82_FR_52040 82 FR 51825 - White River Electric Association, Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

82 FR 51825 - White River Electric Association, Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 215 (November 8, 2017)

Page Range51825-51826
FR Document2017-24276

Federal Register, Volume 82 Issue 215 (Wednesday, November 8, 2017)
[Federal Register Volume 82, Number 215 (Wednesday, November 8, 2017)]
[Notices]
[Pages 51825-51826]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24276]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD18-2-000]


White River Electric Association, Inc.; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On October 31, 2017, White River Electric Association, Inc., filed 
a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act (FPA), as 
amended by section 4 of the Hydropower Regulatory Efficiency Act of 
2013 (HREA). The proposed Town of Meeker Hydro Project would have an 
installed capacity of up to 180 kilowatts (kW), and would be located 
along the existing Meeker Power Canal near the Town of Meeker, Rio 
Blanco County, Colorado.
    Applicant Contact: Trina Zagar-Brown, General Counsel, 233 6th 
Street, P.O. Box 958, Meeker, CO 81641, Phone No. (970) 878-5041.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) Up to two low head turbines with a total 
generating capacity not to exceed 180 kW; (2) two approximately 20-
foot-long, 44-inch-diameter penstocks exiting an existing 25-foot by 
50-foot forebay structure; (3) a small controls structure; and (4) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of up to 500,000 kilowatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                               Satisfies
      Statutory provision                 Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the facility              Y
 HREA.                            uses is a tunnel, canal,
                                  pipeline, aqueduct, flume,
                                  ditch, or similar manmade
                                  water conveyance that is
                                  operated for the
                                  distribution of water for
                                  agricultural, municipal, or
                                  industrial consumption and
                                  not primarily for the
                                  generation of electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is constructed,          Y
 by HREA.                         operated, or maintained for
                                  the generation of electric
                                  power and uses for such
                                  generation only the
                                  hydroelectric potential of
                                  a non-federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                   Y
 by HREA.                         installed capacity that
                                  does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9, 2013,          Y
 amended by HREA.                 the facility is not
                                  licensed, or exempted from
                                  the licensing requirements
                                  of Part I of the FPA.
------------------------------------------------------------------------


[[Page 51826]]

    Preliminary Determination: The proposed addition of the 
hydroelectric project along the existing irrigation canal will not 
alter its primary purpose.\1\ Therefore, based upon the above 
information and criteria, Commission staff preliminarily determines 
that the proposal satisfies the requirements for a qualifying conduit 
hydropower facility, which is not required to be licensed or exempted 
from licensing.
---------------------------------------------------------------------------

    \1\ White River Electric Association, Inc. states in its Notice 
of Intent that the Meeker Power Canal was constructed in 1912 to 
supply water to a hydroelectric facility, which was decommissioned 
in the 1960's. Since then, the Meeker Power Canal has been 
continuously operated to provide water for irrigation and 
agricultural use, which is now its primary purpose.
---------------------------------------------------------------------------

    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A 
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) 
state in the heading the name of the applicant and the project number 
of the application to which the filing responds; (3) state the name, 
address, and telephone number of the person filing; and (4) otherwise 
comply with the requirements of sections 385.2001 through 385.2005 of 
the Commission's regulations.\2\ All comments contesting Commission 
staff's preliminary determination that the facility meets the 
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD18-2) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: November 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-24276 Filed 11-7-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices                                                     51825

                                               accordance with 18 CFR 4.34(b) and                        and 20 of the Interstate Commerce Act                   DEPARTMENT OF ENERGY
                                               385.2010.                                                 and parts 341 and 357 of the
                                                  You may also register online at http://                Commission’s regulations with respect                   Federal Energy Regulatory
                                               www.ferc.gov/docs-filing/                                 to four pipeline assets, as more fully                  Commission
                                               esubscription.asp to be notified via                      explained in the petition.
                                               email of new filings and issuances                           Any person desiring to intervene or to               [Docket No. CD18–2–000]
                                               related to this or other pending projects.                protest this filing must file in
                                               For assistance, contact FERC Online                       accordance with Rules 211 and 214 of                    White River Electric Association, Inc.;
                                               Support.                                                  the Commission’s Rules of Practice and                  Notice of Preliminary Determination of
                                                  n. A license applicant must file no                    Procedure (18 CFR 385.211 and 385.214.                  a Qualifying Conduit Hydropower
                                               later than 60 days following the date of                  Protests will be considered by the                      Facility and Soliciting Comments and
                                               issuance of this notice: (1) A copy of the                Commission in determining the                           Motions To Intervene
                                               water quality certification; (2) a copy of                appropriate action to be taken, but will
                                               the request for certification, including                  not serve to make protestants parties to                   On October 31, 2017, White River
                                               proof of the date on which the certifying                 the proceeding. Any person wishing to                   Electric Association, Inc., filed a notice
                                               agency received the request; or (3)                       become a party must file a notice of                    of intent to construct a qualifying
                                               evidence of waiver of water quality                       intervention or motion to intervene, as                 conduit hydropower facility, pursuant
                                               certification.                                            appropriate. Such notices, motions, or
                                                  o. Procedural schedule: The                                                                                    to section 30 of the Federal Power Act
                                                                                                         protests must be filed on or before the                 (FPA), as amended by section 4 of the
                                               application will be processed according                   comment date. Anyone filing a motion
                                               to the following schedule. Revisions to                                                                           Hydropower Regulatory Efficiency Act
                                                                                                         to intervene or protest must serve a copy               of 2013 (HREA). The proposed Town of
                                               the schedule will be made as                              of that document on the Petitioner.
                                               appropriate.                                                                                                      Meeker Hydro Project would have an
                                                                                                            The Commission encourages                            installed capacity of up to 180 kilowatts
                                                       Major milestone                  Target date      electronic submission of protests and                   (kW), and would be located along the
                                                                                                         interventions in lieu of paper using the                existing Meeker Power Canal near the
                                               Draft EA Issued ....................   June 2018.         eFiling link at http://www.ferc.gov.                    Town of Meeker, Rio Blanco County,
                                               Comments on Draft EA due               July 2018.         Persons unable to file electronically                   Colorado.
                                               Final EA Issued ....................   October 2018.      should submit an original and 5 copies
                                                                                                         of the protest or intervention to the                      Applicant Contact: Trina Zagar-
                                                                                                         Federal Energy Regulatory Commission,                   Brown, General Counsel, 233 6th Street,
                                                 Dated: November 2, 2017.
                                                                                                         888 First Street NE., Washington, DC                    P.O. Box 958, Meeker, CO 81641, Phone
                                               Kimberly D. Bose,
                                                                                                         20426.                                                  No. (970) 878–5041.
                                               Secretary.
                                               [FR Doc. 2017–24273 Filed 11–7–17; 8:45 am]                  This filing is accessible on-line at                    FERC Contact: Christopher Chaney,
                                                                                                         http://www.ferc.gov, using the eLibrary                 Phone No. (202) 502–6778, email:
                                               BILLING CODE 6717–01–P
                                                                                                         link and is available for review in the                 Christopher.Chaney@ferc.gov.
                                                                                                         Commission’s Public Reference Room in                      Qualifying Conduit Hydropower
                                               DEPARTMENT OF ENERGY                                      Washington, DC. There is an                             Facility Description: The proposed
                                                                                                         eSubscription link on the Web site that                 project would consist of: (1) Up to two
                                               Federal Energy Regulatory                                 enables subscribers to receive email                    low head turbines with a total
                                               Commission                                                notification when a document is added                   generating capacity not to exceed 180
                                               [Docket No. OR18–5–000]
                                                                                                         to a subscribed docket(s). For assistance               kW; (2) two approximately 20-foot-long,
                                                                                                         with any FERC Online service, please                    44-inch-diameter penstocks exiting an
                                               Notice of Request for Temporary                           email FERCOnlineSupport@ferc.gov, or                    existing 25-foot by 50-foot forebay
                                               Waiver; Marathon Pipe Line LLC                            call (866) 208–3676 (toll free). For TTY,               structure; (3) a small controls structure;
                                                                                                         call (202) 502–8659.                                    and (4) appurtenant facilities. The
                                                 Take notice that on November 1,                            Comment Date: 5:00 p.m. Eastern time
                                               2017, pursuant to Rule 204 of the                                                                                 proposed project would have an
                                                                                                         on November 17, 2017.                                   estimated annual generating capacity of
                                               Federal Energy Regulatory
                                               Commission’s (Commission) Rules of                          Dated: November 2, 2017.                              up to 500,000 kilowatt-hours.
                                               Practice and Procedure, 18 CFR 385.204,                   Kimberly D. Bose,                                          A qualifying conduit hydropower
                                               Marathon Pipe Line LLC filed a petition                   Secretary.                                              facility is one that is determined or
                                               for temporary waiver of the tariff filing                 [FR Doc. 2017–24272 Filed 11–7–17; 8:45 am]             deemed to meet all of the criteria shown
                                               and reporting requirements of sections 6                  BILLING CODE 6717–01–P                                  in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                           Satisfies
                                                          Statutory provision                                                                Description                                                    (Y/N)

                                               FPA 30(a)(3)(A), as amended by                  The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar                      Y
                                                 HREA.                                           manmade water conveyance that is operated for the distribution of water for agricultural,
                                                                                                 municipal, or industrial consumption and not primarily for the generation of electricity.
ethrower on DSK3G9T082PROD with NOTICES




                                               FPA 30(a)(3)(C)(i), as amended by               The facility is constructed, operated, or maintained for the generation of electric power and                       Y
                                                 HREA.                                           uses for such generation only the hydroelectric potential of a non-federally owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by              The facility has an installed capacity that does not exceed 5 megawatts .................................           Y
                                                 HREA.
                                               FPA 30(a)(3)(C)(iii), as amended by             On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                       Y
                                                 HREA.                                          quirements of Part I of the FPA.




                                          VerDate Sep<11>2014    17:26 Nov 07, 2017    Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\08NON1.SGM    08NON1


                                               51826                     Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices

                                                  Preliminary Determination: The                       FERCOnlineSupport@ferc.gov, (866)                     to the applicant’s request for blanket
                                               proposed addition of the hydroelectric                  208–3676 (toll free), or (202) 502–8659               authorization, under 18 CFR part 34, of
                                               project along the existing irrigation                   (TTY). In lieu of electronic filing, please           future issuances of securities and
                                               canal will not alter its primary                        send a paper copy to: Secretary, Federal              assumptions of liability, is November
                                               purpose.1 Therefore, based upon the                     Energy Regulatory Commission, 888                     22, 2017.
                                               above information and criteria,                         First Street NE., Washington, DC 20426.                  The Commission encourages
                                               Commission staff preliminarily                          A copy of all other filings in reference              electronic submission of protests and
                                               determines that the proposal satisfies                  to this application must be accompanied               interventions in lieu of paper, using the
                                               the requirements for a qualifying                       by proof of service on all persons listed             FERC Online links at http://
                                               conduit hydropower facility, which is                   in the service list prepared by the                   www.ferc.gov. To facilitate electronic
                                               not required to be licensed or exempted                 Commission in this proceeding, in                     service, persons with Internet access
                                               from licensing.                                         accordance with 18 CFR 4.34(b) and                    who will eFile a document and/or be
                                                  Comments and Motions To Intervene:                   385.2010.                                             listed as a contact for an intervenor
                                               Deadline for filing comments contesting                   Locations of Notice of Intent: Copies               must create and validate an
                                               whether the facility meets the qualifying               of the notice of intent can be obtained               eRegistration account using the
                                               criteria is 45 days from the issuance                   directly from the applicant or such                   eRegistration link. Select the eFiling
                                               date of this notice.                                    copies can be viewed and reproduced at                link to log on and submit the
                                                  Deadline for filing motions to                       the Commission in its Public Reference                intervention or protests.
                                               intervene is 30 days from the issuance                  Room, Room 2A, 888 First Street NE.,                     Persons unable to file electronically
                                               date of this notice.                                    Washington, DC 20426. The filing may                  should submit an original and 5 copies
                                                  Anyone may submit comments or a                      also be viewed on the web at http://                  of the intervention or protest to the
                                               motion to intervene in accordance with                  www.ferc.gov/docs-filing/elibrary.asp                 Federal Energy Regulatory Commission,
                                               the requirements of Rules of Practice                   using the ‘‘eLibrary’’ link. Enter the                888 First Street NE., Washington, DC
                                               and Procedure, 18 CFR 385.210 and                       docket number (i.e., CD18–2) in the                   20426.
                                               385.214. Any motions to intervene must                  docket number field to access the                        The filings in the above-referenced
                                               be received on or before the specified                  document. For assistance, call toll-free              proceeding are accessible in the
                                               deadline date for the particular                        1–866–208–3676 or email                               Commission’s eLibrary system by
                                               proceeding.                                             FERCOnlineSupport@ferc.gov. For TTY,                  clicking on the appropriate link in the
                                                  Filing and Service of Responsive                     call (202) 502–8659.                                  above list. They are also available for
                                               Documents: All filings must (1) bear in                                                                       electronic review in the Commission’s
                                                                                                         Dated: November 2, 2017.
                                               all capital letters the COMMENTS                                                                              Public Reference Room in Washington,
                                               CONTESTING QUALIFICATION FOR A                          Kimberly D. Bose,
                                                                                                                                                             DC. There is an eSubscription link on
                                               CONDUIT HYDROPOWER FACILITY or                          Secretary.
                                                                                                                                                             the Web site that enables subscribers to
                                               MOTION TO INTERVENE, as                                 [FR Doc. 2017–24276 Filed 11–7–17; 8:45 am]
                                                                                                                                                             receive email notification when a
                                               applicable; (2) state in the heading the                BILLING CODE 6717–01–P                                document is added to a subscribed
                                               name of the applicant and the project                                                                         docket(s). For assistance with any FERC
                                               number of the application to which the                                                                        Online service, please email
                                               filing responds; (3) state the name,                    DEPARTMENT OF ENERGY
                                                                                                                                                             FERCOnlineSupport@ferc.gov. or call
                                               address, and telephone number of the                                                                          (866) 208–3676 (toll free). For TTY, call
                                                                                                       Federal Energy Regulatory
                                               person filing; and (4) otherwise comply                                                                       (202) 502–8659.
                                                                                                       Commission
                                               with the requirements of sections
                                                                                                                                                               Dated: November 2, 2017.
                                               385.2001 through 385.2005 of the                        [Docket No. ER18–206–000]
                                               Commission’s regulations.2 All                                                                                Kimberly D. Bose,
                                               comments contesting Commission staff’s                  Southern Partners, INC; Supplemental                  Secretary.
                                               preliminary determination that the                      Notice That Initial Market-Based Rate                 [FR Doc. 2017–24270 Filed 11–7–17; 8:45 am]
                                               facility meets the qualifying criteria                  Filing Includes Request for Blanket                   BILLING CODE 6717–01–P
                                               must set forth their evidentiary basis.                 Section 204 Authorization
                                                  The Commission strongly encourages                     This is a supplemental notice in the
                                               electronic filing. Please file motions to                                                                     DEPARTMENT OF ENERGY
                                                                                                       above-referenced proceeding of
                                               intervene and comments using the                        Southern Partners, INC’s application for
                                               Commission’s eFiling system at http://                                                                        Federal Energy Regulatory
                                                                                                       market-based rate authority, with an                  Commission
                                               www.ferc.gov/docs-filing/efiling.asp.                   accompanying rate tariff, noting that
                                               Commenters can submit brief comments                    such application includes a request for               [Docket No. OR18–4–000]
                                               up to 6,000 characters, without prior                   blanket authorization, under 18 CFR
                                               registration, using the eComment system                                                                       Marathon Pipe Line LLC; Notice of
                                                                                                       part 34, of future issuances of securities            Petition for Declaratory Order
                                               at http://www.ferc.gov/docs-filing/                     and assumptions of liability.
                                               ecomment.asp. You must include your                       Any person desiring to intervene or to                Take notice that on November 1,
                                               name and contact information at the end                 protest should file with the Federal                  2017, pursuant to Rule 207(a)(2) of the
                                               of your comments. For assistance,                       Energy Regulatory Commission, 888                     Federal Energy Regulatory
                                               please contact FERC Online Support at                   First Street NE., Washington, DC 20426,               Commission’s (Commission) Rules of
                                                                                                       in accordance with Rules 211 and 214                  Practice and Procedure, 18 CFR
ethrower on DSK3G9T082PROD with NOTICES




                                                  1 White River Electric Association, Inc. states in

                                               its Notice of Intent that the Meeker Power Canal        of the Commission’s Rules of Practice                 385.207(a)(2) (2016), Marathon Pipe
                                               was constructed in 1912 to supply water to a            and Procedure (18 CFR 385.211 and                     Line LLC (MPL), filed a petition for a
                                               hydroelectric facility, which was decommissioned        385.214). Anyone filing a motion to                   declaratory order seeking approval of
                                               in the 1960’s. Since then, the Meeker Power Canal       intervene or protest must serve a copy                the overall rate structure and terms of
                                               has been continuously operated to provide water for
                                               irrigation and agricultural use, which is now its       of that document on the Applicant.                    service for a redesign and expansion
                                               primary purpose.                                          Notice is hereby given that the                     project for two interstate crude oil
                                                  2 18 CFR 385.2001–2005 (2017).                       deadline for filing protests with regard              pipelines that MPL operates, namely the


                                          VerDate Sep<11>2014   17:26 Nov 07, 2017   Jkt 244001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\08NON1.SGM   08NON1



Document Created: 2017-11-08 01:21:06
Document Modified: 2017-11-08 01:21:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 51825 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR