82_FR_42848 82 FR 42674 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

82 FR 42674 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 174 (September 11, 2017)

Page Range42674-42674
FR Document2017-19119

Federal Register, Volume 82 Issue 174 (Monday, September 11, 2017)
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Page 42674]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19119]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-487-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on August 22, 2017, Columbia Gas Transmission, LLC 
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700, 
filed in Docket No. CP17-487-000 and pursuant to sections 157.205 and 
157.208 of the Commission's regulations, a prior notice under its 
blanket certificate issued in Docket No. CP83-76-000 requesting 
authorization to install facilities and appurtenances and to make other 
modifications (Crawford Counterstorage Project) at its existing 
Crawford Compressor Station, located in Fairfield County, Ohio. The 
project will increase the compression available for counterstorage at 
its existing Crawford Storage Field, located in Hocking and Fairfield 
Counties, Ohio, all as more fully set forth in the application, which 
is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Columbia proposes to install one (1) Cat 3520/Ariel high-speed 
reciprocating compressor unit, rated at 1,480 horsepower. Additionally, 
Columbia proposes to designate as standby units two (2) existing 
Waukesha reciprocating compressor units, rated at 250 hp each (Units 2 
and 3), which are currently utilized for counterstorage compression. 
The project will also involve the construction of a new compressor 
building, new dehydration system, new gas cooler, new separators and 
scrubbers, new control room building, and new station piping. The 
project will result in an increase in counterstorage compression of 980 
hp. The certificated physical parameters of the Crawford Storage Field 
will remain unchanged by the proposed modifications. The estimated cost 
of the project is approximately $20 million.
    Any questions regarding this application should be directed to 
Robert D. Jackson, Manager, Certificates & Regulatory Administration, 
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, 
Houston, Texas 77002-2700, at (832) 320-5487 or FAX (832) 320-6487, or 
[email protected].
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the e-Filing link. Persons unable to file 
electronically should submit original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time, October 31, 2017.

    Dated: August 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-19119 Filed 9-8-17; 8:45 am]
BILLING CODE 6717-01-P



                                                    42674                     Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices

                                                    intent to file competing applications: 60               project will increase the compression                    Pursuant to section 157.9 of the
                                                    days from the issuance of this notice.                  available for counterstorage at its                   Commission’s rules, 18 CFR 157.9,
                                                    Competing applications and notices of                   existing Crawford Storage Field, located              within 90 days of this Notice the
                                                    intent must meet the requirements of 18                 in Hocking and Fairfield Counties,                    Commission staff will either: Complete
                                                    CFR 4.36.                                               Ohio, all as more fully set forth in the              its environmental assessment (EA) and
                                                       The Commission strongly encourages                   application, which is on file with the                place it into the Commission’s public
                                                    electronic filing. Please file comments,                Commission and open to public                         record (eLibrary) for this proceeding; or
                                                    motions to intervene, notices of intent,                inspection. The filing may also be                    issue a Notice of Schedule for
                                                    and competing applications using the                    viewed on the web at http://                          Environmental Review. If a Notice of
                                                    Commission’s eFiling system at http://                  www.ferc.gov using the ‘‘eLibrary’’ link.             Schedule for Environmental Review is
                                                    www.ferc.gov/docs-filing/efiling.asp.                   Enter the docket number excluding the                 issued, it will indicate, among other
                                                    Commenters can submit brief comments                    last three digits in the docket number                milestones, the anticipated date for the
                                                    up to 6,000 characters, without prior                   field to access the document. For                     Commission staff’s issuance of the final
                                                    registration, using the eComment system                 assistance, contact FERC at                           environmental impact statement (FEIS)
                                                    at http://www.ferc.gov/docs-filing/                     FERCOnlineSupport@ferc.gov or call                    or EA for this proposal. The filing of the
                                                    ecomment.asp. You must include your                     toll-free, (886) 208–3676 or TYY, (202)               EA in the Commission’s public record
                                                    name and contact information at the end                 502–8659.                                             for this proceeding or the issuance of a
                                                    of your comments. For assistance,                          Columbia proposes to install one (1)               Notice of Schedule for Environmental
                                                    please contact FERC Online Support at                   Cat 3520/Ariel high-speed reciprocating               Review will serve to notify federal and
                                                    FERCOnlineSupport@ferc.gov, (866)                       compressor unit, rated at 1,480                       state agencies of the timing for the
                                                    208–3676 (toll free), or (202) 502–8659                 horsepower. Additionally, Columbia                    completion of all necessary reviews, and
                                                    (TTY). In lieu of electronic filing, please             proposes to designate as standby units                the subsequent need to complete all
                                                    send a paper copy to: Secretary, Federal                two (2) existing Waukesha reciprocating               federal authorizations within 90 days of
                                                    Energy Regulatory Commission, 888                       compressor units, rated at 250 hp each                the date of issuance of the Commission
                                                    First Street NE., Washington, DC 20426.                 (Units 2 and 3), which are currently                  staff’s FEIS or EA.
                                                    The first page of any filing should                     utilized for counterstorage compression.
                                                                                                                                                                     Persons who wish to comment only
                                                    include docket number P–14833–000.                      The project will also involve the
                                                                                                                                                                  on the environmental review of this
                                                       More information about this project,                 construction of a new compressor
                                                                                                                                                                  project should submit an original and
                                                    including a copy of the application, can                building, new dehydration system, new
                                                                                                                                                                  two copies of their comments to the
                                                    be viewed or printed on the eLibrary                    gas cooler, new separators and
                                                                                                                                                                  Secretary of the Commission.
                                                    link of the Commission’s Web site at                    scrubbers, new control room building,
                                                                                                                                                                  Environmental commenter’s will be
                                                    http://www.ferc.gov/docs-filing/                        and new station piping. The project will
                                                                                                            result in an increase in counterstorage               placed on the Commission’s
                                                    elibrary.asp. Enter the docket number                                                                         environmental mailing list, will receive
                                                    (P–14833) in the docket number field to                 compression of 980 hp. The certificated
                                                                                                            physical parameters of the Crawford                   copies of the environmental documents,
                                                    access the document. For assistance,                                                                          and will be notified of meetings
                                                    contact FERC Online Support.                            Storage Field will remain unchanged by
                                                                                                            the proposed modifications. The                       associated with the Commission’s
                                                      Dated: September 1, 2017.                             estimated cost of the project is                      environmental review process.
                                                    Kimberly D. Bose,                                       approximately $20 million.                            Environmental commenter’s will not be
                                                    Secretary.                                                 Any questions regarding this                       required to serve copies of filed
                                                    [FR Doc. 2017–19118 Filed 9–8–17; 8:45 am]              application should be directed to Robert              documents on all other parties.
                                                                                                            D. Jackson, Manager, Certificates &                   However, the non-party commentary,
                                                    BILLING CODE 6717–01–P
                                                                                                            Regulatory Administration, Columbia                   will not receive copies of all documents
                                                                                                            Gas Transmission, LLC, 700 Louisiana                  filed by other parties or issued by the
                                                    DEPARTMENT OF ENERGY                                    Street, Suite 700, Houston, Texas                     Commission (except for the mailing of
                                                                                                            77002–2700, at (832) 320–5487 or FAX                  environmental documents issued by the
                                                    Federal Energy Regulatory                               (832) 320–6487, or robert_jackson@                    Commission) and will not have the right
                                                    Commission                                              transcanada.com.                                      to seek court review of the
                                                                                                               Any person may, within 60 days after               Commission’s final order.
                                                    [Docket No. CP17–487–000]
                                                                                                            the issuance of the instant notice by the                The Commission strongly encourages
                                                    Columbia Gas Transmission, LLC;                         Commission, file pursuant to Rule 214                 electronic filings of comments, protests,
                                                    Notice of Request Under Blanket                         of the Commission’s Procedural Rules                  and interventions via the Internet in lieu
                                                    Authorization                                           (18 CFR 385.214) a motion to intervene                of paper. See 18 CFR 385.2001(a)(1)(iii)
                                                                                                            or notice of intervention. Any person                 and the instructions on the
                                                      Take notice that on August 22, 2017,                  filing to intervene or the Commission’s               Commission’s Web site (www.ferc.gov)
                                                    Columbia Gas Transmission, LLC                          staff may, pursuant to section 157.205 of             under the e-Filing link. Persons unable
                                                    (Columbia), 700 Louisiana Street, Suite                 the Commission’s Regulations under the                to file electronically should submit
                                                    700, Houston, Texas 77002–2700, filed                   Natural Gas Act (NGA) (18 CFR 157.205)                original and 5 copies of the protest or
                                                    in Docket No. CP17–487–000 and                          file a protest to the request. If no protest          intervention to the Federal Energy
                                                    pursuant to sections 157.205 and                        is filed within the time allowed                      Regulatory Commission, 888 First Street
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    157.208 of the Commission’s                             therefore, the proposed activity shall be             NE., Washington, DC 20426.
                                                    regulations, a prior notice under its                   deemed to be authorized effective the                    Comment Date: 5:00 p.m. Eastern
                                                    blanket certificate issued in Docket No.                day after the time allowed for protest. If            Time, October 31, 2017.
                                                    CP83–76–000 requesting authorization                    a protest is filed and not withdrawn
                                                    to install facilities and appurtenances                 within 30 days after the time allowed                   Dated: August 31, 2017.
                                                    and to make other modifications                         for filing a protest, the instant request             Kimberly D. Bose,
                                                    (Crawford Counterstorage Project) at its                shall be treated as an application for                Secretary.
                                                    existing Crawford Compressor Station,                   authorization pursuant to section 7 of                [FR Doc. 2017–19119 Filed 9–8–17; 8:45 am]
                                                    located in Fairfield County, Ohio. The                  the NGA.                                              BILLING CODE 6717–01–P




                                               VerDate Sep<11>2014   17:54 Sep 08, 2017   Jkt 241001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2017-09-09 00:03:37
Document Modified: 2017-09-09 00:03:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time, October 31, 2017.
FR Citation82 FR 42674 