82_FR_42877 82 FR 42703 - Final Environmental Impact Statement for Vista Grande Drainage Basin Improvement Project, Golden Gate National Recreation Area, San Francisco and San Mateo Counties, California

82 FR 42703 - Final Environmental Impact Statement for Vista Grande Drainage Basin Improvement Project, Golden Gate National Recreation Area, San Francisco and San Mateo Counties, California

DEPARTMENT OF THE INTERIOR
National Park Service

Federal Register Volume 82, Issue 174 (September 11, 2017)

Page Range42703-42704
FR Document2017-19085

The National Park Service (NPS) announces the availability of the Final Environmental Impact Statement (Final EIS) for the proposed Vista Grande Drainage Basin Project (Project), prepared in cooperation with the City of Daly City (Daly City). The Final EIS incorporates the Final Environmental Impact Report (EIR) prepared by Daly City. Daly City is seeking a Special Use Permit from the NPS for construction activities proposed at Fort Funston, a possible Right of Way approval for outfall-related infrastructure on the beach below Fort Funston, and modernization of an existing easement to clarify the rights and obligations of the parties with regard to proposed structures within Fort Funston.

Federal Register, Volume 82 Issue 174 (Monday, September 11, 2017)
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Pages 42703-42704]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19085]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

National Park Service

[NPS-PWR-PWRO-23152; PPPWGOGAP0 PPMPSAS1Z.YP0000]


Final Environmental Impact Statement for Vista Grande Drainage 
Basin Improvement Project, Golden Gate National Recreation Area, San 
Francisco and San Mateo Counties, California

AGENCY: National Park Service, Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The National Park Service (NPS) announces the availability of 
the Final Environmental Impact Statement (Final EIS) for the proposed 
Vista Grande Drainage Basin Project (Project), prepared in cooperation 
with the City of Daly City (Daly City). The Final EIS incorporates the 
Final Environmental Impact Report (EIR) prepared by Daly City. Daly 
City is seeking a Special Use Permit from the NPS for construction 
activities proposed at Fort Funston, a possible Right of Way approval 
for outfall-related infrastructure on the beach below Fort Funston, and 
modernization of an existing easement to clarify the rights and 
obligations of the parties with regard to proposed structures within 
Fort Funston.

DATES: The NPS will execute a Record of Decision no sooner than 30 days 
after the date of publication by the Environmental Protection Agency 
(EPA) of the notice of filing and availability of the Final EIS in the 
Federal Register.

FOR FURTHER INFORMATION CONTACT: Please contact Steve Ortega at the 
Golden Gate National Recreation Area (GGNRA) Planning Division at (415) 
561-4930 or [email protected].

ADDRESSES: An electronic copy of the Final EIS is available on the 
project Web site (http://parkplanning.nps.gov/Vista_Grande). A limited 
number of printed copies of the Final EIS are available for public 
inspection, and may be requested by contacting the GGNRA Planning 
Division as noted above.

