82_FR_42846 82 FR 42672 - Combined Notice of Filings #2

82 FR 42672 - Combined Notice of Filings #2

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 174 (September 11, 2017)

Page Range42672-42673
FR Document2017-19147

Federal Register, Volume 82 Issue 174 (Monday, September 11, 2017)
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Pages 42672-42673]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19147]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC17-143-000.
    Applicants: Great Valley Solar 1, LLC, Great Valley Solar 2, LLC, 
Great Valley Solar 3, LLC.
    Description: Supplement to July 31, 2017 Application for 
Authorization of Transaction Pursuant to Section 203 of the Federal 
Power Act of Great Valley Solar 1, LLC, et. al.
    Filed Date: 8/31/17.
    Accession Number: 20170831-5248.
    Comments Due: 5 p.m. ET 9/11/17.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG17-148-000.
    Applicants: HD Project One, LLC.
    Description: Notice of Self-Certification of EG or FC of HD Project 
One, LLC.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5164.
    Comments Due: 5 p.m. ET 9/22/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-2401-001.
    Applicants: SP Decatur Parkway Solar, LLC.
    Description: Tariff Amendment: Amendment of Application for MBR 
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5091.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2403-001.
    Applicants: SP Pawpaw Solar, LLC.
    Description: Tariff Amendment: Amendment of Application for MBR 
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.

[[Page 42673]]

    Filed Date: 9/1/17.
    Accession Number: 20170901-5096.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2404-001.
    Applicants: SP Sandhills Solar, LLC.
    Description: Tariff Amendment: Amendment of Application for MBR 
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5095.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2416-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Annual Calculation of the Cost of New Entry value 
(``CONE'') for each Local Resource Zone (``LRZ'') in the MISO Region of 
Midcontinent Independent System Operator, Inc.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5104.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2417-000.
    Applicants: Great Valley Solar 3, LLC.
    Description: Initial rate filing: Great Valley Solar 3, LLC LGIA 
Co-Tenancy Agreement Certificate of Concurrence to be effective 10/1/
2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5114.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2418-000.
    Applicants: Great Valley Solar 3, LLC.
    Description: Initial rate filing: Great Valley Solar 3, LLC Shared 
Facilities Agreement Certificate of Concurrence to be effective 10/1/
2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5115.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2419-000.
    Applicants: Gateway Cogeneration 1, LLC.
    Description: Request of Gateway Cogeneration 1, LLC for Limited 
Waiver of Tariff Provisions and Expedited Action.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5117.
    Comments Due: 5 p.m. ET 9/11/17.

    Docket Numbers: ER17-2420-000.
    Applicants: Alcoa Power Generating Inc.
    Description: Sec.  205(d) Rate Filing: Second Supplemental 
Transmission Services Agreement to be effective 7/1/2016.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5121.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2421-000.
    Applicants: ISO New England Inc., New England Power Pool 
Participants Committee.
    Description: Sec.  205(d) Rate Filing: Revisions to Incorporate a 
Clustering Approach in the Interconnection Procedures to be effective 
11/1/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5182.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2422-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: JPB Caltrain Supplement No. 
3 under Master Agreement to be effective 9/5/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5189.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2423-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Initial rate filing: Amended and Restated Engineering 
and Procurement Agreement to be effective 9/1/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5194.
    Comments Due: 5 p.m. ET 9/22/17.

    Docket Numbers: ER17-2424-000.
    Applicants: San Diego Gas & Electric Company.
    Description: Sec.  205(d) Rate Filing: SDGE TO Tariff Revisions to 
Appendices IV and IX to be effective 12/1/2017.
    Filed Date: 9/1/17.
    Accession Number: 20170901-5212.
    Comments Due: 5 p.m. ET 9/22/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-19147 Filed 9-8-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                    42672                     Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices

                                                    a 26-foot-wide, 1.3-foot-deep gated                     the specified intervention deadline date,             to the following procedural schedule.
                                                    intake located on top of the spillway                   a competing development application,                  Revisions to the schedule may be made
                                                    protected by a 6-foot-high, 30-foot-wide                or a notice of intent to file such an                 as appropriate.
                                                    steel trash rack with 6-inch clear bar                  application. Submission of a timely
                                                    spacing; (4) a 27-foot-long, 6-foot-wide,               notice of intent allows an interested                          Milestone              Target date
                                                    concrete sluiceway; (5) a concrete                      person to file the competing
                                                    powerhouse, located at the base of the                  development application no later than                 Notice of the availability   November 9, 2017.
                                                                                                                                                                    of the EA.
                                                    dam, containing one 50-foot-long by 9-                  120 days after the specified intervention
                                                    foot-diameter Archimedes screw                          deadline date. Applications for
                                                    turbine-generator unit (ASG unit), rated                preliminary permits will not be                         Dated: September 1, 2017.
                                                    at 140 kW; (6) a water-level sensor, and                accepted in response to this notice.                  Kimberly D. Bose,
                                                    automatic sluice gate controller; (7) a                    q. A notice of intent must specify the             Secretary.
                                                    650-foot-long, 460-volt, above-ground                   exact name, business address, and                     [FR Doc. 2017–19116 Filed 9–8–17; 8:45 am]
                                                    transmission line; and (8) appurtenant                  telephone number of the prospective                   BILLING CODE 6717–01–P
                                                    facilities. The estimated annual                        applicant, and must include an
                                                    generation of the proposed Camp                         unequivocal statement of intent to
                                                    McDowell Project would be about 950                     submit a development application. A                   DEPARTMENT OF ENERGY
                                                    megawatt-hours. The applicant proposes                  notice of intent must be served on the
                                                    to operate the project in a run-of-river                applicant(s) named in this public notice.             Federal Energy Regulatory
                                                    mode. There are no federal or state                        r. Anyone may submit comments, a                   Commission
                                                    lands associated with the project.                      protest, or a motion to intervene in
                                                       m. Due to the applicant’s close                      accordance with the requirements of                   Combined Notice of Filings #2
                                                    coordination with federal and state                     Rules of Practice and Procedure, 18 CFR
                                                                                                            385.210, .211, .214. In determining the                  Take notice that the Commission
                                                    agencies during the preparation of the
                                                                                                            appropriate action to take, the                       received the following electric corporate
                                                    application, studies completed during
                                                                                                            Commission will consider all protests or              filings:
                                                    pre-filing consultation, and small size
                                                    and location of the project, we intend to               other comments filed, but only those                     Docket Numbers: EC17–143–000.
                                                    waive scoping and expedite the                          who file a motion to intervene in                        Applicants: Great Valley Solar 1, LLC,
                                                    exemption process. Based on a review of                 accordance with the Commission’s                      Great Valley Solar 2, LLC, Great Valley
                                                    the application and resource agency                     Rules may become a party to the                       Solar 3, LLC.
                                                    consultation letters filed to date,                     proceeding. Any comments, protests, or                   Description: Supplement to July 31,
                                                    Commission staff intends to prepare a                   motions to intervene must be received                 2017 Application for Authorization of
                                                    single environmental assessment (EA).                   on or before the specified comment date               Transaction Pursuant to Section 203 of
                                                    Commission staff determined that the                    for the particular application.                       the Federal Power Act of Great Valley
                                                    issues that need to be addressed in its                    All filings must (1) bear in all capital           Solar 1, LLC, et. al.
                                                    EA have been adequately identified                      letters the title PROTEST, MOTION TO                     Filed Date: 8/31/17.
                                                    during the pre-filing period, which                     INTERVENE, NOTICE OF INTENT TO                           Accession Number: 20170831–5248.
                                                    included a public scoping meeting and                   FILE COMPETING APPLICATION,                              Comments Due: 5 p.m. ET 9/11/17.
                                                    site visit, and no new issues are likely                COMPETING APPLICATION,                                   Take notice that the Commission
                                                    to be identified through additional                     COMMENTS, REPLY COMMENTS,                             received the following exempt
                                                    scoping. The EA will assess the                         RECOMMENDATIONS, or TERMS AND                         wholesale generator filings:
                                                    potential effects of project construction               CONDITIONS; (2) set forth in the                         Docket Numbers: EG17–148–000.
                                                    and operation on geology and soils,                     heading the name of the applicant and                    Applicants: HD Project One, LLC.
                                                    aquatic, terrestrial, threatened and                    the project number of the application to                 Description: Notice of Self-
                                                    endangered species, recreation and land                 which the filing responds; (3) furnish                Certification of EG or FC of HD Project
                                                    use, aesthetic, and cultural and historic               the name, address, and telephone                      One, LLC.
                                                    resources.                                              number of the person protesting or                       Filed Date: 9/1/17.
                                                       n. A copy of the application is                      intervening; and (4) otherwise comply                    Accession Number: 20170901–5164.
                                                    available for review at the Commission                  with the requirements of 18 CFR                          Comments Due: 5 p.m. ET 9/22/17.
                                                    in the Public Reference Room or may be                  385.2001 through 385.2005. All
                                                                                                            comments, recommendations, terms and                     Take notice that the Commission
                                                    viewed on the Commission’s Web site at
                                                                                                            conditions or prescriptions must set                  received the following electric rate
                                                    http://www.ferc.gov using the eLibrary
                                                                                                            forth their evidentiary basis and                     filings:
                                                    link. Enter the docket number excluding
                                                    the last three digits in the docket                     otherwise comply with the requirements                   Docket Numbers: ER17–2401–001.
                                                    number field to access the document.                    of 18 CFR 4.34(b). Agencies may obtain                   Applicants: SP Decatur Parkway
                                                    For assistance, contact FERC Online                     copies of the application directly from               Solar, LLC.
                                                    Support. A copy is also available for                   the applicant. A copy of any protest or                  Description: Tariff Amendment:
                                                    inspection and reproduction at the                      motion to intervene must be served                    Amendment of Application for MBR
                                                    address in item h above.                                upon each representative of the                       Authority and Initial Baseline Tariff
                                                       o. You may also register online at                   applicant specified in the particular                 Filing to be effective 9/1/2017.
                                                                                                                                                                     Filed Date: 9/1/17.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    http://www.ferc.gov/docs-filing/                        application. A copy of all other filings
                                                    esubscription.asp to be notified via                    in reference to this application must be                 Accession Number: 20170901–5091.
                                                    email of new filings and issuances                      accompanied by proof of service on all                   Comments Due: 5 p.m. ET 9/22/17.
                                                    related to this or other pending projects.              persons listed in the service list                       Docket Numbers: ER17–2403–001.
                                                    For assistance, contact FERC Online                     prepared by the Commission in this                       Applicants: SP Pawpaw Solar, LLC.
                                                    Support.                                                proceeding, in accordance with 18 CFR                    Description: Tariff Amendment:
                                                       p. Any qualified applicant desiring to               4.34(b) and 385.2010.                                 Amendment of Application for MBR
                                                    file a competing application must                          s. Procedural Schedule: The                        Authority and Initial Baseline Tariff
                                                    submit to the Commission, on or before                  application will be processed according               Filing to be effective 9/1/2017.


                                               VerDate Sep<11>2014   16:34 Sep 08, 2017   Jkt 241001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1


                                                                              Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices                                            42673

                                                      Filed Date: 9/1/17.                                   Approach in the Interconnection                       DEPARTMENT OF ENERGY
                                                      Accession Number: 20170901–5096.                      Procedures to be effective 11/1/2017.
                                                      Comments Due: 5 p.m. ET 9/22/17.                        Filed Date: 9/1/17.                                 Federal Energy Regulatory
                                                      Docket Numbers: ER17–2404–001.                                                                              Commission
                                                                                                              Accession Number: 20170901–5182.
                                                      Applicants: SP Sandhills Solar, LLC.                                                                        [Project No. 14833–000]
                                                      Description: Tariff Amendment:                          Comments Due: 5 p.m. ET 9/22/17.
                                                    Amendment of Application for MBR                          Docket Numbers: ER17–2422–000.                      Notice of Preliminary Permit
                                                    Authority and Initial Baseline Tariff                                                                         Application Accepted for Filing and
                                                                                                              Applicants: Pacific Gas and Electric
                                                    Filing to be effective 9/1/2017.                                                                              Soliciting Comments, Motions To
                                                                                                            Company.
                                                      Filed Date: 9/1/17.                                                                                         Intervene, and Competing
                                                      Accession Number: 20170901–5095.                        Description: § 205(d) Rate Filing: JPB              Applications; Merchant Hydro
                                                      Comments Due: 5 p.m. ET 9/22/17.                      Caltrain Supplement No. 3 under Master                Developers, LLC
                                                      Docket Numbers: ER17–2416–000.                        Agreement to be effective 9/5/2017.
                                                                                                                                                                     On January 18, 2017, Merchant Hydro
                                                      Applicants: Midcontinent                                Filed Date: 9/1/17.                                 Developers, LLC, filed an application for
                                                    Independent System Operator, Inc.                         Accession Number: 20170901–5189.                    a preliminary permit, pursuant to
                                                      Description: Annual Calculation of                      Comments Due: 5 p.m. ET 9/22/17.                    section 4(f) of the Federal Power Act
                                                    the Cost of New Entry value (‘‘CONE’’)                                                                        (FPA), proposing to study the feasibility
                                                    for each Local Resource Zone (‘‘LRZ’’)                    Docket Numbers: ER17–2423–000.                      of the Snoosh Mountain Pumped
                                                    in the MISO Region of Midcontinent                        Applicants: Puget Sound Energy, Inc.                Storage Hydroelectric Project to be
                                                    Independent System Operator, Inc.                                                                             located in Somerset County,
                                                                                                              Description: Initial rate filing:
                                                      Filed Date: 9/1/17.                                                                                         Pennsylvania. The sole purpose of a
                                                                                                            Amended and Restated Engineering and
                                                      Accession Number: 20170901–5104.                                                                            preliminary permit, if issued, is to grant
                                                                                                            Procurement Agreement to be effective
                                                      Comments Due: 5 p.m. ET 9/22/17.                                                                            the permit holder priority to file a
                                                                                                            9/1/2017.
                                                      Docket Numbers: ER17–2417–000.                                                                              license application during the permit
                                                      Applicants: Great Valley Solar 3, LLC.                  Filed Date: 9/1/17.
                                                                                                                                                                  term. A preliminary permit does not
                                                      Description: Initial rate filing: Great                 Accession Number: 20170901–5194.                    authorize the permit holder to perform
                                                    Valley Solar 3, LLC LGIA Co-Tenancy                       Comments Due: 5 p.m. ET 9/22/17.                    any land-disturbing activities or
                                                    Agreement Certificate of Concurrence to                                                                       otherwise enter upon lands or waters
                                                    be effective 10/1/2017.                                   Docket Numbers: ER17–2424–000.                      owned by others without the owners’
                                                      Filed Date: 9/1/17.                                     Applicants: San Diego Gas & Electric                express permission.
                                                      Accession Number: 20170901–5114.                      Company.                                                 The proposed project would consist of
                                                      Comments Due: 5 p.m. ET 9/22/17.                        Description: § 205(d) Rate Filing:                  the following: (1) A new upper reservoir
                                                      Docket Numbers: ER17–2418–000.                        SDGE TO Tariff Revisions to                           with a surface area of 66 acres and a
                                                      Applicants: Great Valley Solar 3, LLC.                Appendices IV and IX to be effective 12/              storage capacity of 990 acre-feet at a
                                                      Description: Initial rate filing: Great               1/2017.                                               surface elevation of approximately 2,670
                                                    Valley Solar 3, LLC Shared Facilities                                                                         feet above mean sea level (msl) created
                                                                                                              Filed Date: 9/1/17.
                                                    Agreement Certificate of Concurrence to                                                                       through construction of a new roller-
                                                    be effective 10/1/2017.                                   Accession Number: 20170901–5212.                    compacted concrete or rock-filled dam
                                                      Filed Date: 9/1/17.                                     Comments Due: 5 p.m. ET 9/22/17.                    and/or dike; (2) excavating a new lower
                                                      Accession Number: 20170901–5115.                                                                            reservoir with a surface area of 60 acres
                                                                                                               The filings are accessible in the
                                                      Comments Due: 5 p.m. ET 9/22/17.                                                                            and a total storage capacity of 1,188
                                                                                                            Commission’s eLibrary system by
                                                      Docket Numbers: ER17–2419–000.                                                                              acre-feet at a surface elevation of 1,850
                                                                                                            clicking on the links or querying the
                                                      Applicants: Gateway Cogeneration 1,                                                                         feet msl; (3) a new 2,670-foot-long, 48-
                                                                                                            docket number.
                                                    LLC.                                                                                                          inch-diameter penstock connecting the
                                                                                                               Any person desiring to intervene or                upper and lower reservoirs; (4) a new
                                                      Description: Request of Gateway                       protest in any of the above proceedings
                                                    Cogeneration 1, LLC for Limited Waiver                                                                        150-foot-long, 50-foot-wide powerhouse
                                                                                                            must file in accordance with Rules 211                containing two turbine-generator units
                                                    of Tariff Provisions and Expedited                      and 214 of the Commission’s
                                                    Action.                                                                                                       with a total rated capacity of 67
                                                                                                            Regulations (18 CFR 385.211 and                       megawatts; (5) a new transmission line
                                                      Filed Date: 9/1/17.                                   385.214) on or before 5:00 p.m. Eastern
                                                      Accession Number: 20170901–5117.                                                                            connecting the powerhouse to a nearby
                                                                                                            time on the specified comment date.                   115-kilovolt electric grid
                                                      Comments Due: 5 p.m. ET 9/11/17.                      Protests may be considered, but                       interconnection point; and (6)
                                                      Docket Numbers: ER17–2420–000.                        intervention is necessary to become a                 appurtenant facilities. Possible initial
                                                      Applicants: Alcoa Power Generating                    party to the proceeding.                              fill water and make-up water would
                                                    Inc.                                                                                                          come from the nearby Raystown Branch
                                                                                                               eFiling is encouraged. More detailed
                                                      Description: § 205(d) Rate Filing:                                                                          of the Juniata River, including
                                                                                                            information relating to filing
                                                    Second Supplemental Transmission                                                                              groundwater. The proposed project
                                                                                                            requirements, interventions, protests,
                                                    Services Agreement to be effective 7/1/                                                                       would have an annual generation of
                                                                                                            service, and qualifying facilities filings
                                                    2016.                                                                                                         242,920 megawatt-hours.
                                                                                                            can be found at: http://www.ferc.gov/
                                                      Filed Date: 9/1/17.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                            docs-filing/efiling/filing-req.pdf. For                  Applicant Contact: Adam Rousselle,
                                                      Accession Number: 20170901–5121.                                                                            Merchant Hydro Developers, LLC, 5710
                                                                                                            other information, call (866) 208–3676
                                                      Comments Due: 5 p.m. ET 9/22/17.                                                                            Oak Crest Drive, Doylestown, PA 18902;
                                                                                                            (toll free). For TTY, call (202) 502–8659.
                                                      Docket Numbers: ER17–2421–000.                                                                              phone: 267–254–6107.
                                                      Applicants: ISO New England Inc.,                       Dated: September 1, 2017.
                                                                                                                                                                     FERC Contact: Monir Chowdhury;
                                                    New England Power Pool Participants                     Nathaniel J. Davis, Sr.,                              phone: (202) 502–6736.
                                                    Committee.                                              Deputy Secretary.                                        Deadline for filing comments, motions
                                                      Description: § 205(d) Rate Filing:                    [FR Doc. 2017–19147 Filed 9–8–17; 8:45 am]            to intervene, competing applications
                                                    Revisions to Incorporate a Clustering                   BILLING CODE 6717–01–P                                (without notices of intent), or notices of


                                               VerDate Sep<11>2014   16:34 Sep 08, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2017-09-09 00:04:19
Document Modified: 2017-09-09 00:04:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates8/31/17.
FR Citation82 FR 42672 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR