82_FR_48313 82 FR 48115 - Petitions for Modification of Application of Existing Mandatory Safety Standards

82 FR 48115 - Petitions for Modification of Application of Existing Mandatory Safety Standards

DEPARTMENT OF LABOR
Mine Safety and Health Administration

Federal Register Volume 82, Issue 198 (October 16, 2017)

Page Range48115-48118
FR Document2017-22270

This notice is a summary of petitions for modification submitted to the Mine Safety and Health Administration (MSHA) by the parties listed below.

Federal Register, Volume 82 Issue 198 (Monday, October 16, 2017)
[Federal Register Volume 82, Number 198 (Monday, October 16, 2017)]
[Notices]
[Pages 48115-48118]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22270]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Mine Safety and Health Administration


Petitions for Modification of Application of Existing Mandatory 
Safety Standards

AGENCY: Mine Safety and Health Administration, Labor.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice is a summary of petitions for modification 
submitted to the Mine Safety and Health Administration (MSHA) by the 
parties listed below.

DATES: All comments on the petitions must be received by MSHA's Office 
of Standards, Regulations, and Variances on or before November 15, 
2017.

ADDRESSES: You may submit your comments, identified by ``docket 
number'' on the subject line, by any of the following methods:
    1. Electronic Mail: [email protected]. Include the docket 
number of the petition in the subject line of the message.
    2. Facsimile: 202-693-9441.
    3. Regular Mail or Hand Delivery: MSHA, Office of Standards, 
Regulations, and Variances, 201 12th Street South, Suite 4E401, 
Arlington, Virginia 22202-5452, Attention: Sheila McConnell, Director, 
Office of Standards, Regulations, and Variances. Persons delivering 
documents are required to check in at the receptionist's desk in Suite 
4E401. Individuals may inspect copies of the petition and comments 
during normal business hours at the address listed above.
    MSHA will consider only comments postmarked by the U.S. Postal 
Service or proof of delivery from another delivery service such as UPS 
or Federal Express on or before the deadline for comments.

FOR FURTHER INFORMATION CONTACT: Barbara Barron, Office of Standards, 
Regulations, and Variances at 202-693-9447 (Voice), 
[email protected] (Email), or 202-693-9441 (Facsimile). [These are 
not toll-free numbers.]

SUPPLEMENTARY INFORMATION: Section 101(c) of the Federal Mine Safety 
and Health Act of 1977 and Title 30 of the Code of Federal Regulations 
Part 44 govern the application, processing, and disposition of 
petitions for modification.

I. Background

    Section 101(c) of the Federal Mine Safety and Health Act of 1977 
(Mine Act) allows the mine operator or representative of miners to file 
a petition to modify the application of any mandatory safety standard 
to a coal or other mine if the Secretary of Labor (Secretary) 
determines that:
    1. An alternative method of achieving the result of such standard 
exists which will at all times guarantee no less than the same measure 
of protection afforded the miners of such mine by such standard; or
    2. That the application of such standard to such mine will result 
in a diminution of safety to the miners in such mine.
    In addition, the regulations at 30 CFR 44.10 and 44.11 establish 
the requirements and procedures for filing petitions for modification.

II. Petitions for Modification

    Docket Number: M-2017-017-C.
    Petitioner: Paramont Contura, LLC, Three Gateway Center, 401 
Liberty Avenue, Pittsburgh, Pennsylvania 15222-1000.
    Mine: Deep Mine 44, MSHA I.D. No. 44-07308, located in Dickenson 
County, Virginia.
    Regulation Affected: 30 CFR 75.1700 (Oil and gas wells).
    Modification Request: The petitioner requests a modification of the 
existing standard to permit an alternative method of compliance with 
respect to gas wells. The petitioner proposes to plug and mine through 
vertically drilled gas wells. The petitioner states that:
    The following alternative methods will be used when mining through 
vertically drilled degasification boreholes with horizontal laterals to 
permit mining through the boreholes.
    a. The petition will apply to all wells being mined through located 
within the mineable reserve at Paramount Coal Company's Deep Mine 44.
    b. District Manager approval is required for the following proposed 
alternative methods:
    (1) A safety barrier of 300 feet in diameter (150 between any mined 
area and a well) will be maintained around all wells (defined herein to 
include all active, inactive, abandoned, shut-in, and previously 
plugged oil and gas wells, and including water injection wells) until 
approval to proceed with mining has been obtained from the District 
Manager (DM). Wells that were drilled into potential oil or gas 
producing formations that did not produce commercial quantities of 
either gas or oil (wildcat wells or dry holes) are also defined as oil 
or gas wells.
    (2) Prior to mining within the safety barrier around any well that 
is intended to be mined through, the mine operator will provide the DM 
a sworn affidavit or declaration executed by a company official stating 
that all mandatory procedures for cleaning out, preparing, and plugging 
each gas or oil well have been completed as described by the terms and 
conditions of this petition. The affidavit or declaration must be 
accompanied by all logs described below and any other records described 
in those subparagraphs which the DM may request. The DM will review the 
affidavit or declaration, the logs, and other records that have been 
requested, and may inspect the well. The DM will determine if the 
operator has complied with the procedures for cleaning, preparing, and 
plugging each well as described by the terms and conditions of this 
petition. If the DM determines

[[Page 48116]]

that the procedures have been complied with, the DM will provide 
approval and the mine operator may mine within the safety barrier of 
the well, subject to the terms of this petition. The petitioner states 
that the terms and conditions of this petition apply to all types of 
coal mining.
    c. The petitioner proposes to use the following procedures when 
cleaning out and preparing vertical oil and gas wells prior to plugging 
or replugging:
    (1) If the total depth of the well is less than 4,000 feet, the 
operator will completely clean out the well from the surface to at 
least 200 feet below the base of the lowest mineable coal seam, unless 
the DM requires cleaning to a greater depth based on the DM's judgment 
as to what is required due to the geological strata, or due to the 
pressure of the well (the operator will provide the DM with all 
information it possesses concerning the geological nature of the strata 
and the pressure of the well). If the total depth of the well is 4,000 
feet, or greater, the operator will completely clean out the well from 
the surface to at least 400 feet below the base of the lowest mineable 
coal seam. The operator will remove all material from the entire 
diameter of the well, wall to wall.
    (2) The operator will prepare down-hole logs for each well that 
will consist of a caliper survey and log(s) suitable for determining 
the top, bottom, and thickness of all coal seams and potential 
hydrocarbon producing strata and the location for a bridge plug. The DM 
may approve the use of a down-hole camera survey in lieu of down-hole 
logs. In addition, a journal will be maintained describing the depth 
and nature of each material encountered; bit size and type used to 
drill each portion of the hole; length and type of each material used 
to plug the well; length of casings(s) removed, perforated or ripped or 
left in place, any sections where casing was cut or milled; and other 
pertinent information concerning cleaning and sealing the well. 
Invoices, work-orders, and other records relating to all work on the 
well will be maintained as part of this journal and provided to MSHA on 
request.
    (3) When cleaning out the well, the operator will make a diligent 
effort to remove all of the casing in the well. If it is not possible 
to remove all of the casing, then the operator must take appropriate 
steps to ensure that the annulus between the casing and between the 
casings and the well walls are filled with expanding cement (minimum 
0.5 percent expansion upon setting) and contain no voids. If the casing 
cannot be removed, it must be cut or milled at all mineable coal seam 
levels. Any casing which remains will be perforated or ripped. 
Perforations or rips are required at least every 50 feet from 200 feet 
(400 feet if the total well depth is 4,000 feet or greater) below the 
base of the lowest mineable coal seam up to 100 feet above the 
uppermost mineable coal seam. If the operator, using a casing bond log, 
can demonstrate to the satisfaction of the DM that all annuli in the 
well are adequately sealed with cement, then the operator will not be 
required to perforate or tip the casing for that particular well. When 
multiple casing and tubing strings are present in the coal horizon(s), 
any casing which remains will be ripped or perforated and filled with 
expanding cement as indicated above. An acceptable casing bond log for 
each casing and tubing string is needed if used in lieu of ripping or 
perforating multiple strings.
    (4) If the DM concludes that the cleaned-out well is emitting 
excessive amounts of gas, a mechanical bridge plug will be place in the 
borehole in a competent stratum at least 200 feet (400 feet if the 
total well depth is 4,000 feet or greater) below the lowest mineable 
coal seam but above the top of the uppermost hydrocarbon-producing 
stratum. The DM may require a greater distance for the mechanical 
bridge plug to be placed below the lowest mineable coal seam based on 
the geological strata, or due to the pressure within the well (the 
operator will provide the DM with all information it possesses 
concerning the geological nature of the strata and the pressure of the 
well). If it is not possible to set a mechanical bridge plug, an 
appropriately sized packer may be used.
    (5) If the uppermost gas-producing stratum is within 300 feet of 
the base of the lowest mineable coal seam, the operator will properly 
put in place mechanical bridge plugs or cap seal plugs or a suitable 
brush plug to isolate the hydrocarbon-producing stratum from the 
expanding cement plug. Nevertheless, the operator will place a minimum 
of 200 feet (400 feet if the total well depth is 4,000 feet or greater) 
of expanding cement below the lowest mineable coal seam, unless the DM 
requires a greater distance based the geological strata, or due to the 
pressure within the well.
    d. The petitioner proposes to use the following procedures for 
plugging or replugging oil or gas wells to the surface after completely 
cleaning out the well:
    (1) The operator will pump expanding cement slurry down the well to 
form a plug that runs from at least 200 feet (400 feet if the total 
well depth is 4,000 feet or greater) below the base of the lowest 
mineable coal seam (or lower if required by the DM based on the 
geological strata, or due to pressure within the well) to the surface. 
The operator will place the expanding cement in the well under a 
pressure of at least 200 pounds per square inch. Portland cement or a 
lightweight cement mixture may be used to fill the area from 100 feet 
above the top of the uppermost mineable coal seam (or higher if 
required by the DM due to the geological strata, or due to the pressure 
within the well) to the surface.
    (2) The operator will embed steel turnings or other small magnetic 
particles in the top of the cement near the surface to serve as a 
permanent magnetic monument of the well. In the alternative, the 
operator will extend a 4\1/2\-inch or larger casing, set in cement, at 
least 36 inches above the ground level with the American Petroleum 
Institute (API) well number either engraved or welded on the casing. 
When the hole cannot be marked with a physical monument (e.g., prime 
farmland), high-resolution GPS coordinates (one-half meter resolution) 
are required.
    e. The petitioner proposes to use the following procedures for 
plugging or replugging oil and gas wells for subsequent use as 
degasification boreholes after completely cleaning out the well:
    (1) The operator will set a cement plug in the well by pumping 
expanding cement slurry down the tubing to provide at least 200 feet 
(400 feet if the total well depth is 4,000 feet or greater) of 
expanding cement below the lowest mineable coal seam, unless the DM 
requires a greater depth based on the geological strata, or due to the 
pressure within the well. The expanding cement will be placed in the 
well under a pressure of at least 200 pounds per square inch. The top 
of the expanding cement will extend at least 100 feet above the top of 
the coal seam being mined, unless the DM requires a greater distance 
based on the geological strata, or due to the pressure within the well.
    (2) The operator will securely grout into the bedrock of the upper 
portion of the degasification well a suitable casing in order to 
protect it. The remainder of the well may be cased or uncased.
    (3) The operator will fit the top of the degasification casing with 
a wellhead, equipped as required by the DM in the approved ventilation 
plan. Such equipment may include check valves, shut-in valves, sampling 
ports, flame arrestor equipment, and security fencing.
    (4) Operation of the degasification well will be addressed in the 
approved ventilation plan. This may include

[[Page 48117]]

periodic tests of methane levels and limits on the minimum methane 
concentrations that may be extracted.
    (5) After the area of the coal mine that is degassed by a well is 
sealed or the coal mine is abandoned, the operator must seal the degas 
holes using the following procedures:
    (i) Insert a tube to the bottom of the drill hole or, if not 
possible, to at least 100 feet above the coal seam being mined.
    (ii) Set a cement plug in the well by pumping Portland cement or a 
lightweight cement mixture down the tubing until the well is filled to 
the surface.
    (iii) Embed steel turnings or other small magnetic particles in the 
top of the cement near the surface to serve as a permanent magnetic 
monument of the well. In the alternative, the operator will extend a 
4\1/2\-inch or larger casing, set in cement, at least 36 inches above 
the ground level with the API well number engraved or welded on the 
casing.
    f. The petitioner proposes to use the following procedures for 
preparing and plugging or replugging oil or gas wells that cannot be 
completely cleaned out due to damage to the well caused by subsidence, 
caving or other factors:
    (1) The operator will drill a hole adjacent and parallel to the 
well to a depth of at least 200 feet below the lowest mineable coal 
seam, unless the DM requires a greater depth based on the geological 
strata, or due to pressures within the well.
    (2) The operator will use a geophysical sensing device to locate 
any casing that may remain in the well.
    (3) When the operator determines, and the DM agrees that there is 
insufficient casing in the well to allow the method outlined in 
subparagraph (g)(3) to be used, then the operator will use a horizontal 
hydraulic fracturing technique to intercept the original well. From at 
least 200 feet below the base of the lowest mineable coal seam to a 
point at least 50 feet above the seam being mined, the operator will 
fracture in at least six places, at intervals to be agreed upon by the 
operator and the DM after considering the geological strata and the 
pressure within the well. The operator will then pump expanding cement 
into the fractured well in sufficient quantities and in a manner that 
fills all intercepted voids.
    (4) The operator will prepare down-hole logs for each well. The 
logs will consist of a caliper survey and log(s) suitable for 
determining the top, bottom, and thickness of all coal seams and 
potential hydrocarbon-producing strata, and the location for the bridge 
plug. The operator may obtain the logs from the adjacent hole rather 
than the well if the condition of the well makes it impractical to 
insert the equipment necessary to obtain the log. The DM may approve 
the use of a down-hole camera survey in lieu of down-hole logs if the 
DM determines that such logs would not be suitable for obtaining the 
above-listed data or are impractical to obtain due to the condition of 
the drill hole. A journal will be maintained, describing the depth and 
nature of each material encountered; bit size and type used to drill 
each portion of the hole; the length and type of each material used to 
plug the well; length of casing(s) removed, perforated, ripped, or left 
in place; and other pertinent information concerning sealing the well. 
Invoices, work-orders, and other records relating to all work on the 
well will be maintained as part of the journal and provided to MSHA on 
request.
    (5) After the operator has plugged the well, the operator will plug 
the adjacent hole, from the bottom to the surface, with Portland cement 
or a lightweight cement mixture. The operator will embed steel turnings 
or other small magnetic particles in the top of the cement near the 
surface to serve as a permanent magnetic monument of the well. In the 
alternative, the operator will extend a 4\1/2\-inch or larger casing, 
set in cement, at least 36 inches above the ground level. A combination 
of the methods outlined in subparagraph (f)(3) and (f)(4) may be used, 
in a single well, depending upon the conditions of the hole and the 
presence of casings. The operator and the DM should discuss the nature 
of each hole. The DM may require that more than one method be utilized.
    g. The petitioner proposes to use the following procedures after 
approval has been granted by the DM to mine within the safety barrier 
or to mine through a plugged or replugged well:
    (1) A representative of the operator, a representative of the 
miners, the appropriate State agency, or the MSHA DM may request a 
conference be conducted prior to mining through any plugged or 
replugged well. The DM will schedule the conference. The party 
requesting the conference will notify all other parties within 
sufficient time for them to have a representative present. The purpose 
of the conference will be to review evaluate, and accommodate any 
abnormal or unusual circumstance(s) related to the condition of the 
well or surrounding strata.
    (2) The operator will mine through a well on a shift approved by 
the DM. The operator will notify the DM and the miner's representative 
in sufficient time prior to mining-through a well in order to provide 
an opportunity to have a representative present.
    (3) When using continuous mining methods, drivage sights will be 
installed at the last open crosscut near the place to be mined to 
ensure intersection of the well. The drivage sights will not be more 
than 50 feet from the well. When using longwall-mining methods, drivage 
sights will be installed on 10-foot centers at a distance of 50 feet in 
advance of the well bore. Drivage sights will be installed in the 
headgate and tailgate.
    (4) The operator will ensure that firefighting equipment, including 
fire extinguishers, rock dust, and sufficient fire hose to reach the 
working face of the area of the well intersection (when either the 
conventional or continuous mining method is used) is available and 
operable during all well intersections. The fire hose will be located 
in the last open crosscut of the entry or room. The operator will 
maintain the water line to the belt conveyor tailpiece along with a 
sufficient amount of fire hose to reach the farthest point of 
penetration on the section. When the longwall mining method is used, a 
hose to the longwall water supply is sufficient.
    (5) The operator will ensure that sufficient supplies of roof 
support and ventilation materials are available and located at the last 
open crosscut. In addition, emergency plugs and suitable sealing 
materials will be available in the immediate area of the well 
intersection.
    (6) On the shift prior to mining through the well, the operator 
will service all equipment and check it for permissibility. Water 
sprays, water pressures, and water flow rates used for dust and spark 
suppression will be examined and any deficiencies will be corrected.
    (7) The operator will calibrate the methane monitor(s) on the 
longwall, continuous mining machine, or cutting machine and loading 
machine on the shift prior to mining through the well.
    (8) When mining is in progress, the operator will perform tests for 
methane with a hand-held methane detector at least every 10 minutes 
from the time that mining with the continuous mining machine is within 
30 feet of the well until the well is intersected and immediately prior 
to mining through it. During the cutting process, no individual will be 
allowed on the return side until the well intersection has been 
completed and the area has been examined, and has been declared safe. 
All workplace examinations will be conducted on the return side of the 
shearer while the shearer is idle.
    (9) When using continuous or conventional mining methods, the

[[Page 48118]]

working place will be free of accumulations of coal dust and coal 
spillages, and rock dust will be applied on the roof, rib, and floor to 
within 20 feet of the face when mining through the well. On longwall 
sections, rock dusting will be conducted and placed on the roof, rib, 
and floor up to both the headgate and tailgate gob.
    (10) When the well is intersected, the operator will deenergize all 
equipment and thoroughly examine and determine they are safe before 
mining is resumed. After a well has been intersected and the working 
place determined safe, mining will continue inby the well at a distance 
sufficient to permit adequate ventilation around the area of the well.
    (11) If the casing is cut or milled at the coal seam level, the use 
of torches should not be necessary. However, in rare instances, torches 
may be used for inadequately or inaccurately cut or milled casings. No 
open flame is permitted in the area until adequate ventilation has been 
established around the wellbore and methane levels less than 1.0 
percent are present in all areas that will be exposed to flames and 
sparks from the torch. The operator will apply a thick layer of rock 
dust to the roof, face, floor, ribs, and any exposed coal within 20 
feet of the casing prior to any use of torches.
    (12) Non-sparking (brass) tools will be located on the working 
section and will be used to expose and examine cased wells.
    (13) No person will be permitted in the area of the mine-through 
operation except those actually engaged in the mining operation, 
including company personnel, representative of the miners, personnel 
from MSHA, and personnel from the appropriate State agency.
    (14) The operator will alert all personnel in the mine to the 
planned intersection of the well prior to their going underground if 
the planned intersection is to occur during their shift. This warning 
will be repeated for all shifts until the well has been mined through.
    (15) A certified official will directly supervise the mine-through 
operation and only the certified official in charge will issue 
instructions concerning the mine-through operation.
    (16) The responsible person required in 30 CFR 75.1501 will be 
responsible for well intersection emergencies. The responsible person 
will review the well intersection procedures prior to any planned 
intersection.
    Within 30 days after this petition becomes final, the petitioner 
will submit proposed revisions for its approved Part 48 training plan 
to the DM. The proposed revisions will include initial and refresher 
training regarding compliance with the terms and conditions of this 
petition. The operator will provide all miners involved in the well 
intersection with training regarding the requirements of this petition 
prior to mining within 150 feet of the next well to be mined through.
    Within 30 days after this petition becomes final, the petitioner 
will submit proposed revisions for its approved mine emergency 
evacuation and firefighting plan required in 30 CFR 75.1501. The 
operator will revise the plans to include the hazards and evacuation 
procedures to be used for well intersections. All underground miners 
will be trained in this revised plan within 30 days of the DM's 
approval of the revised evacuation plan.
    The petitioner asserts that the proposed alternative method will at 
all times guarantee no less than the same measure of protection 
afforded by the existing standard.

Sheila McConnell,
Director, Office of Standards, Regulations, and Variances.
[FR Doc. 2017-22270 Filed 10-13-17; 8:45 am]
BILLING CODE 4520-43-P



                                                                            Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices                                           48115

                                               Yaspro Electronics (Shanghai) Co., Ltd.,                Administration (MSHA) by the parties                  II. Petitions for Modification
                                                  Room 1808E, No. 488, Vaohua Road,                    listed below.                                            Docket Number: M–2017–017–C.
                                                  Pudong New District, Shanghai, China                 DATES: All comments on the petitions                     Petitioner: Paramont Contura, LLC,
                                                  (c) The Office of Unfair Import                      must be received by MSHA’s Office of                  Three Gateway Center, 401 Liberty
                                               Investigations, U.S. International Trade                Standards, Regulations, and Variances                 Avenue, Pittsburgh, Pennsylvania
                                               Commission, 500 E Street SW., Suite                     on or before November 15, 2017.                       15222–1000.
                                               401, Washington, DC 20436; and                          ADDRESSES: You may submit your                           Mine: Deep Mine 44, MSHA I.D. No.
                                                  (4) For the investigation so instituted,             comments, identified by ‘‘docket                      44–07308, located in Dickenson County,
                                               the Chief Administrative Law Judge,                     number’’ on the subject line, by any of               Virginia.
                                               U.S. International Trade Commission,                    the following methods:                                   Regulation Affected: 30 CFR 75.1700
                                               shall designate the presiding                              1. Electronic Mail: zzMSHA-                        (Oil and gas wells).
                                               Administrative Law Judge.                               comments@dol.gov. Include the docket                     Modification Request: The petitioner
                                                  Responses to the complaint and the                   number of the petition in the subject                 requests a modification of the existing
                                               notice of investigation must be                         line of the message.                                  standard to permit an alternative
                                               submitted by the named respondents in                      2. Facsimile: 202–693–9441.                        method of compliance with respect to
                                               accordance with section 210.13 of the                      3. Regular Mail or Hand Delivery:                  gas wells. The petitioner proposes to
                                               Commission’s Rules of Practice and                      MSHA, Office of Standards,                            plug and mine through vertically drilled
                                               Procedure, 19 CFR 210.13. Pursuant to                   Regulations, and Variances, 201 12th                  gas wells. The petitioner states that:
                                               19 CFR 201.16(e) and 210.13(a), such                    Street South, Suite 4E401, Arlington,                    The following alternative methods
                                               responses will be considered by the                     Virginia 22202–5452, Attention: Sheila                will be used when mining through
                                               Commission if received not later than 20                McConnell, Director, Office of                        vertically drilled degasification
                                               days after the date of service by the                   Standards, Regulations, and Variances.                boreholes with horizontal laterals to
                                               Commission of the complaint and the                     Persons delivering documents are                      permit mining through the boreholes.
                                               notice of investigation. Extensions of                  required to check in at the receptionist’s               a. The petition will apply to all wells
                                               time for submitting responses to the                    desk in Suite 4E401. Individuals may                  being mined through located within the
                                               complaint and the notice of                             inspect copies of the petition and
                                                                                                                                                             mineable reserve at Paramount Coal
                                               investigation will not be granted unless                comments during normal business
                                                                                                                                                             Company’s Deep Mine 44.
                                               good cause therefor is shown.                           hours at the address listed above.
                                                                                                                                                                b. District Manager approval is
                                                                                                          MSHA will consider only comments
                                                  Failure of a respondent to file a timely                                                                   required for the following proposed
                                                                                                       postmarked by the U.S. Postal Service or
                                               response to each allegation in the                                                                            alternative methods:
                                                                                                       proof of delivery from another delivery
                                               complaint and in this notice may be                                                                              (1) A safety barrier of 300 feet in
                                                                                                       service such as UPS or Federal Express
                                               deemed to constitute a waiver of the                                                                          diameter (150 between any mined area
                                                                                                       on or before the deadline for comments.
                                               right to appear and contest the                                                                               and a well) will be maintained around
                                                                                                       FOR FURTHER INFORMATION CONTACT:
                                               allegations of the complaint and this                                                                         all wells (defined herein to include all
                                               notice, and to authorize the                            Barbara Barron, Office of Standards,                  active, inactive, abandoned, shut-in, and
                                               administrative law judge and the                        Regulations, and Variances at 202–693–
                                                                                                                                                             previously plugged oil and gas wells,
                                               Commission, without further notice to                   9447 (Voice), barron.barbara@dol.gov
                                                                                                                                                             and including water injection wells)
                                               the respondent, to find the facts to be as              (Email), or 202–693–9441 (Facsimile).
                                                                                                                                                             until approval to proceed with mining
                                               alleged in the complaint and this notice                [These are not toll-free numbers.]
                                                                                                                                                             has been obtained from the District
                                               and to enter an initial determination                   SUPPLEMENTARY INFORMATION: Section                    Manager (DM). Wells that were drilled
                                               and a final determination containing                    101(c) of the Federal Mine Safety and                 into potential oil or gas producing
                                               such findings, and may result in the                    Health Act of 1977 and Title 30 of the                formations that did not produce
                                               issuance of an exclusion order or a cease               Code of Federal Regulations Part 44                   commercial quantities of either gas or
                                               and desist order or both directed against               govern the application, processing, and               oil (wildcat wells or dry holes) are also
                                               the respondent.                                         disposition of petitions for modification.            defined as oil or gas wells.
                                                 By order of the Commission.                           I. Background                                            (2) Prior to mining within the safety
                                                 Issued: October 10, 2017.                                Section 101(c) of the Federal Mine                 barrier around any well that is intended
                                                                                                       Safety and Health Act of 1977 (Mine                   to be mined through, the mine operator
                                               Lisa R. Barton,
                                                                                                       Act) allows the mine operator or                      will provide the DM a sworn affidavit or
                                               Secretary to the Commission.
                                                                                                       representative of miners to file a                    declaration executed by a company
                                               [FR Doc. 2017–22267 Filed 10–13–17; 8:45 am]                                                                  official stating that all mandatory
                                                                                                       petition to modify the application of any
                                               BILLING CODE 7020–02–P
                                                                                                       mandatory safety standard to a coal or                procedures for cleaning out, preparing,
                                                                                                       other mine if the Secretary of Labor                  and plugging each gas or oil well have
                                                                                                       (Secretary) determines that:                          been completed as described by the
                                               DEPARTMENT OF LABOR                                        1. An alternative method of achieving              terms and conditions of this petition.
                                                                                                       the result of such standard exists which              The affidavit or declaration must be
                                               Mine Safety and Health Administration                                                                         accompanied by all logs described
                                                                                                       will at all times guarantee no less than
                                                                                                       the same measure of protection afforded               below and any other records described
                                               Petitions for Modification of
                                                                                                       the miners of such mine by such                       in those subparagraphs which the DM
                                               Application of Existing Mandatory
                                                                                                       standard; or                                          may request. The DM will review the
                                               Safety Standards
                                                                                                          2. That the application of such                    affidavit or declaration, the logs, and
ethrower on DSK3G9T082PROD with NOTICES




                                               AGENCY: Mine Safety and Health                          standard to such mine will result in a                other records that have been requested,
                                               Administration, Labor.                                  diminution of safety to the miners in                 and may inspect the well. The DM will
                                               ACTION: Notice.                                         such mine.                                            determine if the operator has complied
                                                                                                          In addition, the regulations at 30 CFR             with the procedures for cleaning,
                                               SUMMARY:   This notice is a summary of                  44.10 and 44.11 establish the                         preparing, and plugging each well as
                                               petitions for modification submitted to                 requirements and procedures for filing                described by the terms and conditions
                                               the Mine Safety and Health                              petitions for modification.                           of this petition. If the DM determines


                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00066   Fmt 4703   Sfmt 4703   E:\FR\FM\16OCN1.SGM   16OCN1


                                               48116                        Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices

                                               that the procedures have been complied                  cut or milled at all mineable coal seam               or greater) below the base of the lowest
                                               with, the DM will provide approval and                  levels. Any casing which remains will                 mineable coal seam (or lower if required
                                               the mine operator may mine within the                   be perforated or ripped. Perforations or              by the DM based on the geological
                                               safety barrier of the well, subject to the              rips are required at least every 50 feet              strata, or due to pressure within the
                                               terms of this petition. The petitioner                  from 200 feet (400 feet if the total well             well) to the surface. The operator will
                                               states that the terms and conditions of                 depth is 4,000 feet or greater) below the             place the expanding cement in the well
                                               this petition apply to all types of coal                base of the lowest mineable coal seam                 under a pressure of at least 200 pounds
                                               mining.                                                 up to 100 feet above the uppermost                    per square inch. Portland cement or a
                                                  c. The petitioner proposes to use the                mineable coal seam. If the operator,                  lightweight cement mixture may be
                                               following procedures when cleaning out                  using a casing bond log, can                          used to fill the area from 100 feet above
                                               and preparing vertical oil and gas wells                demonstrate to the satisfaction of the                the top of the uppermost mineable coal
                                               prior to plugging or replugging:                        DM that all annuli in the well are                    seam (or higher if required by the DM
                                                  (1) If the total depth of the well is less           adequately sealed with cement, then the               due to the geological strata, or due to the
                                               than 4,000 feet, the operator will                      operator will not be required to                      pressure within the well) to the surface.
                                               completely clean out the well from the                  perforate or tip the casing for that                     (2) The operator will embed steel
                                               surface to at least 200 feet below the                  particular well. When multiple casing                 turnings or other small magnetic
                                               base of the lowest mineable coal seam,                  and tubing strings are present in the                 particles in the top of the cement near
                                               unless the DM requires cleaning to a                    coal horizon(s), any casing which                     the surface to serve as a permanent
                                               greater depth based on the DM’s                         remains will be ripped or perforated and              magnetic monument of the well. In the
                                               judgment as to what is required due to                  filled with expanding cement as                       alternative, the operator will extend a
                                               the geological strata, or due to the                    indicated above. An acceptable casing                 41⁄2-inch or larger casing, set in cement,
                                               pressure of the well (the operator will                 bond log for each casing and tubing                   at least 36 inches above the ground level
                                               provide the DM with all information it                  string is needed if used in lieu of                   with the American Petroleum Institute
                                               possesses concerning the geological                     ripping or perforating multiple strings.              (API) well number either engraved or
                                               nature of the strata and the pressure of                   (4) If the DM concludes that the                   welded on the casing. When the hole
                                               the well). If the total depth of the well               cleaned-out well is emitting excessive                cannot be marked with a physical
                                               is 4,000 feet, or greater, the operator will            amounts of gas, a mechanical bridge                   monument (e.g., prime farmland), high-
                                               completely clean out the well from the                  plug will be place in the borehole in a               resolution GPS coordinates (one-half
                                               surface to at least 400 feet below the                  competent stratum at least 200 feet (400              meter resolution) are required.
                                               base of the lowest mineable coal seam.                  feet if the total well depth is 4,000 feet               e. The petitioner proposes to use the
                                               The operator will remove all material                   or greater) below the lowest mineable                 following procedures for plugging or
                                               from the entire diameter of the well,                   coal seam but above the top of the                    replugging oil and gas wells for
                                               wall to wall.                                           uppermost hydrocarbon-producing                       subsequent use as degasification
                                                  (2) The operator will prepare down-                  stratum. The DM may require a greater                 boreholes after completely cleaning out
                                               hole logs for each well that will consist               distance for the mechanical bridge plug               the well:
                                               of a caliper survey and log(s) suitable for             to be placed below the lowest mineable                   (1) The operator will set a cement
                                               determining the top, bottom, and                        coal seam based on the geological strata,             plug in the well by pumping expanding
                                               thickness of all coal seams and potential               or due to the pressure within the well                cement slurry down the tubing to
                                               hydrocarbon producing strata and the                    (the operator will provide the DM with                provide at least 200 feet (400 feet if the
                                               location for a bridge plug. The DM may                  all information it possesses concerning               total well depth is 4,000 feet or greater)
                                               approve the use of a down-hole camera                   the geological nature of the strata and               of expanding cement below the lowest
                                               survey in lieu of down-hole logs. In                    the pressure of the well). If it is not               mineable coal seam, unless the DM
                                               addition, a journal will be maintained                  possible to set a mechanical bridge plug,             requires a greater depth based on the
                                               describing the depth and nature of each                 an appropriately sized packer may be                  geological strata, or due to the pressure
                                               material encountered; bit size and type                 used.                                                 within the well. The expanding cement
                                               used to drill each portion of the hole;                    (5) If the uppermost gas-producing                 will be placed in the well under a
                                               length and type of each material used to                stratum is within 300 feet of the base of             pressure of at least 200 pounds per
                                               plug the well; length of casings(s)                     the lowest mineable coal seam, the                    square inch. The top of the expanding
                                               removed, perforated or ripped or left in                operator will properly put in place                   cement will extend at least 100 feet
                                               place, any sections where casing was                    mechanical bridge plugs or cap seal                   above the top of the coal seam being
                                               cut or milled; and other pertinent                      plugs or a suitable brush plug to isolate             mined, unless the DM requires a greater
                                               information concerning cleaning and                     the hydrocarbon-producing stratum                     distance based on the geological strata,
                                               sealing the well. Invoices, work-orders,                from the expanding cement plug.                       or due to the pressure within the well.
                                               and other records relating to all work on               Nevertheless, the operator will place a                  (2) The operator will securely grout
                                               the well will be maintained as part of                  minimum of 200 feet (400 feet if the                  into the bedrock of the upper portion of
                                               this journal and provided to MSHA on                    total well depth is 4,000 feet or greater)            the degasification well a suitable casing
                                               request.                                                of expanding cement below the lowest                  in order to protect it. The remainder of
                                                  (3) When cleaning out the well, the                  mineable coal seam, unless the DM                     the well may be cased or uncased.
                                               operator will make a diligent effort to                 requires a greater distance based the                    (3) The operator will fit the top of the
                                               remove all of the casing in the well. If                geological strata, or due to the pressure             degasification casing with a wellhead,
                                               it is not possible to remove all of the                 within the well.                                      equipped as required by the DM in the
                                               casing, then the operator must take                        d. The petitioner proposes to use the              approved ventilation plan. Such
ethrower on DSK3G9T082PROD with NOTICES




                                               appropriate steps to ensure that the                    following procedures for plugging or                  equipment may include check valves,
                                               annulus between the casing and                          replugging oil or gas wells to the surface            shut-in valves, sampling ports, flame
                                               between the casings and the well walls                  after completely cleaning out the well:               arrestor equipment, and security
                                               are filled with expanding cement                           (1) The operator will pump expanding               fencing.
                                               (minimum 0.5 percent expansion upon                     cement slurry down the well to form a                    (4) Operation of the degasification
                                               setting) and contain no voids. If the                   plug that runs from at least 200 feet (400            well will be addressed in the approved
                                               casing cannot be removed, it must be                    feet if the total well depth is 4,000 feet            ventilation plan. This may include


                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00067   Fmt 4703   Sfmt 4703   E:\FR\FM\16OCN1.SGM   16OCN1


                                                                            Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices                                           48117

                                               periodic tests of methane levels and                    adjacent hole rather than the well if the             to provide an opportunity to have a
                                               limits on the minimum methane                           condition of the well makes it                        representative present.
                                               concentrations that may be extracted.                   impractical to insert the equipment                      (3) When using continuous mining
                                                  (5) After the area of the coal mine that             necessary to obtain the log. The DM may               methods, drivage sights will be installed
                                               is degassed by a well is sealed or the                  approve the use of a down-hole camera                 at the last open crosscut near the place
                                               coal mine is abandoned, the operator                    survey in lieu of down-hole logs if the               to be mined to ensure intersection of the
                                               must seal the degas holes using the                     DM determines that such logs would not                well. The drivage sights will not be
                                               following procedures:                                   be suitable for obtaining the above-listed            more than 50 feet from the well. When
                                                  (i) Insert a tube to the bottom of the               data or are impractical to obtain due to              using longwall-mining methods, drivage
                                               drill hole or, if not possible, to at least             the condition of the drill hole. A journal            sights will be installed on 10-foot
                                               100 feet above the coal seam being                      will be maintained, describing the depth              centers at a distance of 50 feet in
                                               mined.                                                  and nature of each material                           advance of the well bore. Drivage sights
                                                  (ii) Set a cement plug in the well by                encountered; bit size and type used to                will be installed in the headgate and
                                               pumping Portland cement or a                            drill each portion of the hole; the length            tailgate.
                                               lightweight cement mixture down the                     and type of each material used to plug                   (4) The operator will ensure that
                                               tubing until the well is filled to the                  the well; length of casing(s) removed,                firefighting equipment, including fire
                                               surface.                                                perforated, ripped, or left in place; and             extinguishers, rock dust, and sufficient
                                                  (iii) Embed steel turnings or other                  other pertinent information concerning                fire hose to reach the working face of the
                                               small magnetic particles in the top of                  sealing the well. Invoices, work-orders,              area of the well intersection (when
                                               the cement near the surface to serve as                 and other records relating to all work on             either the conventional or continuous
                                               a permanent magnetic monument of the                    the well will be maintained as part of                mining method is used) is available and
                                               well. In the alternative, the operator will             the journal and provided to MSHA on                   operable during all well intersections.
                                               extend a 41⁄2-inch or larger casing, set in             request.                                              The fire hose will be located in the last
                                               cement, at least 36 inches above the                      (5) After the operator has plugged the              open crosscut of the entry or room. The
                                               ground level with the API well number                   well, the operator will plug the adjacent             operator will maintain the water line to
                                               engraved or welded on the casing.                       hole, from the bottom to the surface,                 the belt conveyor tailpiece along with a
                                                  f. The petitioner proposes to use the                with Portland cement or a lightweight                 sufficient amount of fire hose to reach
                                               following procedures for preparing and                  cement mixture. The operator will                     the farthest point of penetration on the
                                               plugging or replugging oil or gas wells                 embed steel turnings or other small                   section. When the longwall mining
                                               that cannot be completely cleaned out                   magnetic particles in the top of the                  method is used, a hose to the longwall
                                               due to damage to the well caused by                     cement near the surface to serve as a                 water supply is sufficient.
                                               subsidence, caving or other factors:                    permanent magnetic monument of the                       (5) The operator will ensure that
                                                  (1) The operator will drill a hole                   well. In the alternative, the operator will           sufficient supplies of roof support and
                                               adjacent and parallel to the well to a                  extend a 41⁄2-inch or larger casing, set in           ventilation materials are available and
                                               depth of at least 200 feet below the                    cement, at least 36 inches above the                  located at the last open crosscut. In
                                               lowest mineable coal seam, unless the                   ground level. A combination of the                    addition, emergency plugs and suitable
                                               DM requires a greater depth based on                    methods outlined in subparagraph (f)(3)               sealing materials will be available in the
                                               the geological strata, or due to pressures              and (f)(4) may be used, in a single well,             immediate area of the well intersection.
                                               within the well.                                        depending upon the conditions of the                     (6) On the shift prior to mining
                                                  (2) The operator will use a                          hole and the presence of casings. The                 through the well, the operator will
                                               geophysical sensing device to locate any                operator and the DM should discuss the                service all equipment and check it for
                                               casing that may remain in the well.                     nature of each hole. The DM may                       permissibility. Water sprays, water
                                                  (3) When the operator determines,                    require that more than one method be                  pressures, and water flow rates used for
                                               and the DM agrees that there is                         utilized.                                             dust and spark suppression will be
                                               insufficient casing in the well to allow                  g. The petitioner proposes to use the               examined and any deficiencies will be
                                               the method outlined in subparagraph                     following procedures after approval has               corrected.
                                               (g)(3) to be used, then the operator will               been granted by the DM to mine within                    (7) The operator will calibrate the
                                               use a horizontal hydraulic fracturing                   the safety barrier or to mine through a               methane monitor(s) on the longwall,
                                               technique to intercept the original well.               plugged or replugged well:                            continuous mining machine, or cutting
                                               From at least 200 feet below the base of                  (1) A representative of the operator, a             machine and loading machine on the
                                               the lowest mineable coal seam to a point                representative of the miners, the                     shift prior to mining through the well.
                                               at least 50 feet above the seam being                   appropriate State agency, or the MSHA                    (8) When mining is in progress, the
                                               mined, the operator will fracture in at                 DM may request a conference be                        operator will perform tests for methane
                                               least six places, at intervals to be agreed             conducted prior to mining through any                 with a hand-held methane detector at
                                               upon by the operator and the DM after                   plugged or replugged well. The DM will                least every 10 minutes from the time
                                               considering the geological strata and the               schedule the conference. The party                    that mining with the continuous mining
                                               pressure within the well. The operator                  requesting the conference will notify all             machine is within 30 feet of the well
                                               will then pump expanding cement into                    other parties within sufficient time for              until the well is intersected and
                                               the fractured well in sufficient                        them to have a representative present.                immediately prior to mining through it.
                                               quantities and in a manner that fills all               The purpose of the conference will be                 During the cutting process, no
                                               intercepted voids.                                      to review evaluate, and accommodate                   individual will be allowed on the return
                                                  (4) The operator will prepare down-                  any abnormal or unusual                               side until the well intersection has been
ethrower on DSK3G9T082PROD with NOTICES




                                               hole logs for each well. The logs will                  circumstance(s) related to the condition              completed and the area has been
                                               consist of a caliper survey and log(s)                  of the well or surrounding strata.                    examined, and has been declared safe.
                                               suitable for determining the top, bottom,                 (2) The operator will mine through a                All workplace examinations will be
                                               and thickness of all coal seams and                     well on a shift approved by the DM. The               conducted on the return side of the
                                               potential hydrocarbon-producing strata,                 operator will notify the DM and the                   shearer while the shearer is idle.
                                               and the location for the bridge plug. The               miner’s representative in sufficient time                (9) When using continuous or
                                               operator may obtain the logs from the                   prior to mining-through a well in order               conventional mining methods, the


                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\16OCN1.SGM   16OCN1


                                               48118                        Federal Register / Vol. 82, No. 198 / Monday, October 16, 2017 / Notices

                                               working place will be free of                           and refresher training regarding                      (Email), or 202–693–9441 (Telefax).
                                               accumulations of coal dust and coal                     compliance with the terms and                         [These are not toll-free numbers].
                                               spillages, and rock dust will be applied                conditions of this petition. The operator             SUPPLEMENTARY INFORMATION:
                                               on the roof, rib, and floor to within 20                will provide all miners involved in the
                                               feet of the face when mining through the                well intersection with training regarding             I. Introduction
                                               well. On longwall sections, rock dusting                the requirements of this petition prior to               Under section 101 of the Federal Mine
                                               will be conducted and placed on the                     mining within 150 feet of the next well               Safety and Health Act of 1977, a mine
                                               roof, rib, and floor up to both the                     to be mined through.                                  operator may petition and the Secretary
                                               headgate and tailgate gob.                                 Within 30 days after this petition                 of Labor (Secretary) may modify the
                                                  (10) When the well is intersected, the               becomes final, the petitioner will submit             application of a mandatory safety
                                               operator will deenergize all equipment                  proposed revisions for its approved                   standard to that mine if the Secretary
                                               and thoroughly examine and determine                    mine emergency evacuation and                         determines that: (1) An alternative
                                               they are safe before mining is resumed.                 firefighting plan required in 30 CFR                  method exists that will guarantee no
                                               After a well has been intersected and                   75.1501. The operator will revise the                 less protection for the miners affected
                                               the working place determined safe,                      plans to include the hazards and                      than that provided by the standard; or
                                               mining will continue inby the well at a                 evacuation procedures to be used for                  (2) the application of the standard will
                                               distance sufficient to permit adequate                  well intersections. All underground                   result in a diminution of safety to the
                                               ventilation around the area of the well.                miners will be trained in this revised                affected miners.
                                                  (11) If the casing is cut or milled at               plan within 30 days of the DM’s                          MSHA bases the final decision on the
                                               the coal seam level, the use of torches                 approval of the revised evacuation plan.              petitioner’s statements, any comments
                                               should not be necessary. However, in                       The petitioner asserts that the                    and information submitted by interested
                                               rare instances, torches may be used for                 proposed alternative method will at all               persons, and a field investigation of the
                                               inadequately or inaccurately cut or                     times guarantee no less than the same                 conditions at the mine. In some
                                               milled casings. No open flame is                        measure of protection afforded by the                 instances, MSHA may approve a
                                               permitted in the area until adequate                    existing standard.                                    petition for modification on the
                                               ventilation has been established around                                                                       condition that the mine operator
                                               the wellbore and methane levels less                    Sheila McConnell,
                                                                                                                                                             complies with other requirements noted
                                               than 1.0 percent are present in all areas               Director, Office of Standards, Regulations,
                                                                                                                                                             in the decision.
                                               that will be exposed to flames and                      and Variances.
                                               sparks from the torch. The operator will                [FR Doc. 2017–22270 Filed 10–13–17; 8:45 am]          II. Granted Petitions for Modification
                                               apply a thick layer of rock dust to the                 BILLING CODE 4520–43–P                                  On the basis of the findings of
                                               roof, face, floor, ribs, and any exposed                                                                      MSHA’s investigation, and as designee
                                               coal within 20 feet of the casing prior                                                                       of the Secretary, MSHA has granted or
                                               to any use of torches.                                  DEPARTMENT OF LABOR                                   partially granted the following petitions
                                                  (12) Non-sparking (brass) tools will be                                                                    for modification:
                                               located on the working section and will                 Mine Safety and Health Administration
                                                                                                                                                               • Docket Number: M–2012–075–C.
                                               be used to expose and examine cased                                                                             FR Notice: 77 FR 30556 (May 23,
                                                                                                       Affirmative Decisions on Petitions for
                                               wells.                                                                                                        2012).
                                                  (13) No person will be permitted in                  Modification Granted in Whole or in
                                                                                                       Part                                                    Petitioner: Mountain Coal Company,
                                               the area of the mine-through operation
                                                                                                                                                             P.O. Box 591, 5174 Highway 133,
                                               except those actually engaged in the                    AGENCY: Mine Safety and Health                        Somerset, Colorado 81434.
                                               mining operation, including company                     Administration (MSHA), Labor.                           Mine: West Elk Mine, MSHA I.D. No.
                                               personnel, representative of the miners,                ACTION: Notice.                                       05–03672, located in Gunnison County,
                                               personnel from MSHA, and personnel
                                                                                                                                                             Colorado.
                                               from the appropriate State agency.                      SUMMARY:   Section 101(c) of the Federal                Regulation Affected: 30 CFR 75.500(d)
                                                  (14) The operator will alert all                     Mine Safety and Health Act of 1977                    (Permissible electric equipment).
                                               personnel in the mine to the planned                    govern the application, processing, and
                                               intersection of the well prior to their                                                                         • Docket Number: M–2014–011–C.
                                                                                                       disposition of petitions for modification.
                                               going underground if the planned                                                                                FR Notice: 79 FR 30174 (May 27,
                                                                                                       This Federal Register Notice notifies the
                                               intersection is to occur during their                                                                         2014).
                                                                                                       public that MSHA has investigated and
                                               shift. This warning will be repeated for                                                                        Petitioner: Consol Pennsylvania Coal
                                                                                                       issued a final decision on certain mine
                                               all shifts until the well has been mined                                                                      Company, LLC, Consol Energy, Inc.,
                                                                                                       operator petitions to modify a safety
                                               through.                                                                                                      CNX Center, 1000 Consol Energy Drive,
                                                                                                       standard.
                                                  (15) A certified official will directly                                                                    Canonsburg, Pennsylvania 15317–6506.
                                               supervise the mine-through operation                    ADDRESSES:   Copies of the final decisions              Mine: Enlow Fork Mine, MSHA I.D.
                                               and only the certified official in charge               are posted on MSHA’s Web site at                      No. 36–07416, located in Greene
                                               will issue instructions concerning the                  https://www.msha.gov/regulations/                     County, Pennsylvania.
                                               mine-through operation.                                 rulemaking/petitions-modification. The                  Regulation Affected: 30 CFR 75.1700
                                                  (16) The responsible person required                 public may inspect the petitions and                  (Oil and Gas wells).
                                               in 30 CFR 75.1501 will be responsible                   final decisions during normal business                  • Docket Number: M–2014–012–C.
                                               for well intersection emergencies. The                  hours in MSHA’s Office of Standards,                    FR Notice: 79 FR 30176 (May 27,
                                               responsible person will review the well                 Regulations, and Variances, 201 12th                  2014).
ethrower on DSK3G9T082PROD with NOTICES




                                               intersection procedures prior to any                    Street South, Suite 4E401, Arlington,                   Petitioner: Consol Pennsylvania Coal
                                               planned intersection.                                   Virginia 22202. All visitors are required             Company, LLC, Consol Energy, Inc.,
                                                  Within 30 days after this petition                   to check in at the receptionist’s desk in             CNX Center, 1000 Consol Energy Drive,
                                               becomes final, the petitioner will submit               Suite 4E401.                                          Canonsburg, Pennsylvania 15317–6506.
                                               proposed revisions for its approved Part                FOR FURTHER INFORMATION CONTACT:                        Mine: Bailey Mine, MSHA I.D. No.
                                               48 training plan to the DM. The                         Barbara Barron at 202–693–9447                        36–07230, located in Greene County,
                                               proposed revisions will include initial                 (Voice), barron.barbara@dol.gov                       Pennsylvania.


                                          VerDate Sep<11>2014   16:59 Oct 13, 2017   Jkt 244001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\16OCN1.SGM   16OCN1



Document Created: 2017-10-14 01:43:02
Document Modified: 2017-10-14 01:43:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesAll comments on the petitions must be received by MSHA's Office of Standards, Regulations, and Variances on or before November 15, 2017.
ContactBarbara Barron, Office of Standards, Regulations, and Variances at 202-693-9447 (Voice), [email protected] (Email), or 202-693-9441 (Facsimile). [These are not toll-free numbers.]
FR Citation82 FR 48115 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR