82_FR_60837 82 FR 60593 - FFP Project 101, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 60593 - FFP Project 101, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 244 (December 21, 2017)

Page Range60593-60594
FR Document2017-27497

Federal Register, Volume 82 Issue 244 (Thursday, December 21, 2017)
[Federal Register Volume 82, Number 244 (Thursday, December 21, 2017)]
[Notices]
[Pages 60593-60594]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-27497]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14861-000]


FFP Project 101, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 20, 2017, FFP Project 101, LLC filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act, proposing to study the feasibility of the Goldendale Energy 
Storage Project (project) to be located near Goldendale in Klickitat 
County, Washington and Sherman County, Oregon. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project will be closed-loop. Water to initially fill 
the reservoirs and required make-up water will be pumped from the 
Columbia River via an existing pumphouse. The proposed project would 
consist of an upper and lower reservoir, an underground water 
conveyance system connecting the two reservoirs, an underground 
powerhouse, and a transmission line. The lower reservoir would be 
formed by a 7,400-foot-long, 170-foot-high rockfill embankment, with 
storage capacity of 7,100 acre-feet at maximum water surface elevation 
of 580 feet and surface area of 62 acres. The upper reservoir would be 
formed by an 8,000-foot-long, 170-foot-high rockfill embankment, with 
storage capacity of 7,100 acre-feet at maximum water surface elevation 
of 2,940 feet and surface area of 59 acres. Water would be conveyed 
from the upper reservoir to the lower reservoir via a 5,000-foot-long, 
concrete and steel tunnel with internal diameters ranging from 20 to 29 
feet, and a 600-foot-long, 15-foot-diameter steel/concrete penstock. 
The powerhouse would contain three, 400-megawatt (MW) Francis-type 
pump-turbine units for a total installed capacity of 1,200 MW. Project 
power would be transmitted through a new 5-mile-long, 500-kilovolt 
transmission line from the powerhouse to Bonneville Power 
Administration's John Day Substation.
    The estimated averaged annual generation of the project would be 
3,500 gigawatt-hours.
    Applicant Contact: Erik Steimle, Rye Development, 745 Atlantic Ave. 
8th Floor, Boston, MA 02111, phone (503) 998-0230.
    FERC Contact: Kim Nguyen, (202) 502-6105.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14861-000.

[[Page 60594]]

    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14861) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: December 15, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-27497 Filed 12-20-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 82, No. 244 / Thursday, December 21, 2017 / Notices                                            60593

                                               www.regulations.gov by selecting the                       Abstract: The Higher Education                     lower reservoir, an underground water
                                               Docket ID number or via postal mail,                    Opportunity Act, Public Law 110–315,                  conveyance system connecting the two
                                               commercial delivery, or hand delivery.                  added provisions for the Higher                       reservoirs, an underground powerhouse,
                                               Please note that comments submitted by                  Education Act of 1965, as amended, in                 and a transmission line. The lower
                                               fax or email and those submitted after                  section 750 and 766 that enable eligible              reservoir would be formed by a 7,400-
                                               the comment period will not be                          students with intellectual disabilities to            foot-long, 170-foot-high rockfill
                                               accepted. Written requests for                          receive Federal Pell Grant, Federal                   embankment, with storage capacity of
                                               information or comments submitted by                    Supplemental Educational Opportunity                  7,100 acre-feet at maximum water
                                               postal mail or delivery should be                       Grant, and Federal Work Study funds if                surface elevation of 580 feet and surface
                                               addressed to the Director of the                        they are enrolled in an approved                      area of 62 acres. The upper reservoir
                                               Information Collection Clearance                        program. The Comprehensive Transition                 would be formed by an 8,000-foot-long,
                                               Division, U.S. Department of Education,                 Program (CTP) for Disbursing Title IV                 170-foot-high rockfill embankment, with
                                               400 Maryland Avenue SW, LBJ, Room                       Aid to Students with Intellectual                     storage capacity of 7,100 acre-feet at
                                               216–34, Washington, DC 20202–4537.                      Disabilities expenditure report is the                maximum water surface elevation of
                                               FOR FURTHER INFORMATION CONTACT: For                    tool for reporting the use of these                   2,940 feet and surface area of 59 acres.
                                               specific questions related to collection                specific funds. The data will be used by              Water would be conveyed from the
                                               activities, please contact Tammy Gay,                   the Department to monitor program                     upper reservoir to the lower reservoir
                                               816–804–0848.                                           effectiveness and accountability of fund              via a 5,000-foot-long, concrete and steel
                                               SUPPLEMENTARY INFORMATION: The                          expenditures. The data is used in                     tunnel with internal diameters ranging
                                               Department of Education (ED), in                        conjunction with institutional program                from 20 to 29 feet, and a 600-foot-long,
                                               accordance with the Paperwork                           reviews to assess the administrative                  15-foot-diameter steel/concrete
                                               Reduction Act of 1995 (PRA) (44 U.S.C.                  capability and compliance of the                      penstock. The powerhouse would
                                               3506(c)(2)(A)), provides the general                    applicant.                                            contain three, 400-megawatt (MW)
                                               public and Federal agencies with an                                                                           Francis-type pump-turbine units for a
                                                                                                         Dated: December 18, 2017.
                                               opportunity to comment on proposed,                                                                           total installed capacity of 1,200 MW.
                                                                                                       Kate Mullan,                                          Project power would be transmitted
                                               revised, and continuing collections of
                                                                                                       Acting Director, Information Collection               through a new 5-mile-long, 500-kilovolt
                                               information. This helps the Department                  Clearance Division, Office of the Chief Privacy
                                               assess the impact of its information                                                                          transmission line from the powerhouse
                                                                                                       Officer, Office of Management.
                                               collection requirements and minimize                                                                          to Bonneville Power Administration’s
                                                                                                       [FR Doc. 2017–27535 Filed 12–20–17; 8:45 am]          John Day Substation.
                                               the public’s reporting burden. It also
                                               helps the public understand the
                                                                                                       BILLING CODE 4000–01–P                                   The estimated averaged annual
                                               Department’s information collection                                                                           generation of the project would be 3,500
                                               requirements and provide the requested                                                                        gigawatt-hours.
                                               data in the desired format. ED is                       DEPARTMENT OF ENERGY                                     Applicant Contact: Erik Steimle, Rye
                                               soliciting comments on the proposed                                                                           Development, 745 Atlantic Ave. 8th
                                                                                                       Federal Energy Regulatory                             Floor, Boston, MA 02111, phone (503)
                                               information collection request (ICR) that
                                                                                                       Commission                                            998–0230.
                                               is described below. The Department of
                                                                                                                                                                FERC Contact: Kim Nguyen, (202)
                                               Education is especially interested in                   [Project No. 14861–000]
                                                                                                                                                             502–6105.
                                               public comment addressing the                                                                                    Deadline for filing comments, motions
                                               following issues: (1) Is this collection                FFP Project 101, LLC; Notice of
                                                                                                       Preliminary Permit Application                        to intervene, competing applications
                                               necessary to the proper functions of the                                                                      (without notices of intent), or notices of
                                               Department; (2) will this information be                Accepted for Filing and Soliciting
                                                                                                       Comments, Motions To Intervene, and                   intent to file competing applications: 60
                                               processed and used in a timely manner;                                                                        days from the issuance of this notice.
                                               (3) is the estimate of burden accurate;                 Competing Applications
                                                                                                                                                             Competing applications and notices of
                                               (4) how might the Department enhance                       On October 20, 2017, FFP Project 101,              intent must meet the requirements of 18
                                               the quality, utility, and clarity of the                LLC filed an application for a                        CFR 4.36.
                                               information to be collected; and (5) how                preliminary permit, pursuant to section                  The Commission strongly encourages
                                               might the Department minimize the                       4(f) of the Federal Power Act, proposing              electronic filing. Please file comments,
                                               burden of this collection on the                        to study the feasibility of the                       motions to intervene, notices of intent,
                                               respondents, including through the use                  Goldendale Energy Storage Project                     and competing applications using the
                                               of information technology. Please note                  (project) to be located near Goldendale               Commission’s eFiling system at http://
                                               that written comments received in                                                                             www.ferc.gov/docs-filing/efiling.asp.
                                                                                                       in Klickitat County, Washington and
                                               response to this notice will be
                                                                                                       Sherman County, Oregon. The sole                      Commenters can submit brief comments
                                               considered public records.
                                                                                                       purpose of a preliminary permit, if                   up to 6,000 characters, without prior
                                                  Title of Collection: Comprehensive
                                               Transition Program (CTP) for Disbursing                 issued, is to grant the permit holder                 registration, using the eComment system
                                               Title IV Aid to Students with                           priority to file a license application                at http://www.ferc.gov/docs-filing/
                                               Intellectual Disabilities Expenditure                   during the permit term. A preliminary                 ecomment.asp. You must include your
                                               Report.                                                 permit does not authorize the permit                  name and contact information at the end
                                                  OMB Control Number: 1845–0113.                       holder to perform any land-disturbing                 of your comments. For assistance,
                                                  Type of Review: An extension of an                   activities or otherwise enter upon lands              please contact FERC Online Support at
                                               existing information collection.                        or waters owned by others without the                 FERCOnlineSupport@ferc.gov, (866)
daltland on DSKBBV9HB2PROD with NOTICES




                                                  Respondents/Affected Public: State,                  owners’ express permission.                           208–3676 (toll free), or (202) 502–8659
                                               Local, and Tribal Governments; Private                     The proposed project will be closed-               (TTY). In lieu of electronic filing, please
                                               Sector.                                                 loop. Water to initially fill the reservoirs          send a paper copy to: Secretary, Federal
                                                  Total Estimated Number of Annual                     and required make-up water will be                    Energy Regulatory Commission, 888
                                               Responses: 70.                                          pumped from the Columbia River via an                 First Street NE, Washington, DC 20426.
                                                  Total Estimated Number of Annual                     existing pumphouse. The proposed                      The first page of any filing should
                                               Burden Hours: 140.                                      project would consist of an upper and                 include docket number P–14861–000.


                                          VerDate Sep<11>2014   20:57 Dec 20, 2017   Jkt 244001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\21DEN1.SGM   21DEN1


                                               60594                          Federal Register / Vol. 82, No. 244 / Thursday, December 21, 2017 / Notices

                                                  More information about this project,                            explains changes in the calculation of                           OMB Control Nos.: 1902–0274.
                                               including a copy of the application, can                           the annual burden estimates. There are                           Type of Request: Three-year extension
                                               be viewed or printed on the ‘‘eLibrary’’                           no changes to the information                                  of the FERC–725U information
                                               link of Commission’s website at http://                            collection, filing, or recordkeeping                           collection requirements with no changes
                                               www.ferc.gov/docs-filing/elibrary.asp.                             requirements.                                                  to the reporting or recordkeeping
                                               Enter the docket number (P–14861) in                               DATES: Comments on the collections of                          requirements.
                                               the docket number field to access the                              information are due by January 22,
                                               document. For assistance, contact FERC                                                                                              Abstract: Two previous notices
                                                                                                                  2018.                                                          proposing the extension of FERC–725U
                                               Online Support.
                                                                                                                  ADDRESSES: Comments filed with OMB,                            were published in the Federal Register.1
                                                 Dated: December 15, 2017.                                        identified by the OMB Control No.                              The total annual burden presented in
                                               Nathaniel J. Davis, Sr.,                                           1902–0274 (FERC–725U) should be sent                           those notices was incorrect and based
                                               Deputy Secretary.                                                  via email to the Office of Information                         on faulty approaches for calculating
                                               [FR Doc. 2017–27497 Filed 12–20–17; 8:45 am]                       and Regulatory Affairs: oira_                                  burden estimates. This 30-day errata/
                                               BILLING CODE 6717–01–P                                             submission@omb.gov, Attention:                                 notice corrects the total annual burden
                                                                                                                  Federal Energy Regulatory Commission                           estimates and explains changes in
                                                                                                                  Desk Officer. The Desk Officer may also                        calculation of the annual burden
                                               DEPARTMENT OF ENERGY                                               be reached via telephone at 202–395–                           estimates.
                                                                                                                  4718.                                                            The burden for the FERC–725U
                                               Federal Energy Regulatory                                             A copy of the comments should also
                                                                                                                                                                                 information collection is estimated
                                               Commission                                                         be sent to the Federal Energy Regulatory
                                                                                                                                                                                 based on the five year cycle of the
                                               [Docket No. IC17–14–000]                                           Commission, identified by the Docket
                                                                                                                                                                                 requirements in the Reliability
                                                                                                                  No. IC17–14–000, by one of the
                                                                                                                                                                                 Standard. Over this five-year cycle,
                                               Commission Information Collection                                  following methods:
                                                                                                                     • eFiling at Commission’s website:                          annual burden levels fluctuate greatly
                                               Activities (FERC–725U); Errata and                                                                                                based on which reporting requirements
                                               Comment Request                                                    http://www.ferc.gov/docs-filing/
                                                                                                                  efiling.asp                                                    are implicated each year.
                                               AGENCY:  Federal Energy Regulatory                                    • Mail/Hand Delivery/Courier:                                 FERC extensions usually request three
                                               Commission, Department of Energy.                                  Federal Energy Regulatory Commission,                          years of extension/approval. However,
                                               ACTION: Errata and comment request.                                Secretary of the Commission, 888 First                         using a three-year timespan to calculate
                                                                                                                  Street NE, Washington, DC 20426.                               the burden would cause the total annual
                                               SUMMARY:   In compliance with the                                     Instructions: All submissions must be                       burden to fluctuate in an
                                               requirements of the Paperwork                                      formatted and filed in accordance with                         unrepresentative way because of the
                                               Reduction Act (PRA) of 1995, the                                   submission guidelines at: http://                              mathematical mismatch between the
                                               Federal Energy Regulatory Commission                               www.ferc.gov/help/submission-                                  Reliability Standard’s five-year cycle
                                               (Commission or FERC) is submitting the                             guide.asp. For user assistance contact                         and the three-year PRA cycle for OMB
                                               information collection FERC–725U                                   FERC Online Support by email at                                approval. Some extension requests
                                               (Mandatory Reliability Standards:                                  ferconlinesupport@ferc.gov, or by phone                        would propose inordinately high or low
                                               Reliability Standard CIP–014) to the                               at: (866) 208–3676 (toll-free), or (202)                       burden solely dependent on the timing
                                               Office of Management and Budget                                    502–8659 for TTY.                                              of the request, not on any actual changes
                                               (OMB) for review of the information                                   Docket: Users interested in receiving                       to reporting requirements.
                                               collection requirements. Any interested                            automatic notification of activity in this
                                                                                                                                                                                   In order to provide the annual burden
                                               person may file comments directly with                             docket or in viewing/downloading
                                                                                                                  comments and issuances in this docket                          estimate in a more representative way,
                                               OMB and should address a copy of                                                                                                  Commission staff is calculating the
                                               those comments to the Commission as                                may do so at http://www.ferc.gov/docs-
                                                                                                                  filing/docs-filing.asp.                                        average annual burden using the five-
                                               explained below. The Commission                                                                                                   year cycle of the Standard and using
                                               published notices in the Federal                                   FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                                 that average for Years 1–3 of this
                                               Register (82 FR 41618, 9/1/2017, and 82                            Ellen Brown may be reached by email
                                                                                                                                                                                 extension.
                                               FR 50645, 11/1/2017) requesting public                             at DataClearance@FERC.gov, by
                                               comments. FERC received no comments                                telephone at (202) 502–8663, and by fax                          Types of Respondents: Intrastate
                                               on the FERC–725U for either notice and                             at (202) 273–0873.                                             natural gas and Hinshaw pipelines.
                                               is making this notation in its submittal                           SUPPLEMENTARY INFORMATION:                                       Estimate of Annual Burden: 2 The
                                               to OMB.                                                               Titles: Mandatory Reliability                               Commission estimates the total Public
                                                  This 30-day errata and notice corrects                          Standards: Reliability Standard CIP–                           Reporting Burden for the FERC–725U
                                               the total annual burden estimates and                              014.                                                           information collection as:
                                                                          FERC–725U: MANDATORY RELIABILITY STANDARDS: RELIABILITY STANDARD CIP–014 3
                                                                                                                                              Number of                            Average burden hours
                                                Year and requirement for this PRA                         Number and type                                      Total number                                              Total burden hours
                                                                                                                                            responses per                         and cost per response 4
                                                         clearance cycle                                   of respondents                                      of responses                                                and total cost
                                                                                                                                              respondent

                                                                                                                 (1)                              (2)          (1) * (2) = (3)                  (4)                           (3) * (4)
daltland on DSKBBV9HB2PROD with NOTICES




                                               Year 1:
                                                   Record Retention ......................    334 TO and 2 TOP 5 ........................                1                336    2 hrs.; $76 ......................   672 hrs.; $25,536.


                                                 1 60-Day notice: 82 FR 41618, 9/1/2017; 30-day                      2 Burden is defined as the total time, effort, or           explanation of what is included in the information
                                               notice: 82 FR 50645, 11/1/2017.                                    financial resources expended by persons to                     collection burden, reference 5 Code of Federal
                                                                                                                  generate, maintain, retain, or disclose or provide             Regulations 1320.3.
                                                                                                                  information to or for a Federal agency. For further



                                          VerDate Sep<11>2014      20:57 Dec 20, 2017        Jkt 244001    PO 00000     Frm 00017      Fmt 4703    Sfmt 4703   E:\FR\FM\21DEN1.SGM          21DEN1



Document Created: 2018-10-25 11:01:27
Document Modified: 2018-10-25 11:01:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 60593 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR