82_FR_52259 82 FR 52043 - Environmental Impact Statements; Notice of Availability

82 FR 52043 - Environmental Impact Statements; Notice of Availability

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 82, Issue 216 (November 9, 2017)

Page Range52043-52043
FR Document2017-24424

Federal Register, Volume 82 Issue 216 (Thursday, November 9, 2017)
[Federal Register Volume 82, Number 216 (Thursday, November 9, 2017)]
[Notices]
[Page 52043]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24424]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9036-1]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or http://www2.epa.gov/nepa/ nepa/.

Weekly receipt of Environmental Impact Statements (EIS)
Filed 10/30/2017 Through 11/03/2017
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-nepa-public/action/eis/search.

EIS No. 20170220, Draft, NSF, WV, Green Bank Observatory, Comment 
Period Ends: 01/08/2018, Contact: Elizabeth Pentecost (703) 292-4907.
EIS No. 20170221, Draft, USFS, CA, San Gabriel River Confluence with 
Cattle Canyon Improvements Project, Comment Period Ends: 12/26/2017, 
Contact: Chinling Chen (626) 574-5255.

    Dated: November 6, 2017.
Kelly Knight,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2017-24424 Filed 11-8-17; 8:45 am]
 BILLING CODE 6560-50-P



                                                                           Federal Register / Vol. 82, No. 216 / Thursday, November 9, 2017 / Notices                                                 52043

                                                District, Regulatory Office at 918–669–                 of these is FM 1396, which would be                     2. Sam Rayburn Library, 800 West
                                                7400.                                                   relocated to cross the reservoir in a                 Sam Rayburn Drive, Bonham, TX 75418;
                                                SUPPLEMENTARY INFORMATION: The FEIS                     different alignment on an entirely new                (903) 583–2455.
                                                was prepared in accordance with the                     bridge that would need to be                            3. Bertha Voyer Memorial Library, 500
                                                                                                        constructed.                                          6th Street, Honey Grove, TX 75446;
                                                National Environmental Policy Act
                                                                                                           An aquatic resources mitigation plan               (903) 378–2206.
                                                (NEPA) of 1969, as amended, and the
                                                                                                        has been prepared by the applicant to                   4. Leonard Public Library, 102 South
                                                USACE regulations for NEPA                                                                                    Main Street, Leonard, TX 75452; (903)
                                                implementation (33 Code of Federal                      comply with the federal policy of ‘‘no
                                                                                                        overall net loss of wetlands’’ and to                 587–2391.
                                                Regulations [CFR] parts 230 and 325                                                                             5. North Texas Municipal Water
                                                (with associated Appendices B and C)).                  provide compensatory mitigation, to the
                                                                                                        extent practicable, for impacts to other              District headquarters, 505 East Brown
                                                The USACE Tulsa District, Regulatory                                                                          Street, Wylie, TX 75098.
                                                Office is the lead federal agency                       waters of the United States that would
                                                                                                                                                                6. U.S. Army Corps of Engineers,
                                                responsible for the FEIS and                            be impacted by construction of the
                                                                                                                                                              Tulsa District, Regulatory Office, 2488
                                                information contained in the EIS will                   proposed reservoir. NTMWD has
                                                                                                                                                              East 81st Street, Tulsa, OK 74137–4290.
                                                serve as the basis for a decision whether               purchased a 14,960-acre parcel of land                  Electronic copies of the FEIS may be
                                                or not to issue a Section 404 permit. All               known as the Riverby Ranch, which                     obtained from the USACE Tulsa District,
                                                comments received on the Revised Draft                  borders the Red River. This working                   Regulatory Office or its Web site at
                                                EIS (RDEIS), to include the Draft EIS                   ranch is located downstream of the                    http://www.swt.usace.army.mil/
                                                (DEIS) comments not specifically                        proposed project within both the same                 Missions/Regulatory/Tulsa-District-
                                                addressed in the RDEIS, are reflected                   watershed (Bois d’Arc Creek) and the                  Environmental-Impact-Statements/.
                                                and responses are provided in the                       same county (Fannin). NTMWD
                                                accompanying Comment Categories and                     acquired the Riverby Ranch specifically               Edward M. Parisotto,
                                                Responses Document. It also provides                    because its biophysical features have the             Acting Chief, Regulatory Office, Tulsa
                                                                                                        potential to provide a portion of the                 District.
                                                information for Federal, State, and local
                                                agencies having jurisdictional                          appropriate mitigation for the proposed               [FR Doc. 2017–24396 Filed 11–8–17; 8:45 am]
                                                responsibility for affected resources.                  project. Additional mitigation is                     BILLING CODE 3720–58–P
                                                   The USACE has determined that the                    proposed within a 1,900-acre upstream
                                                basic project purpose in the present case               site and within the proposed reservoir
                                                is to develop a new water supply for the                itself. Though not part of the proposed               ENVIRONMENTAL PROTECTION
                                                applicant NTMWD and its member                          mitigation plan, Bois d’Arc Creek                     AGENCY
                                                cities and customers.                                   downstream of the reservoir will receive
                                                                                                                                                              [ER–FRL–9036–1]
                                                   The purpose of the FEIS is to provide                environmental flow releases as a result
                                                decision-makers and the public with                     of an operations plan and flow regime                 Environmental Impact Statements;
                                                information pertaining to the Proposed                  established in consultation with the                  Notice of Availability
                                                Action and Alternatives, and to disclose                Texas Commission on Environmental
                                                environmental impacts and identify                      Quality (TCEQ), and stipulated in the                   Responsible Agency: Office of Federal
                                                mitigation measures to reduce impacts.                  Water Rights Permit issued by TCEQ to                 Activities, General Information (202)
                                                NTMWD proposes to build the LBCR                        NTMWD.                                                564–7146 or http://www2.epa.gov/
                                                with a total storage capacity of                           The U.S. Environmental Protection                  nepa/.
                                                approximately 367,609 acre-feet. A dam                  Agency Region 6, U.S. Forest Service,                 Weekly receipt of Environmental Impact
                                                approximately 10,400 feet (about 2                      U.S. Fish and Wildlife Service, and the                 Statements (EIS)
                                                miles) long and up to 90 feet high would                Texas Parks and Wildlife Department                   Filed 10/30/2017 Through 11/03/2017
                                                be constructed, and much of the                         participated as cooperating agencies in               Pursuant to 40 CFR 1506.9.
                                                reservoir footprint would be cleared of                 the formulation of the FEIS.                          Notice
                                                trees and built structures. NTMWD also                     On December 8, 2009, the USACE
                                                                                                                                                                Section 309(a) of the Clean Air Act
                                                proposes to construct several related                   held a NEPA EIS public scoping
                                                                                                                                                              requires that EPA make public its
                                                facilities or connected actions. These                  meeting in Bonham, Texas. On March
                                                                                                                                                              comments on EISs issued by other
                                                include a raw water intake pump station                 24, 2015, the USACE held a public
                                                                                                                                                              Federal agencies. EPA’s comment letters
                                                and electrical substation at the reservoir              meeting during the comment period on
                                                                                                                                                              on EISs are available at: https://
                                                site, as well as a 90 to 96-inch diameter               the previous DEIS. On March 27, 2017,
                                                                                                                                                              cdxnodengn.epa.gov/cdx-nepa-public/
                                                buried pipeline to carry raw water from                 the USACE published the availability of
                                                                                                                                                              action/eis/search.
                                                the new reservoir approximately 35                      the RDEIS in response to comments
                                                miles in a southwesterly direction. The                 received on the DEIS. The revision and                EIS No. 20170220, Draft, NSF, WV,
                                                raw water pipeline will connect to a                    publication of this FEIS is informed by                 Green Bank Observatory, Comment
                                                new water treatment plant (WTP)—the                     public and agency comment on the                        Period Ends: 01/08/2018, Contact:
                                                ‘‘North WTP’’—and terminal storage                      original DEIS and RDEIS and changes                     Elizabeth Pentecost (703) 292–4907.
                                                                                                                                                              EIS No. 20170221, Draft, USFS, CA, San
                                                reservoir (TSR) that would be located                   have been made to address commented
                                                                                                                                                                Gabriel River Confluence with Cattle
                                                west of the City of Leonard, also in                    issues. No public meeting is planned
                                                                                                                                                                Canyon Improvements Project,
                                                Fannin County, Texas. The North WTP                     during this comment period. Copies of
                                                                                                                                                                Comment Period Ends: 12/26/2017,
                                                and TSR will be constructed regardless                  the FEIS will be available for review at
                                                                                                                                                                Contact: Chinling Chen (626) 574–
                                                of whether NTMWD receives a Section                     the USACE Tulsa District Office, the
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                5255.
                                                404 permit to proceed with the                          permit applicant’s office in Wylie Texas,
                                                Proposed Action; the North WTP and                      and at four locations in the project area                Dated: November 6, 2017.
                                                TSR are not part of the Proposed Action.                in Fannin County, Texas, addresses of                 Kelly Knight,
                                                A number of rural roads within the                      each as follows.                                      Director, NEPA Compliance Division, Office
                                                footprint and in the vicinity of the                       1. Bonham Public Library, 305 East                 of Federal Activities.
                                                proposed reservoir would have to be                     5th Street, Bonham, TX 75418; (903)                   [FR Doc. 2017–24424 Filed 11–8–17; 8:45 am]
                                                closed or relocated; the most significant               583–3128.                                             BILLING CODE 6560–50–P




                                           VerDate Sep<11>2014   17:32 Nov 08, 2017   Jkt 244001   PO 00000   Frm 00006   Fmt 4703   Sfmt 9990   E:\FR\FM\09NON1.SGM   09NON1



Document Created: 2018-10-25 10:29:16
Document Modified: 2018-10-25 10:29:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 52043 