In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection (FERC-725U, Mandatory Reliability Standards: Mandatory Reliability Standard CIP-014) to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (82 FR 41618, 9/1/2017) requesting public comments. The Commission received no comments on the FERC-725U and is making this notation in its submittal to OMB.

Federal Register, Volume 82 Issue 210 (Wednesday, November 1, 2017)
[Federal Register Volume 82, Number 210 (Wednesday, November 1, 2017)]
[Notices]
[Pages 50645-50646]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-23723]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC17-14-000]


Commission Information Collection Activities (FERC-725U); Comment 
Request

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection (FERC-725U, Mandatory 
Reliability Standards: Mandatory Reliability Standard CIP-014) to the 
Office of Management and Budget (OMB) for review of the information 
collection requirements. Any interested person may file comments 
directly with OMB and should address a copy of those comments to the 
Commission as explained below. The Commission previously issued a 
Notice in the Federal Register (82 FR 41618, 9/1/2017) requesting 
public comments. The Commission received no comments on the FERC-725U 
and is making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by December 1, 
2017.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0274, should be sent via email to the Office of Information and 
Regulatory Affairs: [email protected]. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-0710.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC17-14-000, by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT:  Ellen Brown may be reached by email 
at [email protected], by telephone at (202) 502-8663, and by fax 
at (202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: Mandatory Reliability Standards: Reliability Standard CIP-
014.
    OMB Control No.: 1902-0274.
    Type of Request: Three-year extension of the FERC-725U information 
collection requirements with no changes to the reporting requirements.
    Abstract: Reliability Standard CIP-014-2 \1\ requires applicable 
transmission owners and transmission operators to identify and protect 
transmission stations and transmission substations, and their 
associated primary control centers that if rendered inoperable or 
damaged as a result of a physical attack could result in instability, 
uncontrolled separation, or cascading within an Interconnection.
---------------------------------------------------------------------------

    \1\ Reliability Standard CIP-014-2 was implemented by the letter 
Order in Docket No. RD15-4-000 issued on 7/14/2015. Docket No. RD15-
4-000 was not submitted to OMB because it did not implicate the 
Paperwork Reduction Act. The revised standard became effective on 
10/2/2015 and is now being included in the FERC-725U information 
collection.
---------------------------------------------------------------------------

    Transmission owners and transmission operators must keep data or 
evidence to show compliance with the standard for three years unless 
directed by its Compliance Enforcement Authority. If a responsible 
entity is found non-compliant, it must keep information related to the 
non-compliance until mitigation is complete and approved, or for the 
three years, whichever is longer.
    Type of Respondents: Transmission owners (TO) and transmission 
operators (TOP).
    Estimate of Annual Burden: \2\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \2\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.

[[Page 50646]]



                  FERC-725U--Mandatory Reliability Standards: Reliability Standard CIP-014 \3\
----------------------------------------------------------------------------------------------------------------
                                                                                 Average burden
                               Number and type     Number of     Total  number   hours and cost    Total burden
                                of respondents   responses per   of  responses    per response   hours and total
                                                  respondent                          \4\              cost
                               (1)............             (2)     (1) * (2) =  (4)............  (3) * (4)
                                                                           (3)
----------------------------------------------------------------------------------------------------------------
Year 1:
    R1.......................  334 TO.........               1             334  20 hrs.; $1,280  6,680 hrs.;
                                                                                                  $427,520.
    R2.......................  334 TO.........               1             334  34 hrs; $2,448.  11,356 hrs.;
                                                                                                  $817,632.
    R3.......................  2 TOP..........               1               2  1 hrs.; $129...  2 hrs.; $258.
    R4.......................  30 TO and 2 TOP               1              32  80 hrs.; $5,120  2,560 hrs.;
                                                                                                  $163,840.
    R5.......................  30 TO and 2 TOP               1              32  320 hrs.;        10,240 hrs.;
                                                                                 $20,480.         $655,360.
    R6.......................  30 TO and 2 TOP               1              32  304 hrs.;        9,728 hrs.;
                                                                                 $19,456.         $622,592.
    Record Retention.........  334 TO and 2                  1             336  2 hrs.; $76....  672 hrs.;
                                TOP.                                                              $25,536.
Year 2:
    Record Retention.........  334 TO and 2                  1             336  2 hrs.; $76....  672 hrs.;
                                TOP.                                                              $25,536.
Year 3:
    R1.......................  30 TO..........               1              30  20 hrs.; $1,280  600 hrs.;
                                                                                                  $38,400.
    R2.......................  30 TO..........               1              30  34 hrs.; $2,436  1,020 hrs.;
                                                                                                  $73,080.
    R3.......................  2 TOP..........               1               2  1 hrs.; $129...  2 hrs.; $258.
    R4.......................  30 TO and 2 TOP               1              32  80 hrs.; $5,120  2,560 hrs.;
                                                                                                  $163,840.
    R5.......................  30 TO and 2 TOP               1              32  80 hrs.; $5,120  2,560 hrs.;
                                                                                                  $163,840.
    R6.......................  30 TO and 2 TOP               1              32  134 hrs.;        4,288 hrs.;
                                                                                 $8,576.          $274,432.
    Record Retention.........  334 TO and 2                  1             336  2 hrs.; $76....  672 hrs.;
                                TOP.                                                              $25,536.
        Year 1 Total.........  ...............  ..............  ..............  ...............  41,238 hrs.;
                                                                                                  $2,712,738.
        Year 2 Total.........  ...............  ..............  ..............  ...............  672 hrs.;
                                                                                                  $25,536.
        Year 3 Total.........  ...............  ..............  ..............  ...............  11,702 hrs.;
                                                                                                  $739,386.
            Total (for Years   ...............  ..............  ..............  ...............  53,612 hrs.;
             1-3).                                                                                $3,477,660.
            Average Annual     ...............  ..............  ..............  ...............  17,871 hrs.;
             Burden and Cost                                                                      $1,159,220.
             (for Years 1-3).
----------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \3\ For each Reliability Standard, the Measure shows the 
acceptable evidence for the associated Reporting Requirement (R 
numbers), and the Compliance section details the related 
Recordkeeping Requirement.
    \4\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * XX per Hour = 
Average Cost per Response.
    The hourly cost figures are based on data for wages plus 
benefits from the Bureau of Labor Statistics (as of 11/9/2016) at 
https://www.bls.gov/oes/current/naics2_22.htm and http://www.bls.gov/news.release/ecec.nr0.htm. The figures are rounded for 
the purposes of calculations in this table and are:
    1. For electrical engineers (occupation code: 17-2071), $64.29/
hr., rounded to $64/hr.
    2. For attorneys (occupation code: 23-0000), $129.12/hr., 
rounded to $129/hr.
    3. For administrative staff (occupation code: 43-0000), $37.75/
hr., rounded to $38/hr.
    The record retention cost is based on the administrative staff 
category; R3 is based on the attorney category; Requirements R1, R4, 
R5 and R6 are based on the electrical engineer category; and R2 is a 
mix of the electrical engineer and related engineering review 
process (30 hrs. at $64/hr.) and attorney (4 hrs. at $129/hr.) 
categories. The resulting average hourly figure is $71.65, rounded 
to $72/hr.

    Dated: October 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-23723 Filed 10-31-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 82, No. 210 / Wednesday, November 1, 2017 / Notices                                                    50645

                                                  Applicants: Otter Tail Power                          DEPARTMENT OF ENERGY                                  at: (866) 208–3676 (toll-free), or (202)
                                                Company, NorthWestern Corporation,                                                                            502–8659 for TTY.
                                                Montana-Dakota Utilities Co.                            Federal Energy Regulatory                                Docket: Users interested in receiving
                                                                                                        Commission                                            automatic notification of activity in this
                                                  Description: § 205(d) Rate Filing:
                                                Filing and Restatement of Big Stone                     [Docket No. IC17–14–000]                              docket or in viewing/downloading
                                                Plant Transmission Facilities Agreement                                                                       comments and issuances in this docket
                                                to be effective 7/30/2010.                              Commission Information Collection                     may do so at http://www.ferc.gov/docs-
                                                                                                        Activities (FERC–725U); Comment                       filing/docs-filing.asp.
                                                  Filed Date: 10/24/17.                                 Request                                               FOR FURTHER INFORMATION CONTACT:
                                                  Accession Number: 20171024–5155.                                                                            Ellen Brown may be reached by email
                                                                                                        AGENCY:  Federal Energy Regulatory
                                                  Comments Due: 5 p.m. ET 11/14/17.                     Commission.                                           at DataClearance@FERC.gov, by
                                                                                                        ACTION: Comment request.
                                                                                                                                                              telephone at (202) 502–8663, and by fax
                                                  Docket Numbers: ER18–154–000.                                                                               at (202) 273–0873.
                                                  Applicants: Southern California                       SUMMARY:    In compliance with the                    SUPPLEMENTARY INFORMATION:
                                                Edison Company.                                         requirements of the Paperwork                            Title: Mandatory Reliability
                                                  Description: § 205(d) Rate Filing: SCE                Reduction Act of 1995, the Federal                    Standards: Reliability Standard CIP–
                                                2018 TRBAA Update to be effective                       Energy Regulatory Commission                          014.
                                                1/1/2018.                                               (Commission or FERC) is submitting its                   OMB Control No.: 1902–0274.
                                                                                                        information collection (FERC–725U,                       Type of Request: Three-year extension
                                                  Filed Date: 10/24/17.                                 Mandatory Reliability Standards:                      of the FERC–725U information
                                                  Accession Number: 20171024–5157.                      Mandatory Reliability Standard CIP–                   collection requirements with no changes
                                                  Comments Due: 5 p.m. ET 11/14/17.                     014) to the Office of Management and                  to the reporting requirements.
                                                                                                        Budget (OMB) for review of the
                                                  Docket Numbers: ER18–155–000.                                                                                  Abstract: Reliability Standard CIP–
                                                                                                        information collection requirements.
                                                                                                                                                              014–2 1 requires applicable transmission
                                                  Applicants: EnPowered.                                Any interested person may file
                                                                                                                                                              owners and transmission operators to
                                                                                                        comments directly with OMB and
                                                  Description: Baseline eTariff Filing:                                                                       identify and protect transmission
                                                                                                        should address a copy of those
                                                EnPowered USA, Inc. Market Based                                                                              stations and transmission substations,
                                                                                                        comments to the Commission as
                                                Rate Tariff to be effective 10/31/2017.                                                                       and their associated primary control
                                                                                                        explained below. The Commission
                                                  Filed Date: 10/25/17.                                                                                       centers that if rendered inoperable or
                                                                                                        previously issued a Notice in the
                                                                                                                                                              damaged as a result of a physical attack
                                                  Accession Number: 20171025–5000.                      Federal Register (82 FR 41618, 9/1/
                                                                                                                                                              could result in instability, uncontrolled
                                                                                                        2017) requesting public comments. The
                                                  Comments Due: 5 p.m. ET 11/15/17.                                                                           separation, or cascading within an
                                                                                                        Commission received no comments on
                                                                                                                                                              Interconnection.
                                                   The filings are accessible in the                    the FERC–725U and is making this
                                                                                                        notation in its submittal to OMB.                        Transmission owners and
                                                Commission’s eLibrary system by
                                                                                                                                                              transmission operators must keep data
                                                clicking on the links or querying the                   DATES: Comments on the collection of
                                                                                                                                                              or evidence to show compliance with
                                                docket number.                                          information are due by December 1,
                                                                                                                                                              the standard for three years unless
                                                   Any person desiring to intervene or                  2017.
                                                                                                                                                              directed by its Compliance Enforcement
                                                protest in any of the above proceedings                 ADDRESSES: Comments filed with OMB,                   Authority. If a responsible entity is
                                                must file in accordance with Rules 211                  identified by the OMB Control No.                     found non-compliant, it must keep
                                                and 214 of the Commission’s                             1902–0274, should be sent via email to                information related to the non-
                                                Regulations (18 CFR 385.211 and                         the Office of Information and Regulatory              compliance until mitigation is complete
                                                385.214) on or before 5:00 p.m. Eastern                 Affairs: oira_submission@omb.gov.                     and approved, or for the three years,
                                                time on the specified comment date.                     Attention: Federal Energy Regulatory                  whichever is longer.
                                                Protests may be considered, but                         Commission Desk Officer. The Desk                        Type of Respondents: Transmission
                                                intervention is necessary to become a                   Officer may also be reached via                       owners (TO) and transmission operators
                                                party to the proceeding.                                telephone at 202–395–0710.                            (TOP).
                                                                                                           A copy of the comments should also                    Estimate of Annual Burden: 2 The
                                                   eFiling is encouraged. More detailed                 be sent to the Commission, in Docket                  Commission estimates the annual public
                                                information relating to filing                          No. IC17–14–000, by either of the                     reporting burden for the information
                                                requirements, interventions, protests,                  following methods:                                    collection as:
                                                service, and qualifying facilities filings                 • eFiling at Commission’s Web site:
                                                can be found at: http://www.ferc.gov/                   http://www.ferc.gov/docs-filing/                         1 Reliability Standard CIP–014–2 was
                                                docs-filing/efiling/filing-req.pdf. For                 efiling.asp.                                          implemented by the letter Order in Docket No.
                                                other information, call (866) 208–3676                     • Mail/Hand Delivery/Courier:                      RD15–4–000 issued on 7/14/2015. Docket No.
                                                (toll free). For TTY, call (202) 502–8659.              Federal Energy Regulatory Commission,                 RD15–4–000 was not submitted to OMB because it
                                                                                                        Secretary of the Commission, 888 First                did not implicate the Paperwork Reduction Act.
                                                  Dated: October 25, 2017.                              Street NE., Washington, DC 20426.                     The revised standard became effective on 10/2/2015
                                                                                                                                                              and is now being included in the FERC–725U
                                                Nathaniel J. Davis, Sr.,                                   Instructions: All submissions must be              information collection.
                                                Deputy Secretary.                                       formatted and filed in accordance with                   2 Burden is defined as the total time, effort, or
sradovich on DSK3GMQ082PROD with NOTICES




                                                [FR Doc. 2017–23772 Filed 10–31–17; 8:45 am]            submission guidelines at: http://                     financial resources expended by persons to
                                                                                                        www.ferc.gov/help/submission-                         generate, maintain, retain, or disclose or provide
                                                BILLING CODE 6717–01–P                                                                                        information to or for a Federal agency. For further
                                                                                                        guide.asp. For user assistance contact                explanation of what is included in the information
                                                                                                        FERC Online Support by email at                       collection burden, reference 5 Code of Federal
                                                                                                        ferconlinesupport@ferc.gov, or by phone               Regulations 1320.3.




                                           VerDate Sep<11>2014   18:16 Oct 31, 2017   Jkt 244001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\01NON1.SGM   01NON1


                                                50646                                 Federal Register / Vol. 82, No. 210 / Wednesday, November 1, 2017 / Notices

                                                                                 FERC–725U—MANDATORY RELIABILITY STANDARDS: RELIABILITY STANDARD CIP–014 3
                                                                                                                                        Number                           Number of                      Total                  Average burden hours                       Total burden hours
                                                                                                                                        and type                       responses per                 number of                and cost per response 4                       and total cost
                                                                                                                                    of respondents                       respondent                  responses

                                                                                                                                              (1)                               (2)                (1) * (2) = (3)                            (4)                               (3) * (4)

                                                Year 1:
                                                    R1 ...................................................................   334 TO ..........................                               1                      334      20 hrs.; $1,280 ...............            6,680 hrs.; $427,520.
                                                    R2 ...................................................................   334 TO ..........................                               1                      334      34 hrs; $2,448 ................            11,356 hrs.; $817,632.
                                                    R3 ...................................................................   2 TOP ............................                              1                        2      1 hrs.; $129 ....................          2 hrs.; $258.
                                                    R4 ...................................................................   30 TO and 2 TOP .........                                       1                       32      80 hrs.; $5,120 ...............            2,560 hrs.; $163,840.
                                                    R5 ...................................................................   30 TO and 2 TOP .........                                       1                       32      320 hrs.; $20,480 ...........              10,240 hrs.; $655,360.
                                                    R6 ...................................................................   30 TO and 2 TOP .........                                       1                       32      304 hrs.; $19,456 ...........              9,728 hrs.; $622,592.
                                                    Record Retention ...........................................             334 TO and 2 TOP .......                                        1                      336      2 hrs.; $76 ......................         672 hrs.; $25,536.
                                                Year 2:
                                                    Record Retention ...........................................             334 TO and 2 TOP .......                                        1                      336      2 hrs.; $76 ......................         672 hrs.; $25,536.
                                                Year 3:
                                                    R1 ...................................................................   30 TO ............................                              1                        30     20 hrs.; $1,280 ...............            600 hrs.; $38,400.
                                                    R2 ...................................................................   30 TO ............................                              1                        30     34 hrs.; $2,436 ...............            1,020 hrs.; $73,080.
                                                    R3 ...................................................................   2 TOP ............................                              1                          2    1 hrs.; $129 ....................          2 hrs.; $258.
                                                    R4 ...................................................................   30 TO and 2 TOP .........                                       1                        32     80 hrs.; $5,120 ...............            2,560 hrs.; $163,840.
                                                    R5 ...................................................................   30 TO and 2 TOP .........                                       1                        32     80 hrs.; $5,120 ...............            2,560 hrs.; $163,840.
                                                    R6 ...................................................................   30 TO and 2 TOP .........                                       1                        32     134 hrs.; $8,576 .............             4,288 hrs.; $274,432.
                                                    Record Retention ...........................................             334 TO and 2 TOP .......                                        1                      336      2 hrs.; $76 ......................         672 hrs.; $25,536.
                                                        Year 1 Total ............................................            .......................................   ........................   ........................   ........................................   41,238 hrs.; $2,712,738.
                                                        Year 2 Total ............................................            .......................................   ........................   ........................   ........................................   672 hrs.; $25,536.
                                                        Year 3 Total ............................................            .......................................   ........................   ........................   ........................................   11,702 hrs.; $739,386.
                                                               Total (for Years 1–3) ........................                .......................................   ........................   ........................   ........................................   53,612 hrs.; $3,477,660.
                                                               Average Annual Burden and Cost                                .......................................   ........................   ........................   ........................................   17,871 hrs.; $1,159,220.
                                                                   (for Years 1–3).



                                                  Comments: Comments are invited on:                                                 Dated: October 25, 2017.                                                                a new point of interconnection with
                                                (1) Whether the collection of                                                      Kimberly D. Bose,                                                                         Tennessee Gas Pipeline Company, LLC
                                                information is necessary for the proper                                            Secretary.                                                                                adjacent to the Meadville Compressor
                                                performance of the functions of the                                                [FR Doc. 2017–23723 Filed 10–31–17; 8:45 am]                                              Station in Crawford County,
                                                Commission, including whether the                                                  BILLING CODE 6717–01–P
                                                                                                                                                                                                                             Pennsylvania and extend to a new
                                                information will have practical utility;                                                                                                                                     delivery point interconnection with the
                                                (2) the accuracy of the agency’s estimate                                                                                                                                    distribution facilities of Dominion
                                                of the burden and cost of the collection                                           DEPARTMENT OF ENERGY                                                                      Energy Ohio (DEO) in North Kingsville
                                                of information, including the validity of                                                                                                                                    in Ashtabula County, Ohio. The project
                                                the methodology and assumptions used;                                              Federal Energy Regulatory                                                                 also includes the reconstruction and
                                                (3) ways to enhance the quality, utility                                           Commission                                                                                conversion of two compressor stations
                                                and clarity of the information collection;                                                                                                                                   totaling 1,862 hp. The Risberg Line
                                                and (4) ways to minimize the burden of                                             [Docket No. CP18–6–000]
                                                                                                                                                                                                                             would provide for 55,000 Dth/d of firm
                                                the collection of information on those                                                                                                                                       transportation service to northeast Ohio
                                                                                                                                   RH energytrans, LLC; Notice of
                                                who are to respond, including the use                                                                                                                                        markets. The estimated cost to construct
                                                                                                                                   Application
                                                of automated collection techniques or                                                                                                                                        the project and to acquire the existing
                                                other forms of information technology.                                               Take notice that on October 16, 2017,                                                   gathering pipeline is about $88 million.
                                                                                                                                   RH energytrans, LLC (RH), 558 West 6th                                                       The filing may be viewed on the Web
                                                   3 For each Reliability Standard, the Measure
                                                                                                                                   Street, Erie, PA 16507, filed an                                                          at http://www.ferc.gov using the
                                                shows the acceptable evidence for the associated
                                                Reporting Requirement (R numbers), and the
                                                                                                                                   application pursuant to section 7(c) of                                                   ‘‘eLibrary’’ link. Enter the docket
                                                Compliance section details the related                                             the Natural Gas Act (NGA) and Parts                                                       number excluding the last three digits in
                                                Recordkeeping Requirement.                                                         157 and 284 of the Commission’s                                                           the docket number field to access the
                                                   4 The estimates for cost per response are derived
                                                                                                                                   Regulations requesting authority to                                                       document. For assistance, contact FERC
                                                using the following formula: Average Burden Hours
                                                per Response * XX per Hour = Average Cost per
                                                                                                                                   construct and operate a new interstate                                                    at FERCOnlineSupport@ferc.gov or call
                                                Response.                                                                          natural gas pipeline system (referred to                                                  toll-free, (886) 208–3676 or TYY, (202)
                                                   The hourly cost figures are based on data for                                   as the Risberg Line), including pipeline                                                  502–8659.
                                                wages plus benefits from the Bureau of Labor                                       facilities, two compressor stations,
                                                Statistics (as of 11/9/2016) at https://www.bls.gov/                                                                                                                            Any questions concerning this
                                                oes/current/naics2_22.htm and http://www.bls.gov/
                                                                                                                                   metering and regulating stations and                                                      application may be directed to James F.
                                                news.release/ecec.nr0.htm. The figures are rounded                                 appurtenant facilities in Pennsylvania                                                    Bowe, Jr., King & Spalding LLP, 1700
                                                for the purposes of calculations in this table and                                 and Ohio.                                                                                 Pennsylvania Avenue, Suite 200,
                                                are:                                                                                 Specifically, the project would
                                                   1. For electrical engineers (occupation code: 17–                                                                                                                         Washington, DC 20006, Phone (202)
                                                2071), $64.29/hr., rounded to $64/hr.
                                                                                                                                   include a total of 59.9 miles of pipeline                                                 626–9601, email jbowe@kslaw.com.
                                                   2. For attorneys (occupation code: 23–0000),                                    incorporating 31.6 miles of existing 8-
                                                                                                                                                                                                                                Pursuant to section 157.9 of the
sradovich on DSK3GMQ082PROD with NOTICES




                                                $129.12/hr., rounded to $129/hr.                                                   inch and 12-inch diameter gas pipeline
                                                                                                                                                                                                                             Commission’s rules, 18 CFR 157.9,
                                                   3. For administrative staff (occupation code: 43–                               currently used as gathering facilities and
                                                0000), $37.75/hr., rounded to $38/hr.                                                                                                                                        within 90 days of this Notice the
                                                                                                                                   28 miles of new 12-inch diameter
                                                   The record retention cost is based on the                                                                                                                                 Commission staff will either: Complete
                                                administrative staff category; R3 is based on the
                                                                                                                                   pipeline. The pipeline facilities begin at
                                                                                                                                                                                                                             its environmental assessment (EA) and
                                                attorney category; Requirements R1, R4, R5 and R6
                                                are based on the electrical engineer category; and                                 attorney (4 hrs. at $129/hr.) categories. The
                                                                                                                                                                                                                             place it into the Commission’s public
                                                R2 is a mix of the electrical engineer and related                                 resulting average hourly figure is $71.65, rounded                                        record (eLibrary) for this proceeding, or
                                                engineering review process (30 hrs. at $64/hr.) and                                to $72/hr.                                                                                issue a Notice of Schedule for


                                           VerDate Sep<11>2014           19:17 Oct 31, 2017            Jkt 244001        PO 00000          Frm 00039          Fmt 4703         Sfmt 4703          E:\FR\FM\01NON1.SGM                   01NON1



Document Created: 2017-11-01 02:02:48
Document Modified: 2017-11-01 02:02:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by December 1, 2017.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation82 FR 50645 