DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 215 (November 8, 2017)

Page Range51828-51828
FR Document2017-24274

Federal Register, Volume 82 Issue 215 (Wednesday, November 8, 2017)
[Federal Register Volume 82, Number 215 (Wednesday, November 8, 2017)]
[Notices]
[Page 51828]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24274]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-441-001]


Northwest Pipeline LLC; Notice of Amendment to Application for 
Certificate of Public Convenience and Necessity

    Take notice that on October 23, 2017, Northwest Pipeline, LLC 
(Northwest), 295 Chipeta Way, Salt Lake City, Utah-84108, has filed an 
amendment to its application filed on May 11, 2017, pursuant to 
sections 7(b) and 7(c) of the Natural Gas Act (NGA) and the Federal 
Energy Regulatory Commission's (Commission) regulations, requesting 
abandonment approvals, and a certificate of public convenience seeking 
authorization to construct and operate its North Seattle Lateral 
Upgrade Project (Project) located in Snohomish County, Washington, all 
as more fully described in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter 
the docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Specifically, the Project consists of: (1) Abandoning by removal 
the existing 8-inch-diameter pipeline between mileposts (MP) 1.9 and 
7.8 on Northwest's North Seattle Delivery Lateral line and installing 
new 20-inch-diameter pipeline from MP 1.9 to 7.8; (2) re-alignment of 
existing 16-inch-diameter pipeline to be installed parallel to the 
proposed 20-inch-diameter pipeline (3) rebuild the existing North 
Seattle/Everett meter station; and (4) installing miscellaneous 
appurtenances; all located in Snohomish County, Washington.
    Any questions regarding this application should be directed to Xan 
Kotter, Northwest Pipeline LLC, PO Box 58900, Salt Lake City, UT 84158-
0900, or call (801) 584-6496, or by email: [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: November 24, 2017.

    Dated: November 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-24274 Filed 11-7-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               51828                    Federal Register / Vol. 82, No. 215 / Wednesday, November 8, 2017 / Notices

                                                  Filed Date: 11/1/17.                                 toll-free, (866) 208–3676 or TTY, (202)               proceeding with the Commission and
                                                  Accession Number: 20171101–5299.                     502–8659.                                             must mail a copy to the applicant and
                                                  Comments Due: 5 p.m. ET 11/22/17.                       Specifically, the Project consists of:             to every other party. Only parties to the
                                                  The filings are accessible in the                    (1) Abandoning by removal the existing                proceeding can ask for court review of
                                               Commission’s eLibrary system by                         8-inch-diameter pipeline between                      Commission orders in the proceeding.
                                               clicking on the links or querying the                   mileposts (MP) 1.9 and 7.8 on
                                                                                                       Northwest’s North Seattle Delivery                       However, a person does not have to
                                               docket number.                                                                                                intervene in order to have comments
                                                  Any person desiring to intervene or                  Lateral line and installing new 20-inch-
                                                                                                       diameter pipeline from MP 1.9 to 7.8;                 considered. The second way to
                                               protest in any of the above proceedings
                                                                                                       (2) re-alignment of existing 16-inch-                 participate is by filing with the
                                               must file in accordance with Rules 211
                                               and 214 of the Commission’s                             diameter pipeline to be installed                     Secretary of the Commission, as soon as
                                               Regulations (18 CFR 385.211 and                         parallel to the proposed 20-inch-                     possible, an original and two copies of
                                               385.214) on or before 5:00 p.m. Eastern                 diameter pipeline (3) rebuild the                     comments in support of or in opposition
                                               time on the specified comment date.                     existing North Seattle/Everett meter                  to this project. The Commission will
                                               Protests may be considered, but                         station; and (4) installing miscellaneous             consider these comments in
                                               intervention is necessary to become a                   appurtenances; all located in                         determining the appropriate action to be
                                               party to the proceeding.                                Snohomish County, Washington.                         taken, but the filing of a comment alone
                                                  eFiling is encouraged. More detailed                    Any questions regarding this                       will not serve to make the filer a party
                                               information relating to filing                          application should be directed to Xan                 to the proceeding. The Commission’s
                                               requirements, interventions, protests,                  Kotter, Northwest Pipeline LLC, PO Box                rules require that persons filing
                                               service, and qualifying facilities filings              58900, Salt Lake City, UT 84158–0900,                 comments in opposition to the project
                                               can be found at: http://www.ferc.gov/                   or call (801) 584–6496, or by email:                  provide copies of their protests only to
                                               docs-filing/efiling/filing-req.pdf. For                 xan.g.kotter@williams.com.
                                                                                                          Pursuant to section 157.9 of the                   the party or parties directly involved in
                                               other information, call (866) 208–3676                                                                        the protest.
                                                                                                       Commission’s rules, 18 CFR 157.9,
                                               (toll free). For TTY, call (202) 502–8659.                                                                       Persons who wish to comment only
                                                                                                       within 90 days of this Notice the
                                                 Dated: November 2, 2017.                              Commission staff will either: Complete                on the environmental review of this
                                               Kimberly D. Bose,                                       its environmental assessment (EA) and                 project should submit an original and
                                               Secretary.                                              place it into the Commission’s public                 two copies of their comments to the
                                               [FR Doc. 2017–24277 Filed 11–7–17; 8:45 am]             record (eLibrary) for this proceeding; or             Secretary of the Commission.
                                               BILLING CODE 6717–01–P                                  issue a Notice of Schedule for                        Environmental commentors will be
                                                                                                       Environmental Review. If a Notice of                  placed on the Commission’s
                                                                                                       Schedule for Environmental Review is                  environmental mailing list, will receive
                                               DEPARTMENT OF ENERGY                                    issued, it will indicate, among other                 copies of the environmental documents,
                                                                                                       milestones, the anticipated date for the              and will be notified of meetings
                                               Federal Energy Regulatory                               Commission staff’s issuance of the final
                                                                                                                                                             associated with the Commission’s
                                               Commission                                              environmental impact statement (FEIS)
                                                                                                                                                             environmental review process.
                                               [Docket No. CP17–441–001]
                                                                                                       or EA for this proposal. The filing of the
                                                                                                       EA in the Commission’s public record                  Environmental commentors will not be
                                                                                                       for this proceeding or the issuance of a              required to serve copies of filed
                                               Northwest Pipeline LLC; Notice of                                                                             documents on all other parties.
                                               Amendment to Application for                            Notice of Schedule for Environmental
                                                                                                       Review will serve to notify federal and               However, the non-party commentors
                                               Certificate of Public Convenience and
                                                                                                       state agencies of the timing for the                  will not receive copies of all documents
                                               Necessity
                                                                                                       completion of all necessary reviews, and              filed by other parties or issued by the
                                                  Take notice that on October 23, 2017,                the subsequent need to complete all                   Commission (except for the mailing of
                                               Northwest Pipeline, LLC (Northwest),                    federal authorizations within 90 days of              environmental documents issued by the
                                               295 Chipeta Way, Salt Lake City, Utah-                  the date of issuance of the Commission                Commission) and will not have the right
                                               84108, has filed an amendment to its                    staff’s FEIS or EA.                                   to seek court review of the
                                               application filed on May 11, 2017,                         There are two ways to become                       Commission’s final order.
                                               pursuant to sections 7(b) and 7(c) of the               involved in the Commission’s review of
                                                                                                                                                                The Commission strongly encourages
                                               Natural Gas Act (NGA) and the Federal                   this project. First, any person wishing to
                                                                                                                                                             electronic filings of comments, protests
                                               Energy Regulatory Commission’s                          obtain legal status by becoming a party
                                               (Commission) regulations, requesting                    to the proceedings for this project                   and interventions in lieu of paper using
                                               abandonment approvals, and a                            should, on or before the comment date                 the eFiling link at http://www.ferc.gov.
                                               certificate of public convenience                       stated below file with the Federal                    Persons unable to file electronically
                                               seeking authorization to construct and                  Energy Regulatory Commission, 888                     should submit an original and 5 copies
                                               operate its North Seattle Lateral                       First Street NE., Washington, DC 20426,               of the protest or intervention to the
                                               Upgrade Project (Project) located in                    a motion to intervene in accordance                   Federal Energy regulatory Commission,
                                               Snohomish County, Washington, all as                    with the requirements of the                          888 First Street NE., Washington, DC
                                               more fully described in the application                 Commission’s Rules of Practice and                    20426.
                                               which is on file with the Commission                    Procedure (18 CFR 385.214 or 385.211)                    Comment Date: November 24, 2017.
                                               and open to public inspection. The                      and the Regulations under the NGA (18
ethrower on DSK3G9T082PROD with NOTICES




                                                                                                                                                               Dated: November 2, 2017.
                                               filing may also be viewed on the web at                 CFR 157.10). A person obtaining party
                                               http://www.ferc.gov using the                           status will be placed on the service list             Kimberly D. Bose,
                                               ‘‘eLibrary’’ link. Enter the docket                     maintained by the Secretary of the                    Secretary.
                                               number excluding the last three digits in               Commission and will receive copies of                 [FR Doc. 2017–24274 Filed 11–7–17; 8:45 am]
                                               the docket number field to access the                   all documents filed by the applicant and              BILLING CODE 6717–01–P
                                               document. For assistance, contact FERC                  by all other parties. A party must submit
                                               at FERCOnlineSupport@ferc.gov or call                   7 copies of filings made in the


                                          VerDate Sep<11>2014   17:26 Nov 07, 2017   Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 9990   E:\FR\FM\08NON1.SGM   08NON1



Document Created: 2017-11-08 01:20:42
Document Modified: 2017-11-08 01:20:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesNovember 24, 2017.
FR Citation82 FR 51828 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR