82_FR_43716 82 FR 43537 - Allocations of Cross-State Air Pollution Rule Allowances From New Unit Set-Asides for the 2017 Compliance Year

82 FR 43537 - Allocations of Cross-State Air Pollution Rule Allowances From New Unit Set-Asides for the 2017 Compliance Year

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 82, Issue 179 (September 18, 2017)

Page Range43537-43539
FR Document2017-19822

The Environmental Protection Agency (EPA) is providing notice of the availability of data on emission allowance allocations to certain units under the Cross-State Air Pollution Rule (CSAPR). EPA has completed final calculations for the first round of allocations of allowances from the CSAPR new unit set-asides (NUSAs) for the 2017 control periods and has posted spreadsheets containing the calculations on EPA's Web site. The only change from the preliminary calculations is the elimination of allocations of CSAPR SO<INF>2</INF> Group 2 allowances to four units in Georgia that for purposes of the preliminary calculations were incorrectly identified as new units instead of existing units.

Federal Register, Volume 82 Issue 179 (Monday, September 18, 2017)
[Federal Register Volume 82, Number 179 (Monday, September 18, 2017)]
[Notices]
[Pages 43537-43539]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19822]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9966-42-OAR]


Allocations of Cross-State Air Pollution Rule Allowances From New 
Unit Set-Asides for the 2017 Compliance Year

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of data availability (NODA).

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is providing notice 
of the availability of data on emission allowance allocations to 
certain units under the Cross-State Air Pollution Rule (CSAPR). EPA has 
completed final calculations for the first round of allocations of 
allowances from the CSAPR new unit set-asides (NUSAs) for the 2017 
control periods and has posted spreadsheets containing the calculations 
on EPA's Web site. The only change from the preliminary calculations is 
the elimination of allocations of CSAPR SO2 Group 2 
allowances to four units in Georgia that for purposes of the 
preliminary calculations were incorrectly identified as new units 
instead of existing units.

DATES: September 18, 2017.

FOR FURTHER INFORMATION CONTACT: Questions concerning this action 
should be addressed to Robert Miller at (202) 343-9077 or 
[email protected] or to Kenon Smith at (202) 343-9164 or 
[email protected].

SUPPLEMENTARY INFORMATION: Under each CSAPR trading program where EPA 
is responsible for determining emission allowance allocations, a 
portion of each state's emissions budget for the program for each 
control period is reserved in a NUSA (and in an additional Indian 
country NUSA in the case of states with Indian country within their 
borders) for allocation to certain units that would not otherwise 
receive allowance allocations. Each NUSA allowance allocation process 
involves up to two rounds of allocations to eligible units, termed 
``new'' units, followed by the allocation to ``existing'' units of any 
allowances not allocated to new units.\1\ In a NODA published in the 
Federal Register on June 21, 2017 (82 FR 28243), we provided notice of 
preliminary calculations for the first-round 2017 NUSA allowance 
allocations. We also described the process for submitting any 
objections to the preliminary calculations. This NODA concerns the 
final calculations for this round of 2017 NUSA allocations.
---------------------------------------------------------------------------

    \1\ The procedures for annually allocating allowances from each 
NUSA to eligible units are set forth in the CSAPR regulations at 40 
CFR 97.411(b) and 97.412 (CSAPR NOX Annual Trading 
Program), 97.511(b) and 97.512 (CSAPR NOX Ozone Season 
Group 1 Trading Program), 97.611(b) and 97.612 (CSAPR SO2 
Group 1 Trading Program), 97.711(b) and 97.712 (CSAPR SO2 
Group 2 Trading Program), and 97.811(b) and 97.812 (CSAPR 
NOX Ozone Season Group 2 Trading Program).
---------------------------------------------------------------------------

    EPA received written objections from four parties in response to 
the June 21

[[Page 43538]]

NODA.\2\ For the reasons discussed below, we have concluded that none 
of the written objections provides a valid basis for altering the 
preliminary calculations of NUSA allowance allocations.
---------------------------------------------------------------------------

    \2\ A fifth written objection was withdrawn prior to EPA's 
drafting of this notice.
---------------------------------------------------------------------------

    The first written objection was submitted by a representative for a 
combustion turbine that commenced commercial operation in 2007 in 
simple cycle configuration and that in 2016 was modified to combined 
cycle configuration through the installation of additional equipment 
including a heat recovery steam generator, duct burners, and a steam 
turbine. According to the objection, the additional equipment should be 
treated for CSAPR purposes as a separate, new affected unit that is 
eligible for allocations of CSAPR NUSA allowances.\3\
---------------------------------------------------------------------------

    \3\ The objection seeks NUSA allocations of CSAPR NOX 
Annual, CSAPR SO2 Group 2, and CSAPR NOX Ozone 
Season Group 2 allowances. However, the facility is located in 
Kansas, and allocations of 2017 CSAPR NOX Annual 
allowances to units in Kansas are governed by a SIP revision rather 
than by the allocation procedures in the federal CSAPR regulations. 
81 FR 42256 (June 29, 2016). EPA therefore addresses the objection 
only as it relates to allowances for the remaining two programs.
---------------------------------------------------------------------------

    EPA disagrees with this objection based primarily on our 
interpretation of the CSAPR definitions of ``combustion turbine'' and 
``unit.'' The CSAPR definition of ``combustion turbine'' covers two 
possible equipment configurations--the equipment required for simple 
cycle operation, consisting of a compressor, combustor, and turbine, 
and the equipment required for combined cycle operation, consisting of 
the preceding equipment plus a heat recovery steam generator, duct 
burners (if any), and a steam turbine.\4\ The facility in question 
meets the CSAPR definition of ``combustion turbine'' both before and 
after the addition of the new equipment described above; the effect of 
adding the new equipment is simply to cause the facility to meet a 
different provision of the definition. Nothing in the definition 
suggests that the addition of equipment to a given facility that causes 
a different provision of the definition to apply should be interpreted 
as splitting that facility into two separate combustion turbines, as 
the objection claims. Moreover, our interpretation that the facility in 
question remains a single combustion turbine is strongly supported by 
the CSAPR definition of ``unit,'' which encompasses a ``combustion 
turbine'' and further states in relevant part that ``[a] unit that 
undergoes a physical change . . . shall continue to be treated as the 
same unit.'' \5\ The objection asserts that this definition means that 
only the original equipment is ``the same unit,'' while the additional 
equipment comprising the ``physical change'' is a separate unit, but we 
disagree. To the contrary, we believe a plain reading of the definition 
indicates that a unit to which a physical change has been made remains 
``the same unit'' but with a physical change.
---------------------------------------------------------------------------

    \4\ The full definition states: ``Combustion turbine means an 
enclosed device comprising: (1) If the device is simple cycle, a 
compressor, a combustor, and a turbine and in which the flue gas 
resulting from the combustion of fuel in the combustor passes 
through the turbine, rotating the turbine; and (2) If the device is 
combined cycle, the equipment described in paragraph (1) of this 
definition and any associated duct burner, heat recovery steam 
generator, and steam turbine.'' 40 CFR 97.702, 97.802.
    \5\ The full definition states: ``Unit means a stationary, 
fossil-fuel-fired boiler, stationary, fossil-fuel-fired combustion 
turbine, or other stationary, fossil-fuel-fired combustion device. A 
unit that undergoes a physical change or is moved to a different 
location or source shall continue to be treated as the same unit. A 
unit (the replaced unit) that is replaced by another unit (the 
replacement unit) at the same or a different source shall continue 
to be treated as the same unit, and the replacement unit shall be 
treated as a separate unit.'' 40 CFR 97.702, 97.802.
---------------------------------------------------------------------------

    In summary, we interpret the CSAPR regulations as providing that 
the facility in question remains the same, single ``combustion 
turbine'' for CSAPR purposes after the addition of the new equipment as 
it was before the addition of the new equipment.\6\ Because we do not 
agree that the additional equipment should be treated as a separate, 
new affected unit for CSAPR purposes, it is unnecessary to address the 
portions of the objection concerning the quantities of NUSA allowances 
for which such a new unit theoretically would be eligible.
---------------------------------------------------------------------------

    \6\ EPA further notes that the facility's representatives have 
not complied with multiple CSAPR requirements that would apply if 
the additional equipment in fact did constitute a separate, new 
affected unit for CSAPR purposes. For example, they have not 
submitted a certificate of representation identifying the additional 
equipment as a new affected unit, see 40 CFR 97.415(d), 97.715(d), 
97.815(d), have not submitted a monitoring plan identifying such a 
new unit (or identifying the new stack as a common stack serving 
multiple units), see Sec. Sec.  97.434(b), 97.734(b), 97.834(b), and 
have not reported any separate hourly emissions or heat input data 
for such a new unit, see Sec. Sec.  97.434(d), 97.734(d), 97.834(d).
---------------------------------------------------------------------------

    The second and third written objections were submitted by 
representatives of two facilities whose units are treated as new units 
for purposes of the original CSAPR trading programs but are treated as 
existing units for purposes of the more recent CSAPR NOX 
Ozone Season Group 2 trading program. The units in question commenced 
commercial operation in 2011 and 2012 and their owners have identified 
them as affected by CSAPR. In the CSAPR rulemaking finalized in 2011 
that established the original four CSAPR trading programs, EPA 
determined that all likely affected units that commenced commercial 
operation prior to January 1, 2010 should be treated as existing units 
for purposes of these four trading programs.\7\ In the CSAPR Update 
rulemaking finalized in 2016 that established the CSAPR NOX 
Ozone Season Group 2 Trading Program, we determined that all likely 
affected units that commenced commercial operation prior to January 1, 
2015 should be treated as existing units for purposes of this trading 
program.\8\ Under these criteria, the units in question are new units 
for purposes of the original four CSAPR trading programs and existing 
units for purposes of the CSAPR NOX Ozone Season Group 2 
Trading Program. The facilities' representatives object to the units' 
classification as existing units under this last trading program and 
request that the units be classified instead as new units eligible for 
allocations of NUSA allowances under this program.
---------------------------------------------------------------------------

    \7\ 76 FR 48208, 48288-91 (August 8, 2011).
    \8\ 81 FR 74504, 74563-66 (October 26, 2016).
---------------------------------------------------------------------------

    As noted above, allocations of NUSA allowances under the CSAPR 
NOX Ozone Season Group 2 Trading Program are governed by 40 
CFR 97.811(b) and 97.812. The regulations provide a detailed set of 
procedures that EPA must follow when allocating NUSA allowances, 
including procedures for identifying the units eligible for each round 
of NUSA allocations for each control period. Under Sec.  
97.811(b)(1)(ii)(B), objections to our preliminary calculations of 
first-round allocations ``shall be limited to addressing whether the 
calculations (including the identification of the CSAPR NOX 
Ozone Season Group 2 units) are in accordance with Sec.  97.812(a)(2) 
through (7) and (12) and Sec. Sec.  97.830 through 97.835''--in other 
words, whether the calculations (including identification of eligible 
units) have been performed in accordance with the detailed procedures 
set forth in the regulations. The objections to the June 21 NODA fall 
outside this narrow scope. The January 1, 2015 cutoff date used to 
determine whether a particular unit is an existing unit for purposes of 
this trading program was established as part of the CSAPR Update 
rulemaking and can be revised only through another rulemaking. The 
process of allocating NUSA allowances is strictly an administrative 
process that implements regulations already in effect, not a

[[Page 43539]]

rulemaking process in which regulations may be revised.
    EPA has confirmed that the units in question are not eligible to 
receive allocations of NUSA allowances under the regulations for the 
CSAPR NOX Ozone Season Group 2 Trading Program. Under Sec.  
97.812(a)(3), first-round allocations are determined for ``each CSAPR 
NOX Ozone Season Group 2 unit described in paragraph (a)(1) 
of this section''--i.e., Sec.  97.812(a)(1). This paragraph of the 
regulations identifies three categories of units eligible for first-
round allocations: First, units that have not been allocated allowances 
as existing units pursuant to Sec.  97.811(a)(1); second, units that 
have been allocated allowances as existing units from a given state's 
budget for a given control period but have lost those allocations under 
the trading program's correction provisions (because the units either 
are not located in that state or are not subject to the program at the 
start of that control period); and third, units that have ceased 
operation for a sufficient length of time to lose their allocations as 
existing units and have subsequently resumed operation.\9\ As discussed 
above, the units in question meet the criteria established in the CSAPR 
Update rulemaking to be considered existing units for purposes of the 
CSAPR NOX Ozone Season Group 2 Trading Program, and the 
units accordingly have been allocated allowances as existing units 
pursuant to Sec.  97.811(a)(1). The units do not fall within one of the 
categories of units eligible for NUSA allocations as set forth in Sec.  
97.812(a)(1), and the regulations do not provide us with the authority 
either to grant exceptions for individual units or to identify 
additional categories of eligible units beyond those set forth in Sec.  
97.812(a)(1).
---------------------------------------------------------------------------

    \9\ See Sec.  97.812(a)(1)(i), (ii), and (iii), respectively.
---------------------------------------------------------------------------

    As an alternative to having the facility's units reclassified as 
new units for purposes of the CSAPR NOX Ozone Season Group 2 
Trading Program, the third written objection also seeks modifications 
to the data used to compute the units' allocations of allowances as 
existing units under that program. However, like the January 1, 2015 
cutoff date, EPA's determinations of which data should be used to 
determine allowance allocations to existing units were made in the 
CSAPR Update rulemaking \10\ and can be revised only through another 
rulemaking, not through the administrative process of allocating NUSA 
allowances. The objection is therefore outside the scope of the June 21 
NODA.
---------------------------------------------------------------------------

    \10\ See 81 FR at 74564-65.
---------------------------------------------------------------------------

    Finally, the fourth written objection seeks modifications to the 
total amount of the NUSA for Oklahoma under the CSAPR NOX 
Ozone Season Group 2 Trading Program. Again, EPA's determinations 
regarding the NUSA total amounts were made in the CSAPR Update 
rulemaking; further, the actual amounts are codified in the CSAPR 
regulations.\11\ The total amount of the NUSA for Oklahoma can be 
revised only through another rulemaking, not through the administrative 
process of allocating NUSA allowances, so the objection is outside the 
scope of the June 21 NODA.
---------------------------------------------------------------------------

    \11\ See 81 FR at 74565; 40 CFR 97.810(a)(17)(ii).
---------------------------------------------------------------------------

    In addition to the written objections discussed above, EPA also 
received a telephone inquiry that led to the discovery of an error in 
the preliminary calculations for NUSA allocations of CSAPR 
SO2 Group 2 allowances. Specifically, because of incorrect 
processing of a change in the plant code used to identify certain 
existing units at the Wansley power plant in Georgia, Wansley CC units 
6A, 6B, 7A, and 7B were incorrectly identified as new units eligible to 
receive NUSA allocations. We have corrected the error and these units 
are not allocated allowances as new units in the final calculations.
    The final unit-by-unit data and allowance allocation calculations 
are set forth in Excel spreadsheets titled 
``CSAPR_NUSA_2017_NOx_Annual_1st_Round_Final_Data'', 
``CSAPR_NUSA_2017_NOx_OS_1st_Round_Final_Data'', and 
``CSAPR_NUSA_2017_SO2_1st_Round_Final_Data'', available on EPA's Web 
site at https://www.epa.gov/csapr/csapr-compliance-year-2017-nusa-nodas. The three spreadsheets show our final determinations of first-
round 2017 NUSA allocations under the CSAPR NOX annual, 
CSAPR NOX ozone season (Group 1 and Group 2), and CSAPR 
SO2 (Group 1 and Group 2) trading programs, respectively.
    EPA notes that an allocation or lack of allocation of allowances to 
a given unit does not constitute a determination that CSAPR does or 
does not apply to the unit. We also note that allocations are subject 
to potential correction.


(Authority: 40 CFR 97.411(b), 97.511(b), 97.611(b), 97.711(b), and 
97.811(b).)


    Dated: July 27, 2017.
Karen L. Orehowsky,
Acting Director, Clean Air Markets Division, Office of Atmospheric 
Programs, Office of Air and Radiation.
[FR Doc. 2017-19822 Filed 9-15-17; 8:45 am]
 BILLING CODE 6560-50-P



                                                                                    Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Notices                                                           43537

                                                                                                           1035TH MEETING—REGULAR MEETING—Continued
                                                                                                                              [September 20, 2017 10:00 a.m.]

                                                        Item No.                                      Docket No.                                                                 Company

                                                E–18    ........................   OMITTED
                                                E–19    ........................   ER17–1333–000 ....................................      Southwest Power Pool, Inc.
                                                E–20    ........................   ER17–520–000 ......................................     Southwest Power Pool, Inc.
                                                E–21    ........................   ER17–772–000,             ER17–772–001,                 Southwest Power Pool, Inc.
                                                                                     ER17–772–002.
                                                E–22 ........................      EL17–34–000 ........................................    Alcoa Corporation.
                                                E–23 ........................      ER16–2320–001 ....................................      Pacific Gas and Electric Company.

                                                                                                                                                GAS

                                                G–1    .........................   OMITTED.
                                                G–2    .........................   RP17–349–000 ......................................     Black Marlin Pipeline Company.
                                                G–3    .........................   RP17–519–000 ......................................     Texas Eastern Transmission, LP.
                                                G–4    .........................   OR13–14–002 .......................................     Western Refining Pipeline, LLC.

                                                                                                                                               HYDRO

                                                H–1    .........................   P–12569–014 ........................................    Public Utility District No. 1 of Okanogan County, Washington.
                                                H–2    .........................   P–12628–013 ........................................    City of Nashua, Iowa.
                                                H–3    .........................   P–2114–289 ..........................................   Public Utility District No. 2 of Grant County, Washington.
                                                H–4    .........................   P–2197–112, P–2197–113 ....................             Alcoa Power Generating Inc., Cube Yadkin Generation LLC.
                                                H–5    .........................   P–2197–110 ..........................................   Alcoa Power Generating Inc., Cube Yadkin Generation LLC.
                                                H–6    .........................   P–2114–286, P–2114–287 ....................             Public Utility District No. 2 of Grant County, Washington.



                                                  Issued: September 13, 2017.                                        ENVIRONMENTAL PROTECTION                                  SUPPLEMENTARY INFORMATION:     Under
                                                Nathaniel J. Davis, Sr.,                                             AGENCY                                                    each CSAPR trading program where
                                                Deputy Secretary.                                                                                                              EPA is responsible for determining
                                                                                                                     [FRL–9966–42–OAR]
                                                                                                                                                                               emission allowance allocations, a
                                                   A free webcast of this event is                                   Allocations of Cross-State Air                            portion of each state’s emissions budget
                                                available through www.ferc.gov. Anyone                               Pollution Rule Allowances From New                        for the program for each control period
                                                with Internet access who desires to view                             Unit Set-Asides for the 2017                              is reserved in a NUSA (and in an
                                                this event can do so by navigating to                                Compliance Year                                           additional Indian country NUSA in the
                                                www.ferc.gov’s Calendar of Events and                                                                                          case of states with Indian country
                                                locating this event in the Calendar.                                 AGENCY: Environmental Protection                          within their borders) for allocation to
                                                                                                                     Agency (EPA).                                             certain units that would not otherwise
                                                   The event will contain a link to its
                                                                                                                     ACTION: Notice of data availability                       receive allowance allocations. Each
                                                webcast. The Capitol Connection
                                                                                                                     (NODA).                                                   NUSA allowance allocation process
                                                provides technical support for the free
                                                webcasts. It also offers access to this                              SUMMARY:   The Environmental Protection                   involves up to two rounds of allocations
                                                event via television in the DC area and                              Agency (EPA) is providing notice of the                   to eligible units, termed ‘‘new’’ units,
                                                via phone bridge for a fee. If you have                              availability of data on emission                          followed by the allocation to ‘‘existing’’
                                                any questions, visit                                                 allowance allocations to certain units                    units of any allowances not allocated to
                                                www.CapitolConnection.org or contact                                 under the Cross-State Air Pollution Rule                  new units.1 In a NODA published in the
                                                Danelle Springer or David Reininger at                               (CSAPR). EPA has completed final                          Federal Register on June 21, 2017 (82
                                                703–993–3100.                                                        calculations for the first round of                       FR 28243), we provided notice of
                                                                                                                     allocations of allowances from the                        preliminary calculations for the first-
                                                   Immediately following the conclusion                                                                                        round 2017 NUSA allowance
                                                of the Commission Meeting, a press                                   CSAPR new unit set-asides (NUSAs) for
                                                                                                                     the 2017 control periods and has posted                   allocations. We also described the
                                                briefing will be held in the Commission                                                                                        process for submitting any objections to
                                                                                                                     spreadsheets containing the calculations
                                                Meeting Room. Members of the public                                                                                            the preliminary calculations. This
                                                                                                                     on EPA’s Web site. The only change
                                                may view this briefing in the designated                                                                                       NODA concerns the final calculations
                                                                                                                     from the preliminary calculations is the
                                                overflow room. This statement is                                     elimination of allocations of CSAPR SO2                   for this round of 2017 NUSA
                                                intended to notify the public that the                               Group 2 allowances to four units in                       allocations.
                                                press briefings that follow Commission                               Georgia that for purposes of the
                                                meetings may now be viewed remotely                                                                                               EPA received written objections from
                                                                                                                     preliminary calculations were                             four parties in response to the June 21
                                                at Commission headquarters, but will                                 incorrectly identified as new units
                                                not be telecast through the Capitol                                  instead of existing units.                                   1 The procedures for annually allocating
sradovich on DSKBBY8HB2PROD with NOTICES




                                                Connection service.                                                  DATES: September 18, 2017.                                allowances from each NUSA to eligible units are set
                                                [FR Doc. 2017–19870 Filed 9–14–17; 11:15 am]                                                                                   forth in the CSAPR regulations at 40 CFR 97.411(b)
                                                                                                                     FOR FURTHER INFORMATION CONTACT:                          and 97.412 (CSAPR NOX Annual Trading Program),
                                                BILLING CODE 6717–01–P
                                                                                                                     Questions concerning this action should                   97.511(b) and 97.512 (CSAPR NOX Ozone Season
                                                                                                                     be addressed to Robert Miller at (202)                    Group 1 Trading Program), 97.611(b) and 97.612
                                                                                                                                                                               (CSAPR SO2 Group 1 Trading Program), 97.711(b)
                                                                                                                     343–9077 or miller.robertl@epa.gov or to                  and 97.712 (CSAPR SO2 Group 2 Trading Program),
                                                                                                                     Kenon Smith at (202) 343–9164 or                          and 97.811(b) and 97.812 (CSAPR NOX Ozone
                                                                                                                     smith.kenon@epa.gov.                                      Season Group 2 Trading Program).



                                           VerDate Sep<11>2014        18:57 Sep 15, 2017        Jkt 241001    PO 00000     Frm 00024       Fmt 4703   Sfmt 4703   E:\FR\FM\18SEN1.SGM   18SEN1


                                                43538                      Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Notices

                                                NODA.2 For the reasons discussed                        interpretation that the facility in                         2011 that established the original four
                                                below, we have concluded that none of                   question remains a single combustion                        CSAPR trading programs, EPA
                                                the written objections provides a valid                 turbine is strongly supported by the                        determined that all likely affected units
                                                basis for altering the preliminary                      CSAPR definition of ‘‘unit,’’ which                         that commenced commercial operation
                                                calculations of NUSA allowance                          encompasses a ‘‘combustion turbine’’                        prior to January 1, 2010 should be
                                                allocations.                                            and further states in relevant part that                    treated as existing units for purposes of
                                                   The first written objection was                      ‘‘[a] unit that undergoes a physical                        these four trading programs.7 In the
                                                submitted by a representative for a                     change . . . shall continue to be treated                   CSAPR Update rulemaking finalized in
                                                combustion turbine that commenced                       as the same unit.’’ 5 The objection                         2016 that established the CSAPR NOX
                                                commercial operation in 2007 in simple                  asserts that this definition means that                     Ozone Season Group 2 Trading
                                                cycle configuration and that in 2016 was                only the original equipment is ‘‘the                        Program, we determined that all likely
                                                modified to combined cycle                              same unit,’’ while the additional                           affected units that commenced
                                                configuration through the installation of               equipment comprising the ‘‘physical                         commercial operation prior to January 1,
                                                additional equipment including a heat                   change’’ is a separate unit, but we                         2015 should be treated as existing units
                                                recovery steam generator, duct burners,                 disagree. To the contrary, we believe a                     for purposes of this trading program.8
                                                and a steam turbine. According to the                   plain reading of the definition indicates                   Under these criteria, the units in
                                                objection, the additional equipment                     that a unit to which a physical change                      question are new units for purposes of
                                                should be treated for CSAPR purposes                    has been made remains ‘‘the same unit’’                     the original four CSAPR trading
                                                as a separate, new affected unit that is                but with a physical change.                                 programs and existing units for
                                                eligible for allocations of CSAPR NUSA                     In summary, we interpret the CSAPR                       purposes of the CSAPR NOX Ozone
                                                allowances.3                                            regulations as providing that the facility                  Season Group 2 Trading Program. The
                                                   EPA disagrees with this objection                    in question remains the same, single                        facilities’ representatives object to the
                                                based primarily on our interpretation of                ‘‘combustion turbine’’ for CSAPR                            units’ classification as existing units
                                                the CSAPR definitions of ‘‘combustion                   purposes after the addition of the new                      under this last trading program and
                                                turbine’’ and ‘‘unit.’’ The CSAPR                       equipment as it was before the addition                     request that the units be classified
                                                definition of ‘‘combustion turbine’’                    of the new equipment.6 Because we do                        instead as new units eligible for
                                                covers two possible equipment                           not agree that the additional equipment                     allocations of NUSA allowances under
                                                configurations—the equipment required                   should be treated as a separate, new                        this program.
                                                for simple cycle operation, consisting of               affected unit for CSAPR purposes, it is
                                                a compressor, combustor, and turbine,                   unnecessary to address the portions of                         As noted above, allocations of NUSA
                                                and the equipment required for                          the objection concerning the quantities                     allowances under the CSAPR NOX
                                                combined cycle operation, consisting of                 of NUSA allowances for which such a                         Ozone Season Group 2 Trading Program
                                                the preceding equipment plus a heat                     new unit theoretically would be eligible.                   are governed by 40 CFR 97.811(b) and
                                                recovery steam generator, duct burners                     The second and third written                             97.812. The regulations provide a
                                                (if any), and a steam turbine.4 The                     objections were submitted by                                detailed set of procedures that EPA
                                                facility in question meets the CSAPR                    representatives of two facilities whose                     must follow when allocating NUSA
                                                definition of ‘‘combustion turbine’’ both               units are treated as new units for                          allowances, including procedures for
                                                before and after the addition of the new                purposes of the original CSAPR trading                      identifying the units eligible for each
                                                equipment described above; the effect of                programs but are treated as existing                        round of NUSA allocations for each
                                                adding the new equipment is simply to                   units for purposes of the more recent                       control period. Under
                                                cause the facility to meet a different                  CSAPR NOX Ozone Season Group 2                              § 97.811(b)(1)(ii)(B), objections to our
                                                provision of the definition. Nothing in                 trading program. The units in question                      preliminary calculations of first-round
                                                the definition suggests that the addition               commenced commercial operation in                           allocations ‘‘shall be limited to
                                                of equipment to a given facility that                   2011 and 2012 and their owners have                         addressing whether the calculations
                                                causes a different provision of the                     identified them as affected by CSAPR.                       (including the identification of the
                                                definition to apply should be                           In the CSAPR rulemaking finalized in                        CSAPR NOX Ozone Season Group 2
                                                interpreted as splitting that facility into                                                                         units) are in accordance with
                                                two separate combustion turbines, as                       5 The full definition states: ‘‘Unit means a             § 97.812(a)(2) through (7) and (12) and
                                                the objection claims. Moreover, our                     stationary, fossil-fuel-fired boiler, stationary, fossil-   §§ 97.830 through 97.835’’—in other
                                                                                                        fuel-fired combustion turbine, or other stationary,         words, whether the calculations
                                                                                                        fossil-fuel-fired combustion device. A unit that
                                                  2 A fifth written objection was withdrawn prior to
                                                                                                        undergoes a physical change or is moved to a                (including identification of eligible
                                                EPA’s drafting of this notice.                          different location or source shall continue to be           units) have been performed in
                                                  3 The objection seeks NUSA allocations of CSAPR       treated as the same unit. A unit (the replaced unit)        accordance with the detailed procedures
                                                NOX Annual, CSAPR SO2 Group 2, and CSAPR                that is replaced by another unit (the replacement           set forth in the regulations. The
                                                NOX Ozone Season Group 2 allowances. However,           unit) at the same or a different source shall continue
                                                the facility is located in Kansas, and allocations of   to be treated as the same unit, and the replacement         objections to the June 21 NODA fall
                                                2017 CSAPR NOX Annual allowances to units in            unit shall be treated as a separate unit.’’ 40 CFR          outside this narrow scope. The January
                                                Kansas are governed by a SIP revision rather than       97.702, 97.802.                                             1, 2015 cutoff date used to determine
                                                by the allocation procedures in the federal CSAPR          6 EPA further notes that the facility’s
                                                                                                                                                                    whether a particular unit is an existing
                                                regulations. 81 FR 42256 (June 29, 2016). EPA           representatives have not complied with multiple
                                                therefore addresses the objection only as it relates    CSAPR requirements that would apply if the
                                                                                                                                                                    unit for purposes of this trading
                                                to allowances for the remaining two programs.           additional equipment in fact did constitute a               program was established as part of the
                                                  4 The full definition states: ‘‘Combustion turbine    separate, new affected unit for CSAPR purposes.             CSAPR Update rulemaking and can be
                                                means an enclosed device comprising: (1) If the         For example, they have not submitted a certificate          revised only through another
sradovich on DSKBBY8HB2PROD with NOTICES




                                                device is simple cycle, a compressor, a combustor,      of representation identifying the additional
                                                and a turbine and in which the flue gas resulting       equipment as a new affected unit, see 40 CFR
                                                                                                                                                                    rulemaking. The process of allocating
                                                from the combustion of fuel in the combustor            97.415(d), 97.715(d), 97.815(d), have not submitted         NUSA allowances is strictly an
                                                passes through the turbine, rotating the turbine; and   a monitoring plan identifying such a new unit (or           administrative process that implements
                                                (2) If the device is combined cycle, the equipment      identifying the new stack as a common stack                 regulations already in effect, not a
                                                described in paragraph (1) of this definition and any   serving multiple units), see §§ 97.434(b), 97.734(b),
                                                associated duct burner, heat recovery steam             97.834(b), and have not reported any separate
                                                                                                                                                                     7 76   FR 48208, 48288–91 (August 8, 2011).
                                                generator, and steam turbine.’’ 40 CFR 97.702,          hourly emissions or heat input data for such a new
                                                97.802.                                                 unit, see §§ 97.434(d), 97.734(d), 97.834(d).                8 81   FR 74504, 74563–66 (October 26, 2016).



                                           VerDate Sep<11>2014   16:54 Sep 15, 2017   Jkt 241001   PO 00000   Frm 00025   Fmt 4703    Sfmt 4703    E:\FR\FM\18SEN1.SGM       18SEN1


                                                                                Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Notices                                                   43539

                                                rulemaking process in which                                   objection is therefore outside the scope                 Dated: July 27, 2017.
                                                regulations may be revised.                                   of the June 21 NODA.                                   Karen L. Orehowsky,
                                                   EPA has confirmed that the units in                           Finally, the fourth written objection               Acting Director, Clean Air Markets Division,
                                                question are not eligible to receive                                                                                 Office of Atmospheric Programs, Office of
                                                                                                              seeks modifications to the total amount
                                                                                                                                                                     Air and Radiation.
                                                allocations of NUSA allowances under                          of the NUSA for Oklahoma under the
                                                                                                                                                                     [FR Doc. 2017–19822 Filed 9–15–17; 8:45 am]
                                                the regulations for the CSAPR NOX                             CSAPR NOX Ozone Season Group 2
                                                Ozone Season Group 2 Trading                                                                                         BILLING CODE 6560–50–P
                                                                                                              Trading Program. Again, EPA’s
                                                Program. Under § 97.812(a)(3), first-                         determinations regarding the NUSA
                                                round allocations are determined for                          total amounts were made in the CSAPR                   ENVIRONMENTAL PROTECTION
                                                ‘‘each CSAPR NOX Ozone Season Group                           Update rulemaking; further, the actual                 AGENCY
                                                2 unit described in paragraph (a)(1) of                       amounts are codified in the CSAPR
                                                this section’’—i.e., § 97.812(a)(1). This                     regulations.11 The total amount of the                 [FRL–9967–48–ORD; Docket ID No. EPA–
                                                paragraph of the regulations identifies                       NUSA for Oklahoma can be revised only                  HQ–ORD–2017–0496, ORD–2017–0497,
                                                three categories of units eligible for first-                                                                        ORD–2014–0526]
                                                                                                              through another rulemaking, not
                                                round allocations: First, units that have                     through the administrative process of
                                                not been allocated allowances as                                                                                     Availability of the Integrated Risk
                                                                                                              allocating NUSA allowances, so the                     Information System (IRIS) Assessment
                                                existing units pursuant to § 97.811(a)(1);                    objection is outside the scope of the
                                                second, units that have been allocated                                                                               Plans for Nitrate/Nitrite, Chloroform,
                                                                                                              June 21 NODA.                                          and Ethylbenzene
                                                allowances as existing units from a
                                                given state’s budget for a given control                         In addition to the written objections               AGENCY: Environmental Protection
                                                period but have lost those allocations                        discussed above, EPA also received a                   Agency (EPA).
                                                under the trading program’s correction                        telephone inquiry that led to the
                                                                                                                                                                     ACTION: Notice of public comment
                                                provisions (because the units either are                      discovery of an error in the preliminary
                                                                                                                                                                     period.
                                                not located in that state or are not                          calculations for NUSA allocations of
                                                subject to the program at the start of that                   CSAPR SO2 Group 2 allowances.                          SUMMARY:   The Environmental Protection
                                                control period); and third, units that                        Specifically, because of incorrect                     Agency (EPA) is announcing a 30-day
                                                have ceased operation for a sufficient                        processing of a change in the plant code               public comment period associated with
                                                length of time to lose their allocations                      used to identify certain existing units at             the draft IRIS Assessment Plans for
                                                as existing units and have subsequently                       the Wansley power plant in Georgia,                    Nitrate/Nitrite, Chloroform, and
                                                resumed operation.9 As discussed                              Wansley CC units 6A, 6B, 7A, and 7B                    Ethylbenzene. These documents
                                                above, the units in question meet the                         were incorrectly identified as new units               communicate information on the
                                                criteria established in the CSAPR                             eligible to receive NUSA allocations. We               scoping needs identified by EPA
                                                Update rulemaking to be considered                            have corrected the error and these units               program and regional offices and the
                                                existing units for purposes of the                            are not allocated allowances as new                    IRIS Program’s initial problem
                                                CSAPR NOX Ozone Season Group 2                                units in the final calculations.                       formulation activities. Specifically, the
                                                Trading Program, and the units                                                                                       assessment plans outline the objectives
                                                                                                                 The final unit-by-unit data and                     for each assessment and the type of
                                                accordingly have been allocated
                                                allowances as existing units pursuant to                      allowance allocation calculations are set              evidence considered most pertinent to
                                                § 97.811(a)(1). The units do not fall                         forth in Excel spreadsheets titled                     address the scoping needs.
                                                within one of the categories of units                         ‘‘CSAPR_NUSA_2017_NOx_Annual_                            EPA is releasing these draft IRIS
                                                eligible for NUSA allocations as set                          1st_Round_Final_Data’’, ‘‘CSAPR_                       Assessment Plans for public comment.
                                                forth in § 97.812(a)(1), and the                              NUSA_2017_NOx_OS_1st_Round_                            These assessment plans will also be
                                                regulations do not provide us with the                        Final_Data’’, and ‘‘CSAPR_NUSA_2017_                   discussed during the September 27–28
                                                authority either to grant exceptions for                      SO2_1st_Round_Final_Data’’, available                  Science Advisory Board (SAB) Chemical
                                                individual units or to identify                               on EPA’s Web site at https://                          Assessment Advisory Committee
                                                additional categories of eligible units                       www.epa.gov/csapr/csapr-compliance-                    (CAAC) peer consultation meeting.
                                                beyond those set forth in § 97.812(a)(1).                     year-2017-nusa-nodas. The three                        These documents were prepared by the
                                                                                                              spreadsheets show our final                            National Center for Environmental
                                                   As an alternative to having the
                                                                                                              determinations of first-round 2017                     Assessment (NCEA) within EPA’s Office
                                                facility’s units reclassified as new units
                                                                                                              NUSA allocations under the CSAPR                       of Research and Development (ORD).
                                                for purposes of the CSAPR NOX Ozone
                                                Season Group 2 Trading Program, the                           NOX annual, CSAPR NOX ozone season                     DATES: The 30-day public comment
                                                third written objection also seeks                            (Group 1 and Group 2), and CSAPR SO2                   period begins September 18, 2017, and
                                                modifications to the data used to                             (Group 1 and Group 2) trading                          ends October 18, 2017. Comments must
                                                compute the units’ allocations of                             programs, respectively.                                be received on or before October 18,
                                                allowances as existing units under that                          EPA notes that an allocation or lack                2017.
                                                program. However, like the January 1,                         of allocation of allowances to a given                 ADDRESSES:   The IRIS Assessment Plan
                                                2015 cutoff date, EPA’s determinations                        unit does not constitute a determination               for Nitrate/Nitrite, will be available via
                                                of which data should be used to                               that CSAPR does or does not apply to                   the Internet on IRIS’ Recent Additions at
                                                determine allowance allocations to                            the unit. We also note that allocations                http://www.epa.gov/iris/iris-recent-
                                                existing units were made in the CSAPR                                                                                additions and in the public docket at
sradovich on DSKBBY8HB2PROD with NOTICES




                                                                                                              are subject to potential correction.
                                                Update rulemaking 10 and can be revised                                                                              http://www.regulations.gov, Docket ID:
                                                only through another rulemaking, not                          (Authority: 40 CFR 97.411(b), 97.511(b),               EPA–HQ–ORD–2017–0496.
                                                through the administrative process of                         97.611(b), 97.711(b), and 97.811(b).)                    The IRIS Assessment Plan for
                                                allocating NUSA allowances. The                                                                                      Chloroform will be available via the
                                                                                                                                                                     Internet on IRIS’ Recent Additions at
                                                  9 See   § 97.812(a)(1)(i), (ii), and (iii), respectively.                                                          http://www.epa.gov/iris/iris-recent-
                                                  10 See   81 FR at 74564–65.                                   11 See   81 FR at 74565; 40 CFR 97.810(a)(17)(ii).   additions and in the public docket at


                                           VerDate Sep<11>2014       16:54 Sep 15, 2017    Jkt 241001    PO 00000   Frm 00026    Fmt 4703   Sfmt 4703   E:\FR\FM\18SEN1.SGM   18SEN1



Document Created: 2017-09-16 00:52:59
Document Modified: 2017-09-16 00:52:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of data availability (NODA).
DatesSeptember 18, 2017.
ContactQuestions concerning this action
FR Citation82 FR 43537 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR