82_FR_59038 82 FR 58799 - City of Fitchburg, Massachusetts; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

82 FR 58799 - City of Fitchburg, Massachusetts; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 239 (December 14, 2017)

Page Range58799-58800
FR Document2017-26924

Federal Register, Volume 82 Issue 239 (Thursday, December 14, 2017)
[Federal Register Volume 82, Number 239 (Thursday, December 14, 2017)]
[Notices]
[Pages 58799-58800]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26924]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD18-3-000]


City of Fitchburg, Massachusetts; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On December 1, 2017, the City of Fitchburg, Massachusetts, filed a 
notice of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed Narrows Road Pressure Reduction Valve (PRV) Station 
Project would have an installed capacity of up to 10 kilowatts (kW), 
and would be located along an existing municipal water supply line 
within the Narrows Road PRV station near the City of Fitchburg, 
Worcester County, Massachusetts.
    Applicant Contact: Weston & Sampson Engineers, Inc., 100 
International Drive, Suite 152, Portsmouth, NH 03801, Phone No. (603) 
431-3937.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) One pump as turbine unit with a nameplate 
capacity of 10 kW located within the existing Narrows Road PRV station; 
and (2) appurtenant facilities. The proposed project would have an 
estimated annual generating capacity of about 65,000 kilowatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
           Statutory provision                                  Description                      Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA......  The conduit the facility uses is a tunnel, canal,                  Y
                                            pipeline, aqueduct, flume, ditch, or similar
                                            manmade water conveyance that is operated for the
                                            distribution of water for agricultural, municipal,
                                            or industrial consumption and not primarily for the
                                            generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA...  The facility is constructed, operated, or maintained               Y
                                            for the generation of electric power and uses for
                                            such generation only the hydroelectric potential of
                                            a non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA..  The facility has an installed capacity that does not               Y
                                            exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA.  On or before August 9, 2013, the facility is not                   Y
                                            licensed, or exempted from the licensing
                                            requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project along the existing municipal water supply line 
will not alter its primary purpose. Therefore, based upon the above 
information and criteria, Commission staff preliminarily determines 
that the proposal satisfies the requirements for a qualifying conduit 
hydropower facility, which is not required to be licensed or exempted 
from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.

[[Page 58800]]

    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A 
CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE, as applicable; 
(2) state in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) state the 
name, address, and telephone number of the person filing; and (4) 
otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE, Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD18-3) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: December 7, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26924 Filed 12-13-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 82, No. 239 / Thursday, December 14, 2017 / Notices                                              58799

                                                opportunity to comment on proposed,                     Education Act of 1965, as amended, in                 of intent to construct a qualifying
                                                revised, and continuing collections of                  section 448 that promotes the use of                  conduit hydropower facility, pursuant
                                                information. This helps the Department                  comprehensive work-learning-service                   to section 30 of the Federal Power Act
                                                assess the impact of its information                    programs as a valuable education                      (FPA), as amended by section 4 of the
                                                collection requirements and minimize                    approach when it is an integral part of               Hydropower Regulatory Efficiency Act
                                                the public’s reporting burden. It also                  the institution’s education program and               of 2013 (HREA). The proposed Narrows
                                                helps the public understand the                         a part of a financial plan which                      Road Pressure Reduction Valve (PRV)
                                                Department’s information collection                     decreases reliance on grants and loans.               Station Project would have an installed
                                                requirements and provide the requested                  The Work Colleges Application and                     capacity of up to 10 kilowatts (kW), and
                                                data in the desired format. ED is                       Agreement form is the tool for an
                                                                                                                                                              would be located along an existing
                                                soliciting comments on the proposed                     institution to apply for participation in
                                                                                                                                                              municipal water supply line within the
                                                information collection request (ICR) that               this program. The data will be used by
                                                                                                        the Department to assess an institution’s             Narrows Road PRV station near the City
                                                is described below. The Department of
                                                                                                        preparedness to participate in this                   of Fitchburg, Worcester County,
                                                Education is especially interested in
                                                                                                        program and as a signed agreement to                  Massachusetts.
                                                public comment addressing the
                                                following issues: (1) Is this collection                comply with all requirements for                        Applicant Contact: Weston &
                                                necessary to the proper functions of the                participating in the program. The data is             Sampson Engineers, Inc., 100
                                                Department; (2) will this information be                used in conjunction with institutional                International Drive, Suite 152,
                                                processed and used in a timely manner;                  program reviews to assess the                         Portsmouth, NH 03801, Phone No. (603)
                                                (3) is the estimate of burden accurate;                 administrative capability and                         431–3937.
                                                (4) how might the Department enhance                    compliance of the applicant.
                                                                                                                                                                FERC Contact: Christopher Chaney,
                                                the quality, utility, and clarity of the                  Dated: December 11, 2017.                           Phone No. (202) 502–6778, email:
                                                information to be collected; and (5) how                Kate Mullan,                                          Christopher.Chaney@ferc.gov.
                                                might the Department minimize the                       Acting Director, Information Collection
                                                burden of this collection on the                        Clearance Division, Office of the Chief Privacy
                                                                                                                                                                Qualifying Conduit Hydropower
                                                respondents, including through the use                  Officer, Office of Management.                        Facility Description: The proposed
                                                of information technology. Please note                  [FR Doc. 2017–26956 Filed 12–13–17; 8:45 am]          project would consist of: (1) One pump
                                                that written comments received in                       BILLING CODE 4000–01–P
                                                                                                                                                              as turbine unit with a nameplate
                                                response to this notice will be                                                                               capacity of 10 kW located within the
                                                considered public records.                                                                                    existing Narrows Road PRV station; and
                                                   Title of Collection: Work Colleges                   DEPARTMENT OF ENERGY                                  (2) appurtenant facilities. The proposed
                                                Application and Agreement.                                                                                    project would have an estimated annual
                                                   OMB Control Number: 1845—NEW.                        Federal Energy Regulatory                             generating capacity of about 65,000
                                                   Type of Review: A new information                    Commission                                            kilowatt-hours.
                                                collection.
                                                                                                        [Docket No. CD18–3–000]                                 A qualifying conduit hydropower
                                                   Respondents/Affected Public: State,
                                                Local, and Tribal Governments.                                                                                facility is one that is determined or
                                                                                                        City of Fitchburg, Massachusetts;                     deemed to meet all of the criteria shown
                                                   Total Estimated Number of Annual                     Notice of Preliminary Determination of
                                                Responses: 10.                                                                                                in the table below.
                                                                                                        a Qualifying Conduit Hydropower
                                                   Total Estimated Number of Annual
                                                                                                        Facility and Soliciting Comments and
                                                Burden Hours: 20.
                                                                                                        Motions To Intervene
                                                   Abstract: The Higher Education
                                                Opportunity Act, Public Law 110–315                       On December 1, 2017, the City of
                                                includes provisions for the Higher                      Fitchburg, Massachusetts, filed a notice

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                Satisfies
                                                            Statutory provision                                                            Description                                           (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water
                                                                                                     for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                     eration of electricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                     erally owned conduit.
                                                FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                  HREA.
                                                FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                  HREA.                                             censing requirements of Part I of the FPA.
sradovich on DSK3GMQ082PROD with NOTICES




                                                  Preliminary Determination: The                        Commission staff preliminarily                          Comments and Motions to Intervene:
                                                proposed addition of the hydroelectric                  determines that the proposal satisfies                Deadline for filing comments contesting
                                                project along the existing municipal                    the requirements for a qualifying                     whether the facility meets the qualifying
                                                water supply line will not alter its                    conduit hydropower facility, which is                 criteria is 45 days from the issuance
                                                primary purpose. Therefore, based upon                  not required to be licensed or exempted               date of this notice.
                                                the above information and criteria,                     from licensing.



                                           VerDate Sep<11>2014   21:28 Dec 13, 2017   Jkt 244001   PO 00000   Frm 00008   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1


                                                58800                      Federal Register / Vol. 82, No. 239 / Thursday, December 14, 2017 / Notices

                                                   Deadline for filing motions to                        docket number field to access the                       Dated: December 7, 2017.
                                                intervene is 30 days from the issuance                   document. For assistance, call toll-free              Kimberly D. Bose,
                                                date of this notice.                                     1–866–208–3676 or email                               Secretary.
                                                   Anyone may submit comments or a                       FERCOnlineSupport@ferc.gov. For TTY,                  [FR Doc. 2017–26926 Filed 12–13–17; 8:45 am]
                                                motion to intervene in accordance with                   call (202) 502–8659.                                  BILLING CODE 6717–01–P
                                                the requirements of Rules of Practice                      Dated: December 7, 2017.
                                                and Procedure, 18 CFR 385.210 and
                                                                                                         Kimberly D. Bose,
                                                385.214. Any motions to intervene must                                                                         DEPARTMENT OF ENERGY
                                                be received on or before the specified                   Secretary.
                                                deadline date for the particular                         [FR Doc. 2017–26924 Filed 12–13–17; 8:45 am]          Federal Energy Regulatory
                                                proceeding.                                              BILLING CODE 6717–01–P                                Commission
                                                   Filing and Service of Responsive
                                                                                                                                                               [Docket No. ER18–391–000]
                                                Documents: All filings must (1) bear in
                                                all capital letters the COMMENTS                         DEPARTMENT OF ENERGY
                                                                                                                                                               EnPowered; Supplemental Notice That
                                                CONTESTING QUALIFICATION FOR A                                                                                 Initial Market-Based Rate Filing
                                                CONDUIT HYDROPOWER FACILITY’’                            Federal Energy Regulatory
                                                                                                         Commission                                            Includes Request for Blanket Section
                                                or ‘‘MOTION TO INTERVENE, as                                                                                   204 Authorization
                                                applicable; (2) state in the heading the                 Combined Notice of Filings
                                                name of the applicant and the project                                                                             This is a supplemental notice in the
                                                number of the application to which the                     Take notice that the Commission has                 above-referenced proceeding of
                                                filing responds; (3) state the name,                     received the following Natural Gas                    EnPowered’s application for market-
                                                address, and telephone number of the                     Pipeline Rate and Refund Report filings:              based rate authority, with an
                                                person filing; and (4) otherwise comply                                                                        accompanying rate tariff, noting that
                                                with the requirements of sections                        Filings Instituting Proceedings                       such application includes a request for
                                                385.2001 through 385.2005 of the                            Docket Numbers: RP18–242–000.                      blanket authorization, under 18 CFR
                                                Commission’s regulations.1 All                                                                                 part 34, of future issuances of securities
                                                comments contesting Commission staff’s                      Applicants: Southern Natural Gas                   and assumptions of liability.
                                                preliminary determination that the                       Company, L.L.C.                                          Any person desiring to intervene or to
                                                facility meets the qualifying criteria                      Description: Compliance filing                     protest should file with the Federal
                                                must set forth their evidentiary basis.                  Abandon Rate Schedule X–72                            Energy Regulatory Commission, 888
                                                   The Commission strongly encourages                    Compliance Filing CP18–2–000 to be                    First Street NE, Washington, DC 20426,
                                                electronic filing. Please file motions to                effective 1/1/2018.                                   in accordance with Rules 211 and 214
                                                intervene and comments using the                            Filed Date: 12/6/17.                               of the Commission’s Rules of Practice
                                                Commission’s eFiling system at http://                      Accession Number: 20171206–5003.                   and Procedure (18 CFR 385.211 and
                                                www.ferc.gov/docs-filing/efiling.asp.                                                                          385.214). Anyone filing a motion to
                                                Commenters can submit brief comments                        Comments Due: 5 p.m. ET 12/18/17.
                                                                                                                                                               intervene or protest must serve a copy
                                                up to 6,000 characters, without prior                      Docket Numbers: RP18–243–000.                       of that document on the Applicant.
                                                registration, using the eComment system                    Applicants: Blue Lake Gas Storage                      Notice is hereby given that the
                                                at http://www.ferc.gov/docs-filing/                      Company.                                              deadline for filing protests with regard
                                                ecomment.asp. You must include your                        Description: Compliance filing                      to the applicant’s request for blanket
                                                name and contact information at the end                  Settlement Compliance Filing RP17–                    authorization, under 18 CFR part 34, of
                                                of your comments. For assistance,                        898–000 to be effective 12/1/2017.                    future issuances of securities and
                                                please contact FERC Online Support at                                                                          assumptions of liability, is December 27,
                                                FERCOnlineSupport@ferc.gov, (866)                          Filed Date: 12/6/17.                                2017.
                                                208–3676 (toll free), or (202) 502–8659                    Accession Number: 20171206–5042.                       The Commission encourages
                                                (TTY). In lieu of electronic filing, please                Comments Due: 5 p.m. ET 12/18/17.                   electronic submission of protests and
                                                send a paper copy to: Secretary, Federal                                                                       interventions in lieu of paper, using the
                                                                                                            The filings are accessible in the
                                                Energy Regulatory Commission, 888                                                                              FERC Online links at http://
                                                                                                         Commission’s eLibrary system by
                                                First Street NE, Washington, DC 20426.                                                                         www.ferc.gov. To facilitate electronic
                                                                                                         clicking on the links or querying the
                                                A copy of all other filings in reference                                                                       service, persons with internet access
                                                                                                         docket number.
                                                to this application must be accompanied                                                                        who will eFile a document and/or be
                                                by proof of service on all persons listed                   Any person desiring to intervene or                listed as a contact for an intervenor
                                                in the service list prepared by the                      protest in any of the above proceedings               must create and validate an
                                                Commission in this proceeding, in                        must file in accordance with Rules 211                eRegistration account using the
                                                accordance with 18 CFR 4.34(b) and                       and 214 of the Commission’s                           eRegistration link. Select the eFiling
                                                385.2010.                                                Regulations (18 CFR 385.211 and                       link to log on and submit the
                                                   Locations of Notice of Intent: Copies                 385.214) on or before 5:00 p.m. Eastern               intervention or protests.
                                                of the notice of intent can be obtained                  time on the specified comment date.                      Persons unable to file electronically
                                                directly from the applicant or such                      Protests may be considered, but                       should submit an original and 5 copies
                                                copies can be viewed and reproduced at                   intervention is necessary to become a                 of the intervention or protest to the
                                                the Commission in its Public Reference                   party to the proceeding.                              Federal Energy Regulatory Commission,
                                                                                                            eFiling is encouraged. More detailed
sradovich on DSK3GMQ082PROD with NOTICES




                                                Room, Room 2A, 888 First Street NE,                                                                            888 First Street NE, Washington, DC
                                                Washington, DC 20426. The filing may                     information relating to filing                        20426.
                                                also be viewed on the web at http://                     requirements, interventions, protests,                   The filings in the above-referenced
                                                www.ferc.gov/docs-filing/elibrary.asp                    service, and qualifying facilities filings            proceeding are accessible in the
                                                using the ‘‘eLibrary’’ link. Enter the                   can be found at: http://www.ferc.gov/                 Commission’s eLibrary system by
                                                docket number (i.e., CD18–3) in the                      docs-filing/efiling/filing-req.pdf. For               clicking on the appropriate link in the
                                                                                                         other information, call (866) 208–3676                above list. They are also available for
                                                  1 18   CFR 385.2001–2005 (2017).                       (toll free). For TTY, call (202) 502–8659.            electronic review in the Commission’s


                                           VerDate Sep<11>2014    21:28 Dec 13, 2017   Jkt 244001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1



Document Created: 2018-10-25 10:53:13
Document Modified: 2018-10-25 10:53:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 58799 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR