82_FR_38858 82 FR 38702 - Agency Information Collection Activities: Oil and Gas and Sulfur Operations in the OCS-General

82 FR 38702 - Agency Information Collection Activities: Oil and Gas and Sulfur Operations in the OCS-General

DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement

Federal Register Volume 82, Issue 156 (August 15, 2017)

Page Range38702-38706
FR Document2017-17209

To comply with the Paperwork Reduction Act of 1995 (PRA), the Bureau of Safety and Environmental Enforcement (BSEE) is notifying the public that we have submitted to OMB an information collection request (ICR) to renew approval of the paperwork requirements in BSEE's regulations concerning, Oil and Gas and Sulfur Operations in the OCS-- General. This notice also provides the public a second opportunity to comment on the revised paperwork burden of these regulatory requirements.

Federal Register, Volume 82 Issue 156 (Tuesday, August 15, 2017)
[Federal Register Volume 82, Number 156 (Tuesday, August 15, 2017)]
[Notices]
[Pages 38702-38706]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-17209]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-2017-0002; 17XE1700DX EEEE500000 EX1SF0000.DAQ000; OMB 
Control Number 1014-0022]


Agency Information Collection Activities: Oil and Gas and Sulfur 
Operations in the OCS--General

ACTION: Notice; request for comments.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), the 
Bureau of Safety and Environmental Enforcement (BSEE) is notifying the 
public that we have submitted to OMB an information collection request 
(ICR) to renew approval of the paperwork requirements in BSEE's 
regulations concerning, Oil and Gas and Sulfur Operations in the OCS--
General. This notice also provides the public a second opportunity to 
comment on the revised paperwork burden of these regulatory 
requirements.

DATES: You must submit comments by September 14, 2017.

ADDRESSES: Submit comments by either fax (202) 395-5806 or email 
([email protected]) directly to the Office of Information and 
Regulatory Affairs, OMB, Attention: Desk Officer for the Department of 
the Interior (1014-0022). Please provide a copy of your comments to 
BSEE by any of the means below.
     Electronically go to http://www.regulations.gov. In the 
Search box, enter BSEE-2017-0002 then click search. Follow the 
instructions to submit public comments and view all related materials. 
We will post all comments.
     Email [email protected], fax (703) 787-1546, or mail or 
hand-carry comments to the Department of the Interior; Bureau of Safety 
and Environmental Enforcement; Regulations and Standards Branch; ATTN: 
Nicole Mason; 45600 Woodland Road, Sterling, VA 20166. Please reference 
ICR 1014-0022 in your comment and include your name and return address.

FOR FURTHER INFORMATION CONTACT: Nicole Mason, Regulations and 
Standards Branch, (703) 787-1607, to request additional information 
about this ICR. To see a copy of the entire ICR submitted to OMB, go to 
http://www.reginfo.gov (select Information Collection Review, Currently 
Under Review).

SUPPLEMENTARY INFORMATION:
    Title: 30 CFR part 250, subpart A, Oil and Gas and Sulfur 
Operations in the OCS--General.
    Form(s): BSEE-0132, BSEE-0143, BSEE-1832.
    OMB Control Number: 1014-0022.
    Abstract: The Outer Continental Shelf (OCS) Lands Act at 43 U.S.C. 
1334 authorizes the Secretary of the Interior to prescribe rules and 
regulations necessary for the administration of the leasing provisions 
of that Act related to mineral resources on the OCS. Such rules and 
regulations will apply to all operations conducted under a lease, 
right-of-way, or a right-of-use and easement. Operations on the OCS 
must preserve, protect, and develop oil and natural gas resources in a 
manner that is consistent with the need to make such resources 
available to meet the Nation's energy needs as rapidly as possible; to 
balance orderly energy resource development with protection of human, 
marine, and coastal environments; to ensure the public a fair and 
equitable return on the resources of the OCS; and to preserve and 
maintain free enterprise competition.
    In addition to the general rulemaking authority of the OCSLA at 43 
U.S.C. 1334, section 301(a) of the Federal Oil and Gas Royalty 
Management Act (FOGRMA), 30 U.S.C. 1751(a), grants authority to the 
Secretary to prescribe such rules and regulations as are reasonably 
necessary to carry out FOGRMA's provisions. While the majority of 
FOGRMA is directed to royalty collection and enforcement, some 
provisions apply to offshore operations. For example, section 108 of 
FOGRMA, 30 U.S.C. 1718, grants the Secretary broad authority to inspect 
lease sites for the purpose of determining whether there is compliance 
with the mineral leasing laws. Section 109(c)(2) and (d)(1), 30 U.S.C. 
1719(c)(2) and (d)(1), impose substantial civil penalties for failure 
to permit lawful inspections and for knowing or willful preparation or 
submission of false, inaccurate, or misleading reports, records, or 
other information. Because the Secretary has delegated some of the 
authority under FOGRMA to BSEE, 30 U.S.C. 1751 is included as 
additional authority for these requirements.
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and OMB Circular A-25, authorize Federal agencies to recover the 
full cost of services that confer special benefits. Under the 
Department of the Interior's implementing policy, BSEE is required to 
charge fees for services that provide special benefits or privileges to 
an identifiable non-Federal recipient above and beyond those which 
accrue to the public at large. A request for approval required in 30 
CFR 250.171 is subject to cost recovery, and BSEE regulations specify 
service fees for these requests in 30 CFR 250.125.
    The Federal Water Pollution Control Act (33 U.S.C. 1331(j)(1)(C)) 
authorizes the President to adopt regulations that establish 
procedures, methods and equipment requirements to prevent oil spills 
and other hazardous substance discharges from offshore and other 
facilities. The regulatory authority for offshore facilities has been 
delegated to the Secretary and further delegated by the Secretary to 
BSEE. The regulations at 30 CFR part 250, subpart A, require compliance 
with all applicable BSEE regulations, including those intended to 
prevent or reduce discharges of oil and other hazardous substances. 
These authorities and responsibilities are among those delegated to 
BSEE. The regulations at 30 CFR part 250, subpart A, concern the 
general regulatory requirements of oil, gas, and sulfur operations in 
the OCS (including the associated forms), and are the subject of

[[Page 38703]]

this collection. This request also covers any related Notices to 
Lessees and Operators (NTLs) that BSEE issues to clarify, supplement, 
or provide additional guidance on some aspects of our regulations.
    The BSEE uses the information collected under the Subpart A 
regulations to ensure that operations on the OCS are carried out in a 
safe and pollution-free manner, do not interfere with the rights of 
other users on the OCS, and balance the protection and development of 
OCS resources. Specifically, we use the information collected to:
     Review records of formal crane operator and rigger 
training, crane operator qualifications, crane inspections, testing, 
and maintenance to ensure that lessees/operators perform operations in 
a safe and workmanlike manner and that equipment is maintained in a 
safe condition. The BSEE also uses the information to make certain that 
all new and existing cranes installed on OCS fixed platforms must be 
equipped with anti-two block safety devices, and to assure that uniform 
methods are employed by lessees for load testing of cranes.
     Review welding plans, procedures, and records to ensure 
that welding is conducted in a safe and workmanlike manner by trained 
and experienced personnel.
     Provide lessees/operators greater flexibility to comply 
with regulatory requirements through approval of alternative equipment 
or procedures and departures to regulations if they demonstrate equal 
or better compliance with the appropriate performance standards.
     Ensure that injection of gas promotes conservation of 
natural resources and prevents waste.
     Record the agent and local agent empowered to receive 
notices and comply with regulatory orders issued.
     Provide for orderly development of leases through the use 
of information to determine the appropriateness of lessee/operator 
requests for suspension of operations, including production.
     Improve safety and environmental protection on the OCS 
through collection and analysis of accident reports to ascertain the 
cause of the accidents and to determine ways to prevent recurrences.
     Ascertain when the lease ceases production or when the 
last well ceases production in order to determine the 180th day after 
the date of completion of the last production. The BSEE will use this 
information to efficiently maintain the lessee/operator lease status.
     Allow lessees/operators who exhibit unacceptable 
performance an incremental approach to improving their overall 
performance prior to a final decision to disqualify a lessee/operator 
or to pursue debarment proceedings through the execution of a 
performance improvement plan (PIP). The Subpart A regulations do not 
address the actual process that we will follow in pursuing the 
disqualification of operators under Sec. Sec.  250.135 and 250.136; 
however, our internal enforcement procedures include allowing such 
operators to demonstrate a commitment to acceptable performance by the 
submission of a PIP.
    The forms associated with this information collection request are 
as follows:
    The BSEE Environmental Compliance Division has decided to 
discontinue use of BSEE Form-0011, Internet Based Safety and 
Environmental Enforcement Reporting System (Isee), due to an evolving 
program and changes in management. The information submitted under 
Sec.  250.193 instructs the public on what information and where to 
submit possible violations making the form obsolete.
    Form BSEE-1832, Incident(s) of Noncompliance (INCs), is used to 
determine that respondents have corrected all incident(s) of 
noncompliance identified during inspections. Everything on the INC form 
is filled out by a BSEE inspector/representative. Industry is only 
required to sign this form upon receipt and respond to BSEE when each 
INC has been corrected, no later than 14 days from the date of 
issuance.
    Form BSEE-0132, Hurricane and Tropical Storm Evacuation and 
Production Curtailment Statistics, is used in the Gulf of Mexico OCS 
Region (GOMR) to obtain general information, such as company name, 
contact, date, time, telephone number; as well as number of platforms 
and drilling rigs evacuated and not evacuated, and production shut-in 
statistics for oil (BOPD) and gas (MMSCFD).
    Form BSEE-0143, Facility/Equipment Damage Report, is used to assess 
initial damage to a structure or equipment and then be aware of changes 
until the damaged structure or equipment is returned to service, as 
well as to assess the production rate at time of shut-in (BPD and/or 
MMCFPD), cumulative production shut-in (BPD and/or MMCFPD), and 
estimated time to return to service (in days).
    Most responses are mandatory, while others are required to obtain 
or retain benefits, or are voluntary. No questions of a sensitive 
nature are asked. The BSEE protects information considered proprietary 
under the Freedom of Information Act (5 U.S.C. 552) and DOI's 
implementing regulations (43 CFR part 2), and under regulations at 30 
CFR 250.197, Data and information to be made available to the public or 
for limited inspection, and 30 CFR part 252, OCS Oil and Gas 
Information Program.
    Frequency: On occasion, daily, weekly, monthly, and varies by 
section.
    Description of Respondents: Potential respondents comprise Federal 
OCS oil, gas, or sulfur lessees and/or operators and holders of 
pipeline rights-of-way.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this information collection is a total of 99,866 
hours and $222,915 non-hour costs. The following chart details the 
individual components and estimated hour burdens. In calculating the 
burdens, we assumed that respondents perform certain requirements in 
the normal course of their activities. We consider these to be usual 
and customary and took that into account in estimating the burden.

                                                Burden Breakdown
----------------------------------------------------------------------------------------------------------------
                                                                           Non-Hour cost burdens
                                       Reporting or      -------------------------------------------------------
Citation 30 CFR 250  Subpart A;       recordkeeping                                                Annual burden
       related forms/NTLs              requirement*           Hour burden      Average number of       hours
                                                                                annual responses     (rounded)
----------------------------------------------------------------------------------------------------------------
104; Form BSEE-1832............  Appeal orders or          Exempt under 5 CFR 1320.4(a)(2), (c)                0
                                  decisions; appeal INCs.
----------------------------------------------------------------------------------------------------------------
107(c).........................  Request waiver by        8..................  2 justifications.              16
                                  demonstrating the use
                                  for BAST would not be
                                  practicable.
----------------------------------------------------------------------------------------------------------------

[[Page 38704]]

 
108(e).........................  Retain records of        7..................  2,011 record-              14,077
                                  design and                                    keepers.
                                  construction for life
                                  of crane, including
                                  installation records
                                  for any anti-two block
                                  safety devices; all
                                  inspection, testing,
                                  and maintenance for at
                                  least 4 years; crane
                                  operator and all
                                  rigger personnel
                                  qualifications for at
                                  least 4 years; all
                                  records must be kept
                                  at the OCS fixed
                                  platform.
----------------------------------------------------------------------------------------------------------------
109(a); 110....................  Submit welding,          9..................  51 plans.........             459
                                  burning, and hot
                                  tapping plans.
----------------------------------------------------------------------------------------------------------------
109(b); 113(c).................  Retain welding plan &    3..................  948 operations...           2,844
                                  approval letter, and
                                  drawings of safe-
                                  welding areas at site;
                                  designated person
                                  advises in writing
                                  that it is safe to
                                  weld.
----------------------------------------------------------------------------------------------------------------
118; 121; 124..................  Apply for injection of   10.................  6 applications...              60
                                  gas; use BSEE-approved
                                  formula to determine
                                  original gas from
                                  injected.
----------------------------------------------------------------------------------------------------------------
125; 126.......................  Cost Recovery Fees,       Cost Recovery Fees and related items                0
                                  confirmation receipt,     are covered individually throughout
                                  etc.; verbal approvals                 Subpart A
                                  pertaining to fees.
----------------------------------------------------------------------------------------------------------------
130-133 (Form BSEE-1832).......  Submit ``green''         3..................  2,802 forms......           8,406
                                  response copy of Form
                                  BSEE-1832, INC(s),
                                  indicating date
                                  violations corrected;
                                  or submit same info
                                  via electronic
                                  reporting.
----------------------------------------------------------------------------------------------------------------
130-133........................  Request reconsideration  7..................  274 requests.....           1,918
                                  from issuance of an
                                  INC.
                                 Request waiver of 14-    1..................  1,572 waivers....           1,572
                                  day response time.
                                 Notify BSEE before       1..................  1,356 notices....           1,356
                                  returning to
                                  operations if shut-in.
----------------------------------------------------------------------------------------------------------------
132(b)(3)......................  During inspections,      4..................  4,554 requests...          18,216
                                  make records available
                                  as requested by
                                  inspectors.
----------------------------------------------------------------------------------------------------------------
133, NTL.......................  Request reimbursement    2..................  2 requests.......               4
                                  within 90 days of
                                  inspection for food,
                                  quarters, and
                                  transportation,
                                  provided to BSEE
                                  representatives.
                                  Submit supporting
                                  verifications of the
                                  meals, such as a meal
                                  log w/inspectors
                                  signature.
----------------------------------------------------------------------------------------------------------------
135............................  Submit PIP under BSEE    40.................  4 plans..........             160
                                  implementing
                                  procedures for
                                  enforcement actions.
----------------------------------------------------------------------------------------------------------------
140............................  Request various oral     2..................  346 requests.....             692
                                  approvals not
                                  specifically covered
                                  elsewhere in
                                  regulatory
                                  requirements.
----------------------------------------------------------------------------------------------------------------
140(c).........................  Submit letter when        Burden covered under 30 CFR Part 250,               0
                                  stopping approved                Subpart K (1014-0019)
                                  flaring with required
                                  information.
----------------------------------------------------------------------------------------------------------------
141; 198.......................  Request approval to use  22.................  1,430 requests...          31,460
                                  new or alternative
                                  procedures, along with
                                  supporting
                                  documentation if
                                  applicable, including
                                  BAST not specifically
                                  covered elsewhere in
                                  regulatory
                                  requirements.
----------------------------------------------------------------------------------------------------------------
142; 198.......................  Request approval of      4..................  405 requests.....           1,620
                                  departure from
                                  operating requirements
                                  not specifically
                                  covered elsewhere in
                                  regulatory
                                  requirements, along
                                  with supporting
                                  documentation if
                                  applicable.
----------------------------------------------------------------------------------------------------------------
145............................  Submit designation of    1..................  9 submittals.....               9
                                  agent and local agent
                                  for Regional
                                  Supervisor's and/or
                                  Regional Director's
                                  approval.
----------------------------------------------------------------------------------------------------------------
150; 151; 152; 154(a)..........  Name and identify        4..................  597 new/                    2,388
                                  facilities, artificial                        replacement
                                  islands, MODUs, helo                          signs.
                                  landing facilities
                                  etc., with signs.
----------------------------------------------------------------------------------------------------------------
150; 154(b)....................  Name and identify wells  2..................  286 new wells....             572
                                  with signs.
----------------------------------------------------------------------------------------------------------------

[[Page 38705]]

 
168; 171; 172; 174; 175; 177;    Request suspension of    11.................  105 requests.....           1,155
 180(b), (d).                     operation or
                                  production; submit
                                  schedule of work
                                  leading to
                                  commencement;
                                  supporting
                                  information; include
                                  pay.gov confirmation
                                  receipt.
                                                         -------------------------------------------------------
                                                                        $2,123 fee x 105 = $222,915
                                                         -------------------------------------------------------
                                 Submit progress reports  3..................  240 reports......             720
                                  on a suspension of
                                  operation or
                                  production as
                                  condition of approval.
----------------------------------------------------------------------------------------------------------------
172(b); 177(a).................  Conduct site-specific    106................  1 study/report...             106
                                  study; submit results;
                                  request payment by
                                  another party. No
                                  instances requiring
                                  this study in several
                                  years--could be
                                  necessary if a
                                  situation occurred
                                  such as severe damage
                                  to a platform or
                                  structure caused by a
                                  hurricane or a vessel
                                  collision.
----------------------------------------------------------------------------------------------------------------
177(b), (c), (d)...............  Various references to      Burden covered under BOEM's 30 CFR                 0
                                  submitting new,             Part 550, Subpart B (1010-0151)
                                  revised, or modified
                                  exploration plan,
                                  development/production
                                  plan, or development
                                  operations
                                  coordination document.
----------------------------------------------------------------------------------------------------------------
180(a), (h), (i),..............  Notify and submit        1.5................  63 reports or                  95
                                  report on various                             notices.
                                  lease-holding
                                  operations and lease
                                  production activities.
----------------------------------------------------------------------------------------------------------------
180(e), (j)....................  Request more than 180    3..................  3 requests/                     9
                                  days to resume          0.5................   notifications.                 2
                                  operations; notify
                                  BSEE if operations do
                                  not begin within 180
                                  days.
180(f), (g), (h), (i)..........  Submit various           3..................  384 submission/             1,152
                                  operation and           0.5................   notifications.               192
                                  production data to
                                  demonstrate production
                                  in paying quantities
                                  to maintain lease
                                  beyond primary term;
                                  notify BSEE when you
                                  begin conducting
                                  operations beyond its
                                  primary term.
----------------------------------------------------------------------------------------------------------------
186; NTL.......................  Submit information and   12.................  202 Submittals...           2,424
                                  reports, as BSEE
                                  requires.
----------------------------------------------------------------------------------------------------------------
186(a)(3); NTL.................  Apply to receive          Not considered information collection               0
                                  administrative                  under 5 CFR 1320.3(h)(1)
                                  entitlements to eWell
                                  (electronic/digital
                                  form submittals).
----------------------------------------------------------------------------------------------------------------
187; 188; 189; 190; 192; NTL...  Report to the District   1.5 Oral...........  505 Oral reports.             758
                                  Manager immediately     4 Written..........  671 Written                 2,684
                                  via oral communication                        reports.
                                  and written follow-up
                                  within 15-calendar
                                  days, incidents
                                  pertaining to:
                                  fatalities; injuries;
                                  LoWC; fires;
                                  explosions; all
                                  collisions resulting
                                  in property or
                                  equipment damage
                                  >$25K; structural
                                  damage to an OCS
                                  facility; cranes;
                                  incidents that damage
                                  or disable safety
                                  systems or equipment
                                  (including
                                  firefighting systems);
                                  include hurricane
                                  reports such as
                                  platform/rig
                                  evacuation, rig
                                  damage, P/L damage,
                                  and platform damage;
                                  operations personnel
                                  to muster for
                                  evacuation not related
                                  to weather or drills;
                                  any additional
                                  information required.
                                  If requested, submit
                                  copy marked as public
                                  information.
                                 FOR ALASKA: Report sea
                                  ice movement/
                                  conditions; start and
                                  termination of ice
                                  management activities;
                                  kicks or unexpected
                                  operational issues.
                                  Submit a written
                                  report within 24 hours
                                  after completing ice
                                  management activities.
----------------------------------------------------------------------------------------------------------------
187(d).........................  Report all spills of      Burden covered under 30 CFR Part 254                0
                                  oil or other liquid                   (1014-0007)
                                  pollutants.
----------------------------------------------------------------------------------------------------------------
188(a)(5)......................  Report to District        Burden covered under 30 CFR Part 250,               0
                                  Manager hydrogen                 Subpart D (1014-0018)
                                  sulfide (H2S) gas
                                  releases immediately
                                  by oral communication.
----------------------------------------------------------------------------------------------------------------
191............................  Submit written            Exempt under 5 CFR 1320.4(a)(2), (c)                0
                                  statement/Request
                                  compensation mileage
                                  and services for
                                  testimony re: accident
                                  investigation.
----------------------------------------------------------------------------------------------------------------

[[Page 38706]]

 
192 (Form BSEE-0132)...........  Daily report of          3..................  884 reports or              2,652
                                  evacuation statistics                         forms.
                                  for natural occurrence/
                                  hurricane (GOMR Form
                                  BSEE-0132 (form takes
                                  1 hour)) when
                                  circumstances warrant;
                                  inform BSEE when you
                                  resume production.
----------------------------------------------------------------------------------------------------------------
192(b) (Form BSEE-0143)........  Use Form BSEE-0143 to    3..................  4 forms..........              12
                                  submit an initial
                                  damage report to the
                                  Regional Supervisor.
----------------------------------------------------------------------------------------------------------------
192(b) (Form BSEE-0143)........  Use Form BSEE-0143 to    1..................  4 forms..........               4
                                  submit subsequent
                                  damage reports on a
                                  monthly basis until
                                  damaged structure or
                                  equipment is returned
                                  to service;
                                  immediately when
                                  information changes;
                                  date item returned to
                                  service must be in
                                  final report.
----------------------------------------------------------------------------------------------------------------
193............................  Report apparent          1.5................  6 reports........               9
                                  violations or non-
                                  compliance.
----------------------------------------------------------------------------------------------------------------
194(c).........................  Report archaeological    3..................  7 reports........              21
                                  discoveries.
----------------------------------------------------------------------------------------------------------------
195............................  Notify District Manager  1..................  2,040                       2,040
                                  within 5 workdays of                          notifications.
                                  putting well in
                                  production status
                                  (usually oral). Follow-
                                  up with either fax/
                                  email within same 5
                                  day period (burden
                                  includes oral and
                                  written).
----------------------------------------------------------------------------------------------------------------
196............................  Request reimbursement    1..................  1 request........               1
                                  of reproduction and
                                  processing costs of
                                  G&G data/information
                                  requested by the
                                  Regional Director.
----------------------------------------------------------------------------------------------------------------
197(c).........................  Submit confidentiality   1..................  1 submittal......               1
                                  agreement.
----------------------------------------------------------------------------------------------------------------
    Total Burden...............                                                21,776 Responses.   99,866 Hours.
                                                                              ----------------------------------
                                                                                 $222,915 Non-Hour Cost Burden.
----------------------------------------------------------------------------------------------------------------
* In the future, BSEE may require electronic filing of some submissions.

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: We have 
identified one non-hour cost burden. Requests for a Suspension of 
Operation or a Suspension of Production (Sec.  250.171) require a cost 
recovery fee of $2,123. We have not identified any other non-hour cost 
burdens associated with this collection of information.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.,) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et 
seq.,) requires each agency ``. . . to provide notice . . . and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information . . .'' Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    To comply with the public consultation process, on March 15, 2017, 
we published a Federal Register notice (82 FR 13846) announcing that we 
would submit this ICR to OMB for approval. The notice provided the 
required 60-day comment period. In addition, Sec.  250.199 provides the 
OMB Control Number for the information collection requirements imposed 
by the 30 CFR 250, Subpart A regulations and forms. The regulation also 
informs the public that they may comment at any time on the collections 
of information and provides the address to which they should send 
comments. Between the last collection submitted and this collection, we 
received eight comments from private citizens. None of the comments 
received were germane to this collection of information.
    Public Availability of Comments: Before including your address, 
phone number, email address, or other personal identifying information 
in your comment, you should be aware that your entire comment--
including your personal identifying information--may be made publicly 
available at any time. While you can ask us in your comment to withhold 
your personal identifying information from public review, we cannot 
guarantee that we will be able to do so.
    BSEE Information Collection Clearance Officer: Nicole Mason, (703) 
787-1607.

    Dated: July 13, 2017.
Doug Morris,
Chief, Office of Offshore Regulatory Programs.
[FR Doc. 2017-17209 Filed 8-14-17; 8:45 am]
 BILLING CODE 4310-VH-P



                                                  38702                        Federal Register / Vol. 82, No. 156 / Tuesday, August 15, 2017 / Notices

                                                  covered in the HCP. Therefore, the                      ADDRESSES:   Submit comments by either                1334, section 301(a) of the Federal Oil
                                                  permit qualifies for a categorical                      fax (202) 395–5806 or email (OIRA_                    and Gas Royalty Management Act
                                                  exclusion under NEPA.                                   Submission@omb.eop.gov) directly to                   (FOGRMA), 30 U.S.C. 1751(a), grants
                                                                                                          the Office of Information and Regulatory              authority to the Secretary to prescribe
                                                  Public Comments
                                                                                                          Affairs, OMB, Attention: Desk Officer                 such rules and regulations as are
                                                    If you wish to comment on the permit                  for the Department of the Interior (1014–             reasonably necessary to carry out
                                                  applications, plans, and associated                     0022). Please provide a copy of your                  FOGRMA’s provisions. While the
                                                  documents, you may submit comments                      comments to BSEE by any of the means                  majority of FOGRMA is directed to
                                                  by any one of the methods in                            below.                                                royalty collection and enforcement,
                                                  ADDRESSES.                                                • Electronically go to http://                      some provisions apply to offshore
                                                                                                          www.regulations.gov. In the Search box,               operations. For example, section 108 of
                                                  Public Availability of Comments
                                                                                                          enter BSEE–2017–0002 then click                       FOGRMA, 30 U.S.C. 1718, grants the
                                                    Before including your address, phone                  search. Follow the instructions to                    Secretary broad authority to inspect
                                                  number, email address, or other                         submit public comments and view all                   lease sites for the purpose of
                                                  personal identifying information in your                related materials. We will post all                   determining whether there is
                                                  comment, you should be aware that                       comments.                                             compliance with the mineral leasing
                                                  your entire comment, including your                       • Email kye.mason@bsee.gov, fax                     laws. Section 109(c)(2) and (d)(1), 30
                                                  personal identifying information, may                   (703) 787–1546, or mail or hand-carry                 U.S.C. 1719(c)(2) and (d)(1), impose
                                                  be made publicly available at any time.                 comments to the Department of the                     substantial civil penalties for failure to
                                                  While you can ask us in your comment                    Interior; Bureau of Safety and                        permit lawful inspections and for
                                                  to withhold your personal identifying                   Environmental Enforcement;                            knowing or willful preparation or
                                                  information from public view, we                        Regulations and Standards Branch;                     submission of false, inaccurate, or
                                                  cannot guarantee that we will be able to                ATTN: Nicole Mason; 45600 Woodland                    misleading reports, records, or other
                                                  do so.                                                  Road, Sterling, VA 20166. Please                      information. Because the Secretary has
                                                                                                          reference ICR 1014–0022 in your                       delegated some of the authority under
                                                  Authority                                                                                                     FOGRMA to BSEE, 30 U.S.C. 1751 is
                                                                                                          comment and include your name and
                                                    We provide this notice under section                  return address.                                       included as additional authority for
                                                  10 of the Act (16 U.S.C. 1531 et seq.)                  FOR FURTHER INFORMATION CONTACT:                      these requirements.
                                                  and NEPA regulations (40 CFR 1506.6).                   Nicole Mason, Regulations and                            The Independent Offices
                                                    Dated: August 9, 2017.                                Standards Branch, (703) 787–1607, to                  Appropriations Act (31 U.S.C. 9701), the
                                                                                                          request additional information about                  Omnibus Appropriations Bill (Pub. L.
                                                  Stephen P. Henry,
                                                                                                          this ICR. To see a copy of the entire ICR             104–133, 110 Stat. 1321, April 26,
                                                  Field Supervisor, Ventura Fish and Wildlife
                                                                                                          submitted to OMB, go to http://                       1996), and OMB Circular A–25,
                                                  Office, Ventura, California.
                                                                                                                                                                authorize Federal agencies to recover
                                                  [FR Doc. 2017–17205 Filed 8–14–17; 8:45 am]             www.reginfo.gov (select Information
                                                                                                                                                                the full cost of services that confer
                                                  BILLING CODE 4333–15–P                                  Collection Review, Currently Under
                                                                                                                                                                special benefits. Under the Department
                                                                                                          Review).
                                                                                                                                                                of the Interior’s implementing policy,
                                                                                                          SUPPLEMENTARY INFORMATION:                            BSEE is required to charge fees for
                                                  DEPARTMENT OF THE INTERIOR                                 Title: 30 CFR part 250, subpart A, Oil             services that provide special benefits or
                                                                                                          and Gas and Sulfur Operations in the                  privileges to an identifiable non-Federal
                                                  Bureau of Safety and Environmental                      OCS—General.
                                                  Enforcement                                                                                                   recipient above and beyond those which
                                                                                                             Form(s): BSEE–0132, BSEE–0143,                     accrue to the public at large. A request
                                                  [Docket ID BSEE–2017–0002; 17XE1700DX                   BSEE–1832.                                            for approval required in 30 CFR 250.171
                                                  EEEE500000 EX1SF0000.DAQ000; OMB                           OMB Control Number: 1014–0022.                     is subject to cost recovery, and BSEE
                                                  Control Number 1014–0022]                                  Abstract: The Outer Continental Shelf              regulations specify service fees for these
                                                                                                          (OCS) Lands Act at 43 U.S.C. 1334                     requests in 30 CFR 250.125.
                                                  Agency Information Collection                           authorizes the Secretary of the Interior                 The Federal Water Pollution Control
                                                  Activities: Oil and Gas and Sulfur                      to prescribe rules and regulations                    Act (33 U.S.C. 1331(j)(1)(C)) authorizes
                                                  Operations in the OCS—General                           necessary for the administration of the               the President to adopt regulations that
                                                                                                          leasing provisions of that Act related to             establish procedures, methods and
                                                  ACTION:   Notice; request for comments.                 mineral resources on the OCS. Such                    equipment requirements to prevent oil
                                                                                                          rules and regulations will apply to all               spills and other hazardous substance
                                                  SUMMARY:   To comply with the                           operations conducted under a lease,                   discharges from offshore and other
                                                  Paperwork Reduction Act of 1995                         right-of-way, or a right-of-use and                   facilities. The regulatory authority for
                                                  (PRA), the Bureau of Safety and                         easement. Operations on the OCS must                  offshore facilities has been delegated to
                                                  Environmental Enforcement (BSEE) is                     preserve, protect, and develop oil and                the Secretary and further delegated by
                                                  notifying the public that we have                       natural gas resources in a manner that                the Secretary to BSEE. The regulations
                                                  submitted to OMB an information                         is consistent with the need to make such              at 30 CFR part 250, subpart A, require
                                                  collection request (ICR) to renew                       resources available to meet the Nation’s              compliance with all applicable BSEE
                                                  approval of the paperwork requirements                  energy needs as rapidly as possible; to               regulations, including those intended to
                                                  in BSEE’s regulations concerning, Oil                   balance orderly energy resource                       prevent or reduce discharges of oil and
                                                  and Gas and Sulfur Operations in the                    development with protection of human,                 other hazardous substances. These
mstockstill on DSK30JT082PROD with NOTICES




                                                  OCS—General. This notice also                           marine, and coastal environments; to                  authorities and responsibilities are
                                                  provides the public a second                            ensure the public a fair and equitable                among those delegated to BSEE. The
                                                  opportunity to comment on the revised                   return on the resources of the OCS; and               regulations at 30 CFR part 250, subpart
                                                  paperwork burden of these regulatory                    to preserve and maintain free enterprise              A, concern the general regulatory
                                                  requirements.                                           competition.                                          requirements of oil, gas, and sulfur
                                                  DATES:You must submit comments by                          In addition to the general rulemaking              operations in the OCS (including the
                                                  September 14, 2017.                                     authority of the OCSLA at 43 U.S.C.                   associated forms), and are the subject of


                                             VerDate Sep<11>2014   17:15 Aug 14, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\15AUN1.SGM   15AUN1


                                                                                       Federal Register / Vol. 82, No. 156 / Tuesday, August 15, 2017 / Notices                                                               38703

                                                  this collection. This request also covers                       collection and analysis of accident                           Form BSEE–0132, Hurricane and
                                                  any related Notices to Lessees and                              reports to ascertain the cause of the                       Tropical Storm Evacuation and
                                                  Operators (NTLs) that BSEE issues to                            accidents and to determine ways to                          Production Curtailment Statistics, is
                                                  clarify, supplement, or provide                                 prevent recurrences.                                        used in the Gulf of Mexico OCS Region
                                                  additional guidance on some aspects of                             • Ascertain when the lease ceases                        (GOMR) to obtain general information,
                                                  our regulations.                                                production or when the last well ceases                     such as company name, contact, date,
                                                     The BSEE uses the information                                production in order to determine the                        time, telephone number; as well as
                                                  collected under the Subpart A                                   180th day after the date of completion                      number of platforms and drilling rigs
                                                  regulations to ensure that operations on                        of the last production. The BSEE will                       evacuated and not evacuated, and
                                                  the OCS are carried out in a safe and                           use this information to efficiently                         production shut-in statistics for oil
                                                  pollution-free manner, do not interfere                         maintain the lessee/operator lease                          (BOPD) and gas (MMSCFD).
                                                  with the rights of other users on the                           status.                                                       Form BSEE–0143, Facility/Equipment
                                                  OCS, and balance the protection and
                                                  development of OCS resources.                                      • Allow lessees/operators who                            Damage Report, is used to assess initial
                                                                                                                  exhibit unacceptable performance an                         damage to a structure or equipment and
                                                  Specifically, we use the information                                                                                        then be aware of changes until the
                                                  collected to:                                                   incremental approach to improving
                                                                                                                  their overall performance prior to a final                  damaged structure or equipment is
                                                     • Review records of formal crane
                                                                                                                  decision to disqualify a lessee/operator                    returned to service, as well as to assess
                                                  operator and rigger training, crane
                                                                                                                  or to pursue debarment proceedings                          the production rate at time of shut-in
                                                  operator qualifications, crane
                                                                                                                  through the execution of a performance                      (BPD and/or MMCFPD), cumulative
                                                  inspections, testing, and maintenance to
                                                                                                                  improvement plan (PIP). The Subpart A                       production shut-in (BPD and/or
                                                  ensure that lessees/operators perform
                                                                                                                  regulations do not address the actual                       MMCFPD), and estimated time to return
                                                  operations in a safe and workmanlike
                                                                                                                  process that we will follow in pursuing                     to service (in days).
                                                  manner and that equipment is
                                                  maintained in a safe condition. The                             the disqualification of operators under                       Most responses are mandatory, while
                                                  BSEE also uses the information to make                          §§ 250.135 and 250.136; however, our                        others are required to obtain or retain
                                                  certain that all new and existing cranes                        internal enforcement procedures                             benefits, or are voluntary. No questions
                                                  installed on OCS fixed platforms must                           include allowing such operators to                          of a sensitive nature are asked. The
                                                  be equipped with anti-two block safety                          demonstrate a commitment to                                 BSEE protects information considered
                                                  devices, and to assure that uniform                             acceptable performance by the                               proprietary under the Freedom of
                                                  methods are employed by lessees for                             submission of a PIP.                                        Information Act (5 U.S.C. 552) and
                                                  load testing of cranes.                                            The forms associated with this                           DOI’s implementing regulations (43 CFR
                                                     • Review welding plans, procedures,                          information collection request are as                       part 2), and under regulations at 30 CFR
                                                  and records to ensure that welding is                           follows:                                                    250.197, Data and information to be
                                                  conducted in a safe and workmanlike                                The BSEE Environmental Compliance                        made available to the public or for
                                                  manner by trained and experienced                               Division has decided to discontinue use                     limited inspection, and 30 CFR part 252,
                                                  personnel.                                                      of BSEE Form-0011, Internet Based                           OCS Oil and Gas Information Program.
                                                     • Provide lessees/operators greater                          Safety and Environmental Enforcement                          Frequency: On occasion, daily,
                                                  flexibility to comply with regulatory                           Reporting System (Isee), due to an                          weekly, monthly, and varies by section.
                                                  requirements through approval of                                evolving program and changes in                               Description of Respondents: Potential
                                                  alternative equipment or procedures                             management. The information                                 respondents comprise Federal OCS oil,
                                                  and departures to regulations if they                           submitted under § 250.193 instructs the                     gas, or sulfur lessees and/or operators
                                                  demonstrate equal or better compliance                                                                                      and holders of pipeline rights-of-way.
                                                                                                                  public on what information and where
                                                  with the appropriate performance
                                                                                                                  to submit possible violations making the                      Estimated Reporting and
                                                  standards.
                                                     • Ensure that injection of gas                               form obsolete.                                              Recordkeeping Hour Burden: The
                                                  promotes conservation of natural                                   Form BSEE–1832, Incident(s) of                           estimated annual hour burden for this
                                                  resources and prevents waste.                                   Noncompliance (INCs), is used to                            information collection is a total of
                                                     • Record the agent and local agent                           determine that respondents have                             99,866 hours and $222,915 non-hour
                                                  empowered to receive notices and                                corrected all incident(s) of                                costs. The following chart details the
                                                  comply with regulatory orders issued.                           noncompliance identified during                             individual components and estimated
                                                     • Provide for orderly development of                         inspections. Everything on the INC form                     hour burdens. In calculating the
                                                  leases through the use of information to                        is filled out by a BSEE inspector/                          burdens, we assumed that respondents
                                                  determine the appropriateness of lessee/                        representative. Industry is only required                   perform certain requirements in the
                                                  operator requests for suspension of                             to sign this form upon receipt and                          normal course of their activities. We
                                                  operations, including production.                               respond to BSEE when each INC has                           consider these to be usual and
                                                     • Improve safety and environmental                           been corrected, no later than 14 days                       customary and took that into account in
                                                  protection on the OCS through                                   from the date of issuance.                                  estimating the burden.

                                                                                                                             BURDEN BREAKDOWN
                                                                                                                                                                                    Non-Hour cost burdens
                                                     Citation 30 CFR 250
                                                   Subpart A; related forms/                       Reporting or recordkeeping requirement*                                                                               Annual burden
mstockstill on DSK30JT082PROD with NOTICES




                                                                                                                                                                                  Average number of annual
                                                             NTLs                                                                                           Hour burden                                                      hours
                                                                                                                                                                                         responses                         (rounded)

                                                  104; Form BSEE–1832 .....                 Appeal orders or decisions; appeal INCs ...................       Exempt under 5 CFR 1320.4(a)(2), (c)                                   0

                                                  107(c) ................................   Request waiver by demonstrating the use for BAST               8 ..................   2 justifications ...................             16
                                                                                             would not be practicable.




                                             VerDate Sep<11>2014        18:44 Aug 14, 2017      Jkt 241001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\15AUN1.SGM          15AUN1


                                                  38704                                 Federal Register / Vol. 82, No. 156 / Tuesday, August 15, 2017 / Notices

                                                                                                                        BURDEN BREAKDOWN—Continued
                                                                                                                                                                                         Non-Hour cost burdens
                                                     Citation 30 CFR 250
                                                   Subpart A; related forms/                        Reporting or recordkeeping requirement*                                                                                     Annual burden
                                                                                                                                                                                       Average number of annual
                                                             NTLs                                                                                                Hour burden                                                        hours
                                                                                                                                                                                              responses                           (rounded)

                                                  108(e) ................................    Retain records of design and construction for life of              7 ..................   2,011 record-keepers .......                    14,077
                                                                                              crane, including installation records for any anti-two
                                                                                              block safety devices; all inspection, testing, and
                                                                                              maintenance for at least 4 years; crane operator
                                                                                              and all rigger personnel qualifications for at least 4
                                                                                              years; all records must be kept at the OCS fixed
                                                                                              platform.

                                                  109(a); 110 .......................        Submit welding, burning, and hot tapping plans .........           9 ..................   51 plans ............................             459

                                                  109(b); 113(c) ...................         Retain welding plan & approval letter, and drawings                3 ..................   948 operations ..................                2,844
                                                                                               of safe-welding areas at site; designated person
                                                                                               advises in writing that it is safe to weld.

                                                  118; 121; 124 ....................         Apply for injection of gas; use BSEE-approved for-                 10 ................    6 applications ...................                 60
                                                                                               mula to determine original gas from injected.

                                                  125; 126 ............................      Cost Recovery Fees, confirmation receipt, etc.;                    Cost Recovery Fees and related items are                                    0
                                                                                               verbal approvals pertaining to fees.                             covered individually throughout Subpart A

                                                  130–133 (Form BSEE–                        Submit ‘‘green’’ response copy of Form BSEE–1832,                  3 ..................   2,802 forms ......................               8,406
                                                    1832).                                     INC(s), indicating date violations corrected; or sub-
                                                                                               mit same info via electronic reporting.

                                                  130–133 ............................       Request reconsideration from issuance of an INC .....              7 ..................   274 requests .....................               1,918
                                                                                             Request waiver of 14-day response time ...................         1 ..................   1,572 waivers ...................                1,572
                                                                                             Notify BSEE before returning to operations if shut-in              1 ..................   1,356 notices ....................               1,356

                                                  132(b)(3) ...........................      During inspections, make records available as re-                  4 ..................   4,554 requests ..................               18,216
                                                                                               quested by inspectors.

                                                  133, NTL ...........................       Request reimbursement within 90 days of inspection                 2 ..................   2 requests .........................                 4
                                                                                               for food, quarters, and transportation, provided to
                                                                                               BSEE        representatives.   Submit    supporting
                                                                                               verifications of the meals, such as a meal log w/in-
                                                                                               spectors signature.

                                                  135 ....................................   Submit PIP under BSEE implementing procedures for                  40 ................    4 plans ..............................            160
                                                                                               enforcement actions.

                                                  140 ....................................   Request various oral approvals not specifically cov-               2 ..................   346 requests .....................                692
                                                                                              ered elsewhere in regulatory requirements.

                                                  140(c) ................................    Submit letter when stopping approved flaring with re-               Burden covered under 30 CFR Part 250,                                      0
                                                                                               quired information.                                                       Subpart K (1014–0019)

                                                  141; 198 ............................      Request approval to use new or alternative proce-                  22 ................    1,430 requests ..................               31,460
                                                                                               dures, along with supporting documentation if ap-
                                                                                               plicable, including BAST not specifically covered
                                                                                               elsewhere in regulatory requirements.

                                                  142; 198 ............................      Request approval of departure from operating re-                   4 ..................   405 requests .....................               1,620
                                                                                               quirements not specifically covered elsewhere in
                                                                                               regulatory requirements, along with supporting doc-
                                                                                               umentation if applicable.

                                                  145 ....................................   Submit designation of agent and local agent for Re-                1 ..................   9 submittals ......................                  9
                                                                                               gional Supervisor’s and/or Regional Director’s ap-
                                                                                               proval.
mstockstill on DSK30JT082PROD with NOTICES




                                                  150; 151; 152; 154(a) .......              Name and identify facilities, artificial islands, MODUs,           4 ..................   597 new/replacement                              2,388
                                                                                               helo landing facilities etc., with signs.                                                 signs.

                                                  150; 154(b) .......................        Name and identify wells with signs .............................   2 ..................   286 new wells ...................                 572




                                             VerDate Sep<11>2014        18:44 Aug 14, 2017       Jkt 241001   PO 00000    Frm 00036    Fmt 4703   Sfmt 4703     E:\FR\FM\15AUN1.SGM           15AUN1


                                                                                        Federal Register / Vol. 82, No. 156 / Tuesday, August 15, 2017 / Notices                                                                 38705

                                                                                                                       BURDEN BREAKDOWN—Continued
                                                                                                                                                                                        Non-Hour cost burdens
                                                     Citation 30 CFR 250
                                                   Subpart A; related forms/                        Reporting or recordkeeping requirement*                                                                                 Annual burden
                                                                                                                                                                                      Average number of annual
                                                             NTLs                                                                                               Hour burden                                                     hours
                                                                                                                                                                                             responses                        (rounded)

                                                  168; 171; 172; 174; 175;                   Request suspension of operation or production; sub-               11 ................    105 requests .....................            1,155
                                                    177; 180(b), (d).                          mit schedule of work leading to commencement;
                                                                                               supporting information; include pay.gov confirma-
                                                                                               tion receipt.

                                                                                                                                                                                      $2,123 fee × 105 = $222,915

                                                                                             Submit progress reports on a suspension of oper-                  3 ..................   240 reports .......................            720
                                                                                               ation or production as condition of approval.

                                                  172(b); 177(a) ...................         Conduct site-specific study; submit results; request              106 ..............     1 study/report ...................             106
                                                                                               payment by another party. No instances requiring
                                                                                               this study in several years—could be necessary if
                                                                                               a situation occurred such as severe damage to a
                                                                                               platform or structure caused by a hurricane or a
                                                                                               vessel collision.

                                                  177(b), (c), (d) ...................       Various references to submitting new, revised, or                   Burden covered under BOEM’s 30 CFR                                     0
                                                                                               modified exploration plan, development/production                    Part 550, Subpart B (1010–0151)
                                                                                               plan, or development operations coordination docu-
                                                                                               ment.

                                                  180(a), (h), (i), ...................      Notify and submit report on various lease-holding op-             1.5 ...............    63 reports or notices ........                  95
                                                                                               erations and lease production activities.

                                                  180(e), (j) ..........................     Request more than 180 days to resume operations;                  3 ..................   3 requests/notifications .....                    9
                                                                                               notify BSEE if operations do not begin within 180               0.5 ...............                                                      2
                                                                                               days.
                                                  180(f), (g), (h), (i) ..............       Submit various operation and production data to                   3 ..................   384 submission/notifica-                      1,152
                                                                                               demonstrate production in paying quantities to                  0.5 ...............      tions.                                        192
                                                                                               maintain lease beyond primary term; notify BSEE
                                                                                               when you begin conducting operations beyond its
                                                                                               primary term.

                                                  186; NTL ...........................       Submit information and reports, as BSEE requires ....             12 ................    202 Submittals ..................             2,424

                                                  186(a)(3); NTL ..................          Apply to receive administrative entitlements to eWell                 Not considered information collection                                0
                                                                                               (electronic/digital form submittals).                                    under 5 CFR 1320.3(h)(1)

                                                  187; 188; 189; 190; 192;                   Report to the District Manager immediately via oral               1.5 Oral .......       505 Oral reports ...............                758
                                                    NTL.                                       communication and written follow-up within 15-cal-              4 Written ......       671 Written reports ...........               2,684
                                                                                               endar days, incidents pertaining to: fatalities; inju-
                                                                                               ries; LoWC; fires; explosions; all collisions resulting
                                                                                               in property or equipment damage >$25K; structural
                                                                                               damage to an OCS facility; cranes; incidents that
                                                                                               damage or disable safety systems or equipment
                                                                                               (including firefighting systems); include hurricane
                                                                                               reports such as platform/rig evacuation, rig dam-
                                                                                               age, P/L damage, and platform damage; oper-
                                                                                               ations personnel to muster for evacuation not re-
                                                                                               lated to weather or drills; any additional information
                                                                                               required. If requested, submit copy marked as pub-
                                                                                               lic information.
                                                                                             FOR ALASKA: Report sea ice movement/conditions;
                                                                                               start and termination of ice management activities;
                                                                                               kicks or unexpected operational issues. Submit a
                                                                                               written report within 24 hours after completing ice
                                                                                               management activities.

                                                  187(d) ................................    Report all spills of oil or other liquid pollutants ...........     Burden covered under 30 CFR Part 254                                   0
                                                                                                                                                                             (1014–0007)
mstockstill on DSK30JT082PROD with NOTICES




                                                  188(a)(5) ...........................      Report to District Manager hydrogen sulfide (H2S)                  Burden covered under 30 CFR Part 250,                                   0
                                                                                               gas releases immediately by oral communication.                          Subpart D (1014–0018)

                                                  191 ....................................   Submit written statement/Request compensation                        Exempt under 5 CFR 1320.4(a)(2), (c)                                  0
                                                                                               mileage and services for testimony re: accident in-
                                                                                               vestigation.




                                             VerDate Sep<11>2014        18:44 Aug 14, 2017       Jkt 241001   PO 00000   Frm 00037    Fmt 4703   Sfmt 4703     E:\FR\FM\15AUN1.SGM          15AUN1


                                                  38706                                 Federal Register / Vol. 82, No. 156 / Tuesday, August 15, 2017 / Notices

                                                                                                                        BURDEN BREAKDOWN—Continued
                                                                                                                                                                                          Non-Hour cost burdens
                                                     Citation 30 CFR 250
                                                   Subpart A; related forms/                        Reporting or recordkeeping requirement*                                                                                     Annual burden
                                                                                                                                                                                        Average number of annual
                                                             NTLs                                                                                                 Hour burden                                                       hours
                                                                                                                                                                                               responses                          (rounded)

                                                  192 (Form BSEE–0132) ...                   Daily report of evacuation statistics for natural occur-            3 ..................   884 reports or forms .........                  2,652
                                                                                               rence/hurricane (GOMR Form BSEE–0132 (form
                                                                                               takes 1 hour)) when circumstances warrant; inform
                                                                                               BSEE when you resume production.

                                                  192(b) (Form BSEE–0143)                    Use Form BSEE–0143 to submit an initial damage                      3 ..................   4 forms .............................             12
                                                                                               report to the Regional Supervisor.

                                                  192(b) (Form BSEE–0143)                    Use Form BSEE–0143 to submit subsequent dam-                        1 ..................   4 forms .............................               4
                                                                                               age reports on a monthly basis until damaged
                                                                                               structure or equipment is returned to service; im-
                                                                                               mediately when information changes; date item re-
                                                                                               turned to service must be in final report.

                                                  193 ....................................   Report apparent violations or non-compliance ...........            1.5 ...............    6 reports ...........................               9

                                                  194(c) ................................    Report archaeological discoveries ..............................    3 ..................   7 reports ...........................             21

                                                  195 ....................................   Notify District Manager within 5 workdays of putting                1 ..................   2,040 notifications ............                2,040
                                                                                              well in production status (usually oral). Follow-up
                                                                                              with either fax/email within same 5 day period (bur-
                                                                                              den includes oral and written).

                                                  196 ....................................   Request reimbursement of reproduction and proc-                     1 ..................   1 request ..........................                1
                                                                                              essing costs of G&G data/information requested by
                                                                                              the Regional Director.

                                                  197(c) ................................    Submit confidentiality agreement ................................   1 ..................   1 submittal ........................                1

                                                        Total Burden ..............                                                                                                     21,776 Responses ...........            99,866 Hours.

                                                                                                                                                                                               $222,915 Non-Hour Cost Burden.
                                                     * In the future, BSEE may require electronic filing of some submissions.


                                                    Estimated Reporting and                                          (a) Evaluate whether the collection is                         collection, we received eight comments
                                                  Recordkeeping Non-Hour Cost Burden:                                necessary or useful; (b) evaluate the                          from private citizens. None of the
                                                  We have identified one non-hour cost                               accuracy of the burden of the proposed                         comments received were germane to
                                                  burden. Requests for a Suspension of                               collection of information; (c) enhance                         this collection of information.
                                                  Operation or a Suspension of                                       the quality, usefulness, and clarity of                           Public Availability of Comments:
                                                  Production (§ 250.171) require a cost                              the information to be collected; and (d)                       Before including your address, phone
                                                  recovery fee of $2,123. We have not                                minimize the burden on the                                     number, email address, or other
                                                  identified any other non-hour cost                                 respondents, including the use of                              personal identifying information in your
                                                  burdens associated with this collection                            technology.                                                    comment, you should be aware that
                                                  of information.                                                       To comply with the public                                   your entire comment—including your
                                                    Public Disclosure Statement: The PRA                             consultation process, on March 15,                             personal identifying information—may
                                                  (44 U.S.C. 3501, et seq.,) provides that                           2017, we published a Federal Register                          be made publicly available at any time.
                                                  an agency may not conduct or sponsor                               notice (82 FR 13846) announcing that                           While you can ask us in your comment
                                                  a collection of information unless it                              we would submit this ICR to OMB for                            to withhold your personal identifying
                                                  displays a currently valid OMB control                             approval. The notice provided the                              information from public review, we
                                                  number. Until OMB approves a                                       required 60-day comment period. In                             cannot guarantee that we will be able to
                                                  collection of information, you are not                             addition, § 250.199 provides the OMB                           do so.
                                                  obligated to respond.                                              Control Number for the information                                BSEE Information Collection
                                                    Comments: Section 3506(c)(2)(A) of                               collection requirements imposed by the                         Clearance Officer: Nicole Mason, (703)
                                                  the PRA (44 U.S.C. 3501, et seq.,)                                 30 CFR 250, Subpart A regulations and                          787–1607.
                                                  requires each agency ‘‘. . . to provide                            forms. The regulation also informs the
                                                                                                                                                                                      Dated: July 13, 2017.
                                                  notice . . . and otherwise consult with                            public that they may comment at any
mstockstill on DSK30JT082PROD with NOTICES




                                                  members of the public and affected                                 time on the collections of information                         Doug Morris,
                                                  agencies concerning each proposed                                  and provides the address to which they                         Chief, Office of Offshore Regulatory Programs.
                                                  collection of information . . .’’ Agencies                         should send comments. Between the                              [FR Doc. 2017–17209 Filed 8–14–17; 8:45 am]
                                                  must specifically solicit comments to:                             last collection submitted and this                             BILLING CODE 4310–VH–P




                                             VerDate Sep<11>2014        18:44 Aug 14, 2017       Jkt 241001   PO 00000    Frm 00038    Fmt 4703    Sfmt 4703     E:\FR\FM\15AUN1.SGM          15AUN1



Document Created: 2017-08-15 01:12:35
Document Modified: 2017-08-15 01:12:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice; request for comments.
DatesYou must submit comments by September 14, 2017.
ContactNicole Mason, Regulations and Standards Branch, (703) 787-1607, to request additional information about this ICR. To see a copy of the entire ICR submitted to OMB, go to http://www.reginfo.gov (select Information Collection Review, Currently Under Review).
FR Citation82 FR 38702 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR