82_FR_45918 82 FR 45729 - Drawbridge Operation Regulation; James River, Hopewell, VA

82 FR 45729 - Drawbridge Operation Regulation; James River, Hopewell, VA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 82, Issue 189 (October 2, 2017)

Page Range45729-45729
FR Document2017-21066

The Coast Guard has issued a temporary deviation from the operating schedule that governs the SR 156/Benjamin Harrison Memorial Bridge which carries SR 156 across the James River, mile 65.0, at Hopewell, VA. The deviation is necessary to facilitate bridge maintenance. This deviation allows the bridge to remain in the closed- to-navigation position.

Federal Register, Volume 82 Issue 189 (Monday, October 2, 2017)
[Federal Register Volume 82, Number 189 (Monday, October 2, 2017)]
[Rules and Regulations]
[Page 45729]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21066]



[[Page 45729]]

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0927]


Drawbridge Operation Regulation; James River, Hopewell, VA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the SR 156/Benjamin Harrison Memorial 
Bridge which carries SR 156 across the James River, mile 65.0, at 
Hopewell, VA. The deviation is necessary to facilitate bridge 
maintenance. This deviation allows the bridge to remain in the closed-
to-navigation position.

DATES: This deviation is effective without actual notice from October 
2, 2017 through 5 a.m. on Saturday, October 7, 2017. For the purposes 
of enforcement, actual notice will be used from 7 p.m. on Saturday, 
September 30, 2017, until October 2, 2017.

ADDRESSES: The docket for this deviation, [USCG-2017-0927] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Michael Thorogood, Bridge 
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6557, email [email protected].

SUPPLEMENTARY INFORMATION: The Virginia Department of Transportation, 
owner and operator of the SR 156/Benjamin Harrison Memorial Bridge that 
carries SR 156, across the James River, mile 65.0, at Hopewell, VA, has 
requested a temporary deviation from the current operating schedule to 
facilitate structural steel maintenance of the vertical lift span for 
the drawbridge. The bridge has a vertical clearance of 50 feet above 
mean high water in the closed position and 145 feet above mean high 
water in the open position.
    The current operating schedule is set out in 33 CFR 117.5. Under 
this temporary deviation, the bridge will be in the closed-to-
navigation position from 7 p.m. to 5 a.m., daily, all week, on 
Saturday, September 30, 2017, through Saturday, October 7, 2017.
    The James River is used by a variety of vessels including U.S. 
Government and public vessels, commercial vessels, tug and barge 
traffic, and recreational vessels. The Coast Guard has carefully 
considered the nature and volume of vessel traffic on the waterway in 
publishing this temporary deviation. Vessels able to pass through the 
bridge in the closed-to-navigation position may do so at any time. The 
bridge will be able to open for emergencies and will open on signal 
during the closure period, if 30 minutes notice is given. The Coast 
Guard will also inform the users of the waterway through our Local 
Notice and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: September 27, 2017.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2017-21066 Filed 9-29-17; 8:45 am]
 BILLING CODE 9110-04-P



                                                                  Federal Register / Vol. 82, No. 189 / Monday, October 2, 2017 / Rules and Regulations                                               45729

                                                DEPARTMENT OF HOMELAND                                  and public vessels, commercial vessels,               listed in item (h)(1) in Table 165.929 to
                                                SECURITY                                                tug and barge traffic, and recreational               33 CFR 165.929 from 8:15 p.m. until
                                                                                                        vessels. The Coast Guard has carefully                9:25 p.m. on September 30, 2017.
                                                Coast Guard                                             considered the nature and volume of
                                                                                                        vessel traffic on the waterway in                     FOR FURTHER INFORMATION CONTACT:   If
                                                33 CFR Part 117                                         publishing this temporary deviation.                  you have questions about this notice of
                                                                                                        Vessels able to pass through the bridge               enforcement, call or email LT John
                                                [Docket No. USCG–2017–0927]
                                                                                                        in the closed-to-navigation position may              Ramos, Waterways Management
                                                Drawbridge Operation Regulation;                        do so at any time. The bridge will be                 Division, Marine Safety Unit Chicago, at
                                                James River, Hopewell, VA                               able to open for emergencies and will                 630–986–2155, email address D09-DG-
                                                                                                        open on signal during the closure                     MSUChicago-Waterways@uscg.mil.
                                                AGENCY: Coast Guard, DHS.                               period, if 30 minutes notice is given.
                                                ACTION:Notice of deviation from                                                                               SUPPLEMENTARY INFORMATION:      The Coast
                                                                                                        The Coast Guard will also inform the                  Guard will enforce the safety zone listed
                                                drawbridge regulation.                                  users of the waterway through our Local               in 33 CFR 165.929: Safety Zone; Corn
                                                SUMMARY:    The Coast Guard has issued a                Notice and Broadcast Notices to
                                                                                                                                                              Festival Fireworks listed as item (h)(1)
                                                temporary deviation from the operating                  Mariners of the change in operating
                                                                                                                                                              in Table 165.929 of 33 CFR 165.929.
                                                schedule that governs the SR 156/                       schedule for the bridge so that vessel
                                                                                                        operators can arrange their transits to               Section 165.929 lists many annual
                                                Benjamin Harrison Memorial Bridge                                                                             events requiring safety zones in the
                                                which carries SR 156 across the James                   minimize any impact caused by the
                                                                                                        temporary deviation.                                  Captain of the Port Lake Michigan zone.
                                                River, mile 65.0, at Hopewell, VA. The                                                                        This safety zone will encompass all
                                                deviation is necessary to facilitate                       In accordance with 33 CFR 117.35(e),
                                                                                                        the drawbridge must return to its regular             waters of the Illinois River within an
                                                bridge maintenance. This deviation
                                                                                                        operating schedule immediately at the                 560 foot radius from approximate
                                                allows the bridge to remain in the
                                                closed-to-navigation position.                          end of the effective period of this                   launch position at 41°21.173′ N.
                                                                                                        temporary deviation. This deviation                   88°25.101′ W. (NAD 83). This safety
                                                DATES: This deviation is effective
                                                                                                        from the operating regulations is                     zone will be enforced on September 30,
                                                without actual notice from October 2,
                                                2017 through 5 a.m. on Saturday,                        authorized under 33 CFR 117.35.                       2017 from 8:15 p.m. until 9:25 p.m.
                                                October 7, 2017. For the purposes of                      Dated: September 27, 2017.                             All vessels must obtain permission
                                                enforcement, actual notice will be used                 Hal R. Pitts,                                         from the Captain of the Port Lake
                                                from 7 p.m. on Saturday, September 30,                  Bridge Program Manager, Fifth Coast Guard             Michigan, or his or her designated on-
                                                2017, until October 2, 2017.                            District.                                             scene representative to enter, move
                                                ADDRESSES: The docket for this                          [FR Doc. 2017–21066 Filed 9–29–17; 8:45 am]           within, or exit this safety zone during
                                                deviation, [USCG–2017–0927] is                          BILLING CODE 9110–04–P                                the enforcement times listed in this
                                                available at http://www.regulations.gov.                                                                      notice of enforcement. All requests must
                                                Type the docket number in the                                                                                 be made in advance and approved by
                                                ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                    DEPARTMENT OF HOMELAND                                the Captain of the Port Lake Michigan
                                                Click on Open Docket Folder on the line                 SECURITY                                              before transits will be authorized.
                                                associated with this deviation.                                                                               Approvals for entry will be granted on
                                                FOR FURTHER INFORMATION CONTACT: If                     Coast Guard
                                                                                                                                                              a case-by-case basis. All vessels and
                                                you have questions on this temporary                                                                          persons granted permission to enter the
                                                deviation, call or email Mr. Michael                    33 CFR Part 165
                                                                                                                                                              safety zone shall obey all lawful orders
                                                Thorogood, Bridge Administration                        [Docket No. USCG–2015–1081]                           or directions of the Captain of the Port
                                                Branch Fifth District, Coast Guard,                                                                           Lake Michigan, or his or her on-scene
                                                telephone 757–398–6557, email                           Safety Zones; Annual Events                           representative.
                                                Michael.R.Thorogood@uscg.mil.                           Requiring Safety Zones in the Captain
                                                SUPPLEMENTARY INFORMATION: The                          of the Port Lake Michigan Zone—Corn                      This notice of enforcement is issued
                                                Virginia Department of Transportation,                  Festival Fireworks                                    under authority of 33 CFR 165.929,
                                                owner and operator of the SR 156/                                                                             Safety Zones; Annual events requiring
                                                Benjamin Harrison Memorial Bridge                       AGENCY:  Coast Guard, DHS.                            safety zones in the Captain of the Port
                                                that carries SR 156, across the James                   ACTION: Notice of enforcement of                      Lake Michigan zone, and 5 U.S.C.
                                                River, mile 65.0, at Hopewell, VA, has                  regulation.                                           552(a). In addition to this publication in
                                                requested a temporary deviation from                                                                          the Federal Register, the Coast Guard
                                                                                                        SUMMARY:   The Coast Guard will enforce
                                                the current operating schedule to                                                                             will provide the maritime community
                                                                                                        a safety zone on the Illinois River in
                                                facilitate structural steel maintenance of                                                                    with advance notification of this
                                                the vertical lift span for the drawbridge.              Morris, IL. This action is necessary and
                                                                                                        intended to ensure the safety of life and             enforcement period via Broadcast
                                                The bridge has a vertical clearance of 50                                                                     Notice to Mariners and Local Notice to
                                                feet above mean high water in the                       property on navigable waters before,
                                                                                                        during, and immediately after a shore                 Mariners. The Captain of the Port Lake
                                                closed position and 145 feet above mean                                                                       Michigan or a designated on-scene
                                                high water in the open position.                        based firework display. During the
                                                                                                        enforcement period listed below, vessels              representative may be contacted via
                                                   The current operating schedule is set
                                                                                                        and persons are prohibited from                       VHF Channel 16 during the event.
                                                out in 33 CFR 117.5. Under this
jstallworth on DSKBBY8HB2PROD with RULES




                                                temporary deviation, the bridge will be                 transiting through, mooring, or                         Dated: September 26, 2017.
                                                in the closed-to-navigation position                    anchoring within this safety zone                     Thomas J. Stuhlreyer,
                                                from 7 p.m. to 5 a.m., daily, all week,                 without approval from the Captain of
                                                                                                                                                              Captain, U.S. Coast Guard, Captain of the
                                                on Saturday, September 30, 2017,                        the Port Lake Michigan or his or her                  Port Lake Michigan.
                                                through Saturday, October 7, 2017.                      designated representative.
                                                                                                                                                              [FR Doc. 2017–21041 Filed 9–29–17; 8:45 am]
                                                   The James River is used by a variety                 DATES: The regulations in 33 CFR
                                                                                                                                                              BILLING CODE 9110–04–P
                                                of vessels including U.S. Government                    165.929 will be enforced for the location


                                           VerDate Sep<11>2014   15:21 Sep 29, 2017   Jkt 244001   PO 00000   Frm 00051   Fmt 4700   Sfmt 9990   E:\FR\FM\02OCR1.SGM   02OCR1



Document Created: 2017-09-30 04:40:34
Document Modified: 2017-09-30 04:40:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective without actual notice from October 2, 2017 through 5 a.m. on Saturday, October 7, 2017. For the purposes of enforcement, actual notice will be used from 7 p.m. on Saturday, September 30, 2017, until October 2, 2017.
ContactIf you have questions on this temporary deviation, call or email Mr. Michael Thorogood, Bridge Administration Branch Fifth District, Coast Guard, telephone 757-398- 6557, email [email protected]
FR Citation82 FR 45729 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR