82_FR_57858 82 FR 57625 - Proposed Revisions to Environmental Qualification of Mechanical and Electrical Equipment

82 FR 57625 - Proposed Revisions to Environmental Qualification of Mechanical and Electrical Equipment

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 233 (December 6, 2017)

Page Range57625-57626
FR Document2017-26256

The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 3.11, ``Environmental Qualification of Mechanical and Electrical Equipment.'' The NRC seeks comments on the proposed draft section revision of the Standard Review Plan (SRP) concerning guidance for the review of combined construction and operating license and operating license applications and amendments for environmental qualification of mechanical and electrical equipment.

Federal Register, Volume 82 Issue 233 (Wednesday, December 6, 2017)
[Federal Register Volume 82, Number 233 (Wednesday, December 6, 2017)]
[Notices]
[Pages 57625-57626]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26256]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0229]


Proposed Revisions to Environmental Qualification of Mechanical 
and Electrical Equipment

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-draft section revision; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting 
public comment on draft NUREG-0800, ``Standard Review Plan for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition,'' Section 3.11, ``Environmental Qualification of Mechanical 
and Electrical Equipment.'' The NRC seeks comments on the proposed 
draft section revision of the Standard Review Plan (SRP) concerning 
guidance for the review of combined construction and operating license 
and operating license applications and amendments for environmental 
qualification of mechanical and electrical equipment.

DATES: Comments must be filed no later than February 5, 2018. Comments 
received after this date will be considered, if it is practical to do 
so, but the Commission is able to ensure consideration only for 
comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0229. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: OWFN-2-A13, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on accessing information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Mark D. Notich, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; 
telephone: 301-415-3053; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0229 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0229.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft revision and current revision to NUREG-0800, Section 3.11, 
``Environmental Qualification of Mechanical and Electrical Equipment,'' 
is available in ADAMS under Accession Nos. ML16343A167 and ML063600397, 
respectively. The redline-strikeout version comparing the draft 
revision 4 and the current version 3 is available under Accession No. 
ML17066A073.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0229 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Further Information

    The NRC seeks public comment on the proposed draft section revision 
of SRP Section 3.11. The changes to SRP Chapter 3 reflect the current 
staff reviews, methods, and practices based on lessons learned from the 
NRC's reviews of design certification and combined license applications 
completed since the last revision of this chapter. The draft SRP 
section would also provide guidance for reviewing an application for a 
combined license under part 52 of title 10 of the Code of Federal 
Regulations (10 CFR).
    Following NRC staff evaluation of public comments, the NRC intends 
to finalize SRP Section 3.11 in ADAMS and post it on the NRC's public 
Web site at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/. The SRP is guidance for the NRC staff. The SRP is not a 
substitute for the NRC regulations, and compliance with the SRP is not 
required.

III. Backfitting and Issue Finality

    Issuance of this draft SRP section, if finalized, would not 
constitute backfitting as defined in 10 CFR 50.109, (the Backfit Rule) 
or otherwise be inconsistent with the issue finality provisions in 10 
CFR part 52. The NRC's position is based upon the following 
considerations.
    1. The draft SRP positions, if finalized, would not constitute 
backfitting, inasmuch as the SRP is internal guidance to NRC staff 
directed at the NRC staff with respect to their regulatory 
responsibilities.
    The SRP provides internal guidance to the NRC staff on how to 
review an application for NRC regulatory approval in the form of 
licensing. Changes in internal staff guidance are not matters for which 
either nuclear power plant applicants or licensees are protected under 
either the Backfit Rule or the issue finality provisions of 10 CFR part 
52.

[[Page 57626]]

    2. The NRC staff has no intention to impose the SRP positions on 
current licensees or already-issued regulatory approvals either now or 
in the future.
    The NRC staff does not intend to impose or apply the positions 
described in the draft SRP to existing (already issued) licenses and 
regulatory approvals. Hence, the issuance of a final SRP, even if 
considered guidance within the purview of the issue finality provisions 
in 10 CFR part 52, would not need to be evaluated as if it were a 
backfit or as being inconsistent with issue finality provisions. If, in 
the future, the NRC staff seeks to impose a position in the SRP on 
holders of already issued licenses in a manner that does not provide 
issue finality as described in the applicable issue finality provision, 
then the staff must make the showing as set forth in the Backfit Rule 
or address the criteria for avoiding issue finality as described in the 
applicable issue finality provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed below--were intended to apply to every NRC 
action that substantially changes the expectations of current and 
future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The NRC staff does not, 
at this time, intend to impose the positions represented in the draft 
SRP in a manner that is inconsistent with any issue finality 
provisions. If, in the future, the staff seeks to impose a position in 
the draft SRP in a manner which does not provide issue finality as 
described in the applicable issue finality provisions, then the staff 
must address the criteria for avoiding issue finality as described in 
the applicable issue finality provision.

    Dated at Rockville, Maryland, this 29th day of November 2017.

    For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, Chief, Licensing Branch 3, Division of New Reactor Licensing, 
Office of New Reactors.
[FR Doc. 2017-26256 Filed 12-5-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                        Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices                                            57625

                                                 Public Comments Invited: Comments                       For additional direction on accessing               comment submissions to remove
                                               submitted in response to this notice will               information and submitting comments,                  identifying or contact information.
                                               be summarized and/or included in the                    see ‘‘Obtaining Information and                         If you are requesting or aggregating
                                               request for OMB’s clearance of this                     Submitting Comments’’ in the                          comments from other persons for
                                               information collection.                                 SUPPLEMENTARY INFORMATION section of                  submission to the NRC, then you should
                                                 Dated: December 1, 2017.                              this document.                                        inform those persons not to include
                                               Kim Miller,                                             FOR FURTHER INFORMATION CONTACT:                      identifying or contact information that
                                               Grants Management Specialist, Office of Chief           Mark D. Notich, Office of New Reactors,               they do not want to be publicly
                                               Information Officer.                                    U.S. Nuclear Regulatory Commission,                   disclosed in their comment submission.
                                               [FR Doc. 2017–26306 Filed 12–5–17; 8:45 am]
                                                                                                       Washington DC 20555–0001; telephone:                  Your request should state that the NRC
                                                                                                       301–415–3053; email: Mark.Notich@                     does not routinely edit comment
                                               BILLING CODE 7036–01–P
                                                                                                       nrc.gov.                                              submissions to remove such information
                                                                                                       SUPPLEMENTARY INFORMATION:
                                                                                                                                                             before making the comment
                                                                                                                                                             submissions available to the public or
                                               NUCLEAR REGULATORY                                      I. Obtaining Information and                          entering the comment submissions into
                                               COMMISSION                                              Submitting Comments                                   ADAMS.
                                               [NRC–2017–0229]                                         A. Obtaining Information                              II. Further Information
                                                                                                          Please refer to Docket ID NRC–2017–                   The NRC seeks public comment on
                                               Proposed Revisions to Environmental                     0229 when contacting the NRC about
                                               Qualification of Mechanical and                                                                               the proposed draft section revision of
                                                                                                       the availability of information for this              SRP Section 3.11. The changes to SRP
                                               Electrical Equipment                                    action. You may obtain publicly-                      Chapter 3 reflect the current staff
                                               AGENCY:  Nuclear Regulatory                             available information related to this                 reviews, methods, and practices based
                                               Commission.                                             action by any of the following methods:               on lessons learned from the NRC’s
                                               ACTION: Standard review plan-draft
                                                                                                          • Federal Rulemaking Web site: Go to               reviews of design certification and
                                               section revision; request for comment.                  http://www.regulations.gov and search                 combined license applications
                                                                                                       for Docket ID NRC–2017–0229.                          completed since the last revision of this
                                               SUMMARY:   The U.S. Nuclear Regulatory                     • NRC’s Agencywide Documents
                                                                                                                                                             chapter. The draft SRP section would
                                               Commission (NRC) is soliciting public                   Access and Management System
                                                                                                                                                             also provide guidance for reviewing an
                                               comment on draft NUREG–0800,                            (ADAMS): You may obtain publicly-
                                                                                                                                                             application for a combined license
                                               ‘‘Standard Review Plan for the Review                   available documents online in the
                                                                                                                                                             under part 52 of title 10 of the Code of
                                               of Safety Analysis Reports for Nuclear                  ADAMS Public Documents collection at
                                                                                                                                                             Federal Regulations (10 CFR).
                                               Power Plants: LWR Edition,’’ Section                    http://www.nrc.gov/reading-rm/
                                                                                                                                                                Following NRC staff evaluation of
                                               3.11, ‘‘Environmental Qualification of                  adams.html. To begin the search, select
                                                                                                                                                             public comments, the NRC intends to
                                               Mechanical and Electrical Equipment.’’                  ‘‘ADAMS Public Documents’’ and then
                                                                                                                                                             finalize SRP Section 3.11 in ADAMS
                                               The NRC seeks comments on the                           select ‘‘Begin Web-based ADAMS
                                                                                                                                                             and post it on the NRC’s public Web site
                                               proposed draft section revision of the                  Search.’’ For problems with ADAMS,
                                                                                                                                                             at http://www.nrc.gov/reading-rm/doc-
                                               Standard Review Plan (SRP) concerning                   please contact the NRC’s Public
                                                                                                                                                             collections/nuregs/staff/sr0800/. The
                                               guidance for the review of combined                     Document Room (PDR) reference staff at
                                                                                                                                                             SRP is guidance for the NRC staff. The
                                               construction and operating license and                  1–800–397–4209, 301–415–4737, or by
                                                                                                                                                             SRP is not a substitute for the NRC
                                               operating license applications and                      email to pdr.resource@nrc.gov. The draft
                                                                                                                                                             regulations, and compliance with the
                                               amendments for environmental                            revision and current revision to
                                                                                                                                                             SRP is not required.
                                               qualification of mechanical and                         NUREG–0800, Section 3.11,
                                               electrical equipment.                                   ‘‘Environmental Qualification of                      III. Backfitting and Issue Finality
                                               DATES: Comments must be filed no later
                                                                                                       Mechanical and Electrical Equipment,’’
                                                                                                                                                                Issuance of this draft SRP section, if
                                               than February 5, 2018. Comments                         is available in ADAMS under Accession
                                                                                                                                                             finalized, would not constitute
                                               received after this date will be                        Nos. ML16343A167 and ML063600397,
                                                                                                                                                             backfitting as defined in 10 CFR 50.109,
                                               considered, if it is practical to do so, but            respectively. The redline-strikeout
                                                                                                                                                             (the Backfit Rule) or otherwise be
                                               the Commission is able to ensure                        version comparing the draft revision 4
                                                                                                                                                             inconsistent with the issue finality
                                               consideration only for comments                         and the current version 3 is available
                                                                                                                                                             provisions in 10 CFR part 52. The NRC’s
                                               received on or before this date.                        under Accession No. ML17066A073.
                                                                                                          • NRC’s PDR: You may examine and                   position is based upon the following
                                               ADDRESSES: You may submit comments                      purchase copies of public documents at                considerations.
                                               by any of the following methods:                        the NRC’s PDR, Room O1–F21, One                          1. The draft SRP positions, if
                                                  • Federal Rulemaking Web site: Go to                 White Flint North, 11555 Rockville                    finalized, would not constitute
                                               http://www.regulations.gov and search                   Pike, Rockville, Maryland 20852.                      backfitting, inasmuch as the SRP is
                                               for Docket ID NRC–2017–0229. Address                                                                          internal guidance to NRC staff directed
                                               questions about NRC dockets to Carol                    B. Submitting Comments                                at the NRC staff with respect to their
                                               Gallagher; telephone: 301–415–3463;                       Please include Docket ID NRC–2017–                  regulatory responsibilities.
                                               email: Carol.Gallagher@nrc.gov. For                     0229 in your comment submission.                         The SRP provides internal guidance
                                               technical questions, contact the                          The NRC cautions you not to include                 to the NRC staff on how to review an
                                               individual listed in the FOR FURTHER                    identifying or contact information that               application for NRC regulatory approval
daltland on DSKBBV9HB2PROD with NOTICES




                                               INFORMATION CONTACT section of this                     you do not want to be publicly                        in the form of licensing. Changes in
                                               document.                                               disclosed in your comment submission.                 internal staff guidance are not matters
                                                  • Mail comments to: May Ma, Office                   The NRC posts all comment                             for which either nuclear power plant
                                               of Administration, Mail Stop: OWFN–2–                   submissions at http://                                applicants or licensees are protected
                                               A13, U.S. Nuclear Regulatory                            www.regulations.gov as well as entering               under either the Backfit Rule or the
                                               Commission, Washington, DC 20555–                       the comment submissions into ADAMS.                   issue finality provisions of 10 CFR part
                                               0001.                                                   The NRC does not routinely edit                       52.


                                          VerDate Sep<11>2014   18:07 Dec 05, 2017   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1


                                               57626                    Federal Register / Vol. 82, No. 233 / Wednesday, December 6, 2017 / Notices

                                                  2. The NRC staff has no intention to                   For the Nuclear Regulatory Commission.              (Public Representative). Section II also
                                               impose the SRP positions on current                     Joseph Colaccino,                                     establishes comment deadline(s)
                                               licensees or already-issued regulatory                  Chief, Chief, Licensing Branch 3, Division of         pertaining to each request.
                                               approvals either now or in the future.                  New Reactor Licensing, Office of New                    The public portions of the Postal
                                                                                                       Reactors.                                             Service’s request(s) can be accessed via
                                                  The NRC staff does not intend to
                                                                                                       [FR Doc. 2017–26256 Filed 12–5–17; 8:45 am]           the Commission’s Web site (http://
                                               impose or apply the positions described
                                                                                                       BILLING CODE 7590–01–P                                www.prc.gov). Non-public portions of
                                               in the draft SRP to existing (already
                                                                                                                                                             the Postal Service’s request(s), if any,
                                               issued) licenses and regulatory                                                                               can be accessed through compliance
                                               approvals. Hence, the issuance of a final                                                                     with the requirements of 39 CFR
                                               SRP, even if considered guidance within                 POSTAL REGULATORY COMMISSION
                                                                                                                                                             3007.40.
                                               the purview of the issue finality                       [Docket Nos. MC2018–38 and CP2018–68;                   The Commission invites comments on
                                               provisions in 10 CFR part 52, would not                 MC2018–39 and CP2018–69]
                                                                                                                                                             whether the Postal Service’s request(s)
                                               need to be evaluated as if it were a                                                                          in the captioned docket(s) are consistent
                                                                                                       New Postal Products
                                               backfit or as being inconsistent with                                                                         with the policies of title 39. For
                                               issue finality provisions. If, in the                   AGENCY:   Postal Regulatory Commission.               request(s) that the Postal Service states
                                               future, the NRC staff seeks to impose a                 ACTION:   Notice.                                     concern market dominant product(s),
                                               position in the SRP on holders of                                                                             applicable statutory and regulatory
                                               already issued licenses in a manner that                SUMMARY:   The Commission is noticing                 requirements include 39 U.S.C. 3622, 39
                                               does not provide issue finality as                      recent Postal Service filings for the                 U.S.C. 3642, 39 CFR part 3010, and 39
                                               described in the applicable issue finality              Commission’s consideration concerning                 CFR part 3020, subpart B. For request(s)
                                               provision, then the staff must make the                 negotiated service agreements. This                   that the Postal Service states concern
                                               showing as set forth in the Backfit Rule                notice informs the public of the filing,              competitive product(s), applicable
                                               or address the criteria for avoiding issue              invites public comment, and takes other               statutory and regulatory requirements
                                                                                                       administrative steps.                                 include 39 U.S.C. 3632, 39 U.S.C. 3633,
                                               finality as described in the applicable
                                               issue finality provision.                               DATES: Comments are due: December 8,                  39 U.S.C. 3642, 39 CFR part 3015, and
                                                                                                       2017.                                                 39 CFR part 3020, subpart B. Comment
                                                  3. Backfitting and issue finality do                                                                       deadline(s) for each request appear in
                                                                                                       ADDRESSES: Submit comments
                                               not—with limited exceptions not                                                                               section II.
                                                                                                       electronically via the Commission’s
                                               applicable here—protect current or                      Filing Online system at http://
                                               future applicants.                                                                                            II. Docketed Proceeding(s)
                                                                                                       www.prc.gov. Those who cannot submit
                                                  Applicants and potential applicants                  comments electronically should contact                  1. Docket No(s).: MC2018–38 and
                                               are not, with certain exceptions,                       the person identified in the FOR FURTHER              CP2018–68; Filing Title: USPS Request
                                               protected by either the Backfit Rule or                 INFORMATION CONTACT section by                        to Add Priority Mail Contract 380 to
                                               any issue finality provisions under 10                  telephone for advice on filing                        Competitive Product List and Notice of
                                               CFR part 52. This is because neither the                alternatives.                                         Filing Materials Under Seal; Filing
                                               Backfit Rule nor the issue finality                                                                           Acceptance Date: November 30, 2017;
                                                                                                       FOR FURTHER INFORMATION CONTACT:
                                               provisions under 10 CFR part 52—with                                                                          Filing Authority: 39 U.S.C. 3642 and 39
                                                                                                       David A. Trissell, General Counsel, at
                                               certain exclusions discussed below—                                                                           CFR 3020.30 et seq.; Public
                                                                                                       202–789–6820.
                                               were intended to apply to every NRC                                                                           Representative: Matthew R. Ashford;
                                                                                                       SUPPLEMENTARY INFORMATION:                            Comments Due: December 8, 2017.
                                               action that substantially changes the
                                                                                                       Table of Contents                                       2. Docket No(s).: MC2018–39 and
                                               expectations of current and future
                                                                                                                                                             CP2018–69; Filing Title: USPS Request
                                               applicants.                                             I. Introduction
                                                                                                                                                             to Add Priority Mail Express, Priority
                                                  The exceptions to the general                        II. Docketed Proceeding(s)
                                                                                                                                                             Mail & First-Class Package Service
                                               principle are applicable whenever an                    I. Introduction                                       Contract 29 to Competitive Product List
                                               applicant references a 10 CFR part 52                      The Commission gives notice that the               and Notice of Filing Materials Under
                                               license (e.g., an early site permit) and/               Postal Service filed request(s) for the               Seal; Filing Acceptance Date: November
                                               or NRC regulatory approval (e.g., a                     Commission to consider matters related                30, 2017; Filing Authority: 39 U.S.C.
                                               design certification rule) with specified               to negotiated service agreement(s). The               3642 and 39 CFR 3020.30 et seq.; Public
                                               issue finality provisions. The NRC staff                request(s) may propose the addition or                Representative: Matthew R. Ashford;
                                               does not, at this time, intend to impose                removal of a negotiated service                       Comments Due: December 8, 2017.
                                               the positions represented in the draft                  agreement from the market dominant or                   This notice will be published in the
                                               SRP in a manner that is inconsistent                    the competitive product list, or the                  Federal Register.
                                               with any issue finality provisions. If, in              modification of an existing product                   Stacy L. Ruble,
                                               the future, the staff seeks to impose a                 currently appearing on the market                     Secretary.
                                               position in the draft SRP in a manner                   dominant or the competitive product                   [FR Doc. 2017–26299 Filed 12–5–17; 8:45 am]
                                               which does not provide issue finality as                list.                                                 BILLING CODE 7710–FW–P
                                               described in the applicable issue finality                 Section II identifies the docket
                                               provisions, then the staff must address                 number(s) associated with each Postal
                                               the criteria for avoiding issue finality as             Service request, the title of each Postal
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                       Service request, the request’s acceptance             POSTAL SERVICE
                                               described in the applicable issue finality
                                               provision.                                              date, and the authority cited by the                  Product Change—Priority Mail
                                                                                                       Postal Service for each request. For each             Express, Priority Mail, & First-Class
                                                 Dated at Rockville, Maryland, this 29th day           request, the Commission appoints an
                                               of November 2017.                                                                                             Package Service Negotiated Service
                                                                                                       officer of the Commission to represent                Agreement
                                                                                                       the interests of the general public in the
                                                                                                       proceeding, pursuant to 39 U.S.C. 505                 AGENCY:    Postal ServiceTM.


                                          VerDate Sep<11>2014   18:07 Dec 05, 2017   Jkt 244001   PO 00000   Frm 00058   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2017-12-06 00:22:33
Document Modified: 2017-12-06 00:22:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan-draft section revision; request for comment.
DatesComments must be filed no later than February 5, 2018. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ContactMark D. Notich, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-3053; email: [email protected]
FR Citation82 FR 57625 