82_FR_51445 82 FR 51233 - Port Arthur Pipeline, LLC; Notice of Application

82 FR 51233 - Port Arthur Pipeline, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 212 (November 3, 2017)

Page Range51233-51234
FR Document2017-23940

Federal Register, Volume 82 Issue 212 (Friday, November 3, 2017)
[Federal Register Volume 82, Number 212 (Friday, November 3, 2017)]
[Notices]
[Pages 51233-51234]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-23940]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP18-7-000: PF17-5-000]


Port Arthur Pipeline, LLC; Notice of Application

    Take notice that on October 16, 2017, Port Arthur Pipeline, LLC 
(Port Arthur Pipeline), 2925 Briarpark, Suite 900, Houston, Texas 
77042, pursuant to Section 7(c) of the NGA, and Parts 157 and 284 of 
the Commission's regulations, filed an application requesting a 
certificate of public convenience and necessity to construct, own, and 
operate its Louisiana Connector Project.
    The Louisiana Connector Project consists of 131 miles of new 42-
inch-diameter pipeline, a new 89,900 horsepower compressor station, 
interconnection facilities with interstate and intrastate natural gas 
facilities, and other appurtenant facilities. The Louisiana Connector 
Project is designed to deliver up to 2,000 million cubic feet (MMcf) 
per day of natural gas to the Liquefaction Project that is currently 
being developed by Port Arthur LNG, LLC and PALNG Common Facilities 
Company, LLC and is under review by the Commission in Docket No. CP17-
20-000. The Louisiana Connector Project facilities will extend from an 
interconnect with Columbia Gas Transmission located northeast of 
Eunice, Louisiana in St. Landry Parish through Evangeline, Allen, 
Beauregard, Calcasieu, and Cameron Parishes in Louisiana and Orange and 
Jefferson Counties in Texas and terminate at the proposed Liquefaction 
Project south of Port Arthur in Jefferson County, Texas. The cost of 
the proposed project is $1,207,584,005, all as more fully set forth in 
the application which is on file with the Commission and open to public 
inspection. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site web 
at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    On March 13, 2017, the Commission staff granted Port Arthur 
Pipeline's request to utilize the Pre-Filing Process and assigned 
Docket No. PF17-5-000 to staff activities involved in the Louisiana 
Connector Project. Now, as of the filing of the October 16, 2017 
application, the Pre-Filing Process for this project has ended. From 
this time forward, this proceeding will be conducted in Docket No. 
CP18-7-000, as noted in the caption of this Notice.
    Any questions regarding this application should be directed to 
Jerrod L. Harrison, Senior Counsel, Port Arthur Pipeline, 488 8th 
Avenue, San Diego, CA 9210, by phone at (619) 696-2987, or by email to 
[email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will issue a Notice 
of Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) for this proposal. The 
issuance of a Notice of Schedule for Environmental Review will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211)

[[Page 51234]]

and the Regulations under the NGA (18 CFR 157.10). A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies of all documents 
filed by the applicant and by all other parties. A party must submit 
five copies of filings made with the Commission and must mail a copy to 
the applicant and to every other party in the proceeding. Only parties 
to the proceeding can ask for court review of Commission orders in the 
proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and five copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on November 20, 2017.

    Dated: October 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-23940 Filed 11-2-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 82, No. 212 / Friday, November 3, 2017 / Notices                                           51233

                                               NYISO Electric System Planning                             The discussions at the meetings                    Port Arthur in Jefferson County, Texas.
                                               Working Group and Transmission                          described above may address matters at                The cost of the proposed project is
                                               Planning Advisory Subcommittee                          issue in the following proceedings:                   $1,207,584,005, all as more fully set
                                               Meeting                                                    New York Independent System                        forth in the application which is on file
                                                                                                       Operator, Inc., Docket No. ER13–102.                  with the Commission and open to
                                               November 3, 2017, 10:00 a.m.–3:00 p.m.                                                                        public inspection. The filing is available
                                                                                                          New York Independent System
                                               (EST)                                                                                                         for review at the Commission in the
                                                                                                       Operator, Inc., Docket No. ER15–2059.
                                                 The above-referenced meeting will be                     New York Independent System                        Public Reference Room or may be
                                               via web conference and teleconference.                  Operator, Inc., Docket No. ER17–2327.                 viewed on the Commission’s Web site
                                                 The above-referenced meeting is open                     New York Transco, LLC, Docket No.                  web at http://www.ferc.gov using the
                                               to stakeholders.                                        ER15–572.                                             ‘‘eLibrary’’ link. Enter the docket
                                                 Further information may be found at:                     For more information, contact James                number excluding the last three digits in
                                               http://www.nyiso.com/public/                            Eason, Office of Energy Market                        the docket number field to access the
                                               committees/documents.jsp?com=bic_                       Regulation, Federal Energy Regulatory                 document. For assistance, contact FERC
                                               espwg&directory=2017-11-03.                             Commission at (202) 502–8622 or                       at FERCOnlineSupport@ferc.gov or call
                                                                                                       James.Eason@ferc.gov.                                 toll-free, (886) 208–3676 or TYY, (202)
                                               NYISO Business Issues Committee                                                                               502–8659.
                                               Meeting                                                   Dated: October 30, 2017.
                                                                                                                                                                On March 13, 2017, the Commission
                                                                                                       Nathaniel J. Davis, Sr.,                              staff granted Port Arthur Pipeline’s
                                               November 15, 2017, 10:00 a.m.–4:00                      Deputy Secretary.
                                               p.m. (EST)                                                                                                    request to utilize the Pre-Filing Process
                                                                                                       [FR Doc. 2017–23944 Filed 11–2–17; 8:45 am]           and assigned Docket No. PF17–5–000 to
                                                 The above-referenced meeting will be                  BILLING CODE 6717–01–P                                staff activities involved in the Louisiana
                                               via web conference and teleconference.                                                                        Connector Project. Now, as of the filing
                                                 The above-referenced meeting is open                                                                        of the October 16, 2017 application, the
                                               to stakeholders.                                        DEPARTMENT OF ENERGY                                  Pre-Filing Process for this project has
                                                 Further information may be found at:                                                                        ended. From this time forward, this
                                               http://www.nyiso.com/public/                            Federal Energy Regulatory                             proceeding will be conducted in Docket
                                               committees/documents.jsp?com=bic&                       Commission                                            No. CP18–7–000, as noted in the caption
                                               directory=2017-11-15.                                   [Docket Nos. CP18–7–000: PF17–5–000]                  of this Notice.
                                                                                                                                                                Any questions regarding this
                                               NYISO Operating Committee Meeting
                                                                                                       Port Arthur Pipeline, LLC; Notice of                  application should be directed to Jerrod
                                               November 17, 2017, 10:00 a.m.–12:00                     Application                                           L. Harrison, Senior Counsel, Port Arthur
                                               p.m. (EST)                                                                                                    Pipeline, 488 8th Avenue, San Diego,
                                                                                                         Take notice that on October 16, 2017,               CA 9210, by phone at (619) 696–2987,
                                                 The above-referenced meeting will be                  Port Arthur Pipeline, LLC (Port Arthur                or by email to jharrison@
                                               via web conference and teleconference.                  Pipeline), 2925 Briarpark, Suite 900,                 sempraglobal.com.
                                                 The above-referenced meeting is open                  Houston, Texas 77042, pursuant to                        Pursuant to section 157.9 of the
                                               to stakeholders.                                        Section 7(c) of the NGA, and Parts 157                Commission’s rules, 18 CFR 157.9,
                                                 Further information may be found at:                  and 284 of the Commission’s                           within 90 days of this Notice, the
                                               http://www.nyiso.com/public/                            regulations, filed an application                     Commission staff will issue a Notice of
                                               committees/documents.jsp?com=oc&                        requesting a certificate of public                    Schedule for Environmental Review. If
                                               directory=2017-11-17.                                   convenience and necessity to construct,               a Notice of Schedule for Environmental
                                                                                                       own, and operate its Louisiana                        Review is issued, it will indicate, among
                                               NYISO Electric System Planning
                                                                                                       Connector Project.                                    other milestones, the anticipated date
                                               Working Group Meeting
                                                                                                         The Louisiana Connector Project                     for the Commission staff’s issuance of
                                               November 17, 2017, 10:00 a.m.–4:00                      consists of 131 miles of new 42-inch-                 the final environmental impact
                                               p.m. (EST)                                              diameter pipeline, a new 89,900                       statement (FEIS) for this proposal. The
                                                 The above-referenced meeting will be                  horsepower compressor station,                        issuance of a Notice of Schedule for
                                               via web conference and teleconference.                  interconnection facilities with interstate            Environmental Review will serve to
                                                 The above-referenced meeting is open                  and intrastate natural gas facilities, and            notify federal and state agencies of the
                                               to stakeholders.                                        other appurtenant facilities. The                     timing for the completion of all
                                                                                                       Louisiana Connector Project is designed               necessary reviews, and the subsequent
                                                 Further information may be found at:
                                                                                                       to deliver up to 2,000 million cubic feet             need to complete all federal
                                               http://www.nyiso.com/public/
                                                                                                       (MMcf) per day of natural gas to the                  authorizations within 90 days of the
                                               committees/documents.jsp?com=bic_
                                                                                                       Liquefaction Project that is currently                date of issuance of the Commission
                                               espwg&directory=2017-11-17.
                                                                                                       being developed by Port Arthur LNG,                   staff’s FEIS.
                                               NYISO Management Committee                              LLC and PALNG Common Facilities                          There are two ways to become
                                               Meeting                                                 Company, LLC and is under review by                   involved in the Commission’s review of
                                                                                                       the Commission in Docket No. CP17–                    this project. First, any person wishing to
                                               November 29, 2017, 10:00 a.m.–4:00
                                                                                                       20–000. The Louisiana Connector                       obtain legal status by becoming a party
                                               p.m. (EST)
                                                                                                       Project facilities will extend from an                to the proceedings for this project
                                                 The above-referenced meeting will be                  interconnect with Columbia Gas                        should, on or before the comment date
ethrower on DSK3G9T082PROD with NOTICES




                                               via web conference and teleconference.                  Transmission located northeast of                     stated below, file with the Federal
                                                 The above-referenced meeting is open                  Eunice, Louisiana in St. Landry Parish                Energy Regulatory Commission, 888
                                               to stakeholders.                                        through Evangeline, Allen, Beauregard,                First Street NE., Washington, DC 20426,
                                                 Further information may be found at:                  Calcasieu, and Cameron Parishes in                    a motion to intervene in accordance
                                               http://www.nyiso.com/public/                            Louisiana and Orange and Jefferson                    with the requirements of the
                                               committees/documents.jsp?                               Counties in Texas and terminate at the                Commission’s Rules of Practice and
                                               com=mc&directory=2017-11-29.                            proposed Liquefaction Project south of                Procedure (18 CFR 385.214 or 385.211)


                                          VerDate Sep<11>2014   16:18 Nov 02, 2017   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\03NON1.SGM   03NON1


                                               51234                        Federal Register / Vol. 82, No. 212 / Friday, November 3, 2017 / Notices

                                               and the Regulations under the NGA (18                     Dated: October 30, 2017.                            the FERC Web site (www.ferc.gov). This
                                               CFR 157.10). A person obtaining party                   Nathaniel J. Davis, Sr.,                              fact sheet addresses a number of
                                               status will be placed on the service list               Deputy Secretary.                                     typically asked questions, including
                                               maintained by the Secretary of the                      [FR Doc. 2017–23940 Filed 11–2–17; 8:45 am]           how to participate in the Commission’s
                                               Commission and will receive copies of                   BILLING CODE 6717–01–P                                proceedings.
                                               all documents filed by the applicant and                                                                      Public Participation
                                               by all other parties. A party must submit
                                               five copies of filings made with the                    DEPARTMENT OF ENERGY                                     For your convenience, there are four
                                               Commission and must mail a copy to                                                                            methods you can use to submit your
                                               the applicant and to every other party in               Federal Energy Regulatory                             comments to the Commission. The
                                               the proceeding. Only parties to the                     Commission                                            Commission will provide equal
                                               proceeding can ask for court review of                  [Docket No. PF17–9–000]                               consideration to all comments received,
                                               Commission orders in the proceeding.                                                                          whether filed in written form or
                                                                                                       Fourchon LNG LLC; Notice of Intent To                 provided verbally. The Commission
                                                  However, a person does not have to                                                                         encourages electronic filing of
                                                                                                       Prepare an Environmental Impact
                                               intervene in order to have comments                     Statement for The Planned Fourchon                    comments and has expert staff available
                                               considered. The second way to                           Lng Project, Request for Comments on                  to assist you at (202) 502–8258 or
                                               participate is by filing with the                       Environmental Issues, and Notice of                   FercOnlineSupport@ferc.gov. Please
                                               Secretary of the Commission, as soon as                 Public Scoping Session                                carefully follow these instructions so
                                               possible, an original and two copies of                                                                       that your comments are properly
                                               comments in support of or in opposition                    The staff of the Federal Energy                    recorded.
                                               to this project. The Commission will                    Regulatory Commission (FERC or                           (1) You can file your comments
                                               consider these comments in                              Commission) will prepare an                           electronically using the eComment
                                               determining the appropriate action to be                environmental impact statement (EIS)                  feature on the Commission’s Web site
                                               taken, but the filing of a comment alone                that will discuss the environmental                   (www.ferc.gov) under the link to
                                               will not serve to make the filer a party                impacts of the Fourchon LNG Project                   Documents and Filings. This is an easy
                                               to the proceeding. The Commission’s                     involving construction and operation of               method for submitting brief, text-only
                                               rules require that persons filing                       facilities by Fourchon LNG LLC                        comments on a project;
                                               comments in opposition to the project                   (Fourchon LNG)] in Lafourche Parish,                     (2) You can file your comments
                                               provide copies of their protests only to                Louisiana. The Commission will use                    electronically by using the eFiling
                                               the party or parties directly involved in               this EIS in its decision-making process               feature on the Commission’s Web site
                                               the protest.                                            to determine whether the project is in                (www.ferc.gov) under the link to
                                                                                                       the public interest.                                  Documents and Filings. With eFiling,
                                                  Persons who wish to comment only                        This notice announces the opening of
                                               on the environmental review of this                                                                           you can provide comments in a variety
                                                                                                       the scoping process the Commission                    of formats by attaching them as a file
                                               project should submit an original and                   will use to gather input from the public
                                               two copies of their comments to the                                                                           with your submission. New eFiling
                                                                                                       and interested agencies on the project.               users must first create an account by
                                               Secretary of the Commission.                            You can make a difference by providing
                                               Environmental commenters will be                                                                              clicking on eRegister. If you are filing a
                                                                                                       us with your specific comments or                     comment on a particular project, please
                                               placed on the Commission’s                              concerns about the project. Your
                                               environmental mailing list, will receive                                                                      select ‘‘Comment on a Filing’’ as the
                                                                                                       comments should focus on the potential                filing type; or
                                               copies of the environmental documents,                  environmental effects, reasonable
                                               and will be notified of meetings                                                                                 (3) You can file a paper copy of your
                                                                                                       alternatives, and measures to avoid or                comments by mailing them to the
                                               associated with the Commission’s                        lessen environmental impacts. Your                    following address. Be sure to reference
                                               environmental review process.                           input will help the Commission staff                  the project docket number (PF17–9–000)
                                               Environmental commenters will not be                    determine what issues they need to                    with your submission: Kimberly D.
                                               required to serve copies of filed                       evaluate in the EIS. To ensure that your              Bose, Secretary, Federal Energy
                                               documents on all other parties.                         comments are timely and properly                      Regulatory Commission, 888 First Street
                                               However, the non-party commenters                       recorded, please send your comments so                NE., Room 1A, Washington, DC 20426.
                                               will not receive copies of all documents                that the Commission receives them in                     (4) In lieu of sending written or
                                               filed by other parties or issued by the                 Washington, DC, on or before December                 electronic comments, the Commission
                                               Commission (except for the mailing of                   6, 2017.                                              invites you to attend the public scoping
                                               environmental documents issued by the                      If you sent comments on this project
                                                                                                                                                             session its staff will conduct in the
                                               Commission) and will not have the right                 to the Commission before the opening of
                                                                                                                                                             project area, scheduled as follows:
                                               to seek court review of the                             this docket on August 3, 2017, you will
                                               Commission’s final order.                               need to file those comments in Docket                 Date and time               Location
                                                  The Commission strongly encourages                   No. PF17–9–000 to ensure they are
                                               electronic filings of comments, protests                considered as part of this proceeding.                Thursday, No-     South LaFourche High
                                                                                                          This notice is being sent to the                     vember 16,        School, 16911 E Main
                                               and interventions in lieu of paper using
                                                                                                       Commission’s current environmental                      2017, 5:00        Street, Cut Off, LA 70345,
                                               the eFiling link at http://www.ferc.gov.
                                                                                                       mailing list for this project. State and                to 8:00 p.m.      985–632–5721.
                                               Persons unable to file electronically
                                                                                                       local government representatives should
ethrower on DSK3G9T082PROD with NOTICES




                                               should submit an original and five                                                                              The primary goal of the scoping
                                                                                                       notify their constituents of this planned
                                               copies of the protest or intervention to                project and encourage them to comment                 session is to have you identify the
                                               the Federal Energy Regulatory                           on their areas of concern.                            specific environmental issues and
                                               Commission, 888 First Street NE.,                          A fact sheet prepared by the FERC                  concerns that should be considered in
                                               Washington, DC 20426.                                   entitled An Interstate Natural Gas                    the EIS to be prepared by FERC for this
                                                  Comment Date: 5:00 p.m. Eastern                      Facility On My Land? What Do I Need                   project. Individual verbal comments
                                               Time on November 20, 2017.                              To Know? is available for viewing on                  will be taken on a one-on-one basis with


                                          VerDate Sep<11>2014   16:18 Nov 02, 2017   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\03NON1.SGM   03NON1



Document Created: 2018-10-25 10:23:42
Document Modified: 2018-10-25 10:23:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on November 20, 2017.
FR Citation82 FR 51233 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR