82_FR_57825 82 FR 57592 - Turlock Irrigation District, Modesto Irrigation District; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

82 FR 57592 - Turlock Irrigation District, Modesto Irrigation District; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 233 (December 6, 2017)

Page Range57592-57593
FR Document2017-26247

Federal Register, Volume 82 Issue 233 (Wednesday, December 6, 2017)
[Federal Register Volume 82, Number 233 (Wednesday, December 6, 2017)]
[Notices]
[Pages 57592-57593]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26247]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14581-002]


Turlock Irrigation District, Modesto Irrigation District; Notice 
of Application Accepted for Filing, Soliciting Motions To Intervene and 
Protests, Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Preliminary Terms and Conditions, and Preliminary 
Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major License.
    b. Project No.: 14581-002.
    c. Date filed: October 11, 2017.
    d. Applicant: Turlock Irrigation District (TID) and Modesto 
Irrigation District (MID) (Districts).
    e. Name of Project: La Grange Hydroelectric Project,
    f. Location: The La Grange Project is located on the Tuolumne River 
in Stanislaus and Tuolumne Counties, California. Portions of the 
project occupy public lands managed by the Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333 
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and 
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto, 
CA 95352, (209) 526-7384.
    i. FERC Contact: Jim Hastreiter at (503) 552-2760 or 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at

[[Page 57593]]

[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14581-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The La Grange Project consists of the following existing 
facilities: (1) La Grange dam, a 310-foot-long, 131-foot-high, masonry 
arch dam; (2) La Grange reservoir with a storage capacity of about 500 
acre-feet; (3) MID headworks, canal, and sluice gates are part of MID's 
retired irrigation canal facilities; (4) TID irrigation intake and 
tunnel; (5) a powerhouse with two Francis turbine-generator units with 
a maximum capacity of 4.9 megawatts. The project's estimated average 
annual generation is about 19,638 megawatt-hours.
    The Districts propose to: (1) Provide a minimum flow of 
approximately 5 to 10 cubic feet per second to the plunge pool 
downstream of La Grange diversion dam at all times; (2) install a fish 
exclusion barrier at the TID sluice channel entrance; (3) conduct 
dissolved oxygen monitoring in the vicinity of the La Grange 
powerhouse; (4) construct a recreational foot trail extending from the 
former Don Pedro Visitor Center parking lot to the La Grange headpond; 
and (5) develop an HPMP in consultation with Tribes, Bureau of Land 
Management, and State Historical Preservation Officer to manage 
potential effects on historic properties.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title PROTEST, 
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, 
PRELIMINARY TERMS AND CONDITIONS, or PRELIMINARY FISHWAY PRESCRIPTIONS; 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary      January 2018.
 terms and conditions, and preliminary
 fishway prescriptions.
Commission issues Draft Environmental       August 2018.
 Statement (EIS).
Comments on Draft EIS.....................  October 2018.
Modified Terms and Conditions.............  December 2018.
Commission Issues Final EIS...............  March 2019.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: November 30, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-26247 Filed 12-5-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               57592                    Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices

                                               Agency NITSA NOA to be effective 2/                       Description: § 205(d) Rate Filing:                  DEPARTMENT OF ENERGY
                                               1/2018.                                                 November 2017 Western
                                                  Filed Date: 11/30/17.                                Interconnection Agreement Biannual                    Federal Energy Regulatory
                                                  Accession Number: 20171130–5084.                     Filing to be effective 2/1/2018.                      Commission
                                                  Comments Due: 5 p.m. ET 12/21/17.                      Filed Date: 11/30/17.                               [Project No. 14581–002]
                                                  Docket Numbers: ER18–353–000.                          Accession Number: 20171130–5161.
                                                  Applicants: New England Power Pool                                                                         Turlock Irrigation District, Modesto
                                               Participants Committee.                                   Comments Due: 5 p.m. ET 12/21/17.                   Irrigation District; Notice of Application
                                                  Description: § 205(d) Rate Filing: Dec                 Docket Numbers: ER18–360–000.                       Accepted for Filing, Soliciting Motions
                                               2017 Membership Filing to be effective                                                                        To Intervene and Protests, Ready for
                                                                                                         Applicants: Entergy Arkansas, Inc.
                                               12/1/2017.                                                                                                    Environmental Analysis, and Soliciting
                                                  Filed Date: 11/30/17.                                  Description: § 205(d) Rate Filing:                  Comments, Recommendations,
                                                  Accession Number: 20171130–5139.                     AECI LBA Agreement to be effective 12/                Preliminary Terms and Conditions, and
                                                  Comments Due: 5 p.m. ET 12/21/17.                    1/2017.                                               Preliminary Fishway Prescriptions
                                                  Docket Numbers: ER18–354–000.                          Filed Date: 11/30/17.
                                                                                                                                                                Take notice that the following
                                                  Applicants: PJM Interconnection,                       Accession Number: 20171130–5171.                    hydroelectric application has been filed
                                               L.L.C.                                                    Comments Due: 5 p.m. ET 12/21/17.                   with the Commission and is available
                                                  Description: § 205(d) Rate Filing:                                                                         for public inspection.
                                               Original Service Agreement No. 4849;                      Docket Numbers: ER18–361–000.                          a. Type of Application: Major License.
                                               Queue No. AA2–169 (WMPA) to be                            Applicants: Public Service Company                     b. Project No.: 14581–002.
                                               effective 11/16/2017.                                   of Oklahoma.                                             c. Date filed: October 11, 2017.
                                                  Filed Date: 11/30/17.                                                                                         d. Applicant: Turlock Irrigation
                                                                                                         Description: § 205(d) Rate Filing:
                                                  Accession Number: 20171130–5140.                                                                           District (TID) and Modesto Irrigation
                                                                                                       PSO–OGE Malcolm Road Delivery Point
                                                  Comments Due: 5 p.m. ET 12/21/17.                                                                          District (MID) (Districts).
                                                                                                       Agreement to be effective 11/2/2017.
                                                  Docket Numbers: ER18–355–000.                                                                                 e. Name of Project: La Grange
                                                  Applicants: PJM Interconnection,                       Filed Date: 11/30/17.                               Hydroelectric Project,
                                               L.L.C.                                                    Accession Number: 20171130–5186.                       f. Location: The La Grange Project is
                                                  Description: § 205(d) Rate Filing:                     Comments Due: 5 p.m. ET 12/21/17.                   located on the Tuolumne River in
                                               Cottonwood Dynamic Schedule                                                                                   Stanislaus and Tuolumne Counties,
                                               Agreement SA No. 4823 to be effective                     Docket Numbers: ER18–362–000.                       California. Portions of the project
                                               11/29/2017.                                               Applicants: AEP Texas Inc.                          occupy public lands managed by the
                                                  Filed Date: 11/30/17.                                  Description: § 205(d) Rate Filing:                  Bureau of Land Management.
                                                  Accession Number: 20171130–5142.                     AEPTX-Apex Midway Wind IA 3rd                            g. Filed Pursuant to: Federal Power
                                                  Comments Due: 5 p.m. ET 12/21/17.                    Amend & Restated to be effective 11/5/                Act, 16 U.S.C. 791(a)–825(r).
                                                  Docket Numbers: ER18–356–000.                        2017.                                                    h. Applicant Contacts: Steve Boyd,
                                                  Applicants: Duke Energy Carolinas,                                                                         Turlock Irrigation District, 333 East
                                                                                                         Filed Date: 11/30/17.                               Canal Drive, Turlock, California 95381–
                                               LLC.
                                                  Description: § 205(d) Rate Filing:                     Accession Number: 20171130–5187.                    0949, (209) 883–8300; and Anna
                                               Amendment to Due West-DEC NITSA to                        Comments Due: 5 p.m. ET 12/21/17.                   Brathwaite, Modesto Irrigation District,
                                               be effective 1/1/2018.                                                                                        P.O. Box 4060, Modesto, CA 95352,
                                                                                                          The filings are accessible in the                  (209) 526–7384.
                                                  Filed Date: 11/30/17.                                Commission’s eLibrary system by
                                                  Accession Number: 20171130–5148.                                                                              i. FERC Contact: Jim Hastreiter at
                                                                                                       clicking on the links or querying the                 (503) 552–2760 or james.hastreiter@
                                                  Comments Due: 5 p.m. ET 12/21/17.                    docket number.                                        ferc.gov.
                                                  Docket Numbers: ER18–357–000.                           Any person desiring to intervene or                   j. Deadline for filing motions to
                                                  Applicants: Pacific Gas and Electric                 protest in any of the above proceedings               intervene and protests, comments,
                                               Company.                                                must file in accordance with Rules 211                recommendations, preliminary terms
                                                  Description: § 205(d) Rate Filing:                   and 214 of the Commission’s                           and conditions, and preliminary
                                               November 2017 Western WDT Service                       Regulations (18 CFR 385.211 and                       prescriptions: 60 days from the issuance
                                               Agreement Biannual Filing to be                         385.214) on or before 5:00 p.m. Eastern               date of this notice; reply comments are
                                               effective 2/1/2018.                                     time on the specified comment date.                   due 105 days from the issuance date of
                                                  Filed Date: 11/30/17.                                Protests may be considered, but                       this notice.
                                                  Accession Number: 20171130–5153.                     intervention is necessary to become a                    The Commission strongly encourages
                                                  Comments Due: 5 p.m. ET 12/21/17.                    party to the proceeding.                              electronic filing. Please file motions to
                                                  Docket Numbers: ER18–358–000.                                                                              intervene, protests, comments,
                                                                                                          eFiling is encouraged. More detailed
                                                  Applicants: San Diego Gas & Electric                                                                       recommendations, preliminary terms
                                                                                                       information relating to filing
                                               Company.                                                                                                      and conditions, and preliminary
                                                                                                       requirements, interventions, protests,
                                                  Description: Fifth Annual                                                                                  fishway prescriptions using the
                                                                                                       service, and qualifying facilities filings
                                               Informational Filing [Cycle 5] of Fourth                                                                      Commission’s eFiling system at http://
                                                                                                       can be found at: http://www.ferc.gov/
                                               Transmission Owner Rate Formula rate                                                                          www.ferc.gov/docs-filing/efiling.asp.
                                                                                                       docs-filing/efiling/filing-req.pdf. For
                                               mechanism of San Diego Gas & Electric                                                                         Commenters can submit brief comments
                                                                                                       other information, call (866) 208–3676
daltland on DSKBBV9HB2PROD with NOTICES




                                               Company.                                                                                                      up to 6,000 characters, without prior
                                                                                                       (toll free). For TTY, call (202) 502–8659.
                                                  Filed Date: 11/30/17.                                                                                      registration, using the eComment system
                                                  Accession Number: 20171130–5155.                       Dated: November 30, 2017.                           at http://www.ferc.gov/docs-filing/
                                                  Comments Due: 5 p.m. ET 12/21/17.                    Nathaniel J. Davis, Sr.,                              ecomment.asp. You must include your
                                                  Docket Numbers: ER18–359–000.                        Deputy Secretary.                                     name and contact information at the end
                                                  Applicants: Pacific Gas and Electric                 [FR Doc. 2017–26241 Filed 12–5–17; 8:45 am]           of your comments. For assistance,
                                               Company.                                                BILLING CODE 6717–01–P                                please contact FERC Online Support at


                                          VerDate Sep<11>2014   18:07 Dec 05, 2017   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1


                                                                        Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices                                                   57593

                                               FERCOnlineSupport@ferc.gov, (866)                       email of new filings and issuances                                Milestone               Target date
                                               208–3676 (toll free), or (202) 502–8659                 related to this or other pending projects.
                                               (TTY). In lieu of electronic filing, please             For assistance, contact FERC Online                    Commission Issues Final EIS      March 2019.
                                               send a paper copy to: Secretary, Federal                Support.
                                               Energy Regulatory Commission, 888                          n. Anyone may submit comments, a                       p. Final amendments to the
                                               First Street NE., Washington, DC 20426.                 protest, or a motion to intervene in                   application must be filed with the
                                               The first page of any filing should                     accordance with the requirements of                    Commission no later than 30 days from
                                               include docket number P–14581–002.                      Rules of Practice and Procedure, 18 CFR                the issuance date of this notice.
                                                  The Commission’s Rules of Practice                   385.210, .211, and .214. In determining                   q. A license applicant must file no
                                               require all intervenors filing documents                the appropriate action to take, the                    later than 60 days following the date of
                                               with the Commission to serve a copy of                  Commission will consider all protests or               issuance of the notice of acceptance and
                                               that document on each person on the                     other comments filed, but only those                   ready for environmental analysis
                                               official service list for the project.                  who file a motion to intervene in                      provided for in 5.22: (1) A copy of the
                                               Further, if an intervenor files comments                accordance with the Commission’s                       water quality certification; (2) a copy of
                                               or documents with the Commission                        Rules may become a party to the                        the request for certification, including
                                               relating to the merits of an issue that                 proceeding. Any comments, protests, or                 proof of the date on which the certifying
                                               may affect the responsibilities of a                    motions to intervene must be received                  agency received the request; or (3)
                                               particular resource agency, they must                   on or before the specified comment date                evidence of waiver of water quality
                                               also serve a copy of the document on                    for the particular application.                        certification.
                                               that resource agency.                                      All filings must (1) bear in all capital              Dated: November 30, 2017.
                                                  k. This application has been accepted                letters the title PROTEST, MOTION TO                   Nathaniel J. Davis, Sr.,
                                               for filing and is now ready for                         INTERVENE, COMMENTS, REPLY                             Deputy Secretary.
                                               environmental analysis.                                 COMMENTS, RECOMMENDATIONS,                             [FR Doc. 2017–26247 Filed 12–5–17; 8:45 am]
                                                  l. The La Grange Project consists of                 PRELIMINARY TERMS AND
                                                                                                                                                              BILLING CODE 6717–01–P
                                               the following existing facilities: (1) La               CONDITIONS, or PRELIMINARY
                                               Grange dam, a 310-foot-long, 131-foot-                  FISHWAY PRESCRIPTIONS; (2) set
                                               high, masonry arch dam; (2) La Grange                   forth in the heading the name of the                   DEPARTMENT OF ENERGY
                                               reservoir with a storage capacity of                    applicant and the project number of the
                                               about 500 acre-feet; (3) MID headworks,                 application to which the filing                        Federal Energy Regulatory
                                               canal, and sluice gates are part of MID’s               responds; (3) furnish the name, address,               Commission
                                               retired irrigation canal facilities; (4) TID            and telephone number of the person
                                               irrigation intake and tunnel; (5) a                                                                            [Docket Nos. CP17–21–001, CP17–21–000,
                                                                                                       protesting or intervening; and (4)                     CP18–7–000]
                                               powerhouse with two Francis turbine-                    otherwise comply with the requirements
                                               generator units with a maximum                          of 18 CFR 385.2001 through 385.2005.                   Port Arthur Pipeline LLC; Notice of
                                               capacity of 4.9 megawatts. The project’s                All comments, recommendations, terms                   Amendment to Application
                                               estimated average annual generation is                  and conditions or prescriptions must set
                                               about 19,638 megawatt-hours.                            forth their evidentiary basis and                         Take notice that on November 7,
                                                  The Districts propose to: (1) Provide                otherwise comply with the requirements                 2017, Port Arthur Pipeline LLC (Port
                                               a minimum flow of approximately 5 to                    of 18 CFR 4.34(b). Agencies may obtain                 Arthur Pipeline), 2925 Briarpark, Suite
                                               10 cubic feet per second to the plunge                  copies of the application directly from                900, Houston, Texas 77042, filed an
                                               pool downstream of La Grange diversion                  the applicant. A copy of any protest or                amendment to its application in Docket
                                               dam at all times; (2) install a fish                    motion to intervene must be served                     No. CP17–21–000, pursuant to section
                                               exclusion barrier at the TID sluice                     upon each representative of the                        7(c) of the Natural Gas Act (NGA) and
                                               channel entrance; (3) conduct dissolved                 applicant specified in the particular                  Part 157 of the Commission’s
                                               oxygen monitoring in the vicinity of the                application. A copy of all other filings               regulations for a certificate of public
                                               La Grange powerhouse; (4) construct a                   in reference to this application must be               convenience and necessity to construct
                                               recreational foot trail extending from the              accompanied by proof of service on all                 and operate the Texas Connector Project
                                               former Don Pedro Visitor Center parking                 persons listed in the service list                     located in Orange and Jefferson
                                               lot to the La Grange headpond; and (5)                  prepared by the Commission in this                     Counties, Texas and Cameron Parish,
                                               develop an HPMP in consultation with                    proceeding, in accordance with 18 CFR                  Louisiana.
                                               Tribes, Bureau of Land Management,                                                                                Specifically, Port Arthur Pipeline
                                                                                                       4.34(b) and 385.2010.
                                               and State Historical Preservation Officer                  o. Procedural Schedule:                             filed an amendment to its proposed Rate
                                               to manage potential effects on historic                    The application will be processed                   Schedules and General Terms and
                                               properties.                                             according to the following revised                     Conditions (GT&C) to reflect the pro
                                                  m. A copy of the application is                      Hydro Licensing Schedule. Revisions to                 forma tariff proposed by Port Arthur
                                               available for review at the Commission                  the schedule may be made as                            Pipeline in Docket No. CP18–7–000 for
                                               in the Public Reference Room or may be                  appropriate.                                           its Louisiana Connector Project. Further,
                                               viewed on the Commission’s Web site at                                                                         Port Arthur Pipeline proposes changes
                                               http://www.ferc.gov using the                                      Milestone                     Target date   to its initial rates for service through the
                                               ‘‘eLibrary’’ link. Enter the docket                                                                            Texas Connector Project to reflect
                                               number excluding the last three digits in               Filing of recommendations,          January 2018.      changes to: (i) The Allowance for Funds
                                               the docket number field to access the                      preliminary terms and con-                          Used During Construction, (ii) the rate
daltland on DSKBBV9HB2PROD with NOTICES




                                               document. For assistance, contact FERC                     ditions, and preliminary                            for service under Port Arthur Pipeline’s
                                                                                                          fishway prescriptions.                              proposed Rate Schedule Enhanced
                                               Online Support. A copy is also available                Commission issues Draft En-         August 2018.
                                               for inspection and reproduction at the                     vironmental Statement
                                                                                                                                                              Hourly Firm Transportation; and (iii)
                                               address in item h above.                                   (EIS).                                              the precedent agreement between Port
                                                  Register online at http://                           Comments on Draft EIS ........      October 2018.      Arthur Pipeline and Port Arthur LNG,
                                               www.ferc.gov/docs-filing/                               Modified Terms and Condi-           December           LLC (Port Arthur LNG) executed in
                                               esubscription.asp to be notified via                       tions.                             2018.            association with the open seasons


                                          VerDate Sep<11>2014   18:07 Dec 05, 2017   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703    E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2017-12-06 00:22:17
Document Modified: 2017-12-06 00:22:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 57592 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR