DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 82, Issue 189 (October 2, 2017)

Page Range45728-45728
FR Document2017-21068

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Stratford Avenue Bridge across the Pequonnock River, mile 0.1 at Bridgeport, Connecticut. This deviation is necessary to facilitate a planned inspection and will allow the owner to temporarily close the draw for five days from 7:30 a.m. to 5:00 p.m. daily.

Federal Register, Volume 82 Issue 189 (Monday, October 2, 2017)
[Federal Register Volume 82, Number 189 (Monday, October 2, 2017)]
[Rules and Regulations]
[Page 45728]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21068]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0878]


Drawbridge Operation Regulation; Pequonnock River, Bridgeport, CT

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Stratford Avenue Bridge across the 
Pequonnock River, mile 0.1 at Bridgeport, Connecticut. This deviation 
is necessary to facilitate a planned inspection and will allow the 
owner to temporarily close the draw for five days from 7:30 a.m. to 
5:00 p.m. daily.

DATES: This deviation is effective from 7:30 a.m. on December 4, 2017 
to 5 p.m. on December 8, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0878, is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email James L. Rousseau, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
617-223-8619, email [email protected].

SUPPLEMENTARY INFORMATION: The owner of the bridge, the Connecticut 
Department of Transportation, requested a temporary deviation in order 
to facilitate planned inspection of the bridge including the entire 
counterweight sheave shaft/trunnion journal surfaces as well as 
machinery cross shaft disconnection and disassembly for associated 
components.
    The Stratford Avenue Bridge across the Pequonnock River, mile 0.1, 
at Bridgeport, Connecticut is a lift bridge with a vertical clearance 
of 8 feet at mean high water and 14 feet at mean low water in the 
closed position. The existing drawbridge operating regulations are 
listed at 33 CFR 117.219(a).
    This temporary deviation will allow the Stratford Avenue Bridge to 
remain closed each day from 7:30 a.m. to 5 p.m. beginning December 4, 
2017 until December 8, 2017. The waterway is transited by small 
recreational vessels and commercial fishing vessels. Coordination with 
waterway users has indicated no objections to the proposed closure of 
the draw. Vessels that can pass under the bridge without an opening may 
do so at all times. The bridge will not be able to open for 
emergencies. There is no alternate route for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so vessel operators may arrange their transits 
to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: September 27, 2017.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-21068 Filed 9-29-17; 8:45 am]
 BILLING CODE 9110-04-P



                                                45728             Federal Register / Vol. 82, No. 189 / Monday, October 2, 2017 / Rules and Regulations

                                                DEPARTMENT OF HOMELAND                                  objections to the closure of the draw and             FOR FURTHER INFORMATION CONTACT:      If
                                                SECURITY                                                no requests for openings have occurred                you have questions on this temporary
                                                                                                        during this period for the last three                 deviation, call or email James L.
                                                Coast Guard                                             years.                                                Rousseau, Bridge Management
                                                                                                           Vessels that can pass under the bridge             Specialist, First District Bridge Branch,
                                                33 CFR Part 117                                         without an opening may do so at all                   U.S. Coast Guard; telephone 617–223–
                                                [Docket No. USCG–2017–0880]                             times. The bridge will not be able to                 8619, email James.L.Rousseau2@
                                                                                                        open for emergencies. The Atlantic                    uscg.mil.
                                                Drawbridge Operation Regulation;                        Ocean can be used as an alternate route
                                                Plum Island River, Newbury, MA                          for vessels to pass. The Coast Guard will             SUPPLEMENTARY INFORMATION:      The owner
                                                                                                        also inform the users of the waterways                of the bridge, the Connecticut
                                                AGENCY: Coast Guard, DHS.                               through our Local and Broadcast                       Department of Transportation, requested
                                                ACTION:Notice of deviation from                         Notices to Mariners of the change in                  a temporary deviation in order to
                                                drawbridge regulation.                                  operating schedule for the bridge so                  facilitate planned inspection of the
                                                                                                        vessel operators may arrange their                    bridge including the entire
                                                SUMMARY:   The Coast Guard has issued a
                                                                                                        transits to minimize any impact caused                counterweight sheave shaft/trunnion
                                                temporary deviation from the operating
                                                                                                        by the temporary deviation.                           journal surfaces as well as machinery
                                                schedule that governs the Plum Island
                                                                                                           In accordance with 33 CFR 117.35(e),               cross shaft disconnection and
                                                Turnpike Bridge across Plum Island
                                                                                                        the drawbridge must return to its regular             disassembly for associated components.
                                                River, mile 3.3, between Newburyport
                                                                                                        operating schedule immediately at the
                                                and Plum Island, Massachusetts. This                                                                             The Stratford Avenue Bridge across
                                                                                                        end of the effective period of this
                                                deviation is necessary to facilitate a                                                                        the Pequonnock River, mile 0.1, at
                                                                                                        temporary deviation. This deviation
                                                planned water main repair project and                                                                         Bridgeport, Connecticut is a lift bridge
                                                                                                        from the operating regulations is
                                                allows the bridge to be closed for twenty                                                                     with a vertical clearance of 8 feet at
                                                                                                        authorized under 33 CFR 117.35.
                                                nine days.                                                                                                    mean high water and 14 feet at mean
                                                DATES: This deviation is effective from                   Dated: September 27, 2017.
                                                                                                                                                              low water in the closed position. The
                                                5 a.m. on October 10, 2017 through 5                    Christopher J. Bisignano,
                                                                                                                                                              existing drawbridge operating
                                                p.m. on November 7, 2017.                               Supervisory Bridge Management Specialist,
                                                                                                        First Coast Guard District.
                                                                                                                                                              regulations are listed at 33 CFR
                                                ADDRESSES: The docket for this                                                                                117.219(a).
                                                deviation, USCG–2017–0880, is                           [FR Doc. 2017–21067 Filed 9–29–17; 8:45 am]
                                                                                                                                                                 This temporary deviation will allow
                                                available at http://www.regulations.gov.                BILLING CODE 9110–04–P
                                                Type the docket number in the                                                                                 the Stratford Avenue Bridge to remain
                                                ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                                                                          closed each day from 7:30 a.m. to 5 p.m.
                                                Click on Open Docket Folder on the line                 DEPARTMENT OF HOMELAND                                beginning December 4, 2017 until
                                                associated with this deviation.                         SECURITY                                              December 8, 2017. The waterway is
                                                FOR FURTHER INFORMATION CONTACT: If
                                                                                                                                                              transited by small recreational vessels
                                                                                                        Coast Guard                                           and commercial fishing vessels.
                                                you have questions on this temporary
                                                deviation, call or email James L.                                                                             Coordination with waterway users has
                                                                                                        33 CFR Part 117                                       indicated no objections to the proposed
                                                Rousseau, Bridge Management
                                                Specialist, First District Bridge Branch,                                                                     closure of the draw. Vessels that can
                                                                                                        [Docket No. USCG–2017–0878]                           pass under the bridge without an
                                                U.S. Coast Guard; telephone 617–223–
                                                8619, email James.L.Rousseau2@                                                                                opening may do so at all times. The
                                                                                                        Drawbridge Operation Regulation;
                                                uscg.mil.                                                                                                     bridge will not be able to open for
                                                                                                        Pequonnock River, Bridgeport, CT
                                                SUPPLEMENTARY INFORMATION:      The owner                                                                     emergencies. There is no alternate route
                                                of the bridge, the Massachusetts                        AGENCY: Coast Guard, DHS.                             for vessels to pass.
                                                Department of Transportation, requested                 ACTION:Notice of deviation from                          The Coast Guard will also inform the
                                                a temporary deviation in order to                       drawbridge regulation.                                users of the waterways through our
                                                facilitate a planned water main repair                                                                        Local and Broadcast Notices to Mariners
                                                                                                        SUMMARY:    The Coast Guard has issued a
                                                next to the bridge. The project includes                                                                      of the change in operating schedule for
                                                                                                        temporary deviation from the operating
                                                installing a temporary water main                                                                             the bridge so vessel operators may
                                                                                                        schedule that governs the Stratford
                                                bypass on the bridge, preventing span                                                                         arrange their transits to minimize any
                                                                                                        Avenue Bridge across the Pequonnock
                                                operation.                                                                                                    impact caused by the temporary
                                                                                                        River, mile 0.1 at Bridgeport,
                                                   The Plum Island Turnpike Bridge                                                                            deviation.
                                                                                                        Connecticut. This deviation is necessary
                                                across Plum Island River, mile 3.3,
                                                                                                        to facilitate a planned inspection and                   In accordance with 33 CFR 117.35(e),
                                                between Newburyport and Plum Island,
                                                                                                        will allow the owner to temporarily                   the drawbridge must return to its regular
                                                Massachusetts is a bascule bridge with
                                                                                                        close the draw for five days from 7:30                operating schedule immediately at the
                                                a vertical clearance of 13 feet at mean
                                                                                                        a.m. to 5:00 p.m. daily.                              end of the effective period of this
                                                high water and 21 feet at mean low
                                                water in the closed position. The                       DATES: This deviation is effective from               temporary deviation. This deviation
                                                existing drawbridge operating                           7:30 a.m. on December 4, 2017 to 5 p.m.               from the operating regulations is
                                                regulations are listed at 33 CFR 117.615.               on December 8, 2017.                                  authorized under 33 CFR 117.35.
jstallworth on DSKBBY8HB2PROD with RULES




                                                   This temporary deviation allows the                  ADDRESSES: The docket for this                          Dated: September 27, 2017.
                                                Plum Island Turnpike Bridge to remain                   deviation, USCG–2017–0878, is                         Christopher J. Bisignano,
                                                closed beginning 5 a.m. October 10,                     available at http://www.regulations.gov.
                                                                                                                                                              Supervisory Bridge Management Specialist,
                                                2017 until 5 p.m. November 7, 2017.                     Type the docket number in the
                                                                                                                                                              First Coast Guard District.
                                                Plum Island River is transited by small                 ‘‘SEARCH’’ box and click ‘‘SEARCH’’.
                                                                                                                                                              [FR Doc. 2017–21068 Filed 9–29–17; 8:45 am]
                                                recreational vessels. Coordination with                 Click on Open Docket Folder on the line
                                                waterway users has indicated no                         associated with this deviation.                       BILLING CODE 9110–04–P




                                           VerDate Sep<11>2014   15:21 Sep 29, 2017   Jkt 244001   PO 00000   Frm 00050   Fmt 4700   Sfmt 9990   E:\FR\FM\02OCR1.SGM   02OCR1



Document Created: 2017-09-30 04:41:28
Document Modified: 2017-09-30 04:41:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 7:30 a.m. on December 4, 2017 to 5 p.m. on December 8, 2017.
ContactIf you have questions on this temporary deviation, call or email James L. Rousseau, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 617-223-8619, email [email protected]
FR Citation82 FR 45728 