82_FR_44138 82 FR 43957 - Combined Notice of Filings

82 FR 43957 - Combined Notice of Filings

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 181 (September 20, 2017)

Page Range43957-43958
FR Document2017-19986

Federal Register, Volume 82 Issue 181 (Wednesday, September 20, 2017)
[Federal Register Volume 82, Number 181 (Wednesday, September 20, 2017)]
[Notices]
[Pages 43957-43958]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19986]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP17-1029-001.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Tariff Amendment: 09/12/17 Negotiated Rates--Hartree

[[Page 43958]]

Partners, LP H-7090-89, Amendment to be effective 11/1/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5100.
    Comments Due: 5 p.m. ET 9/25/17.

    Docket Numbers: RP17-1039-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Sec.  4(d) Rate Filing: 09/12/17 Negotiated Rates--
Freepoint Commodities LLC R-7250-20 to be effective 11/1/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5090.
    Comments Due: 5 p.m. ET 9/25/17.

    Docket Numbers: RP17-1040-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Sec.  4(d) Rate Filing: 09/12/17 Negotiated Rates--ENI 
Trading & Shipping Inc R-7825-04 to be effective 11/1/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5124.
    Comments Due: 5 p.m. ET 9/25/17.

    Docket Numbers: RP17-1041-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Sec.  4(d) Rate Filing: 09/12/17 Negotiated Rates--ENI 
Trading & Shipping Inc R7825-05 to be effective 11/1/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5125.
    Comments Due: 5 p.m. ET 9/25/17.

    Docket Numbers: RP17-1042-000.
    Applicants: Alliance Pipeline L.P.
    Description: Sec.  4(d) Rate Filing: Brion Duvernay Name Change to 
be effective 10/1/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5141.
    Comments Due: 5 p.m. ET 9/25/17.

    Docket Numbers: RP17-498-003.
    Applicants: Cameron Interstate Pipeline, LLC.
    Description: Compliance filing Cameron Interstate Pipeline 
Compliance Filing to be effective 9/12/2017.
    Filed Date: 9/12/17.
    Accession Number: 20170912-5140.
    Comments Due: 5 p.m. ET 9/25/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 13, 2017.
 Nathaniel J. Davis, Sr.,
 Deputy Secretary.
[FR Doc. 2017-19986 Filed 9-19-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                        Federal Register / Vol. 82, No. 181 / Wednesday, September 20, 2017 / Notices                                                  43957

                                                IV. Figure 5: Decrease in Compressor Watts              3.1.7 Test Sequence                                    operate over the lifetime of the product than
                                                (3 Ton AC) With 3 Additional 24-Hour                      Manufacturers may optionally operate the             those results obtained under the current 20
                                                Break-In Periods, Relative to 20-Hour Break-            equipment under test for a ‘‘break-in’’ period,        hour break-in period limit.
                                                In Baseline                                             not to exceed 2072 hours, prior to conducting            Competitive Disadvantage. If JCI must
                                                  See the following Web site for figure 5:              the test method specified in this section. A           continue to comply with the 20 Hour Break-
                                                https://www.regulations.gov/docket?D=EERE-              manufacturer who elects to use this optional           In Limit for its VSS systems, these systems
                                                2017-BT-WAV-0037.                                       compressor break-in period in its                      will be disadvantaged in the market relative
                                                                                                        certification testing should record this               to other types central air conditioners and
                                                Figure 6: Decrease in Compressor Watts (5               information (including the duration) in the            heat pumps for which a break-in period of 20
                                                Ton AC) With 3 Additional 24-Hour Break-                test data underlying the certified ratings that        hours or less products results representative
                                                In Periods, Relative to 20-Hour Break-In                are required to be maintained under 10 CFR             of actual operating efficiency. As shown
                                                Baseline                                                                                                       above, the impact of the 20 Hour Break-In
                                                                                                        429.71. When testing a ducted unit (except if
                                                   See the following Web site for figure 6:                                                                    Limit on ratings is significant—it can reduce
                                                                                                        a heating- only heat pump), conduct the A or
                                                https://www.regulations.gov/docket?D=EERE-                                                                     ratings by 1 to 2 SEER. The effects of such
                                                                                                        A2 Test first to establish the cooling full-load air
                                                2017-BT-WAV-0037.                                                                                              depressed ratings in the market can be
                                                                                                        volume rate. For ducted heat pumps where
                                                   These test results show that a VSS system                                                                   significant.
                                                                                                        the heating and cooling full-load air volume
                                                is not fully broken in at 20 hours, and that                                                                     Public Policy Reasons to Grant Interim
                                                                                                        rates are different, make the first heating
                                                rating such a system with only 20-hour                                                                         Waiver. Without an interim waiver,
                                                                                                        mode test one that requires the heating full-
                                                break-in period can understate a system’s                                                                      consumers will continue to be exposed to
                                                                                                        load air volume rate. For ducted heating-only
                                                SEER rating performance by 1 to 2 SEER (or                                                                     materially inaccurate information about the
                                                                                                        heat pumps, conduct the H1 or H12 Test first           energy consumption characteristics of JCI’s
                                                approximately 5% to 10%). Because the 20                to establish the heating full-load air volume
                                                Hour Break-In Limit does not allow sufficient                                                                  VSS systems. This inaccurate information
                                                                                                        rate. When conducting a cyclic test, always            harms consumers (especially those seeking to
                                                time for full break-in of VSS systems, the              conduct it immediately after the steady-state
                                                efficiency rating of a VSS system measured                                                                     evaluate very high efficiency CAC/HP
                                                                                                        test that requires the same test conditions.           products) and distorts markets. Further,
                                                under Appendix M falls below the actual                 For variable-speed systems, the first test
                                                efficiency level at which the system will                                                                      underrating high efficiency products is
                                                                                                        using the cooling minimum air volume rate              inconsistent with the policy objectives of
                                                operate for the great majority of its time in           should precede the EV Test, and the first test
                                                service. JCI is thus unable to represent, on the                                                               EPCA.
                                                                                                        using the heating minimum air volume rate                For all of these reasons, the Department
                                                basis of Appendix M testing, the full                   must precede the H2V Test. The test
                                                efficiency at which its VSS systems will                                                                       should grant an interim waiver while it
                                                                                                        laboratory makes all other decisions on the            considers the petition for waiver set out
                                                operate. To achieve a particular efficiency             test sequence.
                                                rating under the Appendix M test method,                                                                       above.
                                                                                                          Thus, the only change would be to modify
                                                JCI is forced to overdesign its VSS systems             the maximum length of the optional break-in            IV. Conclusion
                                                to meet an even higher target efficiency rating         period for JCI’s VSS systems. As required by             For the reasons stated above, JCI
                                                after full break-in. In short, the 20 Hour              Appendix M, JCI would report the break-in              respectfully requests that DOE grant this
                                                Break-In Limit in Appendix M results in the             period used in its product compliance                  petition for waiver of the 20 Hour Break-In
                                                underrating of JCI’s VCC systems, and thus              certifications.                                        Limit with respect to its VSS systems. JCI
                                                produces materially inaccurate data about the
                                                                                                        II. Similar Products                                   further requests DOE to grant its request for
                                                efficiency of VSS systems for comparison
                                                                                                                                                               an interim waiver while its petition for
                                                purposes, leaving homeowners without the                   JCI is aware of the following manufacturers         waiver is under consideration.
                                                information needed to objectively evaluate              of residential central air conditioners and              If you have any questions or would like to
                                                the benefits of such systems.                           heat pumps that offer VSS systems using                discuss this request, please contact me at
                                                   This underrating under Appendix M for                scroll compressors with oil injection: Carrier         (316) 832–6393, Chris Ware at (414) 524–
                                                JCI’s VSS systems has significant                       Corporation, Daikin Industries, Goodman                5443, or Doug Smith of Van Ness Feldman,
                                                consequences in the marketplace. Because of             Manufacturing Co. LP, Lennox International             LLP at (202) 298–1902. We greatly appreciate
                                                underrating due to the 20 Hour Break-In                 Inc., Nortek Global HVAC, Rheem Sales                  your attention to this matter.
                                                Limit, the full efficiency advantage of JCI’s           Company, and Trane.
                                                VSS systems will not be apparent versus                                                                        Sincerely,
                                                lower-efficiency full stage compressor                  III. Petition for Interim Waiver                       Steve Tice,
                                                products, for which the 20 Hour Break-In                   Pursuant to 10 CFR 430.27, JCI also                 UPG Vice-President, Engineering Unitary
                                                Limit does not bias results. Consumers for              requests an interim waiver of the 20 Hour              Products, Johnson Controls, Inc.
                                                whom central air conditioner measured                   Break-In Limit for the JCI VSS systems. DOE            steven.a.tice@jci.com.
                                                efficiency is an important factor will be               will grant an interim waiver if it appears             Cc: Johanna Jochum, Office of the General
                                                misled about the merits of VSS systems on               likely that the petition for waiver will be            Counsel
                                                the basis of measured efficiency under                  granted and/or if DOE determines that it
                                                Appendix M. Although the JCI models at                                                                         [FR Doc. 2017–20032 Filed 9–19–17; 8:45 am]
                                                                                                        would be desirable for public policy reasons
                                                issue are very efficient, and perform well                                                                     BILLING CODE 6450–01–P
                                                                                                        to grant immediate relief pending a
                                                above the applicable minimum efficiency
                                                                                                        determination on the petition for waiver.10
                                                standards, accurate ratings for high efficiency
                                                                                                        Interim relief is important to ensure that JCI
                                                products such as these are important for                                                                       DEPARTMENT OF ENERGY
                                                purposes of, for instance, determining                  can make materially accurate representations
                                                eligibility for Energy Star, utility rebates, tax       about the energy efficiency of its VSS
                                                                                                        systems in its certifications to DOE and               Federal Energy Regulatory
                                                credits, and green building recognition.
                                                                                                        marketing materials while DOE is                       Commission
                                                I. Alternative Test Procedures                          considering the merits of JCI’s petition for
                                                   DOE’s Appendix M test procedure, as                  waiver.                                                Combined Notice of Filings
                                                currently promulgated but with the option of               Likely Success of the Petition for Waiver.
                                                                                                        For the reasons outlined above, JCI believes             Take notice that the Commission has
                                                an extended, 72-hour break-in period,                                                                          received the following Natural Gas
                                                constitutes the appropriate alternate test              that there are strong arguments for granting
sradovich on DSKBBY8HB2PROD with NOTICES




                                                procedure that will evaluate the performance            the petition for waiver on the merits.                 Pipeline Rate and Refund Report filings:
                                                of JCI’s VSS systems in a manner                        Specifically, JCI testing of its VSS systems           Filings Instituting Proceedings
                                                representative of its energy characteristics.           shows that a 72-hour break-in period
                                                Therefore, JCI proposes to test the basic               produces test results that are more                      Docket Numbers: RP17–1029–001.
                                                models for which it seeks waiver by applying            representative of the actual product                     Applicants: Iroquois Gas
                                                the entirety of Appendix M to 10 CFR part               efficiencies at which the VSS systems will             Transmission System, L.P.
                                                430, subpart B, with a single modification to                                                                    Description: Tariff Amendment:
                                                Section 3.1.7, as shown below:                            10 10   CFR 430.27(e)(2).                            09/12/17 Negotiated Rates—Hartree


                                           VerDate Sep<11>2014   18:28 Sep 19, 2017   Jkt 241001   PO 00000   Frm 00026    Fmt 4703   Sfmt 4703   E:\FR\FM\20SEN1.SGM   20SEN1


                                                43958                   Federal Register / Vol. 82, No. 181 / Wednesday, September 20, 2017 / Notices

                                                Partners, LP H–7090–89, Amendment to                    requirements, interventions, protests,                888 First Street NE., Washington, DC
                                                be effective 11/1/2017.                                 service, and qualifying facilities filings            20426.
                                                   Filed Date: 9/12/17.                                 can be found at: http://www.ferc.gov/                    The filings in the above-referenced
                                                   Accession Number: 20170912–5100.                     docs-filing/efiling/filing-req.pdf. For               proceeding are accessible in the
                                                   Comments Due: 5 p.m. ET 9/25/17.                     other information, call (866) 208–3676                Commission’s eLibrary system by
                                                   Docket Numbers: RP17–1039–000.                       (toll free). For TTY, call (202) 502–8659.            clicking on the appropriate link in the
                                                   Applicants: Iroquois Gas                               Dated: September 13, 2017.                          above list. They are also available for
                                                Transmission System, L.P.                               Nathaniel J. Davis, Sr.,
                                                                                                                                                              electronic review in the Commission’s
                                                   Description: § 4(d) Rate Filing:                                                                           Public Reference Room in Washington,
                                                                                                        Deputy Secretary.
                                                09/12/17 Negotiated Rates—Freepoint                                                                           DC. There is an eSubscription link on
                                                                                                        [FR Doc. 2017–19986 Filed 9–19–17; 8:45 am]
                                                Commodities LLC R–7250–20 to be                                                                               the Web site that enables subscribers to
                                                                                                        BILLING CODE 6717–01–P                                receive email notification when a
                                                effective 11/1/2017.
                                                   Filed Date: 9/12/17.                                                                                       document is added to a subscribed
                                                   Accession Number: 20170912–5090.                                                                           docket(s). For assistance with any FERC
                                                   Comments Due: 5 p.m. ET 9/25/17.                     DEPARTMENT OF ENERGY
                                                                                                                                                              Online service, please email
                                                   Docket Numbers: RP17–1040–000.                       Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov or call
                                                   Applicants: Iroquois Gas                             Commission                                            (866) 208–3676 (toll free). For TTY, call
                                                Transmission System, L.P.                                                                                     (202) 502–8659.
                                                   Description: § 4(d) Rate Filing:                     [Docket No. ER17–2457–000]
                                                                                                                                                                Dated: September 14, 2017.
                                                09/12/17 Negotiated Rates—ENI Trading                                                                         Nathaniel J. Davis, Sr.,
                                                & Shipping Inc R–7825–04 to be                          Rock Creek Wind Project, LLC;
                                                                                                        Supplemental Notice That Initial                      Deputy Secretary.
                                                effective 11/1/2017.
                                                   Filed Date: 9/12/17.                                 Market-Based Rate Filing Includes                     [FR Doc. 2017–20017 Filed 9–19–17; 8:45 am]
                                                   Accession Number: 20170912–5124.                     Request for Blanket Section 204                       BILLING CODE 6717–01–P

                                                   Comments Due: 5 p.m. ET 9/25/17.                     Authorization
                                                   Docket Numbers: RP17–1041–000.                          This is a supplemental notice in the               DEPARTMENT OF ENERGY
                                                   Applicants: Iroquois Gas                             above-referenced proceeding of Rock
                                                Transmission System, L.P.                               Creek Wind Project, LLC’s application                 Federal Energy Regulatory
                                                   Description: § 4(d) Rate Filing:                     for market-based rate authority, with an              Commission
                                                09/12/17 Negotiated Rates—ENI Trading                   accompanying rate tariff, noting that
                                                & Shipping Inc R7825–05 to be effective                 such application includes a request for               [Docket No. CP17–79–000]
                                                11/1/2017.                                              blanket authorization, under 18 CFR
                                                   Filed Date: 9/12/17.                                                                                       Florida Gas Transmission Company,
                                                                                                        part 34, of future issuances of securities            L.L.C.; Notice of Availability of the
                                                   Accession Number: 20170912–5125.                     and assumptions of liability.
                                                   Comments Due: 5 p.m. ET 9/25/17.                                                                           Environmental Assessment for the
                                                                                                           Any person desiring to intervene or to             Proposed Wekive Parkway Relocation
                                                   Docket Numbers: RP17–1042–000.                       protest should file with the Federal                  Project
                                                   Applicants: Alliance Pipeline L.P.                   Energy Regulatory Commission, 888
                                                   Description: § 4(d) Rate Filing: Brion               First Street NE., Washington, DC 20426,                 The staff of the Federal Energy
                                                Duvernay Name Change to be effective                    in accordance with Rules 211 and 214                  Regulatory Commission (FERC or
                                                10/1/2017.                                              of the Commission’s Rules of Practice                 Commission) has prepared an
                                                   Filed Date: 9/12/17.                                 and Procedure (18 CFR 385.211 and                     environmental assessment (EA) for the
                                                   Accession Number: 20170912–5141.                     385.214). Anyone filing a motion to                   Wekiva Parkway Relocation Project,
                                                   Comments Due: 5 p.m. ET 9/25/17.                     intervene or protest must serve a copy                proposed by Florida Gas Transmission
                                                   Docket Numbers: RP17–498–003.                        of that document on the Applicant.                    Company, L.L.C. (Florida Gas) in the
                                                   Applicants: Cameron Interstate                          Notice is hereby given that the                    above-referenced docket. Florida Gas
                                                Pipeline, LLC.                                          deadline for filing protests with regard              requests authorization to abandon in
                                                   Description: Compliance filing                       to the applicant’s request for blanket                place and relocate portions of their
                                                Cameron Interstate Pipeline Compliance                  authorization, under 18 CFR part 34, of               existing 12-inch Sanford Lateral and 26-
                                                Filing to be effective 9/12/2017.                       future issuances of securities and                    inch Sanford Lateral Loop pipeline in
                                                   Filed Date: 9/12/17.                                 assumptions of liability, is October 4,               Lake and Seminole Counties, FL, that
                                                   Accession Number: 20170912–5140.                     2017.                                                 conflict with construction of the Florida
                                                   Comments Due: 5 p.m. ET 9/25/17.                        The Commission encourages                          Department of Transportation (FDOT)
                                                   The filings are accessible in the                    electronic submission of protests and                 Wekiva Parkway. The affected pipelines
                                                Commission’s eLibrary system by                         interventions in lieu of paper, using the             are to be relocated to new adjacent right-
                                                clicking on the links or querying the                   FERC Online links at http://                          of-way abutting the north side of
                                                docket number.                                          www.ferc.gov. To facilitate electronic                FDOT’s Wekiva Parkway right-of-way.
                                                   Any person desiring to intervene or                  service, persons with Internet access                   The EA assesses the potential
                                                protest in any of the above proceedings                 who will eFile a document and/or be                   environmental effects of the
                                                must file in accordance with Rules 211                  listed as a contact for an intervenor                 construction and operation of the
                                                and 214 of the Commission’s                             must create and validate an                           Wekiva Parkway Relocation Project in
                                                Regulations (18 CFR 385.211 and                         eRegistration account using the                       accordance with the requirements of the
sradovich on DSKBBY8HB2PROD with NOTICES




                                                385.214) on or before 5:00 p.m. Eastern                 eRegistration link. Select the eFiling                National Environmental Policy Act
                                                time on the specified comment date.                     link to log on and submit the                         (NEPA). The FERC staff concludes that
                                                Protests may be considered, but                         intervention or protests.                             approval of the proposed project, with
                                                intervention is necessary to become a                      Persons unable to file electronically              appropriate mitigating measures, would
                                                party to the proceeding.                                should submit an original and 5 copies                not constitute a major federal action
                                                   eFiling is encouraged. More detailed                 of the intervention or protest to the                 significantly affecting the quality of the
                                                information relating to filing                          Federal Energy Regulatory Commission,                 human environment.


                                           VerDate Sep<11>2014   18:28 Sep 19, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\20SEN1.SGM   20SEN1



Document Created: 2018-10-24 14:22:31
Document Modified: 2018-10-24 14:22:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates9/12/17.
FR Citation82 FR 43957 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR