82_FR_52039 82 FR 51824 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; KEI (Maine) Power Management (III) LLC

82 FR 51824 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; KEI (Maine) Power Management (III) LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 215 (November 8, 2017)

Page Range51824-51825
FR Document2017-24273

Federal Register, Volume 82 Issue 215 (Wednesday, November 8, 2017)
[Federal Register Volume 82, Number 215 (Wednesday, November 8, 2017)]
[Notices]
[Pages 51824-51825]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24273]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2808-017]


Notice of Application Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions; KEI (Maine) Power Management (III) LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2808-017.
    c. Date filed: January 30, 2017.
    d. Applicant: KEI (Maine) Power Management (III) LLC.
    e. Name of Project: Barker's Mill Hydroelectric Project.
    f. Location: On the Little Androscoggin River, in the City of 
Auburn, Androscoggin County, Maine. The project does not occupy lands 
of the United States.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Lewis Loon, General Manager/Operations and 
Maintenance, KEI (Maine) Power Management (III) LLC, 423 Brunswick 
Avenue, Gardiner, ME 04345; (207) 203-3027; email: 
[email protected].
    i. FERC Contact: Karen Sughrue at (202) 502-8556; or email at 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-2808-017.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, and is ready for 
environmental analysis at this time.
    l. The Barker's Mill Project consists of the following existing 
facilities: (1) A 232-foot-long, 30-foot-high concrete dam with a 125-
foot-long spillway section with flashboards, a 46-foot-long non-
overflow section with two waste gates along the left buttress, and a 
61-foot-long non-overflow section with seven stop-logs adjacent to the 
intake canal; (2) a 16.5-acre reservoir with a storage capacity of 150-
acre-feet; (3) a 60-foot-long, 20-foot-wide, 9 foot, 7 inch-deep intake 
canal on the right bank with seven stop-logs near the intake to the 
power canal, which serves as the downstream fish passage; (4) a 35-
foot-long, 20-foot-wide gatehouse containing a single gate and fitted 
with trash racks; (5) a buried 650-foot-long, 10 foot, 2 inch-wide, 7 
foot, 2 inch-high concrete penstock; (6) a 50-foot-long, 25-foot-wide 
concrete partially buried powerhouse containing a single semi-Kaplan-
type turbine/generating unit with a rated capacity of 1.5 MW; (7) a 
tailrace; (8) a 250-foot-long, 4.2 kilovolt underground power line; (9) 
a substation; and (10) appurtenant facilities. The average annual 
generation is estimated to be 5,087 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or 
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant 
and the project number of the application to which the filing responds; 
(3) furnish the name, address, and telephone number of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the application directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in

[[Page 51825]]

accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
             Major milestone                        Target date
------------------------------------------------------------------------
Draft EA Issued.........................  June 2018.
Comments on Draft EA due................  July 2018.
Final EA Issued.........................  October 2018.
------------------------------------------------------------------------


    Dated: November 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-24273 Filed 11-7-17; 8:45 am]
BILLING CODE 6717-01-P



                                               51824                    Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices

                                                  Docket Numbers: ER18–238–000.                        with the Commission and is available                     k. This application has been accepted,
                                                  Applicants: GSP Schiller LLC.                        for public inspection.                                and is ready for environmental analysis
                                                  Description: Baseline eTariff Filing:                   a. Type of Application: Subsequent                 at this time.
                                               Schiller MBR Filing to be effective                     Minor License.                                           l. The Barker’s Mill Project consists of
                                               12/28/2017.                                                b. Project No.: 2808–017.                          the following existing facilities: (1) A
                                                  Filed Date: 11/2/17.                                    c. Date filed: January 30, 2017.                   232-foot-long, 30-foot-high concrete
                                                  Accession Number: 20171102–5241.                                                                           dam with a 125-foot-long spillway
                                                                                                          d. Applicant: KEI (Maine) Power
                                                  Comments Due: 5 p.m. ET 11/24/17.                                                                          section with flashboards, a 46-foot-long
                                                                                                       Management (III) LLC.
                                                  Docket Numbers: ER18–239–000.                                                                              non-overflow section with two waste
                                                                                                          e. Name of Project: Barker’s Mill
                                                  Applicants: GSP Lost Nation LLC.                                                                           gates along the left buttress, and a 61-
                                                                                                       Hydroelectric Project.
                                                  Description: Baseline eTariff Filing:                                                                      foot-long non-overflow section with
                                               Lost Nation MBR Filing to be effective                     f. Location: On the Little
                                                                                                                                                             seven stop-logs adjacent to the intake
                                               12/28/2017.                                             Androscoggin River, in the City of
                                                                                                                                                             canal; (2) a 16.5-acre reservoir with a
                                                  Filed Date: 11/2/17.                                 Auburn, Androscoggin County, Maine.
                                                                                                                                                             storage capacity of 150-acre-feet; (3) a
                                                  Accession Number: 20171102–5243.                     The project does not occupy lands of the
                                                                                                                                                             60-foot-long, 20-foot-wide, 9 foot, 7
                                                  Comments Due: 5 p.m. ET 11/24/17.                    United States.
                                                                                                                                                             inch-deep intake canal on the right bank
                                                  Docket Numbers: ER18–240–000.                           g. Filed Pursuant to: Federal Power                with seven stop-logs near the intake to
                                                  Applicants: Metcalf Energy Center,                   Act 16 U.S.C. 791(a)–825(r).                          the power canal, which serves as the
                                               LLC.                                                       h. Applicant Contact: Lewis Loon,                  downstream fish passage; (4) a 35-foot-
                                                  Description: Baseline eTariff Filing:                General Manager/Operations and                        long, 20-foot-wide gatehouse containing
                                               Metcalf RMR Agreement Filing to be                      Maintenance, KEI (Maine) Power                        a single gate and fitted with trash racks;
                                               effective 1/1/2018.                                     Management (III) LLC, 423 Brunswick                   (5) a buried 650-foot-long, 10 foot, 2
                                                  Filed Date: 11/2/17.                                 Avenue, Gardiner, ME 04345; (207)                     inch-wide, 7 foot, 2 inch-high concrete
                                                  Accession Number: 20171102–5246.                     203–3027; email: Lewis.Loon@                          penstock; (6) a 50-foot-long, 25-foot-
                                                  Comments Due: 5 p.m. ET 11/24/17.                    kruger.com.                                           wide concrete partially buried
                                                  The filings are accessible in the                       i. FERC Contact: Karen Sughrue at                  powerhouse containing a single semi-
                                               Commission’s eLibrary system by                         (202) 502–8556; or email at                           Kaplan-type turbine/generating unit
                                               clicking on the links or querying the                   Karen.Sughrue@ferc.gov.                               with a rated capacity of 1.5 MW; (7) a
                                               docket number.                                             j. Deadline for filing comments,                   tailrace; (8) a 250-foot-long, 4.2 kilovolt
                                                  Any person desiring to intervene or                  recommendations, terms and                            underground power line; (9) a
                                               protest in any of the above proceedings                 conditions, and prescriptions: 60 days                substation; and (10) appurtenant
                                               must file in accordance with Rules 211                  from the issuance date of this notice;                facilities. The average annual generation
                                               and 214 of the Commission’s                             reply comments are due 105 days from                  is estimated to be 5,087 megawatt-hours.
                                               Regulations (18 CFR 385.211 and                         the issuance date of this notice.                        m. A copy of the application is
                                               385.214) on or before 5:00 p.m. Eastern                    The Commission strongly encourages                 available for review at the Commission
                                               time on the specified comment date.                     electronic filing. Please file comments,              in the Public Reference Room or may be
                                               Protests may be considered, but                         recommendations, terms and                            viewed on the Commission’s Web site at
                                               intervention is necessary to become a                   conditions, and prescriptions using the               http://www.ferc.gov using the eLibrary
                                               party to the proceeding.                                Commission’s eFiling system at http://                link. Enter the docket number excluding
                                                  eFiling is encouraged. More detailed                 www.ferc.gov/docs-filing/efiling.asp.                 the last three digits in the docket
                                               information relating to filing                          Commenters can submit brief comments                  number field to access the document.
                                               requirements, interventions, protests,                  up to 6,000 characters, without prior                 For assistance, contact FERC Online
                                               service, and qualifying facilities filings              registration, using the eComment system               Support. A copy is also available for
                                               can be found at: http://www.ferc.gov/                   at http://www.ferc.gov/docs-filing/                   inspection and reproduction at the
                                               docs-filing/efiling/filing-req.pdf. For                 ecomment.asp. You must include your                   address in item h above.
                                               other information, call (866) 208–3676                  name and contact information at the end                  All filings must (1) bear in all capital
                                               (toll free). For TTY, call (202) 502–8659.              of your comments. For assistance,                     letters the title COMMENTS, REPLY
                                                 Dated: November 2, 2017.                              please contact FERC Online Support at                 COMMENTS, RECOMMENDATIONS,
                                               Kimberly D. Bose,                                       FERCOnlineSupport@ferc.gov, (866)                     TERMS AND CONDITIONS, or
                                                                                                       208–3676 (toll free), or (202) 502–8659               PRESCRIPTIONS; (2) set forth in the
                                               Secretary.
                                                                                                       (TTY). In lieu of electronic filing, please           heading the name of the applicant and
                                               [FR Doc. 2017–24269 Filed 11–7–17; 8:45 am]
                                                                                                       send a paper copy to: Secretary, Federal              the project number of the application to
                                               BILLING CODE 6717–01–P
                                                                                                       Energy Regulatory Commission, 888                     which the filing responds; (3) furnish
                                                                                                       First Street NE., Washington, DC 20426.               the name, address, and telephone
                                                                                                       The first page of any filing should                   number of the person submitting the
                                               DEPARTMENT OF ENERGY
                                                                                                       include docket number P–2808–017.                     filing; and (4) otherwise comply with
                                               Federal Energy Regulatory                                  The Commission’s Rules of Practice                 the requirements of 18 CFR 385.2001
                                               Commission                                              require all intervenors filing documents              through 385.2005. All comments,
                                                                                                       with the Commission to serve a copy of                recommendations, terms and conditions
                                               [Project No. 2808–017]                                  that document on each person on the                   or prescriptions must set forth their
                                                                                                       official service list for the project.                evidentiary basis and otherwise comply
ethrower on DSK3G9T082PROD with NOTICES




                                               Notice of Application Ready for
                                               Environmental Analysis and Soliciting                   Further, if an intervenor files comments              with the requirements of 18 CFR 4.34(b).
                                               Comments, Recommendations, Terms                        or documents with the Commission                      Agencies may obtain copies of the
                                               and Conditions, and Prescriptions; KEI                  relating to the merits of an issue that               application directly from the applicant.
                                               (Maine) Power Management (III) LLC                      may affect the responsibilities of a                  Each filing must be accompanied by
                                                                                                       particular resource agency, they must                 proof of service on all persons listed on
                                                 Take notice that the following                        also serve a copy of the document on                  the service list prepared by the
                                               hydroelectric application has been filed                that resource agency.                                 Commission in this proceeding, in


                                          VerDate Sep<11>2014   17:26 Nov 07, 2017   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\08NON1.SGM   08NON1


                                                                           Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices                                                     51825

                                               accordance with 18 CFR 4.34(b) and                        and 20 of the Interstate Commerce Act                   DEPARTMENT OF ENERGY
                                               385.2010.                                                 and parts 341 and 357 of the
                                                  You may also register online at http://                Commission’s regulations with respect                   Federal Energy Regulatory
                                               www.ferc.gov/docs-filing/                                 to four pipeline assets, as more fully                  Commission
                                               esubscription.asp to be notified via                      explained in the petition.
                                               email of new filings and issuances                           Any person desiring to intervene or to               [Docket No. CD18–2–000]
                                               related to this or other pending projects.                protest this filing must file in
                                               For assistance, contact FERC Online                       accordance with Rules 211 and 214 of                    White River Electric Association, Inc.;
                                               Support.                                                  the Commission’s Rules of Practice and                  Notice of Preliminary Determination of
                                                  n. A license applicant must file no                    Procedure (18 CFR 385.211 and 385.214.                  a Qualifying Conduit Hydropower
                                               later than 60 days following the date of                  Protests will be considered by the                      Facility and Soliciting Comments and
                                               issuance of this notice: (1) A copy of the                Commission in determining the                           Motions To Intervene
                                               water quality certification; (2) a copy of                appropriate action to be taken, but will
                                               the request for certification, including                  not serve to make protestants parties to                   On October 31, 2017, White River
                                               proof of the date on which the certifying                 the proceeding. Any person wishing to                   Electric Association, Inc., filed a notice
                                               agency received the request; or (3)                       become a party must file a notice of                    of intent to construct a qualifying
                                               evidence of waiver of water quality                       intervention or motion to intervene, as                 conduit hydropower facility, pursuant
                                               certification.                                            appropriate. Such notices, motions, or
                                                  o. Procedural schedule: The                                                                                    to section 30 of the Federal Power Act
                                                                                                         protests must be filed on or before the                 (FPA), as amended by section 4 of the
                                               application will be processed according                   comment date. Anyone filing a motion
                                               to the following schedule. Revisions to                                                                           Hydropower Regulatory Efficiency Act
                                                                                                         to intervene or protest must serve a copy               of 2013 (HREA). The proposed Town of
                                               the schedule will be made as                              of that document on the Petitioner.
                                               appropriate.                                                                                                      Meeker Hydro Project would have an
                                                                                                            The Commission encourages                            installed capacity of up to 180 kilowatts
                                                       Major milestone                  Target date      electronic submission of protests and                   (kW), and would be located along the
                                                                                                         interventions in lieu of paper using the                existing Meeker Power Canal near the
                                               Draft EA Issued ....................   June 2018.         eFiling link at http://www.ferc.gov.                    Town of Meeker, Rio Blanco County,
                                               Comments on Draft EA due               July 2018.         Persons unable to file electronically                   Colorado.
                                               Final EA Issued ....................   October 2018.      should submit an original and 5 copies
                                                                                                         of the protest or intervention to the                      Applicant Contact: Trina Zagar-
                                                                                                         Federal Energy Regulatory Commission,                   Brown, General Counsel, 233 6th Street,
                                                 Dated: November 2, 2017.
                                                                                                         888 First Street NE., Washington, DC                    P.O. Box 958, Meeker, CO 81641, Phone
                                               Kimberly D. Bose,
                                                                                                         20426.                                                  No. (970) 878–5041.
                                               Secretary.
                                               [FR Doc. 2017–24273 Filed 11–7–17; 8:45 am]                  This filing is accessible on-line at                    FERC Contact: Christopher Chaney,
                                                                                                         http://www.ferc.gov, using the eLibrary                 Phone No. (202) 502–6778, email:
                                               BILLING CODE 6717–01–P
                                                                                                         link and is available for review in the                 Christopher.Chaney@ferc.gov.
                                                                                                         Commission’s Public Reference Room in                      Qualifying Conduit Hydropower
                                               DEPARTMENT OF ENERGY                                      Washington, DC. There is an                             Facility Description: The proposed
                                                                                                         eSubscription link on the Web site that                 project would consist of: (1) Up to two
                                               Federal Energy Regulatory                                 enables subscribers to receive email                    low head turbines with a total
                                               Commission                                                notification when a document is added                   generating capacity not to exceed 180
                                               [Docket No. OR18–5–000]
                                                                                                         to a subscribed docket(s). For assistance               kW; (2) two approximately 20-foot-long,
                                                                                                         with any FERC Online service, please                    44-inch-diameter penstocks exiting an
                                               Notice of Request for Temporary                           email FERCOnlineSupport@ferc.gov, or                    existing 25-foot by 50-foot forebay
                                               Waiver; Marathon Pipe Line LLC                            call (866) 208–3676 (toll free). For TTY,               structure; (3) a small controls structure;
                                                                                                         call (202) 502–8659.                                    and (4) appurtenant facilities. The
                                                 Take notice that on November 1,                            Comment Date: 5:00 p.m. Eastern time
                                               2017, pursuant to Rule 204 of the                                                                                 proposed project would have an
                                                                                                         on November 17, 2017.                                   estimated annual generating capacity of
                                               Federal Energy Regulatory
                                               Commission’s (Commission) Rules of                          Dated: November 2, 2017.                              up to 500,000 kilowatt-hours.
                                               Practice and Procedure, 18 CFR 385.204,                   Kimberly D. Bose,                                          A qualifying conduit hydropower
                                               Marathon Pipe Line LLC filed a petition                   Secretary.                                              facility is one that is determined or
                                               for temporary waiver of the tariff filing                 [FR Doc. 2017–24272 Filed 11–7–17; 8:45 am]             deemed to meet all of the criteria shown
                                               and reporting requirements of sections 6                  BILLING CODE 6717–01–P                                  in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                           Satisfies
                                                          Statutory provision                                                                Description                                                    (Y/N)

                                               FPA 30(a)(3)(A), as amended by                  The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar                      Y
                                                 HREA.                                           manmade water conveyance that is operated for the distribution of water for agricultural,
                                                                                                 municipal, or industrial consumption and not primarily for the generation of electricity.
ethrower on DSK3G9T082PROD with NOTICES




                                               FPA 30(a)(3)(C)(i), as amended by               The facility is constructed, operated, or maintained for the generation of electric power and                       Y
                                                 HREA.                                           uses for such generation only the hydroelectric potential of a non-federally owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by              The facility has an installed capacity that does not exceed 5 megawatts .................................           Y
                                                 HREA.
                                               FPA 30(a)(3)(C)(iii), as amended by             On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                       Y
                                                 HREA.                                          quirements of Part I of the FPA.




                                          VerDate Sep<11>2014    17:26 Nov 07, 2017    Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\08NON1.SGM    08NON1



Document Created: 2017-11-08 01:20:21
Document Modified: 2017-11-08 01:20:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 51824 

2025 Federal Register | Disclaimer | Privacy Policy