SUPPLEMENTARY INFORMATION: The purpose and need for the Project is to 
alleviate flooding in the Vista Grande Drainage Basin and Canal and 
provide a sustainable source of water for management of Lake Merced 
water levels and quality, and to ensure that the portion of the Project 
within federally managed lands, if authorized, is constructed, 
operated, and maintained in a manner that is consistent with the 
protection and enhancement of resources, values, and uses of lands and 
waters under federal jurisdiction. NPS's objectives for the Project 
include the following: (1) Avoid, minimize, or mitigate environmental 
impacts to Park natural and cultural resources; (2) during 
construction, ensure the health and safety of park visitors and staff, 
maintain access to and through Fort Funston, and minimize impacts to 
the visitor experience; (3) permanently improve public access along the 
beach; and (4) minimize impacts on park assets and sustain or restore 
all park assets (e.g., facilities, features, grounds) to pre-
construction or better conditions.
    Range of Alternatives: The Project would address storm-related 
flooding in the Vista Grande Drainage Basin, while providing the 
additional benefit of augmenting the level of Lake Merced. The project 
would also improve recreational access and reduce litter transfer and 
deposition along the beach below Fort Funston and maximize the use of 
existing rights-of-way, easements, and infrastructure to minimize 
construction-related costs, habitat disturbance, and disruption to 
recreational users. The Final EIS describes and analyzes the following 
four alternatives:
    No Project/No Action Alternative would result in no construction of 
the physical components of the proposed Project, and none of the 
proposed operational changes to stormwater routing or Lake Merced water 
management would be made. The NPS would not grant the Special Use 
Permit or amend the existing easement, and no construction could occur 
within NPS-managed lands. Annual Canal sediment removal activities 
would continue, as well as as-needed maintenance activities. Because 
Canal and Tunnel capacity would not be improved, occasional flooding of 
the Canal and associated flooding of John Muir Drive into Lake Merced 
and in local neighborhoods would continue. This alternative serves as 
the environmental baseline from which potential effects of the 
``action'' alternatives were compared.
    Proposed Project, identified as the NPS preferred alternative, 
would consist of the following: (1) Improvements within the Vista 
Grande Basin storm drain system upstream of the Vista Grande Canal; (2) 
Partial replacement of the existing Vista Grande Canal to incorporate a 
gross solid screening device, an approximately 2.6-acre constructed 
treatment wetland, and diversion and discharge structures to route some 
stormwater (and authorized non-stormwater) flows from the Vista Grande 
Canal to Lake Merced and to allow lake water to be used for summer 
treatment wetland maintenance; (3) Modification of the existing 
effluent gravity pipeline so that it may be used year round to convey 
treated effluent from the nearby North San Mateo County Sanitation 
District Wastewater Treatment Plant to the existing outlet and diffuser 
by gravity, and abandoning the force main pipeline; (4) Modification of 
the existing lake overflow structure to include an adjustable weir and 
siphon that allows water from the lake to flow into the Canal and 
Tunnel; (5) Replacement of the existing Vista Grande Tunnel to expand 
its hydraulic capacity and extend its operating lifetime and 
replacement of the Lake Merced Portal to the Tunnel; and (6) 
Replacement of the existing Ocean Outlet structure and a portion of the 
existing 33-inch submarine outfall pipeline that crosses the beach at 
Fort Funston.
    Tunnel Alignment Alternative would include the construction of a 
replacement tunnel south of the existing Tunnel. The new tunnel would 
run from a new east portal at the Canal to a new or rehabilitated Ocean 
Outlet structure at Fort Funston. The Tunnel would run beneath the 
Olympic Club, Highway 35, and the GGNRA lands. This alternative could 
be paired with either the proposed Canal improvements or the Canal 
Configuration Alternative.
    Canal Configuration Alternative would not construct the box culvert 
replacing the first 1,500 feet of the Canal; rather, the diversion 
structure described for the proposed Project

[[Page 42704]]

would be relocated to the southern (upstream) end of the Canal. The box 
culvert under John Muir Drive also would be relocated and would cross 
under John Muir Drive close to the southern end of Impound Lake. The 
design of the diversion structure, box culvert under John Muir Drive, 
and Lake Merced Outlet would be approximately the same as for the 
proposed Project, but located at the upstream (southern) end of the 
Canal. The diversion structure would replace the first approximately 
350 feet of the Canal, and the rest of the Canal would be unchanged 
except as needed for temporary construction access to the Lake Merced 
Tunnel Portal. Under the Canal Configuration Alternative, only one 
wetland cell of approximately 1.7 acres would be constructed. This 
alternative could be paired with either the proposed Tunnel 
improvements or the Tunnel Alignment Alternative.
    The EPA notice of filing and availability of the Draft EIS was 
published on April 29, 2016, which opened the 60 day public review and 
comment period. The draft document was posted online at http://parkplanning.nps.gov/Vista_Grande, and printed copies were available on 
request. Daly City conducted one public meeting in Daly City on May 26, 
2016. Following a review of agency and public comments on the Draft 
EIS, the NPS and Daly City prepared written responses to substantive 
comments relevant to the National Environmental Policy Act (NEPA) and 
California Environmental Quality Act (CEQA) review of the Project. 
Responses to comments are provided in Chapter 3 of the Final EIS. 
Staff-initiated revisions to the text of the Draft EIS as well as 
revisions made in response to pertinent comments are provided in 
Chapter 4 of the Final EIS.
    The NPS will execute a Record of Decision no sooner than 30 days 
following EPA's notice published in the Federal Register announcing 
filing and release of the Final EIS. The official responsible for 
approval of the Vista Grande Drainage Basin Improvement Project is the 
Regional Director of the Pacific West Region, and subsequently the 
General Superintendent, GGNRA, will be responsible for NPS 
implementation.

    Authority: 42 U.S.C. 4321 et seq.

    Dated: July 25, 2017.
Martha J. Lee,
Acting Regional Director, Pacific West Region.
[FR Doc. 2017-19085 Filed 9-8-17; 8:45 am]
 BILLING CODE 4312-52-P



                                                                              Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices                                          42703

                                                    the date of this sale notice (43 CFR                    FOR FURTHER INFORMATION CONTACT:                      managed lands. Annual Canal sediment
                                                    3473.2).                                                Please contact Steve Ortega at the                    removal activities would continue, as
                                                      A lease issued as a result of this                    Golden Gate National Recreation Area                  well as as-needed maintenance
                                                    offering will provide for payment of an                 (GGNRA) Planning Division at (415)                    activities. Because Canal and Tunnel
                                                    annual rental of $3 per acre, or fraction               561–4930 or goga_planning@nps.gov.                    capacity would not be improved,
                                                    thereof, and a royalty payable to the                   ADDRESSES: An electronic copy of the                  occasional flooding of the Canal and
                                                    United States of 12.5 percent of the                    Final EIS is available on the project Web             associated flooding of John Muir Drive
                                                    value of coal mined by surface methods                  site (http://parkplanning.nps.gov/Vista_              into Lake Merced and in local
                                                    and 8 percent of the value of coal mined                Grande). A limited number of printed                  neighborhoods would continue. This
                                                    by underground methods. Bidding                         copies of the Final EIS are available for             alternative serves as the environmental
                                                    instructions for the tract offered and the              public inspection, and may be requested               baseline from which potential effects of
                                                    terms and conditions of the proposed                    by contacting the GGNRA Planning                      the ‘‘action’’ alternatives were
                                                    coal lease are included in the Detailed                 Division as noted above.                              compared.
                                                    Statement of Lease Sale. Copies of the                                                                           Proposed Project, identified as the
                                                                                                            SUPPLEMENTARY INFORMATION: The
                                                    statement and the proposed coal lease                                                                         NPS preferred alternative, would consist
                                                                                                            purpose and need for the Project is to
                                                    are available at the Montana-Dakotas                                                                          of the following: (1) Improvements
                                                                                                            alleviate flooding in the Vista Grande
                                                    State Office. Casefile NDM 107039 is                                                                          within the Vista Grande Basin storm
                                                                                                            Drainage Basin and Canal and provide
                                                    also available for public inspection at                                                                       drain system upstream of the Vista
                                                                                                            a sustainable source of water for                     Grande Canal; (2) Partial replacement of
                                                    the Montana-Dakotas State Office.                       management of Lake Merced water                       the existing Vista Grande Canal to
                                                    (Authority: 43 CFR 3422.3–2)                            levels and quality, and to ensure that                incorporate a gross solid screening
                                                                                                            the portion of the Project within                     device, an approximately 2.6-acre
                                                    Richard M. Hotaling,
                                                                                                            federally managed lands, if authorized,               constructed treatment wetland, and
                                                    Acting Associate State Director.                        is constructed, operated, and
                                                    [FR Doc. 2017–19179 Filed 9–8–17; 8:45 am]                                                                    diversion and discharge structures to
                                                                                                            maintained in a manner that is                        route some stormwater (and authorized
                                                    BILLING CODE 4310–DN–P                                  consistent with the protection and                    non-stormwater) flows from the Vista
                                                                                                            enhancement of resources, values, and                 Grande Canal to Lake Merced and to
                                                                                                            uses of lands and waters under federal                allow lake water to be used for summer
                                                    DEPARTMENT OF THE INTERIOR                              jurisdiction. NPS’s objectives for the                treatment wetland maintenance; (3)
                                                    National Park Service                                   Project include the following: (1) Avoid,             Modification of the existing effluent
                                                                                                            minimize, or mitigate environmental                   gravity pipeline so that it may be used
                                                                                                            impacts to Park natural and cultural                  year round to convey treated effluent
                                                    [NPS–PWR–PWRO–23152; PPPWGOGAP0
                                                    PPMPSAS1Z.YP0000]                                       resources; (2) during construction,                   from the nearby North San Mateo
                                                                                                            ensure the health and safety of park                  County Sanitation District Wastewater
                                                    Final Environmental Impact Statement                    visitors and staff, maintain access to and            Treatment Plant to the existing outlet
                                                    for Vista Grande Drainage Basin                         through Fort Funston, and minimize                    and diffuser by gravity, and abandoning
                                                    Improvement Project, Golden Gate                        impacts to the visitor experience; (3)                the force main pipeline; (4)
                                                    National Recreation Area, San                           permanently improve public access                     Modification of the existing lake
                                                    Francisco and San Mateo Counties,                       along the beach; and (4) minimize                     overflow structure to include an
                                                    California                                              impacts on park assets and sustain or                 adjustable weir and siphon that allows
                                                                                                            restore all park assets (e.g., facilities,            water from the lake to flow into the
                                                    AGENCY:   National Park Service, Interior.              features, grounds) to pre-construction or             Canal and Tunnel; (5) Replacement of
                                                    ACTION:   Notice of availability.                       better conditions.                                    the existing Vista Grande Tunnel to
                                                                                                               Range of Alternatives: The Project                 expand its hydraulic capacity and
                                                    SUMMARY:    The National Park Service                   would address storm-related flooding in               extend its operating lifetime and
                                                    (NPS) announces the availability of the                 the Vista Grande Drainage Basin, while                replacement of the Lake Merced Portal
                                                    Final Environmental Impact Statement                    providing the additional benefit of                   to the Tunnel; and (6) Replacement of
                                                    (Final EIS) for the proposed Vista                      augmenting the level of Lake Merced.                  the existing Ocean Outlet structure and
                                                    Grande Drainage Basin Project (Project),                The project would also improve                        a portion of the existing 33-inch
                                                    prepared in cooperation with the City of                recreational access and reduce litter                 submarine outfall pipeline that crosses
                                                    Daly City (Daly City). The Final EIS                    transfer and deposition along the beach               the beach at Fort Funston.
                                                    incorporates the Final Environmental                    below Fort Funston and maximize the                      Tunnel Alignment Alternative would
                                                    Impact Report (EIR) prepared by Daly                    use of existing rights-of-way, easements,             include the construction of a
                                                    City. Daly City is seeking a Special Use                and infrastructure to minimize                        replacement tunnel south of the existing
                                                    Permit from the NPS for construction                    construction-related costs, habitat                   Tunnel. The new tunnel would run
                                                    activities proposed at Fort Funston, a                  disturbance, and disruption to                        from a new east portal at the Canal to
                                                    possible Right of Way approval for                      recreational users. The Final EIS                     a new or rehabilitated Ocean Outlet
                                                    outfall-related infrastructure on the                   describes and analyzes the following                  structure at Fort Funston. The Tunnel
                                                    beach below Fort Funston, and                           four alternatives:                                    would run beneath the Olympic Club,
                                                    modernization of an existing easement                      No Project/No Action Alternative                   Highway 35, and the GGNRA lands.
                                                    to clarify the rights and obligations of
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                            would result in no construction of the                This alternative could be paired with
                                                    the parties with regard to proposed                     physical components of the proposed                   either the proposed Canal
                                                    structures within Fort Funston.                         Project, and none of the proposed                     improvements or the Canal
                                                    DATES: The NPS will execute a Record                    operational changes to stormwater                     Configuration Alternative.
                                                    of Decision no sooner than 30 days after                routing or Lake Merced water                             Canal Configuration Alternative
                                                    the date of publication by the                          management would be made. The NPS                     would not construct the box culvert
                                                    Environmental Protection Agency (EPA)                   would not grant the Special Use Permit                replacing the first 1,500 feet of the
                                                    of the notice of filing and availability of             or amend the existing easement, and no                Canal; rather, the diversion structure
                                                    the Final EIS in the Federal Register.                  construction could occur within NPS-                  described for the proposed Project


                                               VerDate Sep<11>2014   16:34 Sep 08, 2017   Jkt 241001   PO 00000   Frm 00064   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1


                                                    42704                     Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices

                                                    would be relocated to the southern                      INTERNATIONAL TRADE                                   complaint names as respondents Aisin
                                                    (upstream) end of the Canal. The box                    COMMISSION                                            Seiki Co., Ltd. of Japan; Aisin Holdings
                                                    culvert under John Muir Drive also                                                                            of America, Inc. of Seymour, IN; Aisin
                                                    would be relocated and would cross                      Notice of Receipt of Complaint;                       Technical Center of America, Inc. of
                                                    under John Muir Drive close to the                      Solicitation of Comments Relating to                  Northville, MI; Aisin World Corporation
                                                    southern end of Impound Lake. The                       the Public Interest                                   of America of Northville, MI; Bayerische
                                                    design of the diversion structure, box                  AGENCY: U.S. International Trade                      Motoren Werke AG of Germany; BMW
                                                    culvert under John Muir Drive, and Lake                 Commission.                                           of North America, LLC of Woodcliff
                                                    Merced Outlet would be approximately                                                                          Lake, NJ; BMW Manufacturing Co., LLC
                                                                                                            ACTION: Notice.
                                                    the same as for the proposed Project, but                                                                     of Greer, SC; Denso Corporation of
                                                    located at the upstream (southern) end                  SUMMARY:   Notice is hereby given that                Japan; Denso International America, Inc.
                                                    of the Canal. The diversion structure                   the U.S. International Trade                          of Southfield, MI; Honda Motor Co., Ltd.
                                                    would replace the first approximately                   Commission has received a complaint                   of Japan; Honda North America, Inc. of
                                                    350 feet of the Canal, and the rest of the              entitled Certain Thermoplastic-                       Torrance, CA; American Honda Motor
                                                                                                            Encapsulated Electric Motors,                         Co., Inc. of Torrance, CA; Honda of
                                                    Canal would be unchanged except as
                                                                                                            Components Thereof, and Products and                  America Mfg., Inc. of Marysville, OH;
                                                    needed for temporary construction
                                                                                                            Vehicles Containing Same, DN 3248; the                Honda Manufacturing of Alabama, LLC
                                                    access to the Lake Merced Tunnel
                                                                                                            Commission is soliciting comments on                  of Lincoln, AL; Honda R & D Americas,
                                                    Portal. Under the Canal Configuration                                                                         Inc. of Torrance, CA; Mitsuba
                                                    Alternative, only one wetland cell of                   any public interest issues raised by the
                                                                                                            complaint or complainant’s filing                     Corporation of Japan; American Mitsuba
                                                    approximately 1.7 acres would be                                                                              Corporation of Mount Pleasant, MI;
                                                    constructed. This alternative could be                  pursuant to the Commission’s Rules of
                                                                                                            Practice and Procedure.                               Nidec Corporation of Japan; Nidec
                                                    paired with either the proposed Tunnel                                                                        Automotive Motor Americas, LLC of
                                                    improvements or the Tunnel Alignment                    FOR FURTHER INFORMATION CONTACT: Lisa
                                                                                                            R. Barton, Secretary to the Commission,               Auburn Hills, MI; Toyota Motor
                                                    Alternative.                                                                                                  Corporation of Japan; Toyota Motor
                                                                                                            U.S. International Trade Commission,
                                                      The EPA notice of filing and                          500 E Street SW., Washington, DC                      North America, Inc. of New York, NY;
                                                    availability of the Draft EIS was                       20436, telephone (202) 205–2000. The                  Toyota Motor Sales, U.S.A., Inc. of
                                                    published on April 29, 2016, which                      public version of the complaint can be                Torrance, CA; Toyota Motor Engineering
                                                    opened the 60 day public review and                     accessed on the Commission’s                          & Manufacturing North America, Inc. of
                                                    comment period. The draft document                                                                            Erlanger, KY; Toyota Motor
                                                                                                            Electronic Document Information
                                                    was posted online at http://                                                                                  Manufacturing, Indiana, Inc. of
                                                                                                            System (EDIS) at https://edis.usitc.gov,
                                                    parkplanning.nps.gov/Vista_Grande,                                                                            Princeton, IN, and Toyota Motor
                                                                                                            and will be available for inspection
                                                    and printed copies were available on                                                                          Manufacturing, Kentucky, Inc. of
                                                                                                            during official business hours (8:45 a.m.
                                                    request. Daly City conducted one public                                                                       Georgetown, KY. The complainant
                                                                                                            to 5:15 p.m.) in the Office of the
                                                    meeting in Daly City on May 26, 2016.                                                                         requests that the Commission issue a
                                                                                                            Secretary, U.S. International Trade
                                                    Following a review of agency and public                                                                       limited exclusion order, cease and
                                                                                                            Commission, 500 E Street SW.,
                                                    comments on the Draft EIS, the NPS and                                                                        desist orders, and impose a bond upon
                                                                                                            Washington, DC 20436, telephone (202)
                                                    Daly City prepared written responses to                                                                       respondents’ alleged infringing articles
                                                                                                            205–2000.
                                                                                                                                                                  during the 60-day Presidential review
                                                    substantive comments relevant to the                       General information concerning the
                                                                                                                                                                  period pursuant to 19 U.S.C. 1337(j).
                                                    National Environmental Policy Act                       Commission may also be obtained by                       Proposed respondents, other
                                                    (NEPA) and California Environmental                     accessing its Internet server at United               interested parties, and members of the
                                                    Quality Act (CEQA) review of the                        States International Trade Commission                 public are invited to file comments, not
                                                    Project. Responses to comments are                      (USITC) at https://www.usitc.gov. The                 to exceed five (5) pages in length,
                                                    provided in Chapter 3 of the Final EIS.                 public record for this investigation may              inclusive of attachments, on any public
                                                    Staff-initiated revisions to the text of the            be viewed on the Commission’s                         interest issues raised by the complaint
                                                    Draft EIS as well as revisions made in                  Electronic Document Information                       or § 210.8(b) filing. Comments should
                                                    response to pertinent comments are                      System (EDIS) at https://edis.usitc.gov.              address whether issuance of the relief
                                                    provided in Chapter 4 of the Final EIS.                 Hearing-impaired persons are advised                  specifically requested by the
                                                                                                            that information on this matter can be                complainant in this investigation would
                                                      The NPS will execute a Record of
                                                                                                            obtained by contacting the                            affect the public health and welfare in
                                                    Decision no sooner than 30 days
                                                                                                            Commission’s TDD terminal on (202)                    the United States, competitive
                                                    following EPA’s notice published in the
                                                                                                            205–1810.                                             conditions in the United States
                                                    Federal Register announcing filing and
                                                                                                            SUPPLEMENTARY INFORMATION: The                        economy, the production of like or
                                                    release of the Final EIS. The official
                                                                                                            Commission has received a complaint                   directly competitive articles in the
                                                    responsible for approval of the Vista
                                                                                                            and a submission pursuant to § 210.8(b)               United States, or United States
                                                    Grande Drainage Basin Improvement
                                                                                                            of the Commission’s Rules of Practice                 consumers.
                                                    Project is the Regional Director of the
                                                                                                            and Procedure filed on behalf of                         In particular, the Commission is
                                                    Pacific West Region, and subsequently
                                                                                                            Intellectual Ventures II LLC on                       interested in comments that:
                                                    the General Superintendent, GGNRA,
                                                                                                            September 5, 2017. The complaint                         (i) Explain how the articles
                                                    will be responsible for NPS
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                            alleges violations of section 337 of the              potentially subject to the requested
                                                    implementation.                                         Tariff Act of 1930 (19 U.S.C. 1337) in                remedial orders are used in the United
                                                       Authority: 42 U.S.C. 4321 et seq.                    the importation into the United States,               States;
                                                     Dated: July 25, 2017.                                  the sale for importation, and the sale                   (ii) identify any public health, safety,
                                                                                                            within the United States after                        or welfare concerns in the United States
                                                    Martha J. Lee,
                                                                                                            importation of certain thermoplastic-                 relating to the requested remedial
                                                    Acting Regional Director, Pacific West Region.          encapsulated electric motors,                         orders;
                                                    [FR Doc. 2017–19085 Filed 9–8–17; 8:45 am]              components thereof, and products and                     (iii) identify like or directly
                                                    BILLING CODE 4312–52–P                                  vehicles containing same. The                         competitive articles that complainant,


                                               VerDate Sep<11>2014   16:34 Sep 08, 2017   Jkt 241001   PO 00000   Frm 00065   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2017-09-09 00:04:19
Document Modified: 2017-09-09 00:04:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesThe NPS will execute a Record of Decision no sooner than 30 days after the date of publication by the Environmental Protection Agency (EPA) of the notice of filing and availability of the Final EIS in the Federal Register.
ContactPlease contact Steve Ortega at the Golden Gate National Recreation Area (GGNRA) Planning Division at (415) 561-4930 or [email protected]
FR Citation82 FR 42703 

2025 Federal Register | Disclaimer | Privacy Policy