82_FR_60251 82 FR 60010 - Utah Board of Water Resources; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

82 FR 60010 - Utah Board of Water Resources; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 241 (December 18, 2017)

Page Range60010-60011
FR Document2017-27173

Federal Register, Volume 82 Issue 241 (Monday, December 18, 2017)
[Federal Register Volume 82, Number 241 (Monday, December 18, 2017)]
[Notices]
[Pages 60010-60011]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-27173]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12966-004]


Utah Board of Water Resources; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Unconstructed Project.
    b. Project No.: 12966-004.
    c. Date Filed: May 2, 2016.
    d. Applicant: Utah Board of Water Resources.
    e. Name of Project: Lake Powell Pipeline Project.
    f. Location: The proposed project would be located in Washington 
and Kane counties, Utah, and in Coconino and Mohave counties, Arizona. 
The project would occupy 449 acres of federal land managed by the 
Bureau of Land Management (BLM).
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Applicant Contact: Joel Williams, Project 
Manager, Utah Division of Water Resources; Telephone (801) 538-7249 or 
[email protected].
    i. FERC Contact: Jim Fargo, (202) 502-6095 or [email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket number P-12966-004.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now is 
ready for environmental analysis.
    l. The proposed 140-mile-long Lake Powell Pipeline Project would 
convey water from the Bureau of Reclamation's Lake Powell through a 
buried 69-inch diameter pipeline up to a high point within the Grand 
Staircase-Escalante National Monument, after which it would flow for 
about 87.5 miles through a series of hydroelectric turbines, ending at 
Sand Hollow reservoir, near St. George, Utah.
    The proposed hydro facilities subject to the Federal Energy 
Regulatory Commission's jurisdiction under Part I of the Federal Power 
Act include: (1) An inline single-unit, 1-megawatt (MW) facility at 
Hydro Station 1 in the Grand Staircase-Escalante National Monument; (2) 
an inline single-unit, 1.7-MW facility at Hydro Station 2 east of 
Colorado City, Arizona; (3) an inline single-unit, 1-MW facility in 
Hildale City, Utah; (4) an inline single-unit, 1.7-MW facility above 
the Hurricane Cliffs forebay reservoir; (5) a 2-unit, 300-MW (150-MW 
each unit) hydroelectric pumped storage development at Hurricane 
Cliffs, with the forebay and afterbay sized to provide ten hours of 
continuous 300-MW output; (6) a single-unit, 35-MW conventional energy 
recovery generation unit built within the Hurricane Cliffs development; 
(7) a single-unit, 5-MW facility at the existing Sand Hollow Reservoir 
and (8) related transmission lines.
    In its application, the applicant proposes to define the FERC-
licensed hydro system to include not only the power-generating 
facilities noted above, but also approximately 89 miles of water 
delivery pipelines that connect these facilities. The Commission has 
not yet determined whether these water delivery pipelines will be 
included as part of the licensed hydro facilities. If the Commission 
licenses only the power generating facilities and excludes the 
intervening pipelines, federal land-managing agencies will be 
responsible for issuing rights-of-way permits for those parts of the 
pipelines that are located on federal lands. If the Commission 
determines that it should also license the intervening pipelines, 
federal land-managing agencies may also be permitted to file conditions 
under section 4(e) of the Federal Power Act for the protection and 
utilization of any federal reservations that the pipelines will occupy, 
depending on which pipeline route is selected.
    In particular, the applicant proposes to use the south alternative 
route for the pipeline, which does not cross the Kaibab Reservation. In 
Scoping Document 2, Commission staff stated that the environmental 
impact statement for the Lake Powell Pipeline Project will include an 
alternative pipeline route across the Kaibab Reservation. Depending on 
the scope of the FERC-licensed hydro system, this alternative may or 
may not be subject to section 4(e) of the Federal Power Act. To cover 
both possibilities, Interior should provide preliminary section 4(e) 
conditions for the Kaibab Reservation alternative, and should also 
provide any proposed rights-of-way conditions for that route if those 
conditions would differ from the section 4(e) conditions, in the event 
that the Commission determines not to include the pipelines as part of 
the licensed Hydro System. The applicant included unsigned rights-of-
way permit applications to the BLM, Bureau of Reclamation, and National 
Park Service in its final license application.
    In compliance with the National Environmental Policy Act of 1969, 
as amended, and the Federal Land Policy and Management Act of 1976, as 
amended, the BLM, Arizona Strip Field Office, St. George, Utah, intends 
to consider amending a portion of the Arizona Strip Field Office 
Resource Management Plan (RMP) to allow development of the Lake Powell 
Pipeline within the Kanab Creek Area of Critical Environmental Concern. 
The EIS will analyze both the proposed Lake Powell Pipeline Project and 
the proposed RMP amendment. The BLM

[[Page 60011]]

will conduct its own scoping process to solicit public comments and 
identify issues.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title PROTEST, 
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS 
AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name 
of the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: December 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27173 Filed 12-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               60010                      Federal Register / Vol. 82, No. 241 / Monday, December 18, 2017 / Notices

                                               should submit an original and 5 copies                  Commenters can submit brief comments                     In its application, the applicant
                                               of the protest or intervention to the                   up to 6,000 characters, without prior                 proposes to define the FERC-licensed
                                               Federal Energy Regulatory Commission,                   registration, using the eComment system               hydro system to include not only the
                                               888 First Street NE, Washington, DC                     at http://www.ferc.gov/docs-filing/                   power-generating facilities noted above,
                                               20426.                                                  ecomment.asp. You must include your                   but also approximately 89 miles of
                                                 Dated: December 11, 2017.                             name and contact information at the end               water delivery pipelines that connect
                                                                                                       of your comments. For assistance,                     these facilities. The Commission has not
                                               Kimberly D. Bose,
                                                                                                       please contact FERC Online Support at                 yet determined whether these water
                                               Secretary.
                                                                                                       FERCOnlineSupport@ferc.gov, (866)                     delivery pipelines will be included as
                                               [FR Doc. 2017–27172 Filed 12–15–17; 8:45 am]                                                                  part of the licensed hydro facilities. If
                                                                                                       208–3676 (toll free), or (202) 502–8659
                                               BILLING CODE 6717–01–P                                  (TTY). In lieu of electronic filing, please           the Commission licenses only the power
                                                                                                       send a paper copy to: Secretary, Federal              generating facilities and excludes the
                                                                                                       Energy Regulatory Commission, 888                     intervening pipelines, federal land-
                                               DEPARTMENT OF ENERGY                                                                                          managing agencies will be responsible
                                                                                                       First Street NE, Washington, DC 20426.
                                                                                                       The first page of any filing should                   for issuing rights-of-way permits for
                                               Federal Energy Regulatory
                                                                                                       include docket number P–12966–004.                    those parts of the pipelines that are
                                               Commission
                                                                                                          The Commission’s Rules of Practice                 located on federal lands. If the
                                               [Project No. 12966–004]                                 require all intervenors filing documents              Commission determines that it should
                                                                                                       with the Commission to serve a copy of                also license the intervening pipelines,
                                               Utah Board of Water Resources;                          that document on each person on the                   federal land-managing agencies may
                                               Notice of Application Accepted for                      official service list for the project.                also be permitted to file conditions
                                               Filing, Soliciting Motions To Intervene                 Further, if an intervenor files comments              under section 4(e) of the Federal Power
                                               and Protests, Ready for Environmental                   or documents with the Commission                      Act for the protection and utilization of
                                               Analysis, and Soliciting Comments,                      relating to the merits of an issue that               any federal reservations that the
                                               Recommendations, Terms and                              may affect the responsibilities of a                  pipelines will occupy, depending on
                                               Conditions, and Prescriptions                           particular resource agency, they must                 which pipeline route is selected.
                                                                                                       also serve a copy of the document on                     In particular, the applicant proposes
                                                 Take notice that the following                                                                              to use the south alternative route for the
                                               hydroelectric application has been filed                that resource agency.
                                                                                                                                                             pipeline, which does not cross the
                                               with the Commission and is available                       k. This application has been accepted
                                                                                                                                                             Kaibab Reservation. In Scoping
                                               for public inspection.                                  for filing and is now is ready for
                                                                                                                                                             Document 2, Commission staff stated
                                                 a. Type of Application: Major                         environmental analysis.
                                                                                                                                                             that the environmental impact statement
                                               Unconstructed Project.                                     l. The proposed 140-mile-long Lake
                                                                                                                                                             for the Lake Powell Pipeline Project will
                                                 b. Project No.: 12966–004.                            Powell Pipeline Project would convey                  include an alternative pipeline route
                                                 c. Date Filed: May 2, 2016.                           water from the Bureau of Reclamation’s                across the Kaibab Reservation.
                                                 d. Applicant: Utah Board of Water                     Lake Powell through a buried 69-inch                  Depending on the scope of the FERC-
                                               Resources.                                              diameter pipeline up to a high point                  licensed hydro system, this alternative
                                                 e. Name of Project: Lake Powell                       within the Grand Staircase-Escalante                  may or may not be subject to section
                                               Pipeline Project.                                       National Monument, after which it                     4(e) of the Federal Power Act. To cover
                                                 f. Location: The proposed project                     would flow for about 87.5 miles through               both possibilities, Interior should
                                               would be located in Washington and                      a series of hydroelectric turbines,                   provide preliminary section 4(e)
                                               Kane counties, Utah, and in Coconino                    ending at Sand Hollow reservoir, near                 conditions for the Kaibab Reservation
                                               and Mohave counties, Arizona. The                       St. George, Utah.                                     alternative, and should also provide any
                                               project would occupy 449 acres of                          The proposed hydro facilities subject              proposed rights-of-way conditions for
                                               federal land managed by the Bureau of                   to the Federal Energy Regulatory                      that route if those conditions would
                                               Land Management (BLM).                                  Commission’s jurisdiction under Part I                differ from the section 4(e) conditions,
                                                 g. Filed Pursuant to: Federal Power                   of the Federal Power Act include: (1) An              in the event that the Commission
                                               Act, 16 U.S.C. 791(a)–825(r).                           inline single-unit, 1-megawatt (MW)                   determines not to include the pipelines
                                                 h. Applicant Contact: Applicant                       facility at Hydro Station 1 in the Grand              as part of the licensed Hydro System.
                                               Contact: Joel Williams, Project Manager,                Staircase-Escalante National Monument;                The applicant included unsigned rights-
                                               Utah Division of Water Resources;                       (2) an inline single-unit, 1.7–MW                     of-way permit applications to the BLM,
                                               Telephone (801) 538–7249 or                             facility at Hydro Station 2 east of                   Bureau of Reclamation, and National
                                               joelwilliams@utah.gov.                                  Colorado City, Arizona; (3) an inline                 Park Service in its final license
                                                 i. FERC Contact: Jim Fargo, (202) 502–                single-unit, 1–MW facility in Hildale                 application.
                                               6095 or james.fargo@ferc.gov.                           City, Utah; (4) an inline single-unit, 1.7–              In compliance with the National
                                                  j. Deadline for filing motions to                    MW facility above the Hurricane Cliffs                Environmental Policy Act of 1969, as
                                               intervene and protests, comments,                       forebay reservoir; (5) a 2-unit, 300–MW               amended, and the Federal Land Policy
                                               recommendations, terms and                              (150–MW each unit) hydroelectric                      and Management Act of 1976, as
                                               conditions, and prescriptions: 60 days                  pumped storage development at                         amended, the BLM, Arizona Strip Field
                                               from the issuance date of this notice;                  Hurricane Cliffs, with the forebay and                Office, St. George, Utah, intends to
                                               reply comments are due 105 days from                    afterbay sized to provide ten hours of                consider amending a portion of the
                                               the issuance date of this notice.                       continuous 300–MW output; (6) a                       Arizona Strip Field Office Resource
daltland on DSKBBV9HB2PROD with NOTICES




                                                  The Commission strongly encourages                   single-unit, 35–MW conventional                       Management Plan (RMP) to allow
                                               electronic filing. Please file motions to               energy recovery generation unit built                 development of the Lake Powell
                                               intervene and protests, comments,                       within the Hurricane Cliffs                           Pipeline within the Kanab Creek Area of
                                               recommendations, terms and                              development; (7) a single-unit, 5–MW                  Critical Environmental Concern. The
                                               conditions, and prescriptions using the                 facility at the existing Sand Hollow                  EIS will analyze both the proposed Lake
                                               Commission’s eFiling system at http://                  Reservoir and (8) related transmission                Powell Pipeline Project and the
                                               www.ferc.gov/docs-filing/efiling.asp.                   lines.                                                proposed RMP amendment. The BLM


                                          VerDate Sep<11>2014   17:53 Dec 15, 2017   Jkt 244001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:\FR\FM\18DEN1.SGM   18DEN1


                                                                          Federal Register / Vol. 82, No. 241 / Monday, December 18, 2017 / Notices                                                 60011

                                               will conduct its own scoping process to                    o. A license applicant must file no                necessary to become a party to the
                                               solicit public comments and identify                    later than 60 days following the date of              proceeding.
                                               issues.                                                 issuance of this notice: (1) A copy of the               eFiling is encouraged. More detailed
                                                  m. A copy of the application is                      water quality certification; (2) a copy of            information relating to filing
                                               available for review at the Commission                  the request for certification, including              requirements, interventions, protests,
                                               in the Public Reference Room or may be                  proof of the date on which the certifying             service, and qualifying facilities filings
                                               viewed on the Commission’s website at                   agency received the request; or (3)                   can be found at: http://www.ferc.gov/
                                               http://www.ferc.gov using the                           evidence of waiver of water quality                   docs-filing/efiling/filing-req.pdf. For
                                               ‘‘eLibrary’’ link. Enter the docket                     certification.                                        other information, call (866) 208–3676
                                               number excluding the last three digits in                 Dated: December 11, 2017.                           (toll free). For TTY, call (202) 502–8659.
                                               the docket number field to access the                   Kimberly D. Bose,                                       Dated: December 11, 2017.
                                               document. For assistance, contact FERC                                                                        Kimberly D. Bose,
                                                                                                       Secretary.
                                               Online Support. A copy is also available
                                                                                                       [FR Doc. 2017–27173 Filed 12–15–17; 8:45 am]          Secretary.
                                               for inspection and reproduction at the
                                                                                                       BILLING CODE 6717–01–P                                [FR Doc. 2017–27170 Filed 12–15–17; 8:45 am]
                                               address in item h above.
                                                                                                                                                             BILLING CODE 6717–01–P
                                                  n. Anyone may submit comments, a
                                               protest, or a motion to intervene in                    DEPARTMENT OF ENERGY
                                               accordance with the requirements of
                                               Rules of Practice and Procedure, 18 CFR                                                                       ENVIRONMENTAL PROTECTION
                                                                                                       Federal Energy Regulatory
                                               385.210, .211, and .214. In determining                                                                       AGENCY
                                                                                                       Commission
                                               the appropriate action to take, the                                                                           [EPA–HQ–OPP–2017–0180; FRL–9970–45]
                                               Commission will consider all protests or                Combined Notice of Filings
                                               other comments filed, but only those                                                                          Federal Insecticide, Fungicide, and
                                               who file a motion to intervene in                         Take notice that the Commission has                 Rodenticide Act Scientific Advisory
                                               accordance with the Commission’s                        received the following Natural Gas                    Panel (FIFRA SAP) Request for Ad Hoc
                                               Rules may become a party to the                         Pipeline Rate and Refund Report filings:              Expert Nominations; Notice of Public
                                               proceeding. Any comments, protests, or                  Filings Instituting Proceedings                       Meeting
                                               motions to intervene must be received
                                                                                                          Docket Number: PR18–2–001.                         AGENCY: Environmental Protection
                                               on or before the specified comment date
                                                                                                          Applicants: Acacia Natural Gas, L.L.C.             Agency (EPA).
                                               for the particular application.
                                                                                                          Description: Tariff filing per                     ACTION: Notice.
                                                  All filings must (1) bear in all capital
                                                                                                       284.123(b),(e)+(g): Acacia Natural Gas
                                               letters the title PROTEST, MOTION TO
                                                                                                       Filing—December 6, 2017 to be effective               SUMMARY:   The Agency is issuing this
                                               INTERVENE, COMMENTS, REPLY
                                                                                                       12/6/2017.                                            notice to announce the opportunity to
                                               COMMENTS, RECOMMENDATIONS,
                                                                                                          Filed Date: 12/6/17.                               provide additional nominations for
                                               TERMS AND CONDITIONS, or
                                                                                                          Accession Number: 201712065111.                    experts to serve as ad hoc members for
                                               PRESCRIPTIONS; (2) set forth in the
                                                                                                          Comments Due: 5 p.m. ET 12/27/17.                  the Federal Insecticide, Fungicide, and
                                               heading the name of the applicant and
                                                                                                          284.123(g) Protests Due: 5 p.m. ET 12/             Rodenticide Act Scientific Advisory
                                               the project number of the application to
                                                                                                       27/17.                                                Panel (FIFRA SAP) reviewing
                                               which the filing responds; (3) furnish
                                                                                                          Docket Numbers: RP18–244–000.                      physiologically-based pharmacokinetic
                                               the name, address, and telephone
                                                                                                          Applicants: National Fuel Gas Supply               (PBPK) modeling to address
                                               number of the person protesting or
                                                                                                       Corporation.                                          pharmacokinetic differences between
                                               intervening; and (4) otherwise comply
                                                                                                          Description: § 4(d) Rate Filing:                   and within species on six selected
                                               with the requirements of 18 CFR
                                                                                                       Security Administrator to be effective                pesticidal active ingredients. This
                                               385.2001 through 385.2005. All
                                                                                                       12/31/9998.                                           meeting of the FIFRA SAP, originally
                                               comments, recommendations, terms and
                                                                                                          Filed Date: 12/7/17.                               scheduled for October 24–27, 2017, has
                                               conditions or prescriptions must set
                                                                                                          Accession Number: 20171207–5081.                   been postponed until 2018. New dates
                                               forth their evidentiary basis and
                                                                                                          Comments Due: 5 p.m. ET 12/19/17.                  for this meeting will be announced in a
                                               otherwise comply with the requirements
                                                                                                          Docket Numbers: RP18–245–000.                      separate notice.
                                               of 18 CFR 4.34(b). Agencies may obtain
                                               copies of the application directly from                    Applicants: Empire Pipeline, Inc.                  DATES: The meeting will be rescheduled
                                               the applicant. A copy of any protest or                    Description: § 4(d) Rate Filing: Empire            for 2018. The Agency will issue another
                                               motion to intervene must be served                      Security Administrator to be effective                announcement once the new date for
                                               upon each representative of the                         12/31/9998.                                           the SAP meeting on PBPK modeling has
                                               applicant specified in the particular                      Filed Date: 12/7/17.                               been determined.
                                               application. A copy of all other filings                   Accession Number: 20171207–5112.                      Nominations. Nominations of
                                               in reference to this application must be                   Comments Due: 5 p.m. ET 12/19/17.                  candidates to serve as ad hoc members
                                               accompanied by proof of service on all                     The filings are accessible in the                  of FIFRA SAP for this meeting should
                                               persons listed in the service list                      Commission’s eLibrary system by                       be provided on or before January 17,
                                               prepared by the Commission in this                      clicking on the links or querying the                 2018. See Request for Nominations
                                               proceeding, in accordance with 18 CFR                   docket number.                                        section for more detail.
                                               4.34(b) and 385.2010.                                      Any person desiring to intervene or                   Submit nominations to serve as ad
daltland on DSKBBV9HB2PROD with NOTICES




                                                  You may also register online at http://              protest in any of the above proceedings               hoc members of FIFRA SAP, requests
                                               www.ferc.gov/docs-filing/                               must file in accordance with Rules 211                for special accommodations, or requests
                                               esubscription.asp to be notified via                    and 214 of the Commission’s                           to present oral comments to the DFO
                                               email of new filings and issuances                      Regulations (18 CFR 385.211 and                       listed under FOR FURTHER INFORMATION
                                                                                                                                                             CONTACT.
                                               related to this or other pending projects.              385.214) on or before 5:00 p.m. Eastern
                                               For assistance, contact FERC Online                     time on the specified date(s). Protests               FOR FURTHER INFORMATION CONTACT:           Dr.
                                               Support.                                                may be considered, but intervention is                Marquea D. King, DFO, Office of


                                          VerDate Sep<11>2014   17:53 Dec 15, 2017   Jkt 244001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\18DEN1.SGM   18DEN1



Document Created: 2017-12-15 23:54:45
Document Modified: 2017-12-15 23:54:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 60010 