82_FR_37361 82 FR 37209 - Southwest Gas Storage Company; Notice of Request Under Blanket Authorization

82 FR 37209 - Southwest Gas Storage Company; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 152 (August 9, 2017)

Page Range37209-37210
FR Document2017-16752

Federal Register, Volume 82 Issue 152 (Wednesday, August 9, 2017)
[Federal Register Volume 82, Number 152 (Wednesday, August 9, 2017)]
[Notices]
[Pages 37209-37210]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-16752]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-475-000]


Southwest Gas Storage Company; Notice of Request Under Blanket 
Authorization

    Take notice that on July 19, 2017, Southwest Gas Storage Company 
(Southwest) 1300 Main Street, Houston, Texas 77002, filed in Docket No. 
CP17-475-000 a prior notice request pursuant to sections 157.20, 
157.208, 157.2135 and 157.216 of the Commission's regulations under the 
Natural Gas Act for authorization to modify, replace, and abandon 
certain natural gas storage facilities and convert certain injection/
withdrawal wells to observation status within Southwest's existing 
Howell Storage Field, located in Livingston County, Michigan, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the web at http://www.ferc.gov using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, please contact FERC 
Online Support at [email protected] or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Blair 
Lichtenwalter, Senior Director of Certificates, Southwest Gas Storage 
Company, 1300 Main Street, Houston, Texas 77002, at (713) 989-1205 or 
by email at [email protected].
    Specifically, Southwest requests authorization to abandon in place 
seven storage lateral pipelines consisting of approximately 8,528 feet 
of existing 4, 6, 8, and 12-inch-diameter lateral pipelines and 
appurtenances, and to convert the connecting injection/withdrawal wells 
to observation status.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If

[[Page 37210]]

a protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the e-Filing link.

    Dated: August 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-16752 Filed 8-8-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 82, No. 152 / Wednesday, August 9, 2017 / Notices                                              37209

                                                   Description: § 205(d) Rate Filing:                      Description: § 205(d) Rate Filing:                 County, Michigan, all as more fully set
                                                Revised MBR Tariff re Cat Seller & 819                  Member Rate Change—North Plains to                    forth in the application which is on file
                                                to be effective 8/3/2017.                               be effective 6/8/2017.                                with the Commission and open to
                                                   Filed Date: 8/2/17.                                     Filed Date: 8/2/17.                                public inspection. The filing may also
                                                   Accession Number: 20170802–5057.                        Accession Number: 20170802–5082.                   be viewed on the web at http://
                                                   Comments Due: 5 p.m. ET 8/23/17.                        Comments Due: 5 p.m. ET 8/23/17.                   www.ferc.gov using the eLibrary link.
                                                   Docket Numbers: ER17–2224–000.                          Docket Numbers: ER17–2231–000.                     Enter the docket number excluding the
                                                   Applicants: New Covert Generating                       Applicants: Public Service Company                 last three digits in the docket number
                                                Company, LLC.                                           of Colorado.                                          field to access the document. For
                                                   Description: § 205(d) Rate Filing:                      Description: § 205(d) Rate Filing:                 assistance, please contact FERC Online
                                                Revised MBR Tariff re Cat Seller & 829                  OATT–PSCo–TSGT-Non-Conforming                         Support at FERCOnlineSupport@
                                                to be effective 8/3/2017.                               BASA 409 0.1.0 to be effective 4/1/2017.              ferc.gov or toll free at (866) 208–3676, or
                                                   Filed Date: 8/2/17.                                     Filed Date: 8/2/17.                                TTY, contact (202) 502–8659.
                                                   Accession Number: 20170802–5058.                        Accession Number: 20170802–5087.                      Any questions concerning this
                                                   Comments Due: 5 p.m. ET 8/23/17.                        Comments Due: 5 p.m. ET 8/23/17.                   application may be directed to Blair
                                                                                                           The filings are accessible in the                  Lichtenwalter, Senior Director of
                                                   Docket Numbers: ER17–2225–000.
                                                                                                        Commission’s eLibrary system by                       Certificates, Southwest Gas Storage
                                                   Applicants: Midcontinent
                                                                                                        clicking on the links or querying the                 Company, 1300 Main Street, Houston,
                                                Independent System Operator, Inc.
                                                                                                        docket number.                                        Texas 77002, at (713) 989–1205 or by
                                                   Description: § 205(d) Rate Filing:
                                                                                                           Any person desiring to intervene or                email at blair.lichtenwalter@
                                                2017–08–02_SA 2931 ATC–WPL J390                                                                               energytransfer.com.
                                                E&P Termination to be effective 8/3/                    protest in any of the above proceedings
                                                                                                        must file in accordance with Rules 211                   Specifically, Southwest requests
                                                2017.                                                                                                         authorization to abandon in place seven
                                                   Filed Date: 8/2/17.                                  and 214 of the Commission’s
                                                                                                        Regulations (18 CFR 385.211 and                       storage lateral pipelines consisting of
                                                   Accession Number: 20170802–5065.                                                                           approximately 8,528 feet of existing 4, 6,
                                                   Comments Due: 5 p.m. ET 8/23/17.                     385.214) on or before 5:00 p.m. Eastern
                                                                                                                                                              8, and 12-inch-diameter lateral
                                                   Docket Numbers: ER17–2226–000.                       time on the specified comment date.
                                                                                                                                                              pipelines and appurtenances, and to
                                                   Applicants: Rolling Hills Generating,                Protests may be considered, but
                                                                                                                                                              convert the connecting injection/
                                                L.L.C.                                                  intervention is necessary to become a
                                                                                                                                                              withdrawal wells to observation status.
                                                   Description: § 205(d) Rate Filing:                   party to the proceeding.                                 Pursuant to section 157.9 of the
                                                Revised MBR Tariff re Cat Seller & 819                     eFiling is encouraged. More detailed               Commission’s rules, 18 CFR 157.9,
                                                to be effective 8/3/2017.                               information relating to filing                        within 90 days of this Notice the
                                                   Filed Date: 8/2/17.                                  requirements, interventions, protests,                Commission staff will either: Complete
                                                   Accession Number: 20170802–5068.                     service, and qualifying facilities filings            its environmental assessment (EA) and
                                                   Comments Due: 5 p.m. ET 8/23/17.                     can be found at: http://www.ferc.gov/                 place it into the Commission’s public
                                                                                                        docs-filing/efiling/filing-req.pdf. For               record (eLibrary) for this proceeding; or
                                                   Docket Numbers: ER17–2227–000.
                                                                                                        other information, call (866) 208–3676                issue a Notice of Schedule for
                                                   Applicants: Southern California
                                                                                                        (toll free). For TTY, call (202) 502–8659.            Environmental Review. If a Notice of
                                                Edison Company.
                                                   Description: § 205(d) Rate Filing:                     Dated: August 2, 2017.                              Schedule for Environmental Review is
                                                Amended and Restated TSA Golden                         Nathaniel J. Davis, Sr.,                              issued, it will indicate, among other
                                                State Water Company RS No. 465 to be                    Deputy Secretary.                                     milestones, the anticipated date for the
                                                effective 10/2/2017.                                    [FR Doc. 2017–16758 Filed 8–8–17; 8:45 am]            Commission staff’s issuance of the final
                                                   Filed Date: 8/2/17.                                  BILLING CODE 6717–01–P
                                                                                                                                                              environmental impact statement (FEIS)
                                                   Accession Number: 20170802–5075.                                                                           or EA for this proposal. The filing of the
                                                   Comments Due: 5 p.m. ET 8/23/17.                                                                           EA in the Commission’s public record
                                                                                                        DEPARTMENT OF ENERGY                                  for this proceeding or the issuance of a
                                                   Docket Numbers: ER17–2228–000.
                                                                                                                                                              Notice of Schedule for Environmental
                                                   Applicants: Midcontinent
                                                                                                        Federal Energy Regulatory                             Review will serve to notify federal and
                                                Independent System Operator, Inc.
                                                                                                        Commission                                            state agencies of the timing for the
                                                   Description: § 205(d) Rate Filing:
                                                                                                                                                              completion of all necessary reviews, and
                                                2017–08–02_SA 2509 ITC-Tuscola Wind                     [Docket No. CP17–475–000]
                                                                                                                                                              the subsequent need to complete all
                                                E&P (J202) Termination to be effective
                                                                                                        Southwest Gas Storage Company;                        federal authorizations within 90 days of
                                                8/3/2017.
                                                                                                        Notice of Request Under Blanket                       the date of issuance of the Commission
                                                   Filed Date: 8/2/17.
                                                                                                        Authorization                                         staff’s FEIS or EA.
                                                   Accession Number: 20170802–5076.                                                                              Any person may, within 60 days after
                                                   Comments Due: 5 p.m. ET 8/23/17.                       Take notice that on July 19, 2017,                  the issuance of the instant notice by the
                                                   Docket Numbers: ER17–2229–000.                       Southwest Gas Storage Company                         Commission, file pursuant to Rule 214
                                                   Applicants: Southwest Power Pool,                    (Southwest) 1300 Main Street, Houston,                of the Commission’s Procedural Rules
                                                Inc.                                                    Texas 77002, filed in Docket No. CP17–                (18 CFR 385.214) a motion to intervene
                                                   Description: § 205(d) Rate Filing:                   475–000 a prior notice request pursuant               or notice of intervention. Any person
                                                Tariff Revisions to Change Frequency of                 to sections 157.20, 157.208, 157.2135                 filing to intervene or the Commission’s
                                                Regional Cost Allocation Review to be                   and 157.216 of the Commission’s                       staff may, pursuant to section 157.205 of
sradovich on DSK3GMQ082PROD with NOTICES




                                                effective 10/1/2017.                                    regulations under the Natural Gas Act                 the Commission’s Regulations under the
                                                   Filed Date: 8/2/17.                                  for authorization to modify, replace, and             Natural Gas Act (NGA) (18 CFR 157.205)
                                                   Accession Number: 20170802–5081.                     abandon certain natural gas storage                   file a protest to the request. If no protest
                                                   Comments Due: 5 p.m. ET 8/23/17.                     facilities and convert certain injection/             is filed within the time allowed
                                                   Docket Numbers: ER17–2230–000.                       withdrawal wells to observation status                therefore, the proposed activity shall be
                                                   Applicants: Golden Spread Electric                   within Southwest’s existing Howell                    deemed to be authorized effective the
                                                Cooperative, Inc.                                       Storage Field, located in Livingston                  day after the time allowed for protest. If


                                           VerDate Sep<11>2014   17:00 Aug 08, 2017   Jkt 241001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1


                                                37210                      Federal Register / Vol. 82, No. 152 / Wednesday, August 9, 2017 / Notices

                                                a protest is filed and not withdrawn                    Forest Service and the U.S. Bureau of                 to construct a qualifying conduit
                                                within 30 days after the time allowed                   Land Management.                                      hydropower facility, pursuant to section
                                                for filing a protest, the instant request                  Staff prepared an environmental                    30 of the Federal Power Act (FPA), as
                                                shall be treated as an application for                  assessment (EA) for the application that              amended by section 4 of the
                                                authorization pursuant to section 7 of                  analyzes the potential environmental                  Hydropower Regulatory Efficiency Act
                                                the NGA.                                                effects of approving the transmission                 of 2013 (HREA). The proposed B24
                                                  The Commission strongly encourages                    line reroute as a non-project use of                  Hydroelectric Station would have a
                                                electronic filings of comments, protests,               project lands. In the EA, staff concludes             combined installed capacity of 150
                                                and interventions via the internet in lieu              that such an approval, with specified
                                                                                                                                                              kilowatts (kW), and would be located
                                                of paper. See 18 CFR 385.2001(a)(1)(iii)                environmental protection measures,
                                                                                                                                                              along a 24-inch diameter raw water
                                                and the instructions on the                             would not constitute a major federal
                                                Commission’s Web site (www.ferc.gov)                    action that would significantly affect the            pipeline. The project would be located
                                                under the e-Filing link.                                quality of the human environment.                     near the Town of La Puente in Los
                                                                                                           A copy of the EA is available for                  Angeles County, California.
                                                  Dated: August 1, 2017.
                                                Kimberly D. Bose,
                                                                                                        review at the Commission’s Public                       Applicant Contact: Robert J. DiPrimio,
                                                                                                        Reference Room or may it be viewed on                 Senior Vice President, San Gabriel
                                                Secretary.
                                                                                                        the Commission’s Web site at                          Valley Water Company, 11142 Garvey
                                                [FR Doc. 2017–16752 Filed 8–8–17; 8:45 am]
                                                                                                        www.ferc.gov using the ‘‘eLibrary’’ link.             Avenue, El Monte, CA 91733; Phone No.
                                                BILLING CODE 6717–01–P
                                                                                                        Enter the docket number P–2100 in the                 (626) 448–6183; Email rjdiprimio@
                                                                                                        docket number field to access the                     sgvwater.com.
                                                                                                        document. For assistance, contact FERC
                                                DEPARTMENT OF ENERGY                                                                                            FERC Contact: Robert Bell, Phone No.
                                                                                                        Online Support at
                                                                                                        FERCOnlineSupport@ferc.gov or toll-                   (202) 502–6062; Email: robert.bell@
                                                Federal Energy Regulatory                                                                                     ferc.gov.
                                                Commission                                              free at 1–866–208–3676, or for TTY,
                                                                                                        202–502–8659.                                           Qualifying Conduit Hydropower
                                                [Project No. 2100–182—California]                          For further information, contact Mr.               Facility Description: The proposed
                                                                                                        John Aedo at (415) 369–3335 or by                     project would consist of: (1) A new
                                                California Department of Water                          email at john.aedo@ferc.gov.
                                                Resources; Notice of Availability of                                                                          powerhouse containing one generating
                                                Environmental Assessment                                  Dated: August 2, 2017.                              unit with an installed capacity of 150
                                                                                                        Kimberly D. Bose,                                     kilowatts (kW) installed in the potable
                                                   In accordance with the National                      Secretary.                                            water pipeline; and (2) appurtenant
                                                Environmental Policy Act of 1969 and                                                                          facilities. The proposed project would
                                                                                                        [FR Doc. 2017–16756 Filed 8–8–17; 8:45 am]
                                                the Federal Energy Regulatory                                                                                 have an estimated annual generation of
                                                                                                        BILLING CODE 6717–01–P
                                                Commission’s (Commission or FERC)                                                                             1,200 megawatt-hours (MWh).
                                                regulations, 18 Code of Federal
                                                Regulations part 380, the Office of                                                                             A qualifying conduit hydropower
                                                                                                        DEPARTMENT OF ENERGY                                  facility is one that is determined or
                                                Energy Projects has reviewed an
                                                application filed June 23, 2017, by the                 Federal Energy Regulatory                             deemed to meet all of the criteria shown
                                                California Department of Water                          Commission                                            in the table below.
                                                Resources to permit Pacific Gas and
                                                Electric Company to reroute a portion of                [Docket No. CD17–17–000]
                                                its transmission line across project lands
                                                                                                        San Gabriel Valley Water Company;
                                                in the vicinity of the project’s
                                                                                                        Notice of Preliminary Determination of
                                                Thermalito Diversion Pool at the
                                                                                                        a Qualifying Conduit Hydropower
                                                Feather River Hydroelectric Project No.
                                                                                                        Facility and Soliciting Comments and
                                                2100. The project is located on the
                                                                                                        Motions To Intervene
                                                Feather River in Butte County,
                                                California, and occupies lands of the                    On July 27, 2017, San Gabriel Valley
                                                United States administered by the U.S.                  Water Company filed a notice of intent

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                Satisfies
                                                            Statutory provision                                                            Description                                           (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water
                                                                                                     for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                     eration of electricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                     erally owned conduit.
sradovich on DSK3GMQ082PROD with NOTICES




                                                FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                  HREA.
                                                FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                  HREA.                                             censing requirements of Part I of the FPA.



                                                  Preliminary Determination: The                        utilize an existing potable water                     to storage tanks for subsequent customer
                                                proposed hydroelectric project will                     pipeline, used to convey potable water                distribution. The addition of the B24


                                           VerDate Sep<11>2014   17:00 Aug 08, 2017   Jkt 241001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2017-08-09 02:18:26
Document Modified: 2017-08-09 02:18:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 37209 

2025 Federal Register | Disclaimer | Privacy Policy