82_FR_45259 82 FR 45073 - Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities

82 FR 45073 - Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 186 (September 27, 2017)

Page Range45073-45074
FR Document2017-20693

The U.S. Nuclear Regulatory Commission (NRC) is issuing revision 2 of Regulatory Guide (RG) 2.6, ``Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities.'' This RG provides licensees and applicants with a method the NRC staff considers acceptable for use in complying with the regulations on the content of emergency plans for research and test reactors and other non-power production and utilization facilities.

Federal Register, Volume 82 Issue 186 (Wednesday, September 27, 2017)
[Federal Register Volume 82, Number 186 (Wednesday, September 27, 2017)]
[Notices]
[Pages 45073-45074]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-20693]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0056]


Emergency Planning for Research and Test Reactors and Other Non-
Power Production and Utilization Facilities

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide, issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
revision 2 of Regulatory Guide (RG) 2.6, ``Emergency Planning for 
Research and Test Reactors and Other Non-Power

[[Page 45074]]

Production and Utilization Facilities.'' This RG provides licensees and 
applicants with a method the NRC staff considers acceptable for use in 
complying with the regulations on the content of emergency plans for 
research and test reactors and other non-power production and 
utilization facilities.

DATES: Revision 2 of RG 2.6 is available on September 27, 2017.

ADDRESSES: Please refer to Docket ID NRC-2017-0056 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0056. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that a document is referenced. 
Revision 2 of RG 2.6 and the regulatory analysis may be found in ADAMS 
under Accession numbers ML17263A472 and ML16035A477 respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
    Regulatory guides are not copyrighted, and the NRC's approval is 
not required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Geoffrey Wertz, Office of Nuclear 
Reactor Regulation, telephone: 301-415-0893, email: 
[email protected]; or Stanley Gardocki, Office of Nuclear 
Regulatory Research, telephone: 301-415-1067, email: 
[email protected]. Both are staff of the U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is issuing a revision to an existing guide in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
agency's regulations, techniques that the NRC staff uses in evaluating 
specific issues or postulated events, and data that the NRC staff needs 
in its review of applications for permits and licenses.
    Revision 2 of RG 2.6 was issued with a temporary designation of 
Draft Regulatory Guide, DG-2004. The purpose of issuing this RG is to 
provide licensees and applicants with a method that the staff of the 
NRC considers acceptable for use in complying with the regulations on 
the content of emergency plans for research and test reactors and other 
non-power production and utilization facilities licensed under part 50 
of title 10 of the Code of Federal Regulations (10 CFR), ``Domestic 
Licensing of Production and Utilization Facilities.''

II. Additional Information

    The NRC published a notice of the availability of DG-2004 in the 
Federal Register on February 24, 2017, (82 FR 11660) for a 60-day 
public comment period. The public comment period closed on April 25, 
2017. The NRC received one public comment on DG-2004. That comment and 
the NRC's response to it are available in ADAMS under Accession No. 
ML17137A099.
    Revision 2 of RG 2.6 addresses new issues identified since the 
guide was last revised in March 1983. This revision endorses the latest 
version of a consensus standard developed by the American National 
Standards Institute (ANSI) and American Nuclear Society (ANS), ANSI/
ANS-15.16-2015, ``Emergency Planning for Research Reactors.'' The NRC 
also expanded the scope of the guide to address non-power facilities 
under 10 CFR part 50, other than research and test reactors. Other 
changes to RG 2.6 include editorial changes and the current program 
guidance for RGs.
    Revising this regulatory guide to adopt, in whole or in part, a 
consensus standard is consistent with the NRC policy of evaluating the 
latest versions of national consensus standards to determine their 
suitability for endorsement by regulatory guides. This approach also 
complies with the NRC's Management Directive 6.5, ``NRC Participation 
in the Development and Use of Consensus Standards'' (ADAMS Accession 
No. ML16193A497), and is in accordance with Public Law 104-113, 
``National Technology Transfer and Advancement Act of 1995.''
    Copies of ANSI/ANS-15.16-2015 may be purchased from the ANS Web 
site (http://www.new.ans.org/store/); or by writing to: American 
Nuclear Society, 555 North Kensington Avenue, La Grange Park, Illinois 
60526, U.S.A., telephone: 1-800-323-3044.

III. Congressional Review Act

    This regulatory guide is a rule as defined in the Congressional 
Review Act (5 U.S.C. 801-808). However, the Office of Management and 
Budget has not found it to be a major rule as defined in the 
Congressional Review Act.

IV. Backfitting

    The regulatory positions in this guidance document demonstrate the 
method that the NRC staff finds acceptable for an applicant or holder 
of a license under 10 CFR part 50 for a research and test reactor and 
other non-power production or utilization facility to meet the 
requirements of the underlying NRC regulations. The issuance of this RG 
is not backfitting, as that term is defined in 10 CFR 50.109, 
``Backfitting,'' because non-power facilities licensed under 10 CFR 
part 50 are not included within the scope of entities protected by 10 
CFR 50.109.

    Dated at Rockville, Maryland, this 21st day of September 2017.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2017-20693 Filed 9-26-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                            Federal Register / Vol. 82, No. 186 / Wednesday, September 27, 2017 / Notices                                                 45073

                                                    accordance with the declassification                    matter are provided and listed with the                  2. The agency’s failure to provide an
                                                    guides or guidelines provided by the                    notice of denial.                                     initial decision on the request for an
                                                    originating agency. If referred, the                       10. When information cannot be                     MDR from the agency within 1 year of
                                                    originating agency will process the                     declassified in its entirety, the NRC will            its filing; or
                                                    request in accordance with its agency’s                 make reasonable efforts to release,                      3. The agency’s failure to provide a
                                                    procedures for mandatory review for                     consistent with other applicable laws,                final decision on an agency-level appeal
                                                    declassification and communicate its                    those declassified portions of the                    within 180 days of the filing of the
                                                    determination to the NRC. The NRC will                  requested information that constitute a               appeal.
                                                    be responsible for collecting all agency                coherent segment.                                        M. Charges for services (e.g., locating
                                                    review results and informing the                           11. A final determination shall be                 and reproducing copies of records) will
                                                    requester of any final decision regarding               made on each request within 1 year                    be made, when deemed applicable, in
                                                    the declassification of the requested                   from the date of receipt.                             accordance with NRC regulations and
                                                    information unless a prior arrangement                     12. Upon completion of the review,                 will be consistent with charges for
                                                    has been made with the originating                      the NRC releases the information to the               information requested under section
                                                    agency. Requests for an MDR made to an                  requester, unless that information is                 9701 of title 31, United States Code and
                                                    element of the Intelligence Community                   prohibited from release under the                     the NRC’s regulations implementing the
                                                    by anyone other than a citizen of the                   provisions of a statutory authority.                  Freedom of Information Act (10 CFR
                                                    United States or an alien lawfully                         13. Upon denial, in whole or in part,              9.35—Duplication Fees), or the Privacy
                                                    admitted for permanent residence may                    of an initial request, the NRC’s response             Act (10 CFR 9.85—Fees).
                                                    be denied by the receiving Intelligence                 shall also notify the requester of the
                                                    Community element.                                      right to an administrative appeal.                    II. Instructions for Submitting
                                                       5. If the matter is marked as, or                       H. When the Director, Division of                  Suggestions or Questions Regarding the
                                                    potentially contains, Restricted Data,                  Security Operations, Office of Nuclear                NRC’s Classified Information Security
                                                    Formerly Restricted Data, or                            Security and Incident Response, denies                Program
                                                    Transclassified Foreign Nuclear                         the release of classified matter requested               Requirements regarding the NRC’s
                                                    Information, then the MDR is processed                  under an MDR, the requester may                       Classified Information Security Program
                                                    in accordance with 10 CFR part 1045,                    appeal the determination to the NRC                   are contained in NRC Management
                                                    ‘‘Nuclear Classification and                            within 60 days of receipt of the denial.              Directive 12.2, ‘‘NRC Classified
                                                    Declassification.’’                                        I. The appeal must be in writing and               Information Security Program,’’ which
                                                       6. If the matter contains cryptologic                submitted to the Office of the Executive              is available for review and printing in
                                                    information then the NRC shall process                  Director for Operations, U.S. Nuclear                 ADAMS under Accession No.
                                                    the MDR in accordance with special                      Regulatory Commission, Washington,                    ML14142A085. Suggestions or questions
                                                    procedures issued by the Secretary of                   DC 20555–0001. The appeal:                            regarding NRC’s Classified Information
                                                    Defense and, when cryptologic                              1. Must include reference to the                   Security Program should be submitted
                                                    information pertains to intelligence                    determination being appealed; and                     in writing to the U.S. Nuclear
                                                    activities, the Director of National                       2. Should specify why the requester
                                                                                                                                                                  Regulatory Commission, Director,
                                                    Intelligence.                                           believes the information does not
                                                                                                                                                                  Division of Security Operations, Office
                                                       7. If the matter contains information                warrant classification.
                                                                                                                                                                  of Nuclear Security and Incident
                                                    pertaining to intelligence sources,                        J. The NRC shall normally make a
                                                                                                                                                                  Response, U.S. Nuclear Regulatory
                                                    methods, and activities then the NRC                    determination within 60 working days
                                                                                                                                                                  Commission Washington, DC 20555–
                                                    shall process the MDR in accordance                     following the receipt of an appeal. If
                                                                                                                                                                  0001.
                                                    with the special procedures issued by                   additional time is required in rendering
                                                    the Director of National Intelligence.                  a decision, the NRC will notify the                     Dated at Rockville, Maryland, this 18th day
                                                       8. If the matter contains foreign                    requester of the additional time needed               of September, 2017.
                                                    government information and the NRC                      and the reason for the extension.                       For the U.S. Nuclear Regulatory
                                                    initially received or classified the                       K. The NRC will notify the requester               Commission,
                                                    foreign government information, then                    in writing of the final decision and of               Michael R. Johnson,
                                                    the NRC shall be responsible for making                 the reason(s) for any denial. The NRC                 Acting Executive Director for Operations.
                                                    a declassification determination after                  may refuse to confirm or deny the                     [FR Doc. 2017–20706 Filed 9–26–17; 8:45 am]
                                                    consultation with concerned                             existence or nonexistence of the                      BILLING CODE 7590–01–P
                                                    governments/agencies. If the NRC did                    requested information whenever the fact
                                                    not initially receive or classify the                   of its existence or nonexistence is itself
                                                    foreign government information, the                     classified under E.O. 13526 or successor              NUCLEAR REGULATORY
                                                    NRC shall refer the request to the agency               orders.                                               COMMISSION
                                                    that received or classified the foreign                    L. If the appeal has been denied, the
                                                                                                            NRC shall notify the requester in writing             [NRC–2017–0056]
                                                    government information for appropriate
                                                    action. In all instances, the NRC may                   of the right to appeal the final NRC                  Emergency Planning for Research and
                                                    consult with the foreign government(s)                  decision to the Interagency Security                  Test Reactors and Other Non-Power
                                                    through appropriate channels prior to                   Classification Appeals Panel (ISCAP).                 Production and Utilization Facilities
                                                    declassification.                                       The rules and procedures for bringing
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                       9. If the matter also contains                       mandatory declassification appeals                    AGENCY:  Nuclear Regulatory
                                                    unclassified information that is                        before the ISCAP are published in ‘‘The               Commission.
                                                    potentially exempt from release under                   Interagency Security Classification                   ACTION: Regulatory guide, issuance.
                                                    the Freedom of Information Act, the                     Appeals Panel (ISCAP) Bylaws, Rules,
                                                    matter is further processed to ensure                   and Appeal Procedures,’’ dated July 9,                SUMMARY:  The U.S. Nuclear Regulatory
                                                    unclassified information that is exempt                 2012 (77 FR 40261). The appeal to the                 Commission (NRC) is issuing revision 2
                                                    from public release is identified and                   ISCAP must be filed within 60 days of:                of Regulatory Guide (RG) 2.6,
                                                    that the appropriate officials responsible                 1. The date of the final agency                    ‘‘Emergency Planning for Research and
                                                    for denying any classified portion of the               decision;                                             Test Reactors and Other Non-Power


                                               VerDate Sep<11>2014   18:59 Sep 26, 2017   Jkt 241001   PO 00000   Frm 00088   Fmt 4703   Sfmt 4703   E:\FR\FM\27SEN1.SGM   27SEN1


                                                    45074                   Federal Register / Vol. 82, No. 186 / Wednesday, September 27, 2017 / Notices

                                                    Production and Utilization Facilities.’’                SUPPLEMENTARY INFORMATION:                            Use of Consensus Standards’’ (ADAMS
                                                    This RG provides licensees and                                                                                Accession No. ML16193A497), and is in
                                                                                                            I. Introduction
                                                    applicants with a method the NRC staff                                                                        accordance with Public Law 104–113,
                                                    considers acceptable for use in                            The NRC is issuing a revision to an                ‘‘National Technology Transfer and
                                                    complying with the regulations on the                   existing guide in the NRC’s ‘‘Regulatory              Advancement Act of 1995.’’
                                                    content of emergency plans for research                 Guide’’ series. This series was                          Copies of ANSI/ANS–15.16–2015 may
                                                    and test reactors and other non-power                   developed to describe and make                        be purchased from the ANS Web site
                                                    production and utilization facilities.                  available to the public information                   (http://www.new.ans.org/store/); or by
                                                    DATES: Revision 2 of RG 2.6 is available
                                                                                                            regarding methods that are acceptable to              writing to: American Nuclear Society,
                                                    on September 27, 2017.                                  the NRC staff for implementing specific               555 North Kensington Avenue, La
                                                                                                            parts of the agency’s regulations,                    Grange Park, Illinois 60526, U.S.A.,
                                                    ADDRESSES: Please refer to Docket ID
                                                                                                            techniques that the NRC staff uses in                 telephone: 1–800–323–3044.
                                                    NRC–2017–0056 when contacting the                       evaluating specific issues or postulated
                                                    NRC about the availability of                           events, and data that the NRC staff                   III. Congressional Review Act
                                                    information regarding this document.                    needs in its review of applications for                  This regulatory guide is a rule as
                                                    You may obtain publicly-available                       permits and licenses.                                 defined in the Congressional Review
                                                    information related to this document                       Revision 2 of RG 2.6 was issued with               Act (5 U.S.C. 801–808). However, the
                                                    using any of the following methods:                     a temporary designation of Draft                      Office of Management and Budget has
                                                       • Federal Rulemaking Web site: Go to                 Regulatory Guide, DG–2004. The                        not found it to be a major rule as
                                                    http://www.regulations.gov and search                   purpose of issuing this RG is to provide              defined in the Congressional Review
                                                    for Docket ID NRC–2017–0056. Address                    licensees and applicants with a method                Act.
                                                    questions about NRC dockets to Carol                    that the staff of the NRC considers
                                                    Gallagher; telephone: 301–415–3463;                     acceptable for use in complying with                  IV. Backfitting
                                                    email: Carol.Gallagher@nrc.gov. For                     the regulations on the content of                        The regulatory positions in this
                                                    technical questions, contact the                        emergency plans for research and test                 guidance document demonstrate the
                                                    individuals listed in the FOR FURTHER                   reactors and other non-power                          method that the NRC staff finds
                                                    INFORMATION CONTACT section of this                     production and utilization facilities                 acceptable for an applicant or holder of
                                                    document.                                               licensed under part 50 of title 10 of the             a license under 10 CFR part 50 for a
                                                       • NRC’s Agencywide Documents                         Code of Federal Regulations (10 CFR),                 research and test reactor and other non-
                                                    Access and Management System                            ‘‘Domestic Licensing of Production and                power production or utilization facility
                                                    (ADAMS): You may obtain publicly                        Utilization Facilities.’’                             to meet the requirements of the
                                                    available documents online in the                                                                             underlying NRC regulations. The
                                                    ADAMS Public Documents collection at                    II. Additional Information
                                                                                                                                                                  issuance of this RG is not backfitting, as
                                                    http://www.nrc.gov/reading-rm/                             The NRC published a notice of the                  that term is defined in 10 CFR 50.109,
                                                    adams.html. To begin the search, select                 availability of DG–2004 in the Federal                ‘‘Backfitting,’’ because non-power
                                                    ‘‘ADAMS Public Documents’’ and then                     Register on February 24, 2017, (82 FR                 facilities licensed under 10 CFR part 50
                                                    select ‘‘Begin Web-based ADAMS                          11660) for a 60-day public comment                    are not included within the scope of
                                                    Search.’’ For problems with ADAMS,                      period. The public comment period                     entities protected by 10 CFR 50.109.
                                                    please contact the NRC’s Public                         closed on April 25, 2017. The NRC
                                                    Document Room (PDR) reference staff at                                                                           Dated at Rockville, Maryland, this 21st day
                                                                                                            received one public comment on DG–                    of September 2017.
                                                    1–800–397–4209, 301–415–4737, or by                     2004. That comment and the NRC’s
                                                    email to pdr.resource@nrc.gov. The                                                                               For the Nuclear Regulatory Commission.
                                                                                                            response to it are available in ADAMS
                                                    ADAMS accession number for each                                                                               Thomas H. Boyce,
                                                                                                            under Accession No. ML17137A099.
                                                    document referenced (if it is available in                 Revision 2 of RG 2.6 addresses new                 Chief, Regulatory Guidance and Generic
                                                    ADAMS) is provided the first time that                                                                        Issues Branch, Division of Engineering, Office
                                                                                                            issues identified since the guide was                 of Nuclear Regulatory Research.
                                                    a document is referenced. Revision 2 of                 last revised in March 1983. This
                                                    RG 2.6 and the regulatory analysis may                                                                        [FR Doc. 2017–20693 Filed 9–26–17; 8:45 am]
                                                                                                            revision endorses the latest version of a
                                                    be found in ADAMS under Accession                                                                             BILLING CODE 7590–01–P
                                                                                                            consensus standard developed by the
                                                    numbers ML17263A472 and                                 American National Standards Institute
                                                    ML16035A477 respectively.                               (ANSI) and American Nuclear Society
                                                       • NRC’s PDR: You may examine and                                                                           NUCLEAR REGULATORY
                                                                                                            (ANS), ANSI/ANS–15.16–2015,                           COMMISSION
                                                    purchase copies of public documents at                  ‘‘Emergency Planning for Research
                                                    the NRC’s PDR, Room O1–F21, One                         Reactors.’’ The NRC also expanded the                 [NRC–2017–0057]
                                                    White Flint North, 11555 Rockville                      scope of the guide to address non-power
                                                    Pike, Rockville, Maryland 20852.                        facilities under 10 CFR part 50, other                Regulatory Guide: ‘‘Physical
                                                       Regulatory guides are not                            than research and test reactors. Other                Inventories and Material Balances at
                                                    copyrighted, and the NRC’s approval is                  changes to RG 2.6 include editorial                   Fuel Cycle Facilities’’
                                                    not required to reproduce them.                         changes and the current program                       AGENCY:  Nuclear Regulatory
                                                    FOR FURTHER INFORMATION CONTACT:                        guidance for RGs.                                     Commission.
                                                    Geoffrey Wertz, Office of Nuclear                          Revising this regulatory guide to                  ACTION: Regulatory guide; issuance.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    Reactor Regulation, telephone: 301–                     adopt, in whole or in part, a consensus
                                                    415–0893, email: Geoffery.Wertz@                        standard is consistent with the NRC                   SUMMARY:   The U.S. Nuclear Regulatory
                                                    nrc.gov; or Stanley Gardocki, Office of                 policy of evaluating the latest versions              Commission (NRC) is issuing Revision 0
                                                    Nuclear Regulatory Research, telephone:                 of national consensus standards to                    of Regulatory Guide (RG) 5.88,
                                                    301–415–1067, email:                                    determine their suitability for                       ‘‘Physical Inventories and Material
                                                    Stanley.Gardocki@nrc.gov. Both are staff                endorsement by regulatory guides. This                Balances at Fuel Cycle Facilities.’’ This
                                                    of the U.S. Nuclear Regulatory                          approach also complies with the NRC’s                 regulatory guide (RG) describes
                                                    Commission, Washington, DC 20555–                       Management Directive 6.5, ‘‘NRC                       approaches and methods that the staff
                                                    0001.                                                   Participation in the Development and                  considers acceptable for licensees and


                                               VerDate Sep<11>2014   18:59 Sep 26, 2017   Jkt 241001   PO 00000   Frm 00089   Fmt 4703   Sfmt 4703   E:\FR\FM\27SEN1.SGM   27SEN1



Document Created: 2018-10-24 14:46:29
Document Modified: 2018-10-24 14:46:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory guide, issuance.
DatesRevision 2 of RG 2.6 is available on September 27, 2017.
ContactGeoffrey Wertz, Office of Nuclear Reactor Regulation, telephone: 301-415-0893, email: [email protected]; or Stanley Gardocki, Office of Nuclear Regulatory Research, telephone: 301-415-1067, email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation82 FR 45073 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR