FR Document2017-22314

On September 12, 2017, NTE Carolinas II, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register.

Federal Register, Volume 82 Issue 198 (Monday, October 16, 2017)
[Federal Register Volume 82, Number 198 (Monday, October 16, 2017)]
[Notices]
[Pages 48069-48070]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22314]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Certification Notice--250; Notice of Filing of Self-Certification 
of Coal Capability Under the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On September 12, 2017, NTE Carolinas II, LLC, as owner and 
operator of a new baseload electric generating powerplant, submitted a 
coal capability self-certification to the Department of Energy (DOE) to 
Sec.  201(d) of the Powerplant and Industrial Fuel Use Act of 1978 
(FUA), as amended, and DOE regulations. The FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register.

[[Page 48070]]


ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: On September 12, 2017, NTE Carolinas II, 
LLC, as owner and operator of a new baseload electric generating 
powerplant, submitted a coal capability self-certification to the 
Department of Energy (DOE) pursuant to Sec.  201(d) of the Powerplant 
and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE 
regulations in 10 CFR 501.60, 61. The FUA and regulations thereunder 
require DOE to publish a notice of filing of self-certification in the 
Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c). Title II of 
FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base 
load electric powerplant may be constructed or operated without the 
capability to use coal or another alternate fuel as a primary energy 
source. Pursuant to the FUA, in order to meet the requirement of coal 
capability, the owner or operator of such a facility proposing to use 
natural gas or petroleum as its primary energy source shall certify to 
the Secretary of Energy (Secretary) prior to construction, or prior to 
operation as a base load electric powerplant, that such powerplant has 
the capability to use coal or another alternate fuel. Such 
certification establishes compliance with FUA section 201(a) as of the 
date it is filed with the Secretary. 42 U.S.C. 8311.
    The following owner of a proposed new baseload electric generating 
powerplant has filed a self-certification of coal-capability with DOE 
pursuant to FUA section 201(d) and in accordance with DOE regulations 
in 10 CFR 501.60, 61:

Owner: NTE Carolinas II, LLC
Capacity: 500 megawatts (MW)
Plant Location: Reidsville, NC 27320
In-Service Date: Early as November 2020

    Issued in Washington, DC, on October 10, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-22314 Filed 10-13-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                                            Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices                                                   48069

                                               public comment addressing the                           DEPARTMENT OF ENERGY                                     mostly on BPA-owned property within
                                               following issues: (1) Is this collection                                                                         the Vantage Substation fence line.
                                               necessary to the proper functions of the                Bonneville Power Administration                             Pacific Power has recently received
                                               Department; (2) will this information be                                                                         approvals from the BLM and the U.S.
                                                                                                       Electrical Interconnection of the                        Bureau of Reclamation (Reclamation) to
                                               processed and used in a timely manner;
                                                                                                       Vantage to Pomona Heights                                construct, operate and maintain one of
                                               (3) is the estimate of burden accurate;
                                                                                                       Transmission Line Project                                the alternatives—the New Northern
                                               (4) how might the Department enhance
                                               the quality, utility, and clarity of the                AGENCY: Bonneville Power                                 Route (NNR) Alternative with an
                                               information to be collected; and (5) how                Administration (BPA), Department of                      Overhead Design Option—that was
                                               might the Department minimize the                       Energy (DOE).                                            considered and analyzed in the Final
                                               burden of this collection on the                                                                                 EIS for the Project. BPA’s decision to
                                                                                                       ACTION: Notice of Availability of Record                 implement its part of the Project is
                                               respondents, including through the use                  of Decision (ROD).
                                               of information technology. Please note                                                                           consistent with those approvals.
                                               that written comments received in                                                                                   All the required design features and
                                                                                                       SUMMARY:    This notice announces the                    mitigation measures for the
                                               response to this notice will be                         availability of the ROD to interconnect
                                               considered public records.                                                                                       transmission line described in the Draft
                                                                                                       the Vantage to Pomona Heights                            EIS, Supplemental Draft EIS, and
                                                  Title of Collection: Comprehensive                   Transmission Line Project in Grant and                   updated in the Final EIS have been
                                               Transition Program (CTP) for Disbursing                 Yakima Counties, Washington. BPA has                     adopted by Pacific Power. Pacific Power
                                               Title IV Aid to Students with                           decided to implement its part of the                     will be responsible for executing
                                               Intellectual Disabilities Expenditure                   Vantage to Pomona Heights 230-kilovolt                   mitigation measures identified in the
                                               Report.                                                 (kV) Transmission Line Project (Project)                 EIS.
                                                                                                       that was analyzed in the Vantage to
                                                  OMB Control Number: 1845–0113.                       Pomona Heights 230-kV Transmission                       ADDRESSES:    The ROD will be available
                                                  Type of Review: An extension of an                   Line Project Final Environmental Impact                  to all interested parties and affected
                                               existing information collection.                        Statement (EIS) (DOI–BLM–OR–134–                         persons and agencies. Copies of the
                                                  Respondents/Affected Public: State,                  2013–0002–EIS and DOE/EIS–0505,                          ROD, Draft EIS, Supplemental Draft EIS,
                                                                                                       October 2016). Pacific Power will                        and Final EIS can be accessed at BPA’s
                                               Local, and Tribal Governments; Private
                                                                                                       construct, operate, and maintain the                     Project Web site at www.bpa.gov/goto/
                                               Sector.
                                                                                                       Project, which will be a new 230-kV                      V2PInterconnection.
                                                  Total Estimated Number of Annual                     transmission line that will extend from
                                               Responses: 70.                                                                                                   FOR FURTHER INFORMATION, CONTACT:
                                                                                                       PacifiCorp’s existing Pomona Heights                     Katey Grange, Bonneville Power
                                                  Total Estimated Number of Annual                     Substation in Yakima County,                             Administration—ECT–4, P.O. Box 3621,
                                               Burden Hours: 140.                                      Washington to BPA’s existing Vantage                     Portland, Oregon 97208–3621; toll-free
                                                                                                       Substation in Grant County,                              telephone number 1–800–622–4519; fax
                                                  Abstract: The Higher Education
                                                                                                       Washington. The U.S. Bureau of Land                      number 503–230–5699; or email
                                               Opportunity Act, Public Law 110–315,
                                                                                                       Management (BLM) was the Lead                            kcgrange@bpa.gov.
                                               added provisions for the Higher                         Federal Agency under the National
                                               Education Act of 1965, as amended, in                   Environmental Policy Act (NEPA) for                        Issued in Portland, Oregon, on October 3,
                                               section 750 and 766 that enable eligible                preparation of the EIS for the Project.                  2017.
                                               students with intellectual disabilities to              Twelve other public entities, including                  Elliot Mainzer,
                                               receive Federal Pell Grant, Federal                     BPA, were involved in the EIS as                         Administrator and Chief Executive Officer.
                                               Supplemental Educational Opportunity                    cooperating agencies under NEPA. BPA                     [FR Doc. 2017–22046 Filed 10–13–17; 8:45 am]
                                               Grant, and Federal Work Study funds if                  has adopted the Final EIS for the                        BILLING CODE 6450–01–P
                                               they are enrolled in an approved                        Project.
                                               program. The Comprehensive Transition                      BPA’s action related to the Project is
                                               Program (CTP) for Disbursing Title IV                   to allow the interconnection of Pacific                  DEPARTMENT OF ENERGY
                                               Aid to Students with Intellectual                       Power’s transmission line to BPA’s
                                               Disabilities expenditure report is the                                                                           Certification Notice—250; Notice of
                                                                                                       Vantage Substation. To allow this
                                               tool for reporting the use of these                                                                              Filing of Self-Certification of Coal
                                                                                                       interconnection, BPA will execute a
                                               specific funds. The data will be used by                                                                         Capability Under the Powerplant and
                                                                                                       Line and Load Interconnection
                                                                                                                                                                Industrial Fuel Use Act
                                               the Department to monitor program                       agreement with PacifiCorp 1 to provide
                                               effectiveness and accountability of fund                interconnection facilities and services                  AGENCY: Office of Electricity Delivery
                                               expenditures. The data is used in                       for the transmission line.                               and Energy Reliability, DOE.
                                               conjunction with institutional program                  Interconnection will involve connecting
                                                                                                                                                                ACTION: Notice of filing.
                                               reviews to assess the administrative                    Pacific Power’s transmission line to an
                                               capability and compliance of the                        existing substation bay at BPA’s Vantage                 SUMMARY:    On September 12, 2017, NTE
                                               applicant.                                              Substation, connecting the transmission                  Carolinas II, LLC, as owner and operator
                                                                                                       line’s fiber to the Vantage Substation                   of a new baseload electric generating
                                                 Dated: October 11, 2017.
                                                                                                       control house, and installing and                        powerplant, submitted a coal capability
                                               Kate Mullan,                                            operating related electrical, metering,                  self-certification to the Department of
ethrower on DSK3G9T082PROD with NOTICES




                                               Acting Director, Information Collection                 and relay equipment. The                                 Energy (DOE) to § 201(d) of the
                                               Clearance Division, Office of the Chief Privacy         interconnection facilities will be located               Powerplant and Industrial Fuel Use Act
                                               Officer, Office of Management.
                                                                                                                                                                of 1978 (FUA), as amended, and DOE
                                               [FR Doc. 2017–22308 Filed 10–13–17; 8:45 am]              1 Pacific Power is a division of PacifiCorp. Pacific
                                                                                                                                                                regulations. The FUA and regulations
                                                                                                       Power has proposed the construction of the Vantage
                                               BILLING CODE 4000–01–P
                                                                                                       to Pomona Heights Transmission Line Project,
                                                                                                                                                                thereunder require DOE to publish a
                                                                                                       while PacifiCorp has requested interconnection of        notice of filing of self-certification in the
                                                                                                       the Project to BPA’s Vantage Substation.                 Federal Register.


                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\16OCN1.SGM    16OCN1


                                               48070                        Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices

                                               ADDRESSES:    Copies of coal capability                 DEPARTMENT OF ENERGY                                  5_Multi-Facility & Mixed Facility Eval
                                               self-certification filings are available for                                                                  Filing to be effective 12/6/2017.
                                               public inspection, upon request, in the                 Federal Energy Regulatory                               Filed Date: 10/6/17.
                                               Office of Electricity Delivery and Energy               Commission
                                                                                                                                                               Accession Number: 20171006–5195.
                                               Reliability, Mail Code OE–20, Room
                                               8G–024, Forrestal Building, 1000                        Combined Notice of Filings #1                           Comments Due: 5 p.m. ET 10/27/17.
                                               Independence Avenue SW.,                                   Take notice that the Commission                      Docket Numbers: ER18–45–000.
                                               Washington, DC 20585.                                   received the following exempt                           Applicants: Southern California
                                               FOR FURTHER INFORMATION CONTACT:
                                                                                                       wholesale generator filings:                          Edison Company.
                                               Christopher Lawrence at (202) 586–                         Docket Numbers: EG18–5–000.                          Description: § 205(d) Rate Filing: SA
                                               5260.                                                      Applicants: Voyager Wind II, LLC.                  No. 972, DSA for Moreno Valley,
                                                                                                          Description: Notice of Self-
                                                                                                                                                             Kitching Street to be effective 11/3/
                                               SUPPLEMENTARY INFORMATION:      On                      Certification of Exempt Wholesale
                                                                                                                                                             2017.
                                               September 12, 2017, NTE Carolinas II,                   Generator Status of Voyager Wind II,
                                               LLC, as owner and operator of a new                     LLC.                                                    Filed Date: 10/10/17.
                                               baseload electric generating powerplant,                   Filed Date: 10/10/17.                                Accession Number: 20171010–5013.
                                               submitted a coal capability self-                          Accession Number: 20171010–5216.                     Comments Due: 5 p.m. ET 10/31/17.
                                               certification to the Department of                         Comments Due: 5 p.m. ET 10/31/17.
                                                                                                          Take notice that the Commission                       Docket Numbers: ER18–46–000.
                                               Energy (DOE) pursuant to § 201(d) of the
                                               Powerplant and Industrial Fuel Use Act                  received the following electric rate                     Applicants: Southwest Power Pool,
                                               of 1978 (FUA), as amended, and DOE                      filings:                                              Inc.
                                               regulations in 10 CFR 501.60, 61. The                      Docket Numbers: ER17–2097–001.                        Description: § 205(d) Rate Filing:
                                               FUA and regulations thereunder require                     Applicants: Midcontinent                           1636R20 Kansas Electric Power
                                               DOE to publish a notice of filing of self-              Independent System Operator, Inc.                     Cooperative, Inc. NITSA and NOA to be
                                               certification in the Federal Register. 42                  Description: Tariff Amendment:                     effective 10/1/2017.
                                               U.S.C. 8311(d) and 10 CFR 501.61(c).                    2017–10–06_Deficiency Response to                        Filed Date: 10/10/17.
                                               Title II of FUA, as amended (42 U.S.C.                  Dynamic NCA Filing to be effective
                                                                                                       1/4/2018.                                                Accession Number: 20171010–5165.
                                               8301 et seq.), provides that no new base
                                               load electric powerplant may be                            Filed Date: 10/6/17.                                  Comments Due: 5 p.m. ET 10/31/17.
                                               constructed or operated without the                        Accession Number: 20171006–5161.                     Docket Numbers: ER18–47–000.
                                               capability to use coal or another                          Comments Due: 5 p.m. ET 10/27/17.
                                                                                                          Docket Numbers: ER18–41–000.                         Applicants: Voyager Wind II, LLC.
                                               alternate fuel as a primary energy
                                                                                                          Applicants: Midcontinent                             Description: Baseline eTariff Filing:
                                               source. Pursuant to the FUA, in order to
                                                                                                       Independent System Operator, Inc.                     MBR Application to be effective 12/10/
                                               meet the requirement of coal capability,
                                                                                                          Description: § 205(d) Rate Filing:                 2017.
                                               the owner or operator of such a facility
                                               proposing to use natural gas or                         2017–10–06_Continuous Improvement                       Filed Date: 10/10/17.
                                               petroleum as its primary energy source                  3_RFP Staggering & Guidance Narrative                   Accession Number: 20171010–5200.
                                               shall certify to the Secretary of Energy                Filing to be effective 12/6/2017.
                                                                                                          Filed Date: 10/6/17.                                 Comments Due: 5 p.m. ET 10/31/17.
                                               (Secretary) prior to construction, or
                                                                                                          Accession Number: 20171006–5173.                      The filings are accessible in the
                                               prior to operation as a base load electric
                                                                                                          Comments Due: 5 p.m. ET 10/27/17.                  Commission’s eLibrary system by
                                               powerplant, that such powerplant has
                                               the capability to use coal or another                      Docket Numbers: ER18–42–000.                       clicking on the links or querying the
                                               alternate fuel. Such certification                         Applicants: Midcontinent                           docket number.
                                               establishes compliance with FUA                         Independent System Operator, Inc.                        Any person desiring to intervene or
                                               section 201(a) as of the date it is filed                  Description: § 205(d) Rate Filing:                 protest in any of the above proceedings
                                               with the Secretary. 42 U.S.C. 8311.                     2017–10–06_Continuous Improvement                     must file in accordance with Rules 211
                                                                                                       4_Proposal Submission & Eval Process                  and 214 of the Commission’s
                                                  The following owner of a proposed                    Filing to be effective 12/6/2017.                     Regulations (18 CFR 385.211 and
                                               new baseload electric generating                           Filed Date: 10/6/17.                               385.214) on or before 5:00 p.m. Eastern
                                               powerplant has filed a self-certification                  Accession Number: 20171006–5189.                   time on the specified comment date.
                                               of coal-capability with DOE pursuant to                    Comments Due: 5 p.m. ET 10/27/17.                  Protests may be considered, but
                                               FUA section 201(d) and in accordance                       Docket Numbers: ER18–43–000.                       intervention is necessary to become a
                                               with DOE regulations in 10 CFR 501.60,                     Applicants: Wisconsin Power and                    party to the proceeding.
                                               61:                                                     Light Company, Quilt Block Wind Farm                     eFiling is encouraged. More detailed
                                               Owner: NTE Carolinas II, LLC                            LLC.                                                  information relating to filing
                                                                                                          Description: § 205(d) Rate Filing: LBA             requirements, interventions, protests,
                                               Capacity: 500 megawatts (MW)                            Agreement Between WPL and Quilt                       service, and qualifying facilities filings
                                               Plant Location: Reidsville, NC 27320                    Block Wind Farm LLC to be effective                   can be found at: http://www.ferc.gov/
                                               In-Service Date: Early as November 2020                 9/18/2017.                                            docs-filing/efiling/filing-req.pdf. For
                                                                                                          Filed Date: 10/6/17.                               other information, call (866) 208–3676
ethrower on DSK3G9T082PROD with NOTICES




                                                 Issued in Washington, DC, on October 10,                 Accession Number: 20171006–5193.
                                               2017.                                                                                                         (toll free). For TTY, call (202) 502–8659.
                                                                                                          Comments Due: 5 p.m. ET 10/27/17.
                                               Christopher Lawrence,                                                                                           Dated: October 10, 2017.
                                                                                                          Docket Numbers: ER18–44–000.
                                               Electricity Policy Analyst, Office of Electricity          Applicants: Midcontinent                           Nathaniel J. Davis, Sr.,
                                               Delivery and Energy Reliability.                        Independent System Operator, Inc.                     Deputy Secretary.
                                               [FR Doc. 2017–22314 Filed 10–13–17; 8:45 am]               Description: § 205(d) Rate Filing:                 [FR Doc. 2017–22280 Filed 10–13–17; 8:45 am]
                                               BILLING CODE 6450–01–P                                  2017–10–06_Continuous Improvement                     BILLING CODE 6717–01–P




                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00021   Fmt 4703   Sfmt 9990   E:\FR\FM\16OCN1.SGM   16OCN1



Document Created: 2017-10-14 01:42:44
Document Modified: 2017-10-14 01:42:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
DatesEarly as November 2020
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation82 FR 48069 