82_FR_59040 82 FR 58801 - Notice of Availability of the Revised Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11-Arch Dams and Request for Comments

82 FR 58801 - Notice of Availability of the Revised Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11-Arch Dams and Request for Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 239 (December 14, 2017)

Page Range58801-58802
FR Document2017-26927

Federal Register, Volume 82 Issue 239 (Thursday, December 14, 2017)
[Federal Register Volume 82, Number 239 (Thursday, December 14, 2017)]
[Notices]
[Pages 58801-58802]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26927]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. Ad18-6-000]


Notice of Availability of the Revised Engineering Guidelines for 
the Evaluation of Hydropower Projects: Chapter 11--Arch Dams and 
Request for Comments

    The staff of the Office of Energy Projects (OEP) is revising 
Chapter 11--

[[Page 58802]]

Arch Dams of its Engineering Guidelines for the Evaluation of 
Hydropower Projects. The staff has revised Chapter 11--Arch Dams \1\ 
and comments are now requested on the draft document from federal and 
state agencies, licensees whose infrastructure portfolio includes arch 
dams, independent consultants and inspectors, and other interested 
parties with special expertise with respect dam safety and arch dams. A 
60-day public comment period is allotted to collect comments. Please 
note that this comment period will close on February 5, 2018.
---------------------------------------------------------------------------

    \1\ The existing Chapter 11--Arch Dams is dated October 1999 and 
can be found on the Federal Energy Regulatory Commission's 
(Commission) website to use as a reference to see the changes made: 
http://www.ferc.gov/industries/hydropower/safety/guidelines/eng-guide/chap11.pdf.
---------------------------------------------------------------------------

    Interested parties can help us determine the appropriate updates 
and improvements by providing: Meaningful comments or suggestions that 
focus on the specific sections requiring clarification; updates to 
reflect current laws and regulations; or improved measures for 
evaluating the safety of arch dams. The more specific your comments, 
the more useful they will be. A detailed explanation of your 
submissions and/or any references of scientific studies associated with 
your comments will greatly help us with this process. We will consider 
all timely comments on the revised Guidelines before issuing the final 
version.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the docket number (AD18-6-000) on the first page of your 
submission. The Commission strongly encourages electronic filing.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for interested persons to 
submit brief, text-only comments up to 6,000 characters. You must 
include your name and contact information at the end of your comments;
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
eRegister. When selecting the filing type, select General, then chose 
Comment (on Filing, Environ. Report or Tech Conf); or
    (3) In lieu of electronic filing, you can mail a paper copy of your 
comments to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
    The OEP staff provided copies of revised Chapter 11--Arch Dams to 
federal and state agencies, licensees whose portfolio includes arch 
dams, independent consultants and inspectors, and other interested 
parties. In addition, all information related to the proposed updates 
to Chapter 11--Arch Dams and submitted comments can be found on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., AD18-
6). Be sure you have selected an appropriate date range. The Commission 
also offers a free service called eSubscription which allows you to 
keep track of all formal issuances and submittals in specific dockets. 
This can reduce the amount of time you spend researching proceedings by 
automatically providing you with electronic notification of these 
filings and direct links to the documents. Go to www.ferc.gov/docs-filing/esubscription.asp. Users must be registered in order to use 
eSubscription.
    For assistance with filing or any of the Commission's online 
systems, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8258.

    Dated: December 7, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26927 Filed 12-13-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 82, No. 239 / Thursday, December 14, 2017 / Notices                                                58801

                                                Public Reference Room in Washington,                    replace the placeholder effective date to                Description: § 205(d) Rate Filing: BGE
                                                DC. There is an eSubscription link on                   be effective N/A.                                     submits revisions to Attachment H–2A
                                                the website that enables subscribers to                    Filed Date: 12/7/17.                               re: Abandoned Plant and Land Costs to
                                                receive email notification when a                          Accession Number: 20171207–5068.                   be effective 2/5/2018.
                                                document is added to a subscribed                          Comments Due: 5 p.m. ET 12/28/17.                     Filed Date: 12/7/17.
                                                docket(s). For assistance with any FERC                    Docket Numbers: ER17–2291–001.                        Accession Number: 20171207–5083.
                                                Online service, please email                               Applicants: PJM Interconnection,                      Comments Due: 5 p.m. ET 12/28/17.
                                                FERCOnlineSupport@ferc.gov. or call                     L.L.C.                                                   Docket Numbers: ER18–405–000.
                                                (866) 208–3676 (toll free). For TTY, call                  Description: Tariff Amendment: PJM                    Applicants: Carson Cogeneration
                                                (202) 502–8659.                                         submits Response to Deficiency Letter re              Company LP.
                                                  Dated: December 7, 2017.                              Pseudo-Tie PJM Tarrif Revisions to be                    Description: Tariff Cancellation:
                                                Kimberly D. Bose,                                       effective 11/9/2017.                                  Cancellation of Market Based Rate Tariff
                                                                                                           Filed Date: 12/7/17.                               to be effective 12/8/2017.
                                                Secretary.
                                                                                                           Accession Number: 20171207–5082.                      Filed Date: 12/7/17.
                                                [FR Doc. 2017–26928 Filed 12–13–17; 8:45 am]               Comments Due: 5 p.m. ET 12/28/17.                     Accession Number: 20171207–5088.
                                                BILLING CODE 6717–01–P
                                                                                                           Docket Numbers: ER18–390–000.                         Comments Due: 5 p.m. ET 12/28/17.
                                                                                                           Applicants: AES Ohio Generation,                      Docket Numbers: ER18–406–000.
                                                                                                        LLC.                                                     Applicants: Brunner Island, LLC.
                                                DEPARTMENT OF ENERGY
                                                                                                           Description: Compliance filing: AES                   Description: § 205(d) Rate Filing:
                                                Federal Energy Regulatory                               Reactive Power Compliance Filing                      Revised Reactive Service Rate Schedule
                                                Commission                                              [EC17–117–000] to be effective 12/31/                 and Request for Waiver to be effective
                                                                                                        9998.                                                 12/31/9998.
                                                Combined Notice of Filings #1                              Filed Date: 12/5/17.                                  Filed Date: 12/7/17.
                                                                                                           Accession Number: 20171205–5120.                      Accession Number: 20171207–5094.
                                                   Take notice that the Commission                         Comments Due: 5 p.m. ET 12/19/17.                     Comments Due: 5 p.m. ET 12/28/17.
                                                received the following electric corporate
                                                                                                           Docket Numbers: ER18–400–000.                         The filings are accessible in the
                                                filings:                                                   Applicants: Tucson Electric Power                  Commission’s eLibrary system by
                                                   Docket Numbers: EC18–28–000.                         Company.                                              clicking on the links or querying the
                                                   Applicants: American Transmission                       Description: § 205(d) Rate Filing:                 docket number.
                                                Company LLC, Wisconsin Power and                        Engineering and Design Agreement,                        Any person desiring to intervene or
                                                Light Company.                                          Rate Schedule No. 338 to be effective                 protest in any of the above proceedings
                                                   Description: Application for                         12/8/2017.                                            must file in accordance with Rules 211
                                                Authority to Acquire Transmission                          Filed Date: 12/7/17.                               and 214 of the Commission’s
                                                Facilities under Section 203 of the FPA                    Accession Number: 20171207–5054.                   Regulations (18 CFR 385.211 and
                                                of American Transmission Company                           Comments Due: 5 p.m. ET 12/28/17.                  § 385.214) on or before 5:00 p.m. Eastern
                                                LLC, et al.                                                                                                   time on the specified comment date.
                                                   Filed Date: 12/6/17.                                    Docket Numbers: ER18–401–000.
                                                   Accession Number: 20171206–5135.                        Applicants: Southwestern Public                    Protests may be considered, but
                                                   Comments Due: 5 p.m. ET 12/27/17.                    Service Company.                                      intervention is necessary to become a
                                                                                                           Description: § 205(d) Rate Filing:                 party to the proceeding.
                                                   Docket Numbers: EC18–29–000.
                                                   Applicants: Big Savage, LLC, Big Sky                 SPS–RBEC–GSEC–IA–TXNW–699–0.0.0                          eFiling is encouraged. More detailed
                                                Wind, LLC, EverPower Commercial                         to be effective 12/8/2017.                            information relating to filing
                                                Services LLC, Highland North LLC,                          Filed Date: 12/7/17.                               requirements, interventions, protests,
                                                                                                           Accession Number: 20171207–5061.                   service, and qualifying facilities filings
                                                Howard Wind LLC, Krayn Wind LLC,
                                                                                                           Comments Due: 5 p.m. ET 12/28/17.                  can be found at: http://www.ferc.gov/
                                                Mustang Hills, LLC, Patton Wind Farm,
                                                LLC.                                                       Docket Numbers: ER18–402–000.                      docs-filing/efiling/filing-req.pdf. For
                                                   Description: Application Under FPA                      Applicants: Virginia Electric and                  other information, call (866) 208–3676
                                                Section 203 of Big Savage, LLC et al.                   Power Company, PJM Interconnection,                   (toll free). For TTY, call (202) 502–8659.
                                                   Filed Date: 12/6/17.                                 L.L.C.                                                  Dated: December 7, 2017.
                                                   Accession Number: 20171206–5143.                        Description: § 205(d) Rate Filing:                 Kimberly D. Bose,
                                                   Comments Due: 5 p.m. ET 12/27/17.                    VEPCO submits WDSAs, Service
                                                                                                                                                              Secretary.
                                                   Take notice that the Commission                      Agreement Nos. 4852, 4853, 4854, and
                                                                                                                                                              [FR Doc. 2017–26925 Filed 12–13–17; 8:45 am]
                                                received the following electric rate                    4855 to be effective 11/11/2017.
                                                                                                                                                              BILLING CODE 6717–01–P
                                                filings:                                                   Filed Date: 12/7/17.
                                                   Docket Numbers: ER12–524–001.                           Accession Number: 20171207–5066.
                                                   Applicants: Longview Power, LLC.                        Comments Due: 5 p.m. ET 12/28/17.
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                   Description: Compliance filing:                         Docket Numbers: ER18–403–000.
                                                Informational Filing Regarding                             Applicants: Westar Energy, Inc.                    Federal Energy Regulatory
                                                Upstream Change in Control and                             Description: Tariff Cancellation:                  Commission
                                                Request for Waiver to be effective N/A.                 Notice of Cancellation of certain
                                                                                                        designated Rate Schedules to be                       [Docket No. Ad18–6–000]
                                                   Filed Date: 12/6/17.
                                                                                                        effective 6/1/2015.
sradovich on DSK3GMQ082PROD with NOTICES




                                                   Accession Number: 20171206–5094.                                                                           Notice of Availability of the Revised
                                                   Comments Due: 5 p.m. ET 12/27/17.                       Filed Date: 12/7/17.
                                                                                                           Accession Number: 20171207–5080.                   Engineering Guidelines for the
                                                   Docket Numbers: ER17–1916–001.                                                                             Evaluation of Hydropower Projects:
                                                   Applicants: Southern Maryland                           Comments Due: 5 p.m. ET 12/28/17.
                                                                                                                                                              Chapter 11—Arch Dams and Request
                                                Electric Cooperative, PJM                                  Docket Numbers: ER18–404–000.                      for Comments
                                                Interconnection, L.L.C.                                    Applicants: Baltimore Gas and
                                                   Description: Compliance filing:                      Electric Company, PJM Interconnection,                  The staff of the Office of Energy
                                                SMECO submits compliance filing to                      L.L.C.                                                Projects (OEP) is revising Chapter 11—


                                           VerDate Sep<11>2014   21:28 Dec 13, 2017   Jkt 244001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1


                                                58802                     Federal Register / Vol. 82, No. 239 / Thursday, December 14, 2017 / Notices

                                                Arch Dams of its Engineering Guidelines                    (3) In lieu of electronic filing, you can          Counties, Oklahoma and Seward
                                                for the Evaluation of Hydropower                        mail a paper copy of your comments to:                County, Kansas. The Commission will
                                                Projects. The staff has revised Chapter                 Kimberly D. Bose, Secretary, Federal                  use this EA in its decision-making
                                                11—Arch Dams 1 and comments are                         Energy Regulatory Commission, 888                     process to determine whether the
                                                now requested on the draft document                     First Street NE, Room 1A, Washington,                 Project is in the public convenience and
                                                from federal and state agencies,                        DC 20426.                                             necessity.
                                                licensees whose infrastructure portfolio                   The OEP staff provided copies of                      This notice announces the opening of
                                                includes arch dams, independent                         revised Chapter 11—Arch Dams to                       the scoping process the Commission
                                                consultants and inspectors, and other                   federal and state agencies, licensees                 will use to gather input from the public
                                                interested parties with special expertise               whose portfolio includes arch dams,                   and interested agencies on the Project.
                                                with respect dam safety and arch dams.                  independent consultants and inspectors,               You can make a difference by providing
                                                A 60-day public comment period is                       and other interested parties. In addition,            us with your specific comments or
                                                allotted to collect comments. Please                    all information related to the proposed               concerns about the Project. Your
                                                note that this comment period will close                updates to Chapter 11—Arch Dams and                   comments should focus on the potential
                                                on February 5, 2018.                                    submitted comments can be found on                    environmental effects, reasonable
                                                   Interested parties can help us                       the FERC website (www.ferc.gov) using                 alternatives, and measures to avoid or
                                                determine the appropriate updates and                   the eLibrary link. Click on the eLibrary              lessen environmental impacts. Your
                                                improvements by providing: Meaningful                   link, click on General Search and enter               input will help the Commission staff
                                                comments or suggestions that focus on                   the docket number, excluding the last                 determine what issues they need to
                                                the specific sections requiring                         three digits in the Docket Number field               evaluate in the EA. To ensure that your
                                                clarification; updates to reflect current               (i.e., AD18–6). Be sure you have                      comments are timely and properly
                                                laws and regulations; or improved                       selected an appropriate date range. The               recorded, please send your comments so
                                                measures for evaluating the safety of                   Commission also offers a free service                 that the Commission receives them in
                                                arch dams. The more specific your                       called eSubscription which allows you                 Washington, DC on or before January 8,
                                                comments, the more useful they will be.                 to keep track of all formal issuances and             2018.
                                                A detailed explanation of your                          submittals in specific dockets. This can                 If you sent comments on this Project
                                                submissions and/or any references of                    reduce the amount of time you spend                   to the Commission before the opening of
                                                scientific studies associated with your                 researching proceedings by                            this docket on July 10, 2017, you will
                                                comments will greatly help us with this                 automatically providing you with                      need to file those comments in Docket
                                                process. We will consider all timely                    electronic notification of these filings              No. PF17–7–000 to ensure they are
                                                comments on the revised Guidelines                      and direct links to the documents. Go to              considered as part of this proceeding.
                                                                                                        www.ferc.gov/docs-filing/                                This notice is being sent to the
                                                before issuing the final version.
                                                                                                        esubscription.asp. Users must be                      Commission’s current environmental
                                                   For your convenience, there are three
                                                                                                        registered in order to use eSubscription.             mailing list for this Project. State and
                                                methods which you can use to submit
                                                                                                           For assistance with filing or any of the           local government representatives should
                                                your comments to the Commission. In
                                                                                                        Commission’s online systems, please                   notify their constituents of this planned
                                                all instances please reference the docket
                                                                                                        contact FERC Online Support at                        Project and encourage them to comment
                                                number (AD18–6–000) on the first page
                                                                                                        FercOnlineSupport@ferc.gov or toll free               on their areas of concern.
                                                of your submission. The Commission                                                                               If you are a landowner receiving this
                                                strongly encourages electronic filing.                  at (866) 208–3676, or for TTY, contact
                                                                                                                                                              notice, a pipeline company
                                                   (1) You can file your comments                       (202) 502–8258.
                                                                                                                                                              representative may contact you about
                                                electronically using the eComment                         Dated: December 7, 2017.                            the acquisition of an easement to
                                                feature on the Commission’s website                     Kimberly D. Bose,                                     construct, operate, and maintain the
                                                (www.ferc.gov) under the link to                        Secretary.                                            planned facilities. The company would
                                                Documents and Filings. This is an easy                                                                        seek to negotiate a mutually acceptable
                                                                                                        [FR Doc. 2017–26927 Filed 12–13–17; 8:45 am]
                                                method for interested persons to submit                                                                       agreement. However, if the Commission
                                                                                                        BILLING CODE 6717–01–P
                                                brief, text-only comments up to 6,000                                                                         approves the Project, that approval
                                                characters. You must include your name                                                                        conveys with it the right of eminent
                                                and contact information at the end of                                                                         domain. Therefore, if easement
                                                                                                        DEPARTMENT OF ENERGY
                                                your comments;                                                                                                negotiations fail to produce an
                                                   (2) You can file your comments                       Federal Energy Regulatory                             agreement, the pipeline company could
                                                electronically using the eFiling feature                Commission                                            initiate condemnation proceedings
                                                on the Commission’s website                                                                                   where compensation would be
                                                (www.ferc.gov) under the link to                        [Docket No. PF17–7–000]
                                                                                                                                                              determined in accordance with state
                                                Documents and Filings. With eFiling,                                                                          law.
                                                                                                        Cimarron River Pipeline, LLC; Notice
                                                you can provide comments in a variety                                                                            A fact sheet prepared by the FERC
                                                                                                        of Intent To Prepare an Environmental
                                                of formats by attaching them as a file                                                                        entitled ‘‘An Interstate Natural Gas
                                                                                                        Assessment for the Planned Request
                                                with your submission. New eFiling                                                                             Facility On My Land? What Do I Need
                                                                                                        for Comments on Environmental
                                                users must first create an account by                                                                         To Know?’’ is available for viewing on
                                                                                                        Issues
                                                clicking on eRegister. When selecting                                                                         the FERC website (www.ferc.gov). This
                                                the filing type, select General, then                     The staff of the Federal Energy                     fact sheet addresses a number of
                                                chose Comment (on Filing, Environ.                      Regulatory Commission (FERC or
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              typically asked questions, including the
                                                Report or Tech Conf); or                                Commission) will prepare an                           use of eminent domain and how to
                                                                                                        environmental assessment (EA) that will               participate in the Commission’s
                                                  1 The existing Chapter 11—Arch Dams is dated          discuss the environmental impacts of                  proceedings.
                                                October 1999 and can be found on the Federal            the Cimarron Expansion Project
                                                Energy Regulatory Commission’s (Commission)
                                                                                                        involving construction and operation of               Public Participation
                                                website to use as a reference to see the changes
                                                made: http://www.ferc.gov/industries/hydropower/        facilities by Cimarron River Pipeline,                  For your convenience, there are three
                                                safety/guidelines/eng-guide/chap11.pdf.                 LLC (Cimarron) in Beaver and Texas                    methods you can use to submit your


                                           VerDate Sep<11>2014   21:28 Dec 13, 2017   Jkt 244001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1



Document Created: 2018-10-25 10:51:39
Document Modified: 2018-10-25 10:51:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 58801 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR