The Coast Guard has issued a temporary deviation from the operating schedule that governs the South Fulton Avenue Bridge across the Hutchinson River, mile 2.9, at Mount Vernon, New York. This deviation is necessary to facilitate bridge rehabilitation allowing the owner to temporarily close the draw for ten days.

Federal Register, Volume 82 Issue 216 (Thursday, November 9, 2017)
[Federal Register Volume 82, Number 216 (Thursday, November 9, 2017)]
[Rules and Regulations]
[Page 52005]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24378]



[[Page 52005]]

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0983]


Drawbridge Operation Regulation; Hutchinson River, Mount Vernon, 
NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the South Fulton Avenue Bridge across 
the Hutchinson River, mile 2.9, at Mount Vernon, New York. This 
deviation is necessary to facilitate bridge rehabilitation allowing the 
owner to temporarily close the draw for ten days.

DATES: This deviation is effective from 12:01 a.m. on November 13, 2017 
until 11:59 p.m. on November 22, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0983, is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4336, email [email protected].

SUPPLEMENTARY INFORMATION: The owner of the bridge, the Westchester 
County Department of Public Works and Transportation, requested a 
temporary deviation in order to facilitate bridge rehabilitation 
including placement of the concrete deck for the counterweight spans, 
installation of concrete on the movable spans, installation of sidewalk 
deck panels, control/mechanical equipment wiring and testing, and 
bridge testing.
    The South Fulton Avenue Bridge across the Hutchinson River, mile 
2.9, at Mount Vernon, New York is a bascule bridge with a vertical 
clearance of 6 feet at mean high water and 13 feet at mean low water in 
the closed position. The existing drawbridge operating regulations are 
listed at 33 CFR 117.793(c).
    This temporary deviation will allow the South Fulton Avenue Bridge 
to remain in the closed position from 12:01 a.m. on November 13, 2017 
to 11:59 p.m. on November 22, 2017. The waterway is transited by 
recreational vessels and commercial vessels. There is only one facility 
upstream of this bridge. Coordination with waterway user has indicated 
no objection to the proposed closure of the draw. Vessels that can pass 
under the bridge without an opening may do so at all times. The bridge 
will not be able to open for emergencies. There is no alternate route 
for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so vessel operators may arrange their transits 
to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: November 3, 2017.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-24378 Filed 11-8-17; 8:45 am]
BILLING CODE 9110-04-P



                                                               Federal Register / Vol. 82, No. 216 / Thursday, November 9, 2017 / Rules and Regulations                                       52005

                                              DEPARTMENT OF HOMELAND                                  vessels and commercial vessels. There is              coast of Rehoboth Beach during
                                              SECURITY                                                only one facility upstream of this bridge.            construction activities. Entry of vessels
                                                                                                      Coordination with waterway user has                   or persons into these zones is prohibited
                                              Coast Guard                                             indicated no objection to the proposed                unless specifically authorized by the
                                                                                                      closure of the draw. Vessels that can                 Captain of the Port Delaware Bay.
                                              33 CFR Part 117                                         pass under the bridge without an                      DATES: This rule is effective without
                                              [Docket No. USCG–2017–0983]                             opening may do so at all times. The                   actual notice from November 9, 2017
                                                                                                      bridge will not be able to open for                   through February 28, 2018. For the
                                              Drawbridge Operation Regulation;                        emergencies. There is no alternate route              purposes of enforcement, actual notice
                                              Hutchinson River, Mount Vernon, NY                      for vessels to pass.                                  will be used from November 6, 2017
                                                                                                         The Coast Guard will also inform the               through November 9, 2017.
                                              AGENCY: Coast Guard, DHS.                               users of the waterways through our                    ADDRESSES: To view documents
                                              ACTION:Notice of deviation from                         Local and Broadcast Notices to Mariners               mentioned in this preamble as being
                                              drawbridge regulation.                                  of the change in operating schedule for               available in the docket, go to http://
                                                                                                      the bridge so vessel operators may                    www.regulations.gov, type USCG–2017–
                                              SUMMARY:    The Coast Guard has issued a                arrange their transits to minimize any                1028 in the ‘‘SEARCH’’ box and click
                                              temporary deviation from the operating                  impact caused by the temporary                        ‘‘SEARCH.’’ Click on Open Docket
                                              schedule that governs the South Fulton                  deviation.                                            Folder on the line associated with this
                                              Avenue Bridge across the Hutchinson                        In accordance with 33 CFR 117.35(e),               rule.
                                              River, mile 2.9, at Mount Vernon, New                   the drawbridge must return to its regular             FOR FURTHER INFORMATION CONTACT: If
                                              York. This deviation is necessary to                    operating schedule immediately at the
                                              facilitate bridge rehabilitation allowing                                                                     you have questions on this rule, call or
                                                                                                      end of the effective period of this                   email Petty Officer Edmund Ofalt,
                                              the owner to temporarily close the draw                 temporary deviation. This deviation
                                              for ten days.                                                                                                 Waterways Management Branch, U.S.
                                                                                                      from the operating regulations is                     Coast Guard Sector Delaware Bay;
                                              DATES: This deviation is effective from                 authorized under 33 CFR 117.35.                       telephone (215) 271–4814, email
                                              12:01 a.m. on November 13, 2017 until                                                                         Edmund.J.Ofalt@uscg.mil.
                                                                                                        Dated: November 3, 2017.
                                              11:59 p.m. on November 22, 2017.
                                                                                                      Christopher J. Bisignano,                             SUPPLEMENTARY INFORMATION:
                                              ADDRESSES: The docket for this
                                                                                                      Supervisory Bridge Management Specialist,             I. Table of Abbreviations
                                              deviation, USCG–2017–0983, is                           First Coast Guard District.
                                              available at http://www.regulations.gov.                                                                      CFR Code of Federal Regulations
                                                                                                      [FR Doc. 2017–24378 Filed 11–8–17; 8:45 am]
                                              Type the docket number in the                                                                                 COTP Captain of the Port
                                                                                                      BILLING CODE 9110–04–P
                                              ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                                                                          DHS Department of Homeland Security
                                              Click on Open Docket Folder on the line                                                                       FR Federal Register
                                              associated with this deviation.                                                                               NPRM Notice of proposed rulemaking
                                                                                                      DEPARTMENT OF HOMELAND                                § Section
                                              FOR FURTHER INFORMATION CONTACT: If                     SECURITY                                              U.S.C. United States Code
                                              you have questions on this temporary
                                              deviation, call or email Judy K. Leung-                 Coast Guard                                           II. Background Information and
                                              Yee, Bridge Management Specialist,                                                                            Regulatory History
                                              First District Bridge Branch, U.S. Coast                33 CFR Part 165                                          The Coast Guard is issuing this
                                              Guard; telephone 212–514–4336, email                                                                          temporary rule without prior notice and
                                                                                                      [Docket Number USCG–2017–1028]
                                              Judy.K.Leung-Yee@uscg.mil.                                                                                    opportunity to comment pursuant to
                                              SUPPLEMENTARY INFORMATION: The owner                    RIN 1625–AA00                                         authority under section 4(a) of the
                                              of the bridge, the Westchester County                                                                         Administrative Procedure Act (APA) (5
                                              Department of Public Works and                          Safety Zone; Atlantic Ocean, Rehoboth                 U.S.C. 553(b)). This provision
                                              Transportation, requested a temporary                   Beach, DE                                             authorizes an agency to issue a rule
                                              deviation in order to facilitate bridge                 AGENCY:    Coast Guard, DHS.                          without prior notice and opportunity to
                                              rehabilitation including placement of                   ACTION:   Temporary final rule.                       comment when the agency for good
                                              the concrete deck for the counterweight                                                                       cause finds that those procedures are
                                              spans, installation of concrete on the                  SUMMARY:   The Coast Guard is                         ‘‘impracticable, unnecessary, or contrary
                                              movable spans, installation of sidewalk                 establishing temporary safety zones in                to the public interest.’’ Under 5 U.S.C.
                                              deck panels, control/mechanical                         the Atlantic Ocean, off the coast of                  553(b)(B), the Coast Guard finds that
                                              equipment wiring and testing, and                       Rehoboth Beach, DE and in Breakwater                  good cause exists for not publishing a
                                              bridge testing.                                         Harbor near Cape Henlopen. Safety zone                notice of proposed rulemaking (NPRM)
                                                 The South Fulton Avenue Bridge                       one is being established for navigable                with respect to this rule due to the short
                                              across the Hutchinson River, mile 2.9, at               waters in the vicinity of the derrick                 time period between when Sector
                                              Mount Vernon, New York is a bascule                     barge HAAKON during dredging                          Delaware Bay received complete details
                                              bridge with a vertical clearance of 6 feet              operations, pipe laying operations,                   of this project, October 30, 2017, and the
                                              at mean high water and 13 feet at mean                  diving operations and underwater                      date when these safety zones needed to
                                              low water in the closed position. The                   construction operations. Safety zone                  go into effect. It is impracticable and
                                              existing drawbridge operating                           two is being established for waters in                contrary to the public interest to publish
                                              regulations are listed at 33 CFR                        the vicinity of the working barges and                an NPRM to provide a notice and
nshattuck on DSK9F9SC42PROD with RULES




                                              117.793(c).                                             pipeline located in Breakwater Harbor                 opportunity for comment period
                                                 This temporary deviation will allow                  during pipeline fusing and testing                    because the safety zones must be
                                              the South Fulton Avenue Bridge to                       operations. This regulation is necessary              established by November 6, 2017, to
                                              remain in the closed position from 12:01                to provide for the safety of life on                  ensure safety of life on navigable waters
                                              a.m. on November 13, 2017 to 11:59                      navigable waters of Breakwater Harbor                 in the vicinity of dredging operations,
                                              p.m. on November 22, 2017. The                          and the Atlantic Ocean in the vicinity                pipe laying operations, diving
                                              waterway is transited by recreational                   of the construction operations off the                operations as well as construction


                                         VerDate Sep<11>2014   13:39 Nov 08, 2017   Jkt 244001   PO 00000   Frm 00033   Fmt 4700   Sfmt 4700   E:\FR\FM\09NOR1.SGM   09NOR1



Document Created: 2018-10-25 10:30:06
Document Modified: 2018-10-25 10:30:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 12:01 a.m. on November 13, 2017 until 11:59 p.m. on November 22, 2017.
ContactIf you have questions on this temporary deviation, call or email Judy K. Leung-Yee, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 212-514-4336, email [email protected]