82_FR_57668 82 FR 57436 - National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Planned FM100 Modernization Project and Request for Comments on Environmental Issues

82 FR 57436 - National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Planned FM100 Modernization Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 232 (December 5, 2017)

Page Range57436-57438
FR Document2017-26140

Federal Register, Volume 82 Issue 232 (Tuesday, December 5, 2017)
[Federal Register Volume 82, Number 232 (Tuesday, December 5, 2017)]
[Notices]
[Pages 57436-57438]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26140]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF17-10-000]


National Fuel Gas Supply Corporation; Notice of Intent To Prepare 
an Environmental Assessment for the Planned FM100 Modernization Project 
and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the FM100 Modernization Project 
involving construction and operation of facilities by National Fuel Gas 
Supply Corporation (National Fuel) in Cameron, Clearfield, Elk, McKean, 
and Potter Counties, Pennsylvania. The Commission will use this EA in 
its decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before December 29, 2017.
    If you sent comments on this project to the Commission before the 
opening of this docket on September 14, 2017, you will need to file 
those comments in Docket No. PF17-10-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow 
these instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
eRegister. If you are filing a comment on a particular project, please 
select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(PF17-10-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Planned Project

    National Fuel plans to abandon, construct, and operate certain 
pipeline and compressor facilities in order to modernize its system to 
meet existing delivery requirements. The FM100 Modernization Project 
would consist of the following facilities and actions:
     Abandonment in place of approximately 12 miles of 12-inch-
diameter pipeline (Line FM120) in Cameron and Elk Counties;
     abandonment in place of approximately 44.9 miles of 12-
inch-diameter pipeline (Line FM100) in Clearfield, Cameron, Elk, and 
Potter Counties;
     abandonment by removal of the existing Costello Compressor 
Station in Potter County;
     installation of 28.9 miles of new 12- or 16-inch-diameter 
natural gas pipeline in McKean and Potter Counties; \1\
---------------------------------------------------------------------------

    \1\ National Fuel is currently gauging interest from shippers 
along this section of new pipeline. If enough interest is received, 
National Fuel may expand the pipeline diameter from 12 to 16 inches, 
resulting in an increase in capacity on National Fuel's system, 
making the project an expansion project.
---------------------------------------------------------------------------

     installation of the new Marvindale Compressor Station (up 
to 2,000 horsepower) in McKean County;

[[Page 57437]]

     installation of 1.2 miles of 24-inch-diameter natural gas 
pipeline loop \2\ in Potter County;
---------------------------------------------------------------------------

    \2\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
---------------------------------------------------------------------------

     installation of approximately 12.5 miles of 6-inch-
diameter FlexSteel(copyright) pipeline into National Fuel's 
existing Line FM120 in Elk and Cameron Counties;
     installation of approximately 355 feet of 6-inch-diameter 
pipeline and aboveground piping/valves to replace the existing FM120 
pipeline in order to keep an existing producer delivery point tied into 
the system in Cameron County; and
     installation of interconnects, valves, metering, and other 
appurtenant facilities.
    The general location of the project facilities is shown in appendix 
1.\3\
---------------------------------------------------------------------------

    \3\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Preliminary calculations are that construction of the planned 
facilities would disturb about 369 acres of land for the aboveground 
facilities, insertion, and the construction of the pipelines. Following 
construction, National Fuel would maintain about 188 acres for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and revert to former uses. About 93 percent of the 
planned pipeline route parallels existing pipeline, utility, or road 
rights-of-way. National Fuel is still determining the disturbance 
required for the abandonment of lines FM100 and FM120.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\4\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \4\ We, us, and our refer to the environmental staff of the 
Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     socioeconomics;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before 
the FERC receives an application. As part of our pre-filing review, we 
have begun to contact some federal and state agencies to discuss their 
involvement in the scoping process and the preparation of the EA.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before we make our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this project to formally cooperate with us in the 
preparation of the EA.\5\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \5\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for Section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the Pennsylvania State Historic Preservation Office, and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\6\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under Section 106.
---------------------------------------------------------------------------

    \6\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. This list also includes all affected landowners (as defined 
in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the planned project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

[[Page 57438]]

Becoming an Intervenor

    Once National Fuel files its application with the Commission, you 
may want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Motions to intervene are more fully described at 
http://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions 
for becoming an intervenor are in the ``Document-less Intervention 
Guide'' under the ``e-filing'' link on the Commission's Web site. 
Please note that the Commission will not accept requests for intervenor 
status at this time. You must wait until the Commission receives a 
formal application for the project.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., PF17-
10). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: November 29, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26140 Filed 12-4-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                57436                       Federal Register / Vol. 82, No. 232 / Tuesday, December 5, 2017 / Notices

                                                   Description: § 205(d) Rate Filing:                   Counties, Pennsylvania. The                           comments to the Commission. The
                                                Revised MBR Tariff to be effective                      Commission will use this EA in its                    Commission encourages electronic filing
                                                11/30/2017.                                             decision-making process to determine                  of comments and has expert staff
                                                   Filed Date: 11/29/17.                                whether the project is in the public                  available to assist you at (202) 502–8258
                                                   Accession Number: 20171129–5058.                     convenience and necessity.                            or FercOnlineSupport@ferc.gov. Please
                                                   Comments Due: 5 p.m. ET 12/20/17.                       This notice announces the opening of               carefully follow these instructions so
                                                   Docket Numbers: ER18–346–000.                        the scoping process the Commission                    that your comments are properly
                                                   Applicants: New England Power                        will use to gather input from the public              recorded.
                                                Company.                                                and interested agencies on the project.                  (1) You can file your comments
                                                   Description: § 205(d) Rate Filing:                   You can make a difference by providing                electronically using the eComment
                                                Related Facilities Agreement with                       us with your specific comments or                     feature on the Commission’s Web site
                                                Granite Reliable Power, LLC to be                       concerns about the project. Your                      (www.ferc.gov) under the link to
                                                effective 11/1/2017.                                    comments should focus on the potential                Documents and Filings. This is an easy
                                                   Filed Date: 11/29/17.                                environmental effects, reasonable                     method for submitting brief, text-only
                                                   Accession Number: 20171129–5085.                     alternatives, and measures to avoid or                comments on a project;
                                                   Comments Due: 5 p.m. ET 12/20/17.                    lessen environmental impacts. Your                       (2) You can file your comments
                                                   The filings are accessible in the                    input will help the Commission staff                  electronically by using the eFiling
                                                Commission’s eLibrary system by                         determine what issues they need to                    feature on the Commission’s Web site
                                                clicking on the links or querying the                   evaluate in the EA. To ensure that your               (www.ferc.gov) under the link to
                                                docket number.                                          comments are timely and properly                      Documents and Filings. With eFiling,
                                                   Any person desiring to intervene or                  recorded, please send your comments so                you can provide comments in a variety
                                                protest in any of the above proceedings                 that the Commission receives them in                  of formats by attaching them as a file
                                                must file in accordance with Rules 211                  Washington, DC on or before December                  with your submission. New eFiling
                                                and 214 of the Commission’s                             29, 2017.                                             users must first create an account by
                                                                                                           If you sent comments on this project               clicking on eRegister. If you are filing a
                                                Regulations (18 CFR 385.211 and
                                                                                                        to the Commission before the opening of               comment on a particular project, please
                                                385.214) on or before 5:00 p.m. Eastern
                                                                                                        this docket on September 14, 2017, you                select ‘‘Comment on a Filing’’ as the
                                                time on the specified comment date.
                                                                                                        will need to file those comments in                   filing type; or
                                                Protests may be considered, but                                                                                  (3) You can file a paper copy of your
                                                intervention is necessary to become a                   Docket No. PF17–10–000 to ensure they
                                                                                                        are considered as part of this                        comments by mailing them to the
                                                party to the proceeding.                                                                                      following address. Be sure to reference
                                                   eFiling is encouraged. More detailed                 proceeding.
                                                                                                           This notice is being sent to the                   the project docket number (PF17–10–
                                                information relating to filing                                                                                000) with your submission: Kimberly D.
                                                                                                        Commission’s current environmental
                                                requirements, interventions, protests,                                                                        Bose, Secretary, Federal Energy
                                                                                                        mailing list for this project. State and
                                                service, and qualifying facilities filings                                                                    Regulatory Commission, 888 First Street
                                                                                                        local government representatives should
                                                can be found at: http://www.ferc.gov/                                                                         NE., Room 1A, Washington, DC 20426.
                                                                                                        notify their constituents of this planned
                                                docs-filing/efiling/filing-req.pdf. For
                                                                                                        project and encourage them to comment                 Summary of the Planned Project
                                                other information, call (866) 208–3676
                                                                                                        on their areas of concern.
                                                (toll free). For TTY, call (202) 502–8659.                 If you are a landowner receiving this                National Fuel plans to abandon,
                                                  Dated: November 29, 2017.                             notice, a pipeline company                            construct, and operate certain pipeline
                                                Nathaniel J. Davis, Sr.,                                representative may contact you about                  and compressor facilities in order to
                                                Deputy Secretary.                                       the acquisition of an easement to                     modernize its system to meet existing
                                                                                                        construct, operate, and maintain the                  delivery requirements. The FM100
                                                [FR Doc. 2017–26132 Filed 12–4–17; 8:45 am]
                                                                                                        planned facilities. The company would                 Modernization Project would consist of
                                                BILLING CODE 6717–01–P
                                                                                                        seek to negotiate a mutually acceptable               the following facilities and actions:
                                                                                                        agreement. However, if the Commission                   • Abandonment in place of
                                                                                                        approves the project, that approval                   approximately 12 miles of 12-inch-
                                                DEPARTMENT OF ENERGY
                                                                                                        conveys with it the right of eminent                  diameter pipeline (Line FM120) in
                                                Federal Energy Regulatory                               domain. Therefore, if easement                        Cameron and Elk Counties;
                                                Commission                                                                                                      • abandonment in place of
                                                                                                        negotiations fail to produce an
                                                                                                                                                              approximately 44.9 miles of 12-inch-
                                                [Docket No. PF17–10–000]                                agreement, the pipeline company could
                                                                                                                                                              diameter pipeline (Line FM100) in
                                                                                                        initiate condemnation proceedings
                                                                                                                                                              Clearfield, Cameron, Elk, and Potter
                                                National Fuel Gas Supply Corporation;                   where compensation would be
                                                                                                                                                              Counties;
                                                Notice of Intent To Prepare an                          determined in accordance with state                     • abandonment by removal of the
                                                Environmental Assessment for the                        law.                                                  existing Costello Compressor Station in
                                                Planned FM100 Modernization Project                        A fact sheet prepared by the FERC                  Potter County;
                                                and Request for Comments on                             entitled ‘‘An Interstate Natural Gas                    • installation of 28.9 miles of new 12-
                                                Environmental Issues                                    Facility On My Land? What Do I Need                   or 16-inch-diameter natural gas pipeline
                                                                                                        To Know?’’ is available for viewing on                in McKean and Potter Counties; 1
                                                  The staff of the Federal Energy                       the FERC Web site (www.ferc.gov). This                  • installation of the new Marvindale
                                                Regulatory Commission (FERC or                          fact sheet addresses a number of                      Compressor Station (up to 2,000
                                                Commission) will prepare an
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        typically asked questions, including the              horsepower) in McKean County;
                                                environmental assessment (EA) that will                 use of eminent domain and how to
                                                discuss the environmental impacts of                    participate in the Commission’s                         1 National Fuel is currently gauging interest from
                                                the FM100 Modernization Project                         proceedings.                                          shippers along this section of new pipeline. If
                                                involving construction and operation of                                                                       enough interest is received, National Fuel may
                                                facilities by National Fuel Gas Supply                  Public Participation                                  expand the pipeline diameter from 12 to 16 inches,
                                                                                                                                                              resulting in an increase in capacity on National
                                                Corporation (National Fuel) in Cameron,                   For your convenience, there are three               Fuel’s system, making the project an expansion
                                                Clearfield, Elk, McKean, and Potter                     methods you can use to submit your                    project.



                                           VerDate Sep<11>2014   18:13 Dec 04, 2017   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\05DEN1.SGM   05DEN1


                                                                             Federal Register / Vol. 82, No. 232 / Tuesday, December 5, 2017 / Notices                                                       57437

                                                   • installation of 1.2 miles of 24-inch-               filed comments during the preparation                 Consultations Under Section 106 of the
                                                diameter natural gas pipeline loop 2 in                  of the EA.                                            National Historic Preservation Act
                                                Potter County;                                              In the EA we will discuss impacts that
                                                   • installation of approximately 12.5                  could occur as a result of the                          In accordance with the Advisory
                                                miles of 6-inch-diameter FlexSteel©                      construction and operation of the                     Council on Historic Preservation’s
                                                pipeline into National Fuel’s existing                   planned project under these general                   implementing regulations for Section
                                                Line FM120 in Elk and Cameron                            headings:                                             106 of the National Historic
                                                Counties;                                                   • Geology and soils;                               Preservation Act, we are using this
                                                   • installation of approximately 355                      • land use;                                        notice to initiate consultation with the
                                                feet of 6-inch-diameter pipeline and                                                                           Pennsylvania State Historic Preservation
                                                                                                            • water resources, fisheries, and
                                                aboveground piping/valves to replace                                                                           Office, and to solicit their views and
                                                                                                         wetlands;
                                                the existing FM120 pipeline in order to                                                                        those of other government agencies,
                                                                                                            • cultural resources;
                                                keep an existing producer delivery point                                                                       interested Indian tribes, and the public
                                                                                                            • vegetation and wildlife;                         on the project’s potential effects on
                                                tied into the system in Cameron County;
                                                                                                            • socioeconomics;                                  historic properties.6 We will define the
                                                and
                                                   • installation of interconnects, valves,                 • air quality and noise;                           project-specific Area of Potential Effects
                                                metering, and other appurtenant                             • endangered and threatened species;               (APE) in consultation with the SHPO as
                                                facilities.                                                 • public safety; and                               the project develops. On natural gas
                                                   The general location of the project                      • cumulative impacts.                              facility projects, the APE at a minimum
                                                facilities is shown in appendix 1.3                         We will also evaluate possible                     encompasses all areas subject to ground
                                                                                                         alternatives to the planned project or                disturbance (examples include
                                                Land Requirements for Construction                       portions of the project, and make                     construction right-of-way, contractor/
                                                  Preliminary calculations are that                      recommendations on how to lessen or                   pipe storage yards, compressor stations,
                                                construction of the planned facilities                   avoid impacts on the various resource                 and access roads). Our EA for this
                                                would disturb about 369 acres of land                    areas.                                                project will document our findings on
                                                for the aboveground facilities, insertion,                  Although no formal application has                 the impacts on historic properties and
                                                and the construction of the pipelines.                   been filed, we have already initiated our             summarize the status of consultations
                                                Following construction, National Fuel                    NEPA review under the Commission’s                    under Section 106.
                                                would maintain about 188 acres for                       pre-filing process. The purpose of the
                                                permanent operation of the project’s                     pre-filing process is to encourage early              Environmental Mailing List
                                                facilities; the remaining acreage would                  involvement of interested stakeholders                   The environmental mailing list
                                                be restored and revert to former uses.                   and to identify and resolve issues before             includes federal, state, and local
                                                About 93 percent of the planned                          the FERC receives an application. As                  government representatives and
                                                pipeline route parallels existing                        part of our pre-filing review, we have                agencies; elected officials; Native
                                                pipeline, utility, or road rights-of-way.                begun to contact some federal and state               American Tribes; other interested
                                                National Fuel is still determining the                   agencies to discuss their involvement in              parties; and local libraries and
                                                disturbance required for the                             the scoping process and the preparation               newspapers. This list also includes all
                                                abandonment of lines FM100 and                           of the EA.                                            affected landowners (as defined in the
                                                FM120.                                                      The EA will present our independent                Commission’s regulations) who are
                                                The EA Process                                           analysis of the issues. The EA will be                potential right-of-way grantors, whose
                                                                                                         available in the public record through                property may be used temporarily for
                                                  The National Environmental Policy                      eLibrary. Depending on the comments                   project purposes, or who own homes
                                                Act (NEPA) requires the Commission to                    received during the scoping process, we               within certain distances of aboveground
                                                take into account the environmental                      may also publish and distribute the EA                facilities, and anyone who submits
                                                impacts that could result from an action                 to the public for an allotted comment                 comments on the project. We will
                                                whenever it considers the issuance of a                  period. We will consider all comments                 update the environmental mailing list as
                                                Certificate of Public Convenience and                    on the EA before we make our                          the analysis proceeds to ensure that we
                                                Necessity. NEPA also requires us 4 to                    recommendations to the Commission.                    send the information related to this
                                                discover and address concerns the                        To ensure we have the opportunity to                  environmental review to all individuals,
                                                public may have about proposals. This                    consider and address your comments,                   organizations, and government entities
                                                process is referred to as scoping. The                   please carefully follow the instructions              interested in and/or potentially affected
                                                main goal of the scoping process is to                   in the Public Participation section,                  by the planned project.
                                                focus the analysis in the EA on the                      beginning on page 2.
                                                important environmental issues. By this                     With this notice, we are asking                       If we publish and distribute the EA,
                                                notice, the Commission requests public                   agencies with jurisdiction by law and/                copies will be sent to the environmental
                                                comments on the scope of the issues to                   or special expertise with respect to the              mailing list for public review and
                                                address in the EA. We will consider all                  environmental issues related to this                  comment. If you would prefer to receive
                                                                                                         project to formally cooperate with us in              a paper copy of the document instead
                                                  2 A pipeline loop is a segment of pipe constructed
                                                                                                         the preparation of the EA.5 Agencies                  of the CD version or would like to
                                                parallel to an existing pipeline to increase capacity.
                                                                                                         that would like to request cooperating                remove your name from the mailing list,
                                                  3 The appendices referenced in this notice will
                                                                                                         agency status should follow the                       please return the attached Information
                                                not appear in the Federal Register. Copies of the
sradovich on DSK3GMQ082PROD with NOTICES




                                                appendices were sent to all those receiving this         instructions for filing comments                      Request (appendix 2).
                                                notice in the mail and are available at www.ferc.gov     provided under the Public Participation
                                                using the link called ‘‘eLibrary’’ or from the                                                                   6 The Advisory Council on Historic Preservation
                                                Commission’s Public Reference Room, 888 First
                                                                                                         section of this notice.
                                                                                                                                                               regulations are at Title 36, Code of Federal
                                                Street NE., Washington, DC 20426, or call (202)                                                                Regulations, Part 800. Those regulations define
                                                502–8371. For instructions on connecting to                5 The Council on Environmental Quality              historic properties as any prehistoric or historic
                                                eLibrary, refer to the last page of this notice.         regulations addressing cooperating agency             district, site, building, structure, or object included
                                                  4 We, us, and our refer to the environmental staff     responsibilities are at Title 40, Code of Federal     in or eligible for inclusion in the National Register
                                                of the Commission’s Office of Energy Projects.           Regulations, Part 1501.6.                             of Historic Places.



                                           VerDate Sep<11>2014   18:13 Dec 04, 2017   Jkt 244001   PO 00000   Frm 00015    Fmt 4703   Sfmt 4703   E:\FR\FM\05DEN1.SGM   05DEN1


                                                57438                       Federal Register / Vol. 82, No. 232 / Tuesday, December 5, 2017 / Notices

                                                Becoming an Intervenor                                  DEPARTMENT OF ENERGY                                     Docket Numbers: ER18–333–000.
                                                                                                                                                                 Applicants: Pacific Gas and Electric
                                                   Once National Fuel files its
                                                                                                        Federal Energy Regulatory                             Company.
                                                application with the Commission, you
                                                                                                        Commission                                               Description: § 205(d) Rate Filing: E&P
                                                may want to become an ‘‘intervenor’’
                                                                                                                                                              Agreement for Proxima Solar, LLC to be
                                                which is an official party to the                       Combined Notice of Filings #1                         effective 11/29/2017.
                                                Commission’s proceeding. Intervenors
                                                                                                           Take notice that the Commission                       Filed Date: 11/28/17.
                                                play a more formal role in the process                                                                           Accession Number: 20171128–5067.
                                                and are able to file briefs, appear at                  received the following electric corporate
                                                                                                        filings:                                                 Comments Due: 5 p.m. ET 12/19/17.
                                                hearings, and be heard by the courts if
                                                they choose to appeal the Commission’s                     Docket Numbers: EC17–138–001.                         Docket Numbers: ER18–334–000.
                                                                                                                                                                 Applicants: Cuyama Solar, LLC.
                                                final ruling. An intervenor formally                       Applicants: 83WI 8me, LLC.
                                                                                                                                                                 Description: § 205(d) Rate Filing:
                                                participates in the proceeding by filing                   Description: Notification of certain
                                                                                                                                                              Revised Market Based Rate Tariff to be
                                                a request to intervene. Motions to                      non-material changes of 83WI 8me, LLC.
                                                                                                           Filed Date: 11/27/17.                              effective 1/28/2018.
                                                intervene are more fully described at
                                                                                                                                                                 Filed Date: 11/28/17.
                                                http://www.ferc.gov/resources/guides/                      Accession Number: 20171127–5146.
                                                                                                                                                                 Accession Number: 20171128–5087.
                                                how-to/intervene.asp. Instructions for                     Comments Due: 5 p.m. ET 12/18/17.
                                                                                                                                                                 Comments Due: 5 p.m. ET 12/19/17.
                                                becoming an intervenor are in the                          Docket Numbers: EC18–25–000.
                                                ‘‘Document-less Intervention Guide’’                                                                             Docket Numbers: ER18–335–000.
                                                                                                           Applicants: Imperial Valley Solar 3,
                                                under the ‘‘e-filing’’ link on the                                                                               Applicants: Luning Energy Holdings
                                                                                                        LLC.
                                                Commission’s Web site. Please note that                                                                       LLC.
                                                                                                           Description: Application for
                                                                                                                                                                 Description: Tariff Cancellation:
                                                the Commission will not accept requests                 Authorization Under Section 203 of the
                                                                                                                                                              Notice of Cancellation of Market-Based
                                                for intervenor status at this time. You                 Federal Power Act for the Acquisition of
                                                                                                                                                              Rate Tariff to be effective 1/28/2018.
                                                must wait until the Commission                          Jurisdictional Facilities and Request for
                                                                                                                                                                 Filed Date: 11/28/17.
                                                receives a formal application for the                   Expedited Consideration of Imperial                      Accession Number: 20171128–5092.
                                                project.                                                Valley Solar 3, LLC.                                     Comments Due: 5 p.m. ET 12/19/17.
                                                                                                           Filed Date: 11/28/17.
                                                Additional Information                                                                                           The filings are accessible in the
                                                                                                           Accession Number: 20171128–5091.
                                                   Additional information about the                        Comments Due: 5 p.m. ET 12/19/17.                  Commission’s eLibrary system by
                                                project is available from the                                                                                 clicking on the links or querying the
                                                                                                           Take notice that the Commission
                                                Commission’s Office of External Affairs,                                                                      docket number.
                                                                                                        received the following electric rate                     Any person desiring to intervene or
                                                at (866) 208–FERC, or on the FERC Web                   filings:
                                                site (www.ferc.gov) using the eLibrary                                                                        protest in any of the above proceedings
                                                                                                           Docket Numbers: ER17–2318–001.                     must file in accordance with Rules 211
                                                link. Click on the eLibrary link, click on                 Applicants: Cuyama Solar, LLC.
                                                General Search and enter the docket                                                                           and 214 of the Commission’s
                                                                                                           Description: Notice of Change in                   Regulations (18 CFR 385.211 and
                                                number, excluding the last three digits                 Status of Cuyama Solar, LLC.
                                                in the Docket Number field (i.e., PF17–                                                                       385.214) on or before 5:00 p.m. Eastern
                                                                                                           Filed Date: 11/28/17.                              time on the specified comment date.
                                                10). Be sure you have selected an                          Accession Number: 20171128–5098.
                                                appropriate date range. For assistance,                                                                       Protests may be considered, but
                                                                                                           Comments Due: 5 p.m. ET 12/19/17.                  intervention is necessary to become a
                                                please contact FERC Online Support at
                                                FercOnlineSupport@ferc.gov or toll free                    Docket Numbers: ER18–319–001.                      party to the proceeding.
                                                at (866) 208–3676, or for TTY, contact                     Applicants: Southwest Power Pool,                     eFiling is encouraged. More detailed
                                                (202) 502–8659. The eLibrary link also                  Inc.                                                  information relating to filing
                                                provides access to the texts of formal                     Description: Compliance filing: Errata             requirements, interventions, protests,
                                                documents issued by the Commission,                     to Compliance Filing in ER18–319 to be                service, and qualifying facilities filings
                                                such as orders, notices, and                            effective 10/19/2017.                                 can be found at: http://www.ferc.gov/
                                                                                                           Filed Date: 11/28/17.                              docs-filing/efiling/filing-req.pdf. For
                                                rulemakings.
                                                                                                           Accession Number: 20171128–5051.                   other information, call (866) 208–3676
                                                   In addition, the Commission offers a
                                                                                                           Comments Due: 5 p.m. ET 12/19/17.                  (toll free). For TTY, call (202) 502–8659.
                                                free service called eSubscription which
                                                allows you to keep track of all formal                     Docket Numbers: ER18–331–000.                        Dated: November 28, 2017.
                                                issuances and submittals in specific                       Applicants: PJM Interconnection,                   Nathaniel J. Davis, Sr.,
                                                dockets. This can reduce the amount of                  L.L.C.
                                                                                                                                                              Deputy Secretary.
                                                time you spend researching proceedings                     Description: § 205(d) Rate Filing:
                                                                                                                                                              [FR Doc. 2017–26097 Filed 12–4–17; 8:45 am]
                                                by automatically providing you with                     Queue #Z1–069/AB1–160, Second
                                                                                                                                                              BILLING CODE 6717–01–P
                                                notification of these filings, document                 Revised Service Agreement No. 4315 to
                                                summaries, and direct links to the                      be effective 10/26/2017.
                                                documents. Go to www.ferc.gov/docs-                        Filed Date: 11/27/17.
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                filing/esubscription.asp.                                  Accession Number: 20171127–5108.
                                                   Finally, public sessions or site visits                 Comments Due: 5 p.m. ET 12/18/17.                  Federal Energy Regulatory
                                                will be posted on the Commission’s                         Docket Numbers: ER18–332–000.                      Commission
                                                calendar located at www.ferc.gov/                          Applicants: Southwest Power Pool,
                                                                                                                                                              [Docket No. CP17–469–000]
sradovich on DSK3GMQ082PROD with NOTICES




                                                EventCalendar/EventsList.aspx along                     Inc.
                                                with other related information.                            Description: § 205(d) Rate Filing: 3378            WBI Energy Transmission, Inc.; Notice
                                                                                                        MKEC & Ninnescah Rural Electric                       of Schedule for Environmental Review
                                                  Dated: November 29, 2017.
                                                                                                        Interconnection Agr to be effective                   of the Billy Creek Storage Field
                                                Kimberly D. Bose,                                       11/15/2017.
                                                Secretary.                                                                                                    Abandonment Project
                                                                                                           Filed Date: 11/28/17.
                                                [FR Doc. 2017–26140 Filed 12–4–17; 8:45 am]                Accession Number: 20171128–5001.                     On June 30, 2017, WBI Energy
                                                BILLING CODE 6717–01–P                                     Comments Due: 5 p.m. ET 12/19/17.                  Transmission, Inc. (WBI) filed an


                                           VerDate Sep<11>2014   18:13 Dec 04, 2017   Jkt 244001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\05DEN1.SGM   05DEN1



Document Created: 2017-12-04 23:45:12
Document Modified: 2017-12-04 23:45:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 57436 