82_FR_37357 82 FR 37205 - Consolidated Water Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

82 FR 37205 - Consolidated Water Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 152 (August 9, 2017)

Page Range37205-37205
FR Document2017-16750

Federal Register, Volume 82 Issue 152 (Wednesday, August 9, 2017)
[Federal Register Volume 82, Number 152 (Wednesday, August 9, 2017)]
[Notices]
[Page 37205]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-16750]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2590-061]


Consolidated Water Power Company; Notice of Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of license to change project 
boundary.
    b. Project No: 2590-061.
    c. Date Filed: June 6, 2017.
    d. Applicant: Consolidated Water Power Company.
    e. Name of Project: Whiting Hydroelectric Project.
    f. Location: The project is located on the Wisconsin River in 
Portage County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Thomas J. Witt, Consolidated Water Power 
Company, 610 High St., P.O. Box 8050, Wisconsin Rapids, WI 54495-8050, 
(715) 422-3927.
    i. FERC Contact: Hillary Berlin, (202) 502-8915, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: August 31, 2017.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-2590-061. Comments emailed to 
Commission staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: Consolidated Water Power Company 
(licensee) filed for Commission approval an application to remove 65 
acres of land on the east side of the Wisconsin River from the project 
boundary. These lands were formerly utilized for industrial purposes, 
and currently serve no project purpose. The licensee will also obtain 
ownership of 217 acres of land already within the project boundary, 25 
of which are located along the eastern shoreline. The licensee will 
relocate a portion of the Green Circle State Trail from the lands 
removed from the boundary to a portion of this land along the 
shoreline.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: August 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-16750 Filed 8-8-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 82, No. 152 / Wednesday, August 9, 2017 / Notices                                                  37205

                                                  Dated: August 3, 2017.                                are not considered part of the                        Commission will consider all protests or
                                                Kimberly D. Bose,                                       Commission record.                                    other comments filed, but only those
                                                Secretary.                                                 The Commission’s Rules of Practice                 who file a motion to intervene in
                                                [FR Doc. 2017–16749 Filed 8–8–17; 8:45 am]              and Procedure require all intervenors                 accordance with the Commission’s
                                                BILLING CODE 6717–01–P
                                                                                                        filing documents with the Commission                  Rules may become a party to the
                                                                                                        to serve a copy of that document on                   proceeding. Any comments, protests, or
                                                                                                        each person whose name appears on the                 motions to intervene must be received
                                                DEPARTMENT OF ENERGY                                    official service list for the project.                on or before the specified comment date
                                                                                                        Further, if an intervenor files comments              for the particular application.
                                                Federal Energy Regulatory                               or documents with the Commission                         o. Filing and Service of Documents:
                                                Commission                                              relating to the merits of an issue that               Any filing must (1) bear in all capital
                                                                                                        may affect the responsibilities of a                  letters the title COMMENTS, PROTEST,
                                                [Project No. 2590–061]                                  particular resource agency, they must                 or MOTION TO INTERVENE as
                                                                                                        also serve a copy of the document on                  applicable; (2) set forth in the heading
                                                Consolidated Water Power Company;                       that resource agency.                                 the name of the applicant and the
                                                Notice of Application Accepted for                         k. Description of Request:                         project number of the application to
                                                Filing and Soliciting Comments,                         Consolidated Water Power Company                      which the filing responds; (3) furnish
                                                Motions To Intervene, and Protests                      (licensee) filed for Commission approval              the name, address, and telephone
                                                                                                        an application to remove 65 acres of                  number of the person commenting,
                                                   Take notice that the following
                                                                                                        land on the east side of the Wisconsin                protesting or intervening; and (4)
                                                hydroelectric application has been filed
                                                                                                        River from the project boundary. These
                                                with the Commission and is available                                                                          otherwise comply with the requirements
                                                                                                        lands were formerly utilized for
                                                for public inspection:                                                                                        of 18 CFR 385.2001 through 385.2005.
                                                                                                        industrial purposes, and currently serve
                                                   a. Application Type: Amendment of                                                                          All comments, motions to intervene, or
                                                                                                        no project purpose. The licensee will
                                                license to change project boundary.                                                                           protests must set forth their evidentiary
                                                                                                        also obtain ownership of 217 acres of
                                                   b. Project No: 2590–061.                                                                                   basis. Any filing made by an intervenor
                                                                                                        land already within the project
                                                   c. Date Filed: June 6, 2017.                                                                               must be accompanied by proof of
                                                                                                        boundary, 25 of which are located along
                                                   d. Applicant: Consolidated Water                                                                           service on all persons listed in the
                                                                                                        the eastern shoreline. The licensee will
                                                Power Company.                                                                                                service list prepared by the Commission
                                                                                                        relocate a portion of the Green Circle
                                                   e. Name of Project: Whiting                                                                                in this proceeding, in accordance with
                                                                                                        State Trail from the lands removed from
                                                Hydroelectric Project.                                  the boundary to a portion of this land                18 CFR 385.2010.
                                                   f. Location: The project is located on               along the shoreline.                                    Dated: August 1, 2017.
                                                the Wisconsin River in Portage County,                     l. Locations of the Application: A                 Kimberly D. Bose,
                                                Wisconsin.                                              copy of the application is available for              Secretary.
                                                   g. Filed Pursuant to: Federal Power                  inspection and reproduction at the                    [FR Doc. 2017–16750 Filed 8–8–17; 8:45 am]
                                                Act, 16 U.S.C. 791a–825r.                               Commission’s Public Reference Room,                   BILLING CODE 6717–01–P
                                                   h. Applicant Contact: Thomas J. Witt,                located at 888 First Street NE., Room
                                                Consolidated Water Power Company,                       2A, Washington, DC 20426, or by calling
                                                610 High St., P.O. Box 8050, Wisconsin                  (202) 502–8371. This filing may also be               DEPARTMENT OF ENERGY
                                                Rapids, WI 54495–8050, (715) 422–                       viewed on the Commission’s Web site at
                                                3927.                                                   http://www.ferc.gov using the                         Federal Energy Regulatory
                                                   i. FERC Contact: Hillary Berlin, (202)               ‘‘eLibrary’’ link. Enter the docket                   Commission
                                                502–8915, hillary.berlin@ferc.gov.                      number excluding the last three digits in
                                                   j. Deadline for filing comments,                     the docket number field to access the                 [Docket No. CP17–79–000]
                                                motions to intervene, and protests:                     document. You may also register online
                                                August 31, 2017.                                        at http://www.ferc.gov/docs-filing/                   Florida Gas Transmission Company,
                                                   The Commission strongly encourages                   esubscription.asp to be notified via                  L.L.C.; Notice of Revised Schedule for
                                                electronic filing. Please file comments,                email of new filings and issuances                    Environmental Review of the Wekiva
                                                motions to intervene, and protests using                related to this or other pending projects.            Parkway Relocation Project
                                                the Commission’s eFiling system at                      For assistance, call 1–866–208–3676 or
                                                http://www.ferc.gov/docs-filing/                        email FERCOnlineSupport@ferc.gov, for                    This notice identifies the Federal
                                                efiling.asp. Commenters can submit                      TTY, call (202) 502–8659. A copy is also              Energy Regulatory Commission staff’s
                                                brief comments up to 6,000 characters,                  available for inspection and                          revised schedule for the completion of
                                                without prior registration, using the                   reproduction at the address in item (h)               the environmental assessment (EA) for
                                                eComment system at http://                              above. Agencies may obtain copies of                  the Florida Gas Transmission Company,
                                                www.ferc.gov/docs-filing/                               the application directly from the                     L.L.C. (Florida Gas) Wekiva Parkway
                                                ecomment.asp. You must include your                     applicant.                                            Relocation Project. The first notice of
                                                name and contact information at the end                    m. Individuals desiring to be included             schedule, issued on June 7, 2017,
                                                of your comments. For assistance,                       on the Commission’s mailing list should               identified July 28, 2017 as the EA
                                                please contact FERC Online Support at                   so indicate by writing to the Secretary               issuance date. However, due to
                                                FERCOnlineSupport@ferc.gov, (866)                       of the Commission.                                    additional environmental information to
                                                208–3676 (toll free), or (202) 502–8659                    n. Comments, Protests, or Motions to               be filed by Florida Gas since issuance of
sradovich on DSK3GMQ082PROD with NOTICES




                                                (TTY). In lieu of electronic filing, please             Intervene: Anyone may submit                          the June 7, 2017 Scheduling Notice, the
                                                send a paper copy to: Secretary, Federal                comments, a protest, or a motion to                   Commission staff requires more time to
                                                Energy Regulatory Commission, 888                       intervene in accordance with the                      complete our review. As a result, staff
                                                First Street NE., Washington, DC 20426.                 requirements of Rules of Practice and                 has revised the schedule for issuance of
                                                The first page of any filing should                     Procedure, 18 CFR 385.210, .211, .214,                the EA, to allow for time to incorporate
                                                include docket number P–2590–061.                       respectively. In determining the                      supplemental information into the final
                                                Comments emailed to Commission staff                    appropriate action to take, the                       document.


                                           VerDate Sep<11>2014   17:00 Aug 08, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2017-08-09 02:18:13
Document Modified: 2017-08-09 02:18:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 37205 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR