2017.
                                                                                                           Virginia State Historic Preservation
                                                  Weltrend Semiconductor                                                                                           Accession Number: 20170602–5155.
                                                                                                           Officer, as required by section 106,
                                                  Xentris Wireless                                                                                                 Comment Date: 5:00 p.m. Eastern
                                                                                                           National Historic Preservation Act, and
mstockstill on DSK30JT082PROD with NOTICES




                                                                                                                                                                 Time on Friday, August 4, 2017.
                                                    Sources include: ‘‘USB Power Brick’’,                  the implementing regulations of the
                                                  USB Implementers Forum, Inc.                             Advisory Council on Historic                             Docket Numbers: RP17–900–000.
                                                    Accessed < http://www.usb.org/                         Preservation at 36 CFR 800.2.                            Applicants: Dominion Energy Questar
                                                  kcompliance/view/                                           l. With this notice, we are designating            Pipeline, LLC.
                                                  CertifiedUSBPowerBricks.pdf                              Pike Island Energy, LLC as the                           Description: Dominion Energy
                                                  [FR Doc. 2017–15134 Filed 7–21–17; 8:45 am]              Commission’s non-federal                              Questar Pipeline, LLC submits tariff
                                                  BILLING CODE 6450–01–P                                   representative for carrying out informal              filing per 154.204: Firm Peaking


                                             VerDate Sep<11>2014   18:13 Jul 21, 2017   Jkt 241001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1



Document Created: 2017-07-22 01:19:57
Document Modified: 2017-07-22 01:19:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 34305 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR