82_FR_52311 82 FR 52095 - Fiscal Year 2017 Positive Train Control Grant Program Project Selections

82 FR 52095 - Fiscal Year 2017 Positive Train Control Grant Program Project Selections

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
Federal Railroad Administration

Federal Register Volume 82, Issue 216 (November 9, 2017)

Page Range52095-52097
FR Document2017-24364

The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) and Federal Railroad Administration (FRA) announce the selection of projects for the Fiscal Year (FY) 2017 Positive Train Control (PTC) Grant Program. A total of $197.01 million in the PTC grant funding, authorized under the Fixing America's Surface Transportation (FAST) Act, will be provided to 17 projects in 13 states. On July 29, 2016, FTA and FRA published a Notice of Funding Opportunity (NOFO) announcing the availability of Federal funding for the PTC Grant Program. These funds will provide financial assistance to states, local governments, and public agencies for the implementation of positive train control systems to improve safety. Funds allocated in this announcement must be obligated in a grant by September 30, 2018.

Federal Register, Volume 82 Issue 216 (Thursday, November 9, 2017)
[Federal Register Volume 82, Number 216 (Thursday, November 9, 2017)]
[Notices]
[Pages 52095-52097]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24364]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

Federal Railroad Administration


Fiscal Year 2017 Positive Train Control Grant Program Project 
Selections

AGENCY: Federal Transit Administration (FTA), Federal Railroad 
Administration (FRA), DOT.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit 
Administration (FTA) and Federal Railroad Administration (FRA) announce 
the selection of projects for the Fiscal Year (FY) 2017 Positive Train 
Control (PTC) Grant Program. A total of $197.01 million in the PTC 
grant funding, authorized under the Fixing America's Surface 
Transportation (FAST) Act, will be provided to 17 projects in 13 
states. On July 29, 2016, FTA and FRA published a Notice of Funding 
Opportunity (NOFO) announcing the availability of Federal funding for 
the PTC Grant Program. These funds will provide financial assistance to 
states, local governments, and public agencies for the implementation 
of positive train control systems to improve safety. Funds allocated in 
this announcement must be obligated in a grant by September 30, 2018.

FOR FURTHER INFORMATION CONTACT: Recipients selected for competitive 
funding in Table 1 should contact the appropriate FTA Regional Office 
for information regarding applying for the funds or program-specific 
information. A list of FTA's Regional Offices can be found at 
www.fta.dot.gov. For questions regarding PTC technology or statutory 
and regulatory requirements, please contact Mr. Devin Rouse, Program 
Manager, Federal Railroad Administration (phone: (202) 493-6185, email: 
[email protected]). A TDD is available at 1-800-877-8339 (TDD/FIRS).

SUPPLEMENTARY INFORMATION: In response to the NOFO, FTA and FRA 
received 27 proposals from 16 states requesting $455 million in Federal 
funds, indicating significant demand for funding to expedite the 
implementation of PTC systems. Project proposals were evaluated based 
on each applicant's responses to the program evaluation criteria 
outlined in the NOFO.
    FTA is funding the 17 projects shown in Table 1 for a total of 
$197.01 million. Recipients selected for competitive funding should 
work with their FTA Regional Office to submit a grant application in 
FTA's transit award management system (TrAMS) for the projects 
identified in the attached table to quickly obligate funds. As funds 
must be obligated by September 30, 2018, all grant applications must be 
submitted to FTA by June 30, 2018. Grant applications must include the 
eligible activities applied for in the original project application. 
Funds must be used consistent with the competitive proposal and for the 
eligible capital purposes established in the NOFO.
    In cases where the award amount is less than the proposer's total 
requested amount, recipients must submit grant applications to fund the 
scalable project option as described in the project's application. If 
the award amount does not correspond to the scalable option, for 
example due to a cap on the award amount, the recipient should work 
with the FTA Regional Office to reduce scope or scale the project so 
that a complete phase or project is accomplished. Recipients are 
reminded that program requirements such as cost sharing or local match 
can be found in the NOFO. A discretionary project identification number 
has been assigned to each project for tracking purposes and must be 
used in the TrAMS application.
    On October 16, 2008, Congress enacted the Railroad Safety 
Improvement Act of 2008 (RSIA), which required Class 1 railroad main 
lines and commuter railroad passenger service to fully implement 
positive train control by December 31, 2015. In the Positive Train 
Control Enforcement and Implementation Act of 2015, Congress extended 
the deadline for implementing positive train control to December 31, 
2018. FTA will streamline the grant application process to help 
commuter railroads meet the approaching deadline. FTA is providing pre-
award authority and will reimburse eligible project costs on successful 
projects consistent with the selected project proposals. The 
eligibility for reimbursement using pre-award authority is contingent 
upon the project meeting other Federal requirements, such as 
environmental requirements, prior to costs being incurred. FTA is not 
applying its regulation, 49 CFR part 633 Project Management Oversight 
to this program. Furthermore, FTA waives the requirement that projects 
be listed in the

[[Page 52096]]

Statewide Transportation Improvement Plan (STIP). Department of Labor 
(DOL) certification is also not required. The above waivers are only 
applicable to funds awarded in this notice.
    Post-award reporting requirements include submission of the Federal 
financial report and milestone progress reports in TrAMS as appropriate 
(see FTA Circular 5010.1E, Award Management Requirements). Unless 
specifically waived, recipients must comply with all applicable Federal 
statutes, regulations, executive orders, FTA circulars, and other 
Federal requirements in carrying out the project supported by the FTA 
grant, including FTA's Buy America requirements.
    Recipients must follow all third-party procurement guidance as 
described in FTA Circular 4220.1F Third Party Contracting Guidance.

    Issued in Washington, DC, this 3rd day of November 2017.

K. Jane Williams,
Acting Administrator, Federal Transit Administration.
Heath Hall,
Acting Administrator, Federal Railroad Administration.

                       Table 1--Fiscal Year 2017 Positive Train Control Project Selections
----------------------------------------------------------------------------------------------------------------
      State             Recipient                  Project ID              Project description     Grant  amount
----------------------------------------------------------------------------------------------------------------
CA...............  Peninsula Corridor   D2017-PTCP-014.................  This project will dual      $21,680,000
                    Joint Powers Board                                    equip seven Caltrain
                    (JPB).                                                trains with
                                                                          Incremental Train
                                                                          Control System (ITCS)
                                                                          and Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) to provide
                                                                          service for
                                                                          approximately 32 miles
                                                                          from south of San Jose
                                                                          to Gilroy, CA on Union
                                                                          Pacific Railroad
                                                                          (UPRR) territory.
CA...............  Southern California  D2017-PTCP-015.................  This project will             3,200,000
                    Regional Rail                                         develop, test, and
                    Authority (SCRRA).                                    deploy tools and
                                                                          processes to improve
                                                                          the reliability,
                                                                          efficiency, and
                                                                          security of SCRRA's
                                                                          Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) PTC with an
                                                                          upgrade from a non-
                                                                          vital to a vital
                                                                          overlay system across
                                                                          249 miles in the
                                                                          greater Los Angeles
                                                                          region of Southern
                                                                          California.
FL...............  South Florida        D2017-PTCP-006.................  This project will            31,633,176
                    Regional                                              complete the
                    Transportation                                        installation of the
                    Authority (SFRTA).                                    established
                                                                          Interoperable
                                                                          Electronic Train
                                                                          Management System
                                                                          (I[hyphen]ETMS) PTC
                                                                          technology consisting
                                                                          of wayside interface
                                                                          units, near side
                                                                          station controls, base
                                                                          radio stations, a back
                                                                          office server,
                                                                          on[hyphen]board PTC
                                                                          kits, and a crew
                                                                          training simulator on
                                                                          the South Florida Rail
                                                                          Corridor.
FL...............  Florida Department   D2017-PTCP-007.................  This project will             1,841,153
                    of Transportation                                     implement the
                    (FDOT).                                               Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) computer-aided
                                                                          dispatch system, track
                                                                          database, and
                                                                          communication network,
                                                                          along 110 miles of the
                                                                          Central Florida Rail
                                                                          Corridor.
IL...............  Commuter Rail        D2017-PTCP-008.................  This project comprises       20,168,000
                    Division of the                                       three subprojects that
                    RTA (Metra).                                          include the
                                                                          installation of
                                                                          wayside PTC signals,
                                                                          reconfiguration of
                                                                          signals, and upgrade
                                                                          of existing PTC
                                                                          Automatic Block
                                                                          Signaling systems on
                                                                          Metra's Milwaukee
                                                                          District West and
                                                                          North lines in
                                                                          Illinois.
IL...............  Illinois Department  D2017-PTCP-009.................  This project will            18,869,888
                    of Transportation                                     complete the design,
                    (IDOT).                                               delivery,
                                                                          installation, testing,
                                                                          and certification of a
                                                                          fully integrated
                                                                          Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) PTC on two
                                                                          contractual routes for
                                                                          Amtrak's use that
                                                                          comprise 14.7 route
                                                                          miles of Terminal
                                                                          Railroad Association
                                                                          of St. Louis (TRRA)
                                                                          right-of-way into and
                                                                          out of St. Louis,
                                                                          Missouri.
MA...............  Massachusetts Bay    D2017-PTCP-001.................  This project will             7,815,963
                    Transportation                                        include the
                    Authority (MBTA).                                     installation of a back
                                                                          office system for PTC
                                                                          that consists of an
                                                                          existing Cab Signaling
                                                                          System (CSS) with
                                                                          Automatic Train
                                                                          Control (ATC)
                                                                          supplemented by the
                                                                          addition of the latest
                                                                          revision to the
                                                                          Advanced Civil Speed
                                                                          Enforcement System II
                                                                          (ACSES II) for the
                                                                          MBTA.
MD...............  Maryland Transit     D2017-PTCP-004.................  This project includes         9,440,000
                    Administration                                        installing
                    (MTA).                                                Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) PTC within the
                                                                          Northeast Corridor
                                                                          along MARC's tracks,
                                                                          and equipping 11 MARC
                                                                          2A cab cars with I-
                                                                          ETMS. The work will be
                                                                          on the Penn Line
                                                                          between Washington,
                                                                          D.C. Union Station and
                                                                          the northern limits of
                                                                          MARC service at
                                                                          Perryville, MD, a
                                                                          total distance of
                                                                          approximately 77
                                                                          directional miles.
MO...............  Missouri Department  D2017-PTCP-012.................  This project will            12,024,877
                    of Transportation                                     design, deliver,
                    (MoDOT).                                              install, test, and
                                                                          certify a fully
                                                                          integrated and
                                                                          functional
                                                                          Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) PTC over
                                                                          approximately 8.5
                                                                          route miles of Kansas
                                                                          City Terminal Railway
                                                                          right-of-way where
                                                                          Amtrak operates in the
                                                                          Kansas City
                                                                          metropolitan region of
                                                                          Missouri.
NJ...............  New Jersey Transit   D2017-PTCP-002.................  This project will            10,000,000
                    Corporation (NJ                                       implement New Jersey
                    Transit).                                             Transit's PTC Phase
                                                                          III, which involves
                                                                          the purchase of
                                                                          onboard equipment
                                                                          kits, along with the
                                                                          installation, testing,
                                                                          and commissioning of
                                                                          the equipment on a
                                                                          total of 440
                                                                          locomotives, electric
                                                                          mobile units, and cab
                                                                          cars.
NM...............  Rio Metro Regional   D2017-PTCP-010.................  This project will             3,600,000
                    Transit District                                      include the
                    (Rio Metro).                                          installation of the
                                                                          Interoperable
                                                                          Electronic Train
                                                                          Management System (I-
                                                                          ETMS) PTC onboard
                                                                          technology on nine
                                                                          locomotives.

[[Page 52097]]

 
NY...............  New York State       D2017-PTCP-003.................  This project will            33,749,974
                    Department of                                         implement Advanced
                    Transportation                                        Civil Speed
                    (NYSDOT).                                             Enforcement System
                                                                          (ACSES) PTC on the
                                                                          Amtrak controlled
                                                                          section of the Empire
                                                                          Corridor Hudson Line,
                                                                          a Federally Designated
                                                                          High Speed Rail
                                                                          Corridor, which spans
                                                                          multiple jurisdictions
                                                                          along its 94 miles
                                                                          from Poughkeepsie to
                                                                          Hoffmans, New York.
OR...............  Oregon Department    D2017-PTCP-016.................  This project will             1,200,000
                    of Transportation                                     install and test PTC
                    (ODOT).                                               equipment on two Talgo
                                                                          Series 8 trainsets
                                                                          owned by ODOT and
                                                                          operated by Amtrak for
                                                                          the regional Amtrak
                                                                          Cascades intercity
                                                                          passenger rail service
                                                                          connecting Eugene,
                                                                          Oregon to Vancouver,
                                                                          British Columbia.
OR...............  Tri-County           D2017-PTCP-017.................  This project will             2,704,000
                    Metropolitan                                          implement two PTC
                    Transportation                                        safety modifications
                    District of Oregon                                    on the 15 mile long
                    (TriMet).                                             Westside Express (WES)
                                                                          commuter rail corridor
                                                                          from Wilsonville to
                                                                          Beaverton, Oregon. The
                                                                          first modification is
                                                                          designed to positively
                                                                          stop a train in
                                                                          advance of a
                                                                          malfunctioning grade
                                                                          crossing, and the
                                                                          second modification
                                                                          will stop a train
                                                                          prior to a work zone
                                                                          or limit speed
                                                                          throughout the work
                                                                          zone.
PA...............  Southeastern         D2017-PTCP-005.................  This project will             5,800,000
                    Pennsylvania                                          install the Advanced
                    Transportation                                        Civil Speed
                    Authority (SEPTA).                                    Enforcement System
                                                                          (ACSES II) PTC System
                                                                          along a 3-mile portion
                                                                          of restored Regional
                                                                          Rail service from
                                                                          Elwyn to Wawa,
                                                                          Pennsylvania, and
                                                                          deploy an onboard
                                                                          survey map software
                                                                          that contains the
                                                                          physical
                                                                          characteristics of the
                                                                          railroad that dictate
                                                                          train operating speeds
                                                                          throughout SEPTA's
                                                                          rail network.
TX...............  Capital              D2017-PTCP-011.................  This project will             9,762,969
                    Metropolitan                                          install the PTC fiber
                    Transportation                                        backbone for an
                    Authority (Capital                                    Enhanced Automatic
                    Metro).                                               Train Control (E-ATC)
                                                                          PTC system on Capital
                                                                          Metro's approximately
                                                                          33 miles of its
                                                                          commuter rail
                                                                          territory in Austin,
                                                                          TX.
UT...............  Utah Transit         D2017-PTCP-013.................  This project involves         3,520,000
                    Authority (UTA).                                      the design and testing
                                                                          of a two-step No-Code
                                                                          Proceed system to
                                                                          assure the safe
                                                                          operation of UTA's
                                                                          FrontRunner Enhanced
                                                                          Automated Train
                                                                          Control (E-ATC) PTC on
                                                                          its two mainline track
                                                                          segments from Provo to
                                                                          Ogden and Ogden to
                                                                          Pleasant View, Utah.
                                                                                                 ---------------
    Total........  ...................  ...............................  .......................    $197,010,000
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2017-24364 Filed 11-8-17; 8:45 am]
 BILLING CODE P



                                                                           Federal Register / Vol. 82, No. 216 / Thursday, November 9, 2017 / Notices                                           52095

                                                Development Corporation (SCEDC) to be                     Issued in Memphis, TN, on November 3,               of PTC systems. Project proposals were
                                                used for future economic development.                   2017.                                                 evaluated based on each applicant’s
                                                DATES: Comments must be received on                     Tommy L. Dupree,                                      responses to the program evaluation
                                                or before December 11, 2017.                            Acting Manager, Memphis Airports District             criteria outlined in the NOFO.
                                                                                                        Office, Southern Region.                                FTA is funding the 17 projects shown
                                                ADDRESSES: Comments on this notice
                                                                                                        [FR Doc. 2017–24413 Filed 11–8–17; 8:45 am]           in Table 1 for a total of $197.01 million.
                                                may be mailed or delivered in triplicate                                                                      Recipients selected for competitive
                                                                                                        BILLING CODE P
                                                to the FAA at the following address:                                                                          funding should work with their FTA
                                                Memphis Airports District Office, Attn:                                                                       Regional Office to submit a grant
                                                Koty Brown, Program Manager, 2600                       DEPARTMENT OF TRANSPORTATION                          application in FTA’s transit award
                                                Thousand Oaks Boulevard, Suite 2250,                                                                          management system (TrAMS) for the
                                                Memphis, TN 38118.                                      Federal Transit Administration                        projects identified in the attached table
                                                   In addition, one copy of any                                                                               to quickly obligate funds. As funds must
                                                comments submitted to the FAA must                      Federal Railroad Administration                       be obligated by September 30, 2018, all
                                                be mailed or delivered to Ms. Joanne                                                                          grant applications must be submitted to
                                                Gentry, Executive Director for                          Fiscal Year 2017 Positive Train Control               FTA by June 30, 2018. Grant
                                                Laurinburg-Maxton Airport Commission                    Grant Program Project Selections                      applications must include the eligible
                                                at the following address: 16701 Airport                 AGENCY: Federal Transit Administration                activities applied for in the original
                                                Road, Maxton, NC 28364.                                 (FTA), Federal Railroad Administration                project application. Funds must be used
                                                FOR FURTHER INFORMATION CONTACT: Koty                   (FRA), DOT.                                           consistent with the competitive
                                                Brown, Program Manager, Federal                         ACTION: Notice.                                       proposal and for the eligible capital
                                                Aviation Administration, Memphis                                                                              purposes established in the NOFO.
                                                Airports District Office, 2600 Thousand                 SUMMARY:   The U.S. Department of                       In cases where the award amount is
                                                Oaks Boulevard, Suite 2250, Memphis,                    Transportation’s (DOT) Federal Transit                less than the proposer’s total requested
                                                TN 38118–2482.                                          Administration (FTA) and Federal                      amount, recipients must submit grant
                                                   The application may be reviewed in                   Railroad Administration (FRA)                         applications to fund the scalable project
                                                person at this same location, by                        announce the selection of projects for                option as described in the project’s
                                                appointment.                                            the Fiscal Year (FY) 2017 Positive Train              application. If the award amount does
                                                                                                        Control (PTC) Grant Program. A total of               not correspond to the scalable option,
                                                SUPPLEMENTARY INFORMATION:     The FAA                  $197.01 million in the PTC grant                      for example due to a cap on the award
                                                proposes to rule and invites public                     funding, authorized under the Fixing                  amount, the recipient should work with
                                                comment on the request to release                       America’s Surface Transportation                      the FTA Regional Office to reduce scope
                                                property for non-aeronautical purposes                  (FAST) Act, will be provided to 17                    or scale the project so that a complete
                                                at Laurinburg-Maxton Airport, Maxton,                   projects in 13 states. On July 29, 2016,              phase or project is accomplished.
                                                NC under the provisions of 49 U.S.C.                    FTA and FRA published a Notice of                     Recipients are reminded that program
                                                47107(h)(2). The FAA determined that                    Funding Opportunity (NOFO)                            requirements such as cost sharing or
                                                the request to release property at                      announcing the availability of Federal                local match can be found in the NOFO.
                                                Laurinburg-Maxton Airport (MEB)                         funding for the PTC Grant Program.                    A discretionary project identification
                                                submitted by the Laurinburg-Maxton                      These funds will provide financial                    number has been assigned to each
                                                Airport Commission on behalf of the                     assistance to states, local governments,              project for tracking purposes and must
                                                City of Laurinburg and the Town of                      and public agencies for the                           be used in the TrAMS application.
                                                Maxton meets the procedural                             implementation of positive train control                On October 16, 2008, Congress
                                                requirements of the FAA and the release                 systems to improve safety. Funds                      enacted the Railroad Safety
                                                of the property does not and will not                   allocated in this announcement must be                Improvement Act of 2008 (RSIA), which
                                                impact future aviation needs at the                     obligated in a grant by September 30,                 required Class 1 railroad main lines and
                                                airport. The FAA may approve the                        2018.                                                 commuter railroad passenger service to
                                                request, in whole or in part, no sooner                                                                       fully implement positive train control
                                                than thirty days after the publication of               FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                              by December 31, 2015. In the Positive
                                                this notice.                                            Recipients selected for competitive                   Train Control Enforcement and
                                                   The following is a brief overview of                 funding in Table 1 should contact the                 Implementation Act of 2015, Congress
                                                the request:                                            appropriate FTA Regional Office for                   extended the deadline for implementing
                                                   The Laurinburg-Maxton Airport                        information regarding applying for the                positive train control to December 31,
                                                Commission on behalf of the City of                     funds or program-specific information.                2018. FTA will streamline the grant
                                                Laurinburg and the Town of Maxton is                    A list of FTA’s Regional Offices can be               application process to help commuter
                                                proposing the release of approximately                  found at www.fta.dot.gov. For questions               railroads meet the approaching
                                                10.66 acres to Scotland County                          regarding PTC technology or statutory                 deadline. FTA is providing pre-award
                                                Economic Development Corporation                        and regulatory requirements, please                   authority and will reimburse eligible
                                                (SCEDC) to be used for future economic                  contact Mr. Devin Rouse, Program                      project costs on successful projects
                                                development. This property is located                   Manager, Federal Railroad                             consistent with the selected project
                                                along SR 1434 Airport Road in Scotland                  Administration (phone: (202) 493–6185,                proposals. The eligibility for
                                                County, NC. The property is separated                   email: devin.rouse@dot.gov). A TDD is                 reimbursement using pre-award
                                                from the majority of airport property by                available at 1–800–877–8339 (TDD/                     authority is contingent upon the project
sradovich on DSK3GMQ082PROD with NOTICES




                                                SR 1434 Airport Road. The proposed                      FIRS).                                                meeting other Federal requirements,
                                                use of this property is compatible with                 SUPPLEMENTARY INFORMATION: In                         such as environmental requirements,
                                                airport operations.                                     response to the NOFO, FTA and FRA                     prior to costs being incurred. FTA is not
                                                   Any person may inspect, by                           received 27 proposals from 16 states                  applying its regulation, 49 CFR part 633
                                                appointment, the request in person at                   requesting $455 million in Federal                    Project Management Oversight to this
                                                the FAA office listed above under FOR                   funds, indicating significant demand for              program. Furthermore, FTA waives the
                                                FURTHER INFORMATION CONTACT.                            funding to expedite the implementation                requirement that projects be listed in the


                                           VerDate Sep<11>2014   17:32 Nov 08, 2017   Jkt 244001   PO 00000   Frm 00058   Fmt 4703   Sfmt 4703   E:\FR\FM\09NON1.SGM   09NON1


                                                52096                          Federal Register / Vol. 82, No. 216 / Thursday, November 9, 2017 / Notices

                                                Statewide Transportation Improvement                        Management Requirements). Unless                       FTA Circular 4220.1F Third Party
                                                Plan (STIP). Department of Labor (DOL)                      specifically waived, recipients must                   Contracting Guidance.
                                                certification is also not required. The                     comply with all applicable Federal                      Issued in Washington, DC, this 3rd day of
                                                above waivers are only applicable to                        statutes, regulations, executive orders,               November 2017.
                                                funds awarded in this notice.                               FTA circulars, and other Federal                       K. Jane Williams,
                                                   Post-award reporting requirements                        requirements in carrying out the project               Acting Administrator, Federal Transit
                                                include submission of the Federal                           supported by the FTA grant, including                  Administration.
                                                financial report and milestone progress                     FTA’s Buy America requirements.                        Heath Hall,
                                                reports in TrAMS as appropriate (see                          Recipients must follow all third-party               Acting Administrator, Federal Railroad
                                                FTA Circular 5010.1E, Award                                 procurement guidance as described in                   Administration.

                                                                                TABLE 1—FISCAL YEAR 2017 POSITIVE TRAIN CONTROL PROJECT SELECTIONS
                                                                                                                                                                                                      Grant
                                                    State               Recipient                 Project ID                                         Project description                             amount

                                                CA ............     Peninsula Cor-        D2017–PTCP–014 .....        This project will dual equip seven Caltrain trains with Incremental           $21,680,000
                                                                      ridor Joint                                       Train Control System (ITCS) and Interoperable Electronic Train
                                                                      Powers Board                                      Management System (I–ETMS) to provide service for approxi-
                                                                      (JPB).                                            mately 32 miles from south of San Jose to Gilroy, CA on Union
                                                                                                                        Pacific Railroad (UPRR) territory.
                                                CA ............     Southern Cali-        D2017–PTCP–015 .....        This project will develop, test, and deploy tools and processes to im-          3,200,000
                                                                      fornia Regional                                   prove the reliability, efficiency, and security of SCRRA’s Interoper-
                                                                      Rail Authority                                    able Electronic Train Management System (I–ETMS) PTC with an
                                                                      (SCRRA).                                          upgrade from a non-vital to a vital overlay system across 249
                                                                                                                        miles in the greater Los Angeles region of Southern California.
                                                FL .............    South Florida         D2017–PTCP–006 .....        This project will complete the installation of the established Interoper-      31,633,176
                                                                      Regional                                          able Electronic Train Management System (I-ETMS) PTC tech-
                                                                      Transportation                                    nology consisting of wayside interface units, near side station con-
                                                                      Authority                                         trols, base radio stations, a back office server, on-board PTC kits,
                                                                      (SFRTA).                                          and a crew training simulator on the South Florida Rail Corridor.
                                                FL .............    Florida Depart-       D2017–PTCP–007 .....        This project will implement the Interoperable Electronic Train Man-             1,841,153
                                                                      ment of Trans-                                    agement System (I–ETMS) computer-aided dispatch system, track
                                                                      portation                                         database, and communication network, along 110 miles of the
                                                                      (FDOT).                                           Central Florida Rail Corridor.
                                                IL ..............   Commuter Rail         D2017–PTCP–008 .....        This project comprises three subprojects that include the installation         20,168,000
                                                                      Division of the                                   of wayside PTC signals, reconfiguration of signals, and upgrade of
                                                                      RTA (Metra).                                      existing PTC Automatic Block Signaling systems on Metra’s Mil-
                                                                                                                        waukee District West and North lines in Illinois.
                                                IL ..............   Illinois Depart-      D2017–PTCP–009 .....        This project will complete the design, delivery, installation, testing,        18,869,888
                                                                        ment of Trans-                                  and certification of a fully integrated Interoperable Electronic Train
                                                                        portation                                       Management System (I–ETMS) PTC on two contractual routes for
                                                                        (IDOT).                                         Amtrak’s use that comprise 14.7 route miles of Terminal Railroad
                                                                                                                        Association of St. Louis (TRRA) right-of-way into and out of St.
                                                                                                                        Louis, Missouri.
                                                MA ............     Massachusetts         D2017–PTCP–001 .....        This project will include the installation of a back office system for          7,815,963
                                                                     Bay Transpor-                                      PTC that consists of an existing Cab Signaling System (CSS) with
                                                                     tation Authority                                   Automatic Train Control (ATC) supplemented by the addition of the
                                                                     (MBTA).                                            latest revision to the Advanced Civil Speed Enforcement System II
                                                                                                                        (ACSES II) for the MBTA.
                                                MD ............     Maryland Transit      D2017–PTCP–004 .....        This project includes installing Interoperable Electronic Train Man-            9,440,000
                                                                     Administration                                     agement System (I–ETMS) PTC within the Northeast Corridor
                                                                     (MTA).                                             along MARC’s tracks, and equipping 11 MARC 2A cab cars with
                                                                                                                        I–ETMS. The work will be on the Penn Line between Washington,
                                                                                                                        D.C. Union Station and the northern limits of MARC service at
                                                                                                                        Perryville, MD, a total distance of approximately 77 directional
                                                                                                                        miles.
                                                MO ...........      Missouri Depart-      D2017–PTCP–012 .....        This project will design, deliver, install, test, and certify a fully inte-    12,024,877
                                                                      ment of Trans-                                    grated and functional Interoperable Electronic Train Management
                                                                      portation                                         System (I–ETMS) PTC over approximately 8.5 route miles of Kan-
                                                                      (MoDOT).                                          sas City Terminal Railway right-of-way where Amtrak operates in
                                                                                                                        the Kansas City metropolitan region of Missouri.
                                                NJ .............    New Jersey            D2017–PTCP–002 .....        This project will implement New Jersey Transit’s PTC Phase III,                10,000,000
                                                                      Transit Cor-                                      which involves the purchase of onboard equipment kits, along with
                                                                      poration (NJ                                      the installation, testing, and commissioning of the equipment on a
sradovich on DSK3GMQ082PROD with NOTICES




                                                                      Transit).                                         total of 440 locomotives, electric mobile units, and cab cars.
                                                NM ............     Rio Metro Re-         D2017–PTCP–010 .....        This project will include the installation of the Interoperable Electronic      3,600,000
                                                                      gional Transit                                    Train Management System (I–ETMS) PTC onboard technology on
                                                                      District (Rio                                     nine locomotives.
                                                                      Metro).




                                           VerDate Sep<11>2014       17:32 Nov 08, 2017   Jkt 244001   PO 00000   Frm 00059   Fmt 4703   Sfmt 4703   E:\FR\FM\09NON1.SGM   09NON1


                                                                                   Federal Register / Vol. 82, No. 216 / Thursday, November 9, 2017 / Notices                                                                                                   52097

                                                                        TABLE 1—FISCAL YEAR 2017 POSITIVE TRAIN CONTROL PROJECT SELECTIONS—Continued
                                                                                                                                                                                                                                                               Grant
                                                    State                Recipient                          Project ID                                                            Project description                                                         amount

                                                NY ............    New York State                 D2017–PTCP–003 .....                    This project will implement Advanced Civil Speed Enforcement Sys-                                                   33,749,974
                                                                    Department of                                                           tem (ACSES) PTC on the Amtrak controlled section of the Empire
                                                                    Transportation                                                          Corridor Hudson Line, a Federally Designated High Speed Rail
                                                                    (NYSDOT).                                                               Corridor, which spans multiple jurisdictions along its 94 miles from
                                                                                                                                            Poughkeepsie to Hoffmans, New York.
                                                OR ............    Oregon Depart-                 D2017–PTCP–016 .....                    This project will install and test PTC equipment on two Talgo Series                                                 1,200,000
                                                                     ment of Trans-                                                         8 trainsets owned by ODOT and operated by Amtrak for the re-
                                                                     portation                                                              gional Amtrak Cascades intercity passenger rail service connecting
                                                                     (ODOT).                                                                Eugene, Oregon to Vancouver, British Columbia.
                                                OR ............    Tri-County Met-                D2017–PTCP–017 .....                    This project will implement two PTC safety modifications on the 15                                                   2,704,000
                                                                     ropolitan                                                              mile long Westside Express (WES) commuter rail corridor from
                                                                     Transportation                                                         Wilsonville to Beaverton, Oregon. The first modification is de-
                                                                     District of Or-                                                        signed to positively stop a train in advance of a malfunctioning
                                                                     egon (TriMet).                                                         grade crossing, and the second modification will stop a train prior
                                                                                                                                            to a work zone or limit speed throughout the work zone.
                                                PA ............    Southeastern                   D2017–PTCP–005 .....                    This project will install the Advanced Civil Speed Enforcement Sys-                                                  5,800,000
                                                                     Pennsylvania                                                           tem (ACSES II) PTC System along a 3-mile portion of restored
                                                                     Transportation                                                         Regional Rail service from Elwyn to Wawa, Pennsylvania, and de-
                                                                     Authority                                                              ploy an onboard survey map software that contains the physical
                                                                     (SEPTA).                                                               characteristics of the railroad that dictate train operating speeds
                                                                                                                                            throughout SEPTA’s rail network.
                                                TX .............   Capital Metro-                 D2017–PTCP–011 .....                    This project will install the PTC fiber backbone for an Enhanced                                                     9,762,969
                                                                     politan Trans-                                                         Automatic Train Control (E–ATC) PTC system on Capital Metro’s
                                                                     portation Au-                                                          approximately 33 miles of its commuter rail territory in Austin, TX.
                                                                     thority (Capital
                                                                     Metro).
                                                UT ............    Utah Transit Au-               D2017–PTCP–013 .....                    This project involves the design and testing of a two-step No-Code                                                   3,520,000
                                                                     thority (UTA).                                                         Proceed system to assure the safe operation of UTA’s
                                                                                                                                            FrontRunner Enhanced Automated Train Control (E–ATC) PTC on
                                                                                                                                            its two mainline track segments from Provo to Ogden and Ogden
                                                                                                                                            to Pleasant View, Utah.

                                                      Total ..     ............................    ....................................   ...............................................................................................................   $197,010,000



                                                [FR Doc. 2017–24364 Filed 11–8–17; 8:45 am]                                Written comments may be submitted by                                          —Geographic Region: ‘‘Florida’’
                                                BILLING CODE P                                                             hand or by mail to the Docket Clerk,
                                                                                                                                                                                                         The complete application is given in
                                                                                                                           U.S. Department of Transportation,
                                                                                                                                                                                                         DOT docket MARAD–2017–0179 at
                                                                                                                           Docket Operations, M–30, West
                                                                                                                                                                                                         http://www.regulations.gov. Interested
                                                DEPARTMENT OF TRANSPORTATION                                               Building Ground Floor, Room W12–140,
                                                                                                                                                                                                         parties may comment on the effect this
                                                                                                                           1200 New Jersey Avenue SE.,
                                                Maritime Administration                                                                                                                                  action may have on U.S. vessel builders
                                                                                                                           Washington, DC 20590. You may also
                                                                                                                                                                                                         or businesses in the U.S. that use U.S.-
                                                [Docket No. MARAD–2017–0179]                                               send comments electronically via the
                                                                                                                                                                                                         flag vessels. If MARAD determines, in
                                                                                                                           Internet at http://www.regulations.gov.
                                                                                                                                                                                                         accordance with 46 U.S.C. 12121 and
                                                Requested Administrative Waiver of                                         All comments will become part of this
                                                                                                                                                                                                         MARAD’s regulations at 46 CFR part
                                                the Coastwise Trade Laws: Vessel                                           docket and will be available for
                                                                                                                                                                                                         388, that the issuance of the waiver will
                                                DOS HOMBRES; Invitation for Public                                         inspection and copying at the above
                                                                                                                                                                                                         have an unduly adverse effect on a U.S.-
                                                Comments                                                                   address between 10:00 a.m. and 5:00
                                                                                                                                                                                                         vessel builder or a business that uses
                                                                                                                           p.m., Monday through Friday, except
                                                AGENCY: Maritime Administration,                                                                                                                         U.S.-flag vessels in that business, a
                                                                                                                           federal holidays. An electronic version
                                                Department of Transportation.                                                                                                                            waiver will not be granted. Comments
                                                                                                                           of this document and all documents
                                                ACTION: Notice.                                                                                                                                          should refer to the docket number of
                                                                                                                           entered into this docket is available at
                                                                                                                                                                                                         this notice and the vessel name in order
                                                SUMMARY:   The Secretary of                                                http://www.regulations.gov.
                                                                                                                                                                                                         for MARAD to properly consider the
                                                Transportation, as represented by the                                      FOR FURTHER INFORMATION CONTACT:                                              comments. Comments should also state
                                                Maritime Administration (MARAD), is                                        Bianca Carr, U.S. Department of                                               the commenter’s interest in the waiver
                                                authorized to grant waivers of the U.S.-                                   Transportation, Maritime                                                      application, and address the waiver
                                                build requirement of the coastwise laws                                    Administration, 1200 New Jersey                                               criteria given in § 388.4 of MARAD’s
                                                under certain circumstances. A request                                     Avenue SE., Room W23–453,                                                     regulations at 46 CFR part 388.
                                                for such a waiver has been received by                                     Washington, DC 20590. Telephone 202–
sradovich on DSK3GMQ082PROD with NOTICES




                                                MARAD. The vessel, and a brief                                             366–9309, Email Bianca.carr@dot.gov.                                          Privacy Act
                                                description of the proposed service, is                                    SUPPLEMENTARY INFORMATION: As                                                   In accordance with 5 U.S.C. 553(c),
                                                listed below.                                                              described by the applicant the intended                                       DOT/MARAD solicits comments from
                                                DATES: Submit comments on or before                                        service of the vessel DOS HOMBRES is:                                         the public to better inform its
                                                December 11, 2017.                                                         —Intended Commercial Use of Vessel:                                           rulemaking process. DOT/MARAD posts
                                                ADDRESSES: Comments should refer to                                          ‘‘Scuba Dive Charters and Sport                                             these comments, without edit, to
                                                docket number MARAD–2017–0179.                                               Fishing Charters’’                                                          www.regulations.gov, as described in


                                           VerDate Sep<11>2014      17:32 Nov 08, 2017            Jkt 244001      PO 00000        Frm 00060       Fmt 4703        Sfmt 4703       E:\FR\FM\09NON1.SGM                 09NON1



Document Created: 2018-10-25 10:30:35
Document Modified: 2018-10-25 10:30:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
ContactRecipients selected for competitive funding in Table 1 should contact the appropriate FTA Regional Office for information regarding applying for the funds or program-specific information. A list of FTA's Regional Offices can be found at www.fta.dot.gov. For questions regarding PTC technology or statutory and regulatory requirements, please contact Mr. Devin Rouse, Program Manager, Federal Railroad Administration (phone: (202) 493-6185, email: [email protected]). A TDD is available at 1-800-877-8339 (TDD/FIRS).
FR Citation82 FR 52095 