82_FR_61440 82 FR 61193 - Indian Electric Power Utilities

82 FR 61193 - Indian Electric Power Utilities

DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs

Federal Register Volume 82, Issue 247 (December 27, 2017)

Page Range61193-61199
FR Document2017-27668

This proposed rule revises regulations addressing electric power utilities of the Colorado River, Flathead, and San Carlos Indian irrigation projects to use plain language, update definitions, lengthen a regulatory deadline, and make other minor changes.

Federal Register, Volume 82 Issue 247 (Wednesday, December 27, 2017)
[Federal Register Volume 82, Number 247 (Wednesday, December 27, 2017)]
[Proposed Rules]
[Pages 61193-61199]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-27668]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

25 CFR Part 175

[167A2100DD/AAKC001030/A0A501010.999900 253G]
RIN 1076-AF31


Indian Electric Power Utilities

AGENCY: Bureau of Indian Affairs, Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This proposed rule revises regulations addressing electric 
power utilities of the Colorado River, Flathead, and San Carlos Indian 
irrigation projects to use plain language, update definitions, lengthen 
a regulatory deadline, and make other minor changes.

DATES: Comments must be received on or before February 26, 2018.

ADDRESSES: You may submit comments by any of the following methods:
     Federal eRulemaking Portal: www.regulations.gov. Search 
for Docket No. BIA-2016-0002 and follow the instructions for submitting 
comments.
     Mail, Hand Delivery, or Courier: Elizabeth Appel, 
Director, Office of Regulatory Affairs and Collaborative Action--Indian 
Affairs, Attn: 1076-AF31, U.S. Dept. of the Interior, 1849 C Street NW, 
Mail Stop 3642, Washington, DC 20240.

FOR FURTHER INFORMATION CONTACT: Elizabeth Appel, Director, Office of 
Regulatory Affairs and Collaborative Action, Office of the Assistant 
Secretary--Indian Affairs; telephone (202) 273-4680, 
[email protected].

SUPPLEMENTARY INFORMATION:
I. Background
II. Description of Changes
III. Procedural Requirements
    A. Regulatory Planning and Review (E.O.s 12866 and 13563) and 
Reducing Regulation and Controlling Regulatory Costs (E.O. 13771)
    B. Regulatory Flexibility Act
    C. Small Business Regulatory Enforcement Fairness Act
    D. Unfunded Mandates Reform Act
    E. Takings (E.O. 12630)
    F. Federalism (E.O. 13132)
    G. Civil Justice Reform (E.O. 12988)
    H. Consultation With Indian Tribes (E.O. 13175)
    I. Paperwork Reduction Act
    J. National Environmental Policy Act
    K. Effects on the Energy Supply (E.O. 13211)
    L. Clarity of This Regulation

I. Background

    Various statutes provide the Bureau of Indian Affairs (BIA) with 
authority to issue this regulation and for administering electric power 
utilities for the Colorado River, Flathead (Mission Valley Power), and 
San Carlos Indian irrigation projects. For example, see 5 U.S.C. 301; 
25 U.S.C. 13; 25 U.S.C. 385c; 43 Stat. 475-76; 45 Stat. 210-13; 49 
Stat. 1039-40; 49 Stat. 1822-23; 54 Stat. 422; 62 Stat. 269-73; 65 
Stat. 254; 99 Stat. 319-20. Each of these power projects provides 
energy, transmission, and distribution of electrical services to 
customers in their respective service areas. BIA (or the contracting/
compacting Indian Tribe) provides oversight and limited technical 
assistance for power projects and conducts operations and maintenance 
of the distribution systems.
    The regulations addressing BIA's administration of the power 
utilities are at 25 CFR part 175, Indian Electric Power Utilities. 
These regulations were last updated in 1991.

II. Description of Changes

    The revisions being proposed today are intended to make the 
regulations more user-friendly through plain language. The proposed 
rule would also update definitions, lengthen the time by which BIA must 
issue a decision on an appeal from 30 days to 60 days (by referring to 
25 CFR 2.19(a)), and require publication of rate adjustments in the 
Federal Register. The following tables summarize the proposed changes:

------------------------------------------------------------------------
                                 Proposed 25 CFR    Summary of proposed
    Current 25 CFR section           section              changes
------------------------------------------------------------------------
175.1 Definitions.............  175.100 What       Deletes the
                                 terms should I     definitions of
                                 know for this      ``appellant'' and
                                 part?              ``officer-in-
                                                    charge.''
                                                   Adds definitions for
                                                    ``bill,'' ``CFR,''
                                                    ``day(s),''
                                                    ``delinquent,''
                                                    ``due date,''
                                                    ``electric energy,''
                                                    ``energy,'' ``fee,''
                                                    ``I, me, my, you,
                                                    and your,''
                                                    ``must,'' ``past due
                                                    bill,'' ``power,''
                                                    ``public notice,''
                                                    ``purchased power,''
                                                    ``taxpayer
                                                    identification
                                                    number,''
                                                    ``utility(ies),''
                                                    and ``we, us, and
                                                    our.''
                                                   Replaces definition
                                                    of ``Area Director''
                                                    with a definition of
                                                    ``BIA.''
                                                   Revises the
                                                    definition of
                                                    ``customer,''
                                                    ``electric power
                                                    utility,''
                                                    ``electric
                                                    service,''
                                                    ``operations
                                                    manual,''
                                                    ``service,''
                                                    ``service fee.''
                                                   Revises the
                                                    definition of
                                                    ``power rate'' and
                                                    replaces it with the
                                                    terms ``rate'' and
                                                    ``electric power
                                                    rate.''
                                                   Revises the
                                                    definition of
                                                    ``service
                                                    agreement'' and
                                                    replaces it with the
                                                    term ``agreement.''
                                                   Revises the
                                                    definition of
                                                    ``special contract''
                                                    and replaces it with
                                                    the term ``special
                                                    agreement.''
175.2 Purpose.................  175.105 What is    Revises for plain
                                 the purpose of     language.
                                 this part?
175.3 Compliance..............  175.110 Does this  Revises for plain
                                 part apply to      language.
                                 me?
175.4 Authority of area         N/A..............  Deletes provisions
 director.                                          containing
                                                    delegations of
                                                    authority to
                                                    eliminate possible
                                                    conflicts with the
                                                    Departmental
                                                    Delegations of
                                                    Authority.

[[Page 61194]]

 
175.5 Operations manual.......  175.115 How does   Revises for plain
                                 BIA administer     language, deletes
                                 its electric       specific means by
                                 power utilities?   which public notice
                                175.120 What are    of changes will be
                                 Operations         provided, and
                                 Manuals?.          incorporates instead
                                                    the definition of
                                                    ``public notice,''
                                                    which provides for
                                                    publishing
                                                    information
                                                    consistent with the
                                                    operations manual.
175.6 Information collection..  175.600 How does   Revises for plain
                                 the Paperwork      language.
                                 Reduction Act
                                 affect this
                                 part?
175.10 Revenues collected from  175.200 Why does   Revises for plain
 power operations.               BIA collect        language and deletes
                                 revenue from you   amortization as an
                                 and the other      example for what BIA
                                 customers it       may use revenue.
                                 serves, and how
                                 is that revenue
                                 used?
                                175.205 When are
                                 BIA rates and
                                 fees reviewed?.
175.11 Procedures for setting   175.210 What is    Deletes provisions
 service fees.                   BIA's procedure    containing
                                 for setting        delegations of
                                 service fees?      authority to
                                                    eliminate possible
                                                    conflicts with
                                                    Departmental
                                                    Delegations of
                                                    Authority.
175.12 Procedures for           175.215 What is    Adds a requirement
 adjusting electric power        BIA's procedure    for BIA to publish a
 rates except for adjustments    for adjusting      proposed rate
 due to changes in the cost of   electric power     adjustment in the
 purchased power or energy.      rates?             Federal Register.
                                175.220 How long
                                 do rate and fee
                                 adjustments stay
                                 in effect?.
175.13 Procedures for           175.235 How does   Revises for plain
 adjusting electric power        BIA include        language.
 rates to reflect changes in     changes in
 the cost of purchased power     purchased power
 or energy.                      costs to our
                                 electric power
                                 rates?
175.20 Gratuities.............  N/A..............  This section is
                                                    deleted because it
                                                    is already addressed
                                                    by other laws.
175.21 Discontinuance of        175.315 What will  Revises for plain
 service.                        happen if I do     language.
                                 not pay my bill?
175.22 Requirements for         175.125 How do I   Revises for plain
 receiving electrical service.   request and        language.
                                 receive service?
175.23 Customer                 N/A..............  Deleted because this
 responsibilities.                                  provision is for a
                                                    project-specific
                                                    authority addressed
                                                    at the local BIA
                                                    level.
175.24 Utility                  N/A..............  Incorporates the
 responsibilities.                                  substance into
                                                    proposed sections
                                                    175.115 and 175.120,
                                                    which refer to
                                                    operations manual
                                                    instead of setting
                                                    out
                                                    responsibilities.
175.30 Billing................  175.300 How does   Revises for plain
                                 BIA calculate my   language.
                                 electric bill?
175.31 Methods and terms of     175.310 How do I   Replaces provision
 payment.                        pay my bill?       stating that the
                                                    utility may refuse,
                                                    for cause, to accept
                                                    personal checks with
                                                    a general statement
                                                    that the electric
                                                    utility that serves
                                                    you may provide
                                                    additional
                                                    requirements.
175.32 Collections............  175.315 What will  Revises for plain
                                 happen if I do     language.
                                 not pay my bill?
                                175.320 What will
                                 happen if my
                                 service is
                                 disconnected and
                                 my account
                                 remains
                                 delinquent?.
175.40 Financing of extensions  175.400 Will the   Revises to direct
 and upgrades.                   utility extend     customers to contact
                                 or upgrade its     the electric power
                                 electric system    utility for more
                                 to serve new or    information.
                                 increased loads?
175.50 Obtaining rights-of-way  175.500 How does   Revises to direct
                                 BIA manage         customers to contact
                                 rights-of-way?     the electric power
                                                    utility for more
                                                    information.
175.51 Ownership.
175.60 Appeals to the area      175.145 Can I      Combines current
 director.                       appeal a BIA       sections 175.60 and
                                 decision?          175.61 into a
                                                    paragraph that
                                                    refers to 25 CFR
                                                    part 2 rather than
                                                    explicitly stating
                                                    appeal procedures.
                                                    Increases the time
                                                    by which BIA must
                                                    issue a decision on
                                                    an appeal from 30
                                                    days to 60 days (see
                                                    25 CFR 2.19(a)).
                                                   Adds a new paragraph
                                                    (b) to clarify that
                                                    a customer must pay
                                                    the bill to continue
                                                    to receive service.
                                                   Incorporates section
                                                    175.62 into new
                                                    paragraphs (c)
                                                    through (e).
175.61 Appeals to the Interior
 Board of Indian Appeals.
175.62 Utility actions pending
 the appeal process.
------------------------------------------------------------------------

New Provisions

------------------------------------------------------------------------
                                 Proposed 25 CFR    Summary of proposed
    Current 25 CFR section           section              changes
------------------------------------------------------------------------
N/A...........................  175.130 What       New section.
                                 information must
                                 I provide when I
                                 request service?
N/A...........................  175.135 Why is     New section.
                                 BIA collecting
                                 this
                                 information?

[[Page 61195]]

 
N/A...........................  175.140 What is    New section.
                                 BIA's authority
                                 to collect my
                                 taxpayer
                                 identification
                                 number?
N/A...........................  175.225 What is    New section.
                                 the Federal
                                 Register, and
                                 where can I get
                                 it?
N/A...........................  175.230 Why are    New section.
                                 changes to
                                 purchased power
                                 costs not
                                 included in the
                                 procedure for
                                 adjusting
                                 electric power
                                 rates?
N/A...........................  175.320 What will  New section.
                                 happen if my
                                 service is
                                 disconnected and
                                 my account
                                 remains
                                 delinquent?
N/A...........................  175.305 When is    New section.
                                 my bill due?
------------------------------------------------------------------------

III. Procedural Requirements

A. Regulatory Planning and Review (E.O.s 12866 and 13563) and Reducing 
Regulation and Controlling Regulatory Costs (E.O. 13771)

    Executive Order (E.O.) 12866 provides that the Office of 
Information and Regulatory Affairs in the Office of Management and 
Budget will review all significant rules. The Office of Information and 
Regulatory Affairs has determined that this rule is not significant.
    E.O. 13563 reaffirms the principles of E.O. 12866 while calling for 
improvements in the nation's regulatory system to promote 
predictability, to reduce uncertainty, and to use the best, most 
innovative, and least burdensome tools for achieving regulatory ends. 
The executive order directs agencies to consider regulatory approaches 
that reduce burdens and maintain flexibility and freedom of choice for 
the public where these approaches are relevant, feasible, and 
consistent with regulatory objectives. E.O. 13563 emphasizes further 
that regulations must be based on the best available science and that 
the rulemaking process must allow for public participation and an open 
exchange of ideas. We have developed this rule in a manner consistent 
with these requirements.
    This proposed rule is not expected to be an E.O. 13771 regulatory 
action because this proposed rule is not significant under E.O. 12866.

B. Regulatory Flexibility Act

    This document will not have a significant economic effect on a 
substantial number of small entities under the Regulatory Flexibility 
Act (5 U.S.C. 601 et seq.) because the rule does not make any changes 
to electric power rates or service fees.

C. Small Business Regulatory Enforcement Fairness Act

    This rule is not a major rule under 5 U.S.C. 804(2), the Small 
Business Regulatory Enforcement Fairness Act. This rule:
    (a) Does not have an annual effect on the economy of $100 million 
or more;
    (b) Will not cause a major increase in costs or prices for 
consumers, individual industries, Federal, State, or local government 
agencies, or geographic regions;
    (c) Does not have significant adverse effects on competition, 
employment, investment, productivity, innovation, or the ability of 
U.S.-based enterprises to compete with foreign-based enterprises.

D. Unfunded Mandates Reform Act

    This rule does not impose an unfunded mandate on State, local, or 
tribal governments or the private sector of more than $100 million per 
year. The rule does not have a significant or unique effect on State, 
local, or tribal governments or the private sector. A statement 
containing the information required by the Unfunded Mandates Reform Act 
(2 U.S.C. 1531 et seq.) is not required.

E. Takings (E.O. 12630)

    This rule does not effect a taking of private property or otherwise 
have taking implications under E.O. 12630. A takings implication 
assessment is not required.

F. Federalism (E.O. 13132)

    Under the criteria in section 1 of E.O. 13132, this rule does not 
have sufficient Federalism implications to warrant the preparation of a 
Federalism summary impact statement. A Federalism summary impact 
statement is not required.

G. Civil Justice Reform (E.O. 12988)

    This rule complies with the requirements of E.O. 12988. 
Specifically, this rule:
    (a) Meets the criteria of section 3(a) requiring that all 
regulations be reviewed to eliminate errors and ambiguity and be 
written to minimize litigation; and
    (b) Meets the criteria of section 3(b)(2) requiring that all 
regulations be written in clear language and contain clear legal 
standards.

H. Consultation With Indian Tribes (E.O. 13175 and Departmental Policy)

    The Department of the Interior strives to strengthen its 
government-to-government relationship with Indian Tribes through a 
commitment to consult with Indian Tribes and recognize their right to 
self-governance and Tribal sovereignty. We have evaluated this rule 
under the Department's consultation policy and under the criteria in 
E.O. 13175 for substantial direct effects on federally recognized 
Indian Tribes and have consulted with those Tribes served by the 
electric power utilities subject to this rule. We hosted two in-person 
Tribal consultation sessions in the vicinity of Tribes served by the 
electric power utilities: one on April 14, 2016, in Pablo, Montana, and 
one on April 19, 2016, in Phoenix, Arizona. One Tribe submitted 
comments on the draft regulation, to which we have responded by letter 
because the comments are primarily unique to the local utility. If any 
Tribe would like additional consultation opportunities on these 
regulatory changes, please contact the person listed in the FOR FURTHER 
INFORMATION CONTACT section of this notice, preferably within the first 
30 days of the comment period.

I. Paperwork Reduction Act

    The information collection requirements contained in 25 CFR part 
175 are authorized by OMB Control

[[Page 61196]]

Number 1076-0021, with an expiration date of June 30, 2019. A 
submission to the Office of Management and Budget under the Paperwork 
Reduction Act (44 U.S.C. 3501 et seq.) is not required because this 
proposed rule would not affect the information collection requirements 
contained in 25 CFR part 175. We may not conduct or sponsor, and you 
are not required to respond to, a collection of information unless it 
displays a currently valid OMB control number.

J. National Environmental Policy Act

    This rule does not constitute a major Federal action significantly 
affecting the quality of the human environment. A detailed statement 
under the National Environmental Policy Act of 1969 (NEPA) is not 
required because the rule is covered by a categorical exclusion. This 
rule is excluded from the requirement to prepare a detailed statement 
because it is a regulation of an administrative nature. (For further 
information, see 43 CFR 46.210(i).) We have also determined that the 
rule does not involve any of the extraordinary circumstances listed in 
43 CFR 46.215 that would require further analysis under NEPA.

K. Effects on the Energy Supply (E.O. 13211)

    This rule is not a significant energy action under the definition 
in E.O. 13211. A Statement of Energy Effects is not required.

L. Clarity of This Regulation

    We are required by Executive Orders 12866 (section 1(b)(12)), 12988 
(section 3(b)(1)(B)), and 13563 (section 1(a)), and by the Presidential 
Memorandum of June 1, 1998, to write all rules in plain language. This 
means that each rule we publish must:
    (a) Be logically organized;
    (b) Use the active voice to address readers directly;
    (c) Use common, everyday words and clear language rather than 
jargon;
    (d) Be divided into short sections and sentences; and
    (e) Use lists and tables wherever possible.
    If you feel that we have not met these requirements, send us 
comments by one of the methods listed in the ADDRESSES section. To 
better help us revise the rule, your comments should be as specific as 
possible. For example, you should tell us the numbers of the sections 
or paragraphs that you find unclear, which sections or sentences are 
too long, the sections where you think lists or tables would be useful, 
etc.

List of Subjects in 25 CFR Part 175

    Administrative practice and procedure, Electric power, Indians-
lands, Reporting and recordkeeping requirements.

    For the reasons given in the preamble, the Bureau of Indian 
Affairs, Department of the Interior proposes to amend chapter 1 of 
title 25 Code of Federal Regulations by revising part 175 to read as 
follows:

PART 175--INDIAN ELECTRIC POWER UTILITIES

Subpart A--General Provisions
Sec.
175.100 What terms should I know for this part?
175.105 What is the purpose of this part?
175.110 Does this part apply to me?
175.115 How does BIA administer its electric power utilities?
175.120 What are Operations Manuals?
175.125 How do I request and receive service?
175.130 What information must I provide when I request service?
175.135 Why is BIA collecting this information?
175.140 What is BIA's authority to collect my taxpayer 
identification number?
175.145 Can I appeal a BIA decision?
Subpart B--Service Fees, Electric Power Rates and Revenues
175.200 Why does BIA collect revenue from you and the other 
customers it serves, and how is that revenue used?
175.205 When are BIA rates and fees reviewed?
175.210 What is BIA's procedure for adjusting service fees?
175.215 What is BIA's procedure for adjusting electric power rates?
175.220 How long do rate and fee adjustments stay in effect?
175.225 What is the Federal Register, and where can I get it?
175.230 Why are changes to purchased power costs not included in the 
procedure for adjusting electric power rates?
175.235 How does BIA include changes in purchased power costs to our 
electric power rates?
Subpart C--Billing, Payments, and Collections
175.300 How does BIA calculate my electric power bill?
175.305 When is my bill due?
175.310 How do I pay my bill?
175.315 What will happen if I do not pay my bill?
175.320 What will happen if my service is disconnected and my 
account remains delinquent?
Subpart D--System Extensions and Upgrades, Rights-of-Way, and Paperwork 
Reduction Act
175.400 Will the utility extend or upgrade its electric system to 
serve new or increased loads?
175.500 How does BIA manage rights-of-way?
175.600 How does the Paperwork Reduction Act affect this part?

    Authority:  5 U.S.C. 301; 25 U.S.C. 13; 25 U.S.C. 385c; 43 Stat. 
475-76; 45 Stat. 210-13; 49 Stat. 1039-40; 49 Stat. 1822-23; 54 
Stat. 422; 62 Stat. 269-73; 65 Stat. 254; 99 Stat. 319-20.

Subpart A--General Provisions


Sec.  175.100   What terms should I know for this part?

    Agreement means the executed written form between you and the 
utility providing your service, except for service provided under a 
Special Agreement.
    BIA means the Bureau of Indian Affairs within the United States 
Department of the Interior or the BIA's authorized representative.
    Bill means our written statement notifying you of the charges and/
or fees you owe the United States for the administration, operation, 
maintenance, rehabilitation, and/or construction of the electric power 
utility servicing you.
    CFR means Code of Federal Regulations.
    Customer means any person or entity to whom we provide service.
    Customer service is the assistance or service provided to 
customers, except for the actual delivery of electric power or energy. 
Customer service may include: Line extension, system upgrade, meter 
testing, connections or disconnection, special meter reading, or other 
assistance or service as provided in the Operations Manual.
    Day(s) means calendar day(s).
    Delinquent means an account that has not been paid and settled by 
the due date.
    Due date means the date by which you must pay your bill. The due 
date is printed on your bill.
    Electric energy (see Electric power).
    Electric power means the energy we deliver to meet customers' 
electrical needs.
    Electric power rate means the charges we establish for delivery of 
energy to our customers, which includes administration costs and 
operation and maintenance costs in addition to the cost of purchased 
power.
    Electric power utility means all structures, equipment, components, 
and human resources necessary for the delivery of electric service.
    Electric service means the delivery of electric power by our 
utility to our customers.
    Energy means electric power.
    Fee (see Service fee).
    I, me, my, you, and your means all interested parties, especially 
persons or

[[Page 61197]]

entities to which we provide service and receive use of our electric 
power service.
    Must means an imperative or mandatory act or requirement.
    Operations manual means the written policies, practices, procedures 
and requirements of the utility providing your service. The Operations 
Manual supplements this Part and includes our responsibilities to our 
customers and our customers' responsibilities to the utility.
    Past due bill means a bill that has not been paid by the due date.
    Power (see Energy).
    Public notice is the notice provided by publishing information 
consistent with the utility's Operations Manual.
    Purchased power means the power we must purchase from power 
marketing providers for resale to our customers to meet changing power 
demands. Each of our utilities establishes its own power purchasing 
agreement based on its power demands and firm power availability.
    Rate (see Electric power rate).
    Reserve funds means funds held in reserve for maintenance, repairs, 
or unexpected expenses.
    Revenue means the monies we collect from our customers through 
service fees and electric power rates.
    Service (see Electric service).
    Service fee means our charge for providing or performing a specific 
administrative or customer service.
    Special agreement means a written agreement between you and us for 
special conditions or circumstances including unmetered services.
    Taxpayer identification number means either your Social Security 
Number or your Employer Identification Number.
    Utility(ies) (see Electric power utility).
    Utility office(s) means our facility used for conducting business 
with our customers and the general public.
    We, us, and our means the United States Government, the Secretary 
of the Interior, the BIA, and all who are authorized to represent us in 
matters covered under this Part.


Sec.  175.105  What is the purpose of this part?

    The purpose of this part is to establish the regulations for 
administering BIA electric power utilities.


Sec.  175.110  Does this part apply to me?

    This part applies to you if we provide you service or if you 
request service from us.


Sec.  175.115  How does BIA administer its electric power utilities?

    We promote efficient administration, operation, maintenance, and 
construction of our utilities by following and enforcing:
    (a) Applicable statutes, regulations, Executive Orders, Indian 
Affairs manuals, Operations Manuals;
    (b) Applicable written policies, procedures, directives, safety 
codes; and
    (c) Utility industry standards.


Sec.  175.120  What are Operations Manuals?

    (a) We maintain an Operations Manual for each of our utilities. 
Each utility's Operations Manual is available at the utility.
    (b) The Operations Manual sets forth the requirements for the 
administration, management, policies, and responsibilities of that 
utility and its customers.
    (c) We update our Operations Manual for each utility to reflect 
changing requirements to administer, operate, or maintain that utility.
    (d) When we determine it necessary to revise an Operations Manual, 
we will:
    (1) Provide public notice of the proposed revision;
    (2) State the effective date of the proposed revision;
    (3) State how and when to submit your comments on our proposed 
revision;
    (4) Provide 30 days from the date of the notice to submit your 
comments; and
    (5) Consider your comments and provide notice of our final 
decision.


Sec.  175.125  How do I request and receive service?

    (a) If you need electrical service in an area where we provide 
service, you must contact our utility in that service area.
    (b) To receive service, you must enter into an Agreement with that 
utility after it has determined that you have met its requirements.


Sec.  175.130  What information must I provide when I request service?

    At a minimum, you must provide the utility with the following 
information when you request service:
    (a) Your full legal name or the legal name of the entity needing 
service;
    (b) Your taxpayer identification number;
    (c) Your billing address;
    (d) Your service address; and
    (e) Any additional information required by the utility.


Sec.  175.135  Why is BIA collecting this information?

    We are collecting this information so we can:
    (a) Provide you with service;
    (b) Bill you for the service we provide; and
    (c) Account for monies you pay us, including any deposits as 
outlined in the Operations Manual.


Sec.  175.140  What is BIA's authority to collect my taxpayer 
identification number?

    We are required to collect your taxpayer identification number 
under the authority of, and as prescribed in, the Debt Collection 
Improvement Act of 1996, Public Law 104-134 (110 Stat. 1321-364).


Sec.  175.145  Can I appeal a BIA decision?

    (a) You may appeal a decision in accordance with the procedures set 
out in 25 CFR part 2, unless otherwise prohibited by law.
    (b) If the appeal involves the discontinuation of service, the 
utility is not required to resume the service during the appeal process 
unless the customer meets the utility's requirements.
    (c) If you appeal your bill, you must pay your bill in accordance 
with this part to continue to receive service from us.
    (1) If the appeal involves the amount of your bill, the bill will 
be considered paid under protest until the final decision has been 
rendered on appeal.
    (2) If you appeal your bill but do not pay the bill in full, you 
may not continue to receive service from us. If the final decision 
rendered in the appeal requires payment of the bill, the bill will be 
handled as a delinquent account and the amount of the bill may be 
subject to interest, penalties, and administrative costs pursuant to 31 
U.S.C. 3717 and 31 CFR 901.9.
    (3) If the appeal involves an electric power rate, the rate will be 
applied and remain in effect subject to the final decision on the 
appeal.

Subpart B--Service Fees, Electric Power Rates and Revenues


Sec.  175.200  Why does BIA collect revenue from you and the other 
customers it serves, and how is that revenue used?

    (a) The revenue we collect from you and the other customers is 
authorized by 25 U.S.C. 385c (60 Stat. 895, as amended by 65 Stat. 
254).
    (b) The revenue we collect may be used to:
    (1) Pay for operation and maintenance of the utility; and
    (2) Maintain Reserve Funds to:
    (i) Make repairs and replacements to the utility;
    (ii) Defray emergency expenses;
    (iii) Ensure the continuous operation of the power system; and
    (iv) Pay other allowable expenses and obligations to the extent 
required or permitted by law.

[[Page 61198]]

Sec.  175.205  When are BIA rates and fees reviewed?

    We review our rates and fees at least annually to:
    (a) Determine if our financial requirements are being met to ensure 
the reliable operation of the utility serving you; and
    (b) Determine if revenues are sufficient to meet the statutory 
requirements.


Sec.  175.210  What is BIA's procedure for adjusting service fees?

    If, based on our annual review, we determine our service fees need 
to be adjusted:
    (a) We will notify you at least 30 days prior to the effective date 
of the adjustment; and
    (b) We will publish a schedule of the adjusted service fees in a 
local newspaper(s) and post them in the local utility office serving 
you.


Sec.  175.215  What is BIA's procedure for adjusting electric power 
rates?

    Except for purchased power costs, if we determine electric power 
rates need to be adjusted, we will:
    (a) Hold public meetings and notify you of their respective time, 
date, and location by newspaper notice and a notice posted in the 
utility office serving you;
    (b) Provide you notice at least 15 days prior to the meeting;
    (c) Provide you a description of the proposed rate adjustment;
    (d) Provide you information on how, where, and when to submit 
comments on our proposed rate adjustment;
    (e) Make a final determination on the proposed rate adjustment 
after all comments have been received, reviewed, and evaluated; and
    (f) Publish the proposed rate adjustment and the final rate in the 
Federal Register if we determine the rate adjustment is necessary.


Sec.  175.220  How long do rate and fee adjustments stay in effect?

    These adjustments remain in effect until we conduct a review and 
determine adjustments are necessary.


Sec.  175.225  What is the Federal Register, and where can I get it?

    The Federal Register is the official daily publication for rules, 
proposed rules, and notices of official actions by Federal agencies and 
organizations, as well as Executive Orders and other Presidential 
Documents and is produced by the Government Publishing Office (GPO). 
You can get Federal Register publications by:
    (a) Visiting www.federalregister.gov or www.thefederalregister.org/fdsys;
    (b) Writing to the GPO at Superintendent of Documents, P.O. Box 
371954, Pittsburgh, PA 15250-7954; or
    (c) Calling the GPO at (202) 512-1800.


Sec.  175.230  Why are changes to purchased power costs not included in 
the procedure for adjusting electric power rates?

    Changes to purchased power costs are not included in the procedure 
for adjusting electric power rates because unforeseen increases in the 
cost of purchased power are:
    (a) Not under our control;
    (b) Determined by current market rates; and
    (c) Subject to market fluctuations that can occur at an 
undetermined time and frequency.


Sec.  175.235  How does BIA include changes in purchased power costs in 
electric power rates?

    When our cost of purchased power changes:
    (a) We determine the effect of the change;
    (b) We adjust the purchased power component of your bill 
accordingly;
    (c) We add the purchased power adjustment to the existing electric 
power rate and put it into effect immediately;
    (d) The purchased power adjustment remains in effect until we 
determine future adjustments are necessary;
    (e) We must publish in the local newspaper and post at our office a 
notice of the purchase power adjustment and the basis for the 
adjustment; and
    (f) Our decision to make a purchased power adjustment must be 
final.

Subpart C--Billing, Payments, and Collections


Sec.  175.300  How does BIA calculate my electric power bill?

    (a) We calculate your electric power bill based on the:
    (1) Current rate schedule for your type service; and
    (2) Applicable service fees for your type service.
    (b) If you have a metered service we must:
    (1) Read your meter monthly;
    (2) Calculate your bill based on your metered energy consumption; 
and
    (3) Issue your bill monthly, unless otherwise provided in a Special 
Agreement.
    (c) If we are unable to calculate your metered energy consumption, 
we must make a reasonable estimate based on one of the following 
reasons:
    (1) Your meter has failed;
    (2) Your meter has been tampered with; or
    (3) Our utility personnel are unable to read your meter.
    (d) If you have an unmetered service, we calculate your bill in 
accordance with your Special Agreement.


Sec.  175.305  When is my bill due?

    The due date is provided on your bill.


Sec.  175.310  How do I pay my bill?

    You may pay your bill by any of the following methods:
    (a) In person at our utility office;
    (b) Mail your payment to the address stated on your bill; or
    (c) As further provided by the electric utility that serves you.


Sec.  175.315  What will happen if I do not pay my bill?

    (a) If you do not pay your bill prior to the close of business on 
the due date, your bill will be past due.
    (b) If your bill is past due we may:
    (1) Disconnect your service; and
    (2) Not reconnect your service until your bill, including any 
applicable fees, is paid in full.
    (c) Specific regulations regarding non-payment can be found in 25 
CFR 143.5(c).


Sec.  175.320  What will happen if my service is disconnected and my 
account remains delinquent?

    (a) If your service has been disconnected and you still have an 
outstanding balance, we will assess you interest, penalties, and 
administrative costs in accordance with 31 CFR 901.9.
    (b) We must forward your delinquent balance to the United States 
Treasury if it is not paid within 180 days after the original due date 
in accordance with 31 CFR 901.1.

Subpart D--System Extensions and Upgrades, Rights-of-Way, and 
Paperwork Reduction Act


Sec.  175.400  Will the utility extend or upgrade its electric system 
to serve new or increased loads?

    The utility may extend or upgrade its electric system to serve new 
or increased loads. Contact your electric power utility providing 
service in your area for further information on new or increased loads.


Sec.  175.500  How does BIA manage rights-of-way?

    Contact your electric power utility providing service in your area 
for further information on rights-of-way.


Sec.  175.600  How does the Paperwork Reduction Act affect this part?

    The collection of information contained in this part have been 
approved by the Office of Management

[[Page 61199]]

and Budget under 44 U.S.C. 3501 et seq. and assigned OMB Control Number 
1076-0021. Response is required to obtain a benefit. A Federal agency 
may not conduct or sponsor, and you are not required to respond to, a 
collection of information unless the form or regulation requesting the 
information displays a currently valid OMB Control Number. Send 
comments regarding this collection of information, including 
suggestions for reducing the burden, to the Information Collection 
Clearance Officer--Indian Affairs, 1849 C Street NW, Washington, DC 
20240.

    Dated: October 19, 2017.
John Tahsuda,
Principal Deputy Assistant Secretary--Indian Affairs, Exercising the 
Authority of the Assistant Secretary--Indian Affairs.
[FR Doc. 2017-27668 Filed 12-26-17; 8:45 am]
 BILLING CODE 4337-15-P



                                                                     Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules                                                                           61193

                                                 Drinking Water of Animals (21 CFR part                            SUMMARY:    This proposed rule revises                                I. Paperwork Reduction Act
                                                 573) to provide for the safe use of                               regulations addressing electric power                                 J. National Environmental Policy Act
                                                 glyceryl polyethylene glycol (15)                                 utilities of the Colorado River, Flathead,                            K. Effects on the Energy Supply (E.O.
                                                 ricinoleate as an emulsifier in animal                            and San Carlos Indian irrigation projects                                13211)
                                                                                                                                                                                         L. Clarity of This Regulation
                                                 food that does not include food for cats,                         to use plain language, update
                                                 dogs, vitamin premixes, or aquaculture.                           definitions, lengthen a regulatory                                 I. Background
                                                    Interested persons were originally                             deadline, and make other minor
                                                                                                                   changes.                                                              Various statutes provide the Bureau of
                                                 given until October 23, 2017, to
                                                                                                                                                                                      Indian Affairs (BIA) with authority to
                                                 comment on the petitioner’s                                       DATES: Comments must be received on                                issue this regulation and for
                                                 environmental assessment.                                         or before February 26, 2018.                                       administering electric power utilities for
                                                    The environmental assessment was                               ADDRESSES: You may submit comments                                 the Colorado River, Flathead (Mission
                                                 not placed on public display until                                by any of the following methods:                                   Valley Power), and San Carlos Indian
                                                 October 13, 2017. On our own initiative,                            • Federal eRulemaking Portal:                                    irrigation projects. For example, see 5
                                                 we are reopening the comment period to                            www.regulations.gov. Search for Docket                             U.S.C. 301; 25 U.S.C. 13; 25 U.S.C. 385c;
                                                 allow potential respondents to                                    No. BIA–2016–0002 and follow the                                   43 Stat. 475–76; 45 Stat. 210–13; 49 Stat.
                                                 thoroughly evaluate and address                                   instructions for submitting comments.                              1039–40; 49 Stat. 1822–23; 54 Stat. 422;
                                                 pertinent environmental issues. The                                 • Mail, Hand Delivery, or Courier:                               62 Stat. 269–73; 65 Stat. 254; 99 Stat.
                                                 Agency believes that a 30-day extension                           Elizabeth Appel, Director, Office of                               319–20. Each of these power projects
                                                 allows adequate time for interested                               Regulatory Affairs and Collaborative                               provides energy, transmission, and
                                                 persons to submit comments without                                Action—Indian Affairs, Attn: 1076–                                 distribution of electrical services to
                                                 significantly delaying rulemaking on                              AF31, U.S. Dept. of the Interior, 1849 C                           customers in their respective service
                                                 this important issue.                                             Street NW, Mail Stop 3642, Washington,                             areas. BIA (or the contracting/
                                                   Dated: December 20, 2017.                                       DC 20240.                                                          compacting Indian Tribe) provides
                                                 Leslie Kux,                                                       FOR FURTHER INFORMATION CONTACT:                                   oversight and limited technical
                                                 Associate Commissioner for Policy.                                Elizabeth Appel, Director, Office of                               assistance for power projects and
                                                 [FR Doc. 2017–27840 Filed 12–26–17; 8:45 am]                      Regulatory Affairs and Collaborative                               conducts operations and maintenance of
                                                 BILLING CODE 4164–01–P
                                                                                                                   Action, Office of the Assistant                                    the distribution systems.
                                                                                                                   Secretary—Indian Affairs; telephone                                   The regulations addressing BIA’s
                                                                                                                   (202) 273–4680, elizabeth.appel@                                   administration of the power utilities are
                                                                                                                   bia.gov.                                                           at 25 CFR part 175, Indian Electric
                                                 DEPARTMENT OF THE INTERIOR                                        SUPPLEMENTARY INFORMATION:                                         Power Utilities. These regulations were
                                                                                                                   I. Background                                                      last updated in 1991.
                                                 Bureau of Indian Affairs                                          II. Description of Changes
                                                                                                                   III. Procedural Requirements                                       II. Description of Changes
                                                 25 CFR Part 175                                                      A. Regulatory Planning and Review (E.O.s
                                                                                                                         12866 and 13563) and Reducing                                  The revisions being proposed today
                                                 [167A2100DD/AAKC001030/                                                 Regulation and Controlling Regulatory                        are intended to make the regulations
                                                 A0A501010.999900 253G]                                                  Costs (E.O. 13771)                                           more user-friendly through plain
                                                                                                                      B. Regulatory Flexibility Act                                   language. The proposed rule would also
                                                 RIN 1076–AF31                                                        C. Small Business Regulatory Enforcement                        update definitions, lengthen the time by
                                                                                                                         Fairness Act                                                 which BIA must issue a decision on an
                                                 Indian Electric Power Utilities                                      D. Unfunded Mandates Reform Act                                 appeal from 30 days to 60 days (by
                                                                                                                      E. Takings (E.O. 12630)
                                                 AGENCY:   Bureau of Indian Affairs,                                  F. Federalism (E.O. 13132)                                      referring to 25 CFR 2.19(a)), and require
                                                 Interior.                                                            G. Civil Justice Reform (E.O. 12988)                            publication of rate adjustments in the
                                                                                                                      H. Consultation With Indian Tribes (E.O.                        Federal Register. The following tables
                                                 ACTION: Proposed rule.
                                                                                                                         13175)                                                       summarize the proposed changes:

                                                            Current 25 CFR                               Proposed 25 CFR section                                                  Summary of proposed changes
                                                                section

                                                 175.1   Definitions ...........................   175.100 What terms                    should        I    Deletes the definitions of ‘‘appellant’’ and ‘‘officer-in-charge.’’
                                                                                                     know for this part?                                    Adds definitions for ‘‘bill,’’ ‘‘CFR,’’ ‘‘day(s),’’ ‘‘delinquent,’’ ‘‘due date,’’
                                                                                                                                                              ‘‘electric energy,’’ ‘‘energy,’’ ‘‘fee,’’ ‘‘I, me, my, you, and your,’’
                                                                                                                                                              ‘‘must,’’ ‘‘past due bill,’’ ‘‘power,’’ ‘‘public notice,’’ ‘‘purchased
                                                                                                                                                              power,’’ ‘‘taxpayer identification number,’’ ‘‘utility(ies),’’ and ‘‘we, us,
                                                                                                                                                              and our.’’
                                                                                                                                                            Replaces definition of ‘‘Area Director’’ with a definition of ‘‘BIA.’’
                                                                                                                                                            Revises the definition of ‘‘customer,’’ ‘‘electric power utility,’’ ‘‘electric
                                                                                                                                                              service,’’ ‘‘operations manual,’’ ‘‘service,’’ ‘‘service fee.’’
                                                                                                                                                            Revises the definition of ‘‘power rate’’ and replaces it with the terms
                                                                                                                                                              ‘‘rate’’ and ‘‘electric power rate.’’
                                                                                                                                                            Revises the definition of ‘‘service agreement’’ and replaces it with the
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                                                                                                                              term ‘‘agreement.’’
                                                                                                                                                            Revises the definition of ‘‘special contract’’ and replaces it with the
                                                                                                                                                              term ‘‘special agreement.’’
                                                 175.2   Purpose ..............................    175.105 What is the purpose of                           Revises for plain language.
                                                                                                     this part?
                                                 175.3   Compliance .........................      175.110 Does this part apply to                          Revises for plain language.
                                                                                                     me?
                                                 175.4   Authority of area director ....           N/A .................................................    Deletes provisions containing delegations of authority to eliminate
                                                                                                                                                              possible conflicts with the Departmental Delegations of Authority.



                                            VerDate Sep<11>2014    20:10 Dec 26, 2017       Jkt 244001     PO 00000       Frm 00002        Fmt 4702        Sfmt 4702   E:\FR\FM\27DEP1.SGM     27DEP1


                                                 61194                    Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules

                                                               Current 25 CFR                                   Proposed 25 CFR section                                                Summary of proposed changes
                                                                   section

                                                 175.5      Operations manual .............               175.115 How does BIA admin-                              Revises for plain language, deletes specific means by which public
                                                                                                            ister its electric power utilities?                      notice of changes will be provided, and incorporates instead the
                                                                                                          175.120 What are Operations                                definition of ‘‘public notice,’’ which provides for publishing informa-
                                                                                                            Manuals?                                                 tion consistent with the operations manual.
                                                 175.6      Information collection ..........             175.600 How does the Paper-                              Revises for plain language.
                                                                                                            work Reduction Act affect this
                                                                                                            part?
                                                 175.10 Revenues collected from                           175.200 Why does BIA collect                             Revises for plain language and deletes amortization as an example
                                                   power operations.                                        revenue from you and the other                           for what BIA may use revenue.
                                                                                                            customers it serves, and how is
                                                                                                            that revenue used?
                                                                                                          175.205 When are BIA rates and
                                                                                                            fees reviewed?
                                                 175.11 Procedures for setting                            175.210 What is BIA’s procedure                          Deletes provisions containing delegations of authority to eliminate
                                                   service fees.                                            for setting service fees?                                possible conflicts with Departmental Delegations of Authority.
                                                 175.12 Procedures for adjusting                          175.215 What is BIA’s procedure                          Adds a requirement for BIA to publish a proposed rate adjustment in
                                                   electric power rates except for                          for adjusting electric power                             the Federal Register.
                                                   adjustments due to changes in                            rates?
                                                   the cost of purchased power or                         175.220 How long do rate and
                                                   energy.                                                  fee adjustments stay in effect?
                                                 175.13 Procedures for adjusting                          175.235 How does BIA include                             Revises for plain language.
                                                   electric power rates to reflect                          changes in purchased power
                                                   changes in the cost of purchased                         costs to our electric power
                                                   power or energy.                                         rates?
                                                 175.20 Gratuities ..........................             N/A .................................................    This section is deleted because it is already addressed by other laws.
                                                 175.21 Discontinuance of service                         175.315 What will happen if I do                         Revises for plain language.
                                                                                                            not pay my bill?
                                                 175.22 Requirements for receiving                        175.125 How do I request and                             Revises for plain language.
                                                   electrical service.                                      receive service?
                                                 175.23 Customer responsibilities                         N/A .................................................    Deleted because this provision is for a project-specific authority ad-
                                                                                                                                                                     dressed at the local BIA level.
                                                 175.24       Utility responsibilities ........           N/A .................................................    Incorporates the substance into proposed sections 175.115 and
                                                                                                                                                                     175.120, which refer to operations manual instead of setting out re-
                                                                                                                                                                     sponsibilities.
                                                 175.30       Billing ................................    175.300 How does BIA calculate                           Revises for plain language.
                                                                                                            my electric bill?
                                                 175.31 Methods                and      terms       of    175.310 How do I pay my bill?                            Replaces provision stating that the utility may refuse, for cause, to
                                                   payment.                                                                                                          accept personal checks with a general statement that the electric
                                                                                                                                                                     utility that serves you may provide additional requirements.
                                                 175.32       Collections ........................        175.315 What will happen if I do                         Revises for plain language.
                                                                                                            not pay my bill?
                                                                                                          175.320 What will happen if my
                                                                                                            service is disconnected and my
                                                                                                            account remains delinquent?
                                                 175.40 Financing               of     extensions         175.400 Will the utility extend or                       Revises to direct customers to contact the electric power utility for
                                                   and upgrades.                                            upgrade its electric system to                           more information.
                                                                                                            serve new or increased loads?
                                                 175.50       Obtaining rights-of-way .....               175.500 How does BIA manage                              Revises to direct customers to contact the electric power utility for
                                                                                                            rights-of-way?                                           more information.
                                                 175.51       Ownership.
                                                 175.60       Appeals to the area direc-                  175.145 Can I appeal a BIA de-                           Combines current sections 175.60 and 175.61 into a paragraph that
                                                   tor.                                                     cision?                                                  refers to 25 CFR part 2 rather than explicitly stating appeal proce-
                                                                                                                                                                     dures. Increases the time by which BIA must issue a decision on
                                                                                                                                                                     an appeal from 30 days to 60 days (see 25 CFR 2.19(a)).
                                                                                                                                                                   Adds a new paragraph (b) to clarify that a customer must pay the bill
                                                                                                                                                                     to continue to receive service.
                                                                                                                                                                   Incorporates section 175.62 into new paragraphs (c) through (e).
                                                 175.61 Appeals to the Interior
                                                   Board of Indian Appeals.
                                                 175.62 Utility actions pending the
                                                   appeal process.
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 New Provisions

                                                               Current 25 CFR                                   Proposed 25 CFR section                                                Summary of proposed changes
                                                                   section

                                                 N/A ..................................................   175.130 What information must I                          New section.
                                                                                                            provide when I request service?
                                                 N/A ..................................................   175.135 Why is BIA collecting                            New section.
                                                                                                            this information?



                                            VerDate Sep<11>2014         20:10 Dec 26, 2017        Jkt 244001      PO 00000       Frm 00003        Fmt 4702        Sfmt 4702   E:\FR\FM\27DEP1.SGM   27DEP1


                                                                          Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules                                                 61195

                                                               Current 25 CFR                                  Proposed 25 CFR section                                Summary of proposed changes
                                                                   section

                                                 N/A ..................................................   175.140 What is BIA’s authority         New section.
                                                                                                            to collect my taxpayer identifica-
                                                                                                            tion number?
                                                 N/A ..................................................   175.225 What is the Federal             New section.
                                                                                                            Register, and where can I get
                                                                                                            it?
                                                 N/A ..................................................   175.230 Why are changes to              New section.
                                                                                                            purchased power costs not in-
                                                                                                            cluded in the procedure for ad-
                                                                                                            justing electric power rates?
                                                 N/A ..................................................   175.320 What will happen if my          New section.
                                                                                                            service is disconnected and my
                                                                                                            account remains delinquent?
                                                 N/A ..................................................   175.305 When is my bill due?            New section.



                                                 III. Procedural Requirements                                        C. Small Business Regulatory                         G. Civil Justice Reform (E.O. 12988)
                                                                                                                     Enforcement Fairness Act                                This rule complies with the
                                                 A. Regulatory Planning and Review
                                                 (E.O.s 12866 and 13563) and Reducing                                   This rule is not a major rule under 5             requirements of E.O. 12988.
                                                 Regulation and Controlling Regulatory                                                                                    Specifically, this rule:
                                                                                                                     U.S.C. 804(2), the Small Business                       (a) Meets the criteria of section 3(a)
                                                 Costs (E.O. 13771)                                                  Regulatory Enforcement Fairness Act.                 requiring that all regulations be
                                                                                                                     This rule:                                           reviewed to eliminate errors and
                                                   Executive Order (E.O.) 12866 provides
                                                 that the Office of Information and                                     (a) Does not have an annual effect on             ambiguity and be written to minimize
                                                 Regulatory Affairs in the Office of                                 the economy of $100 million or more;                 litigation; and
                                                                                                                        (b) Will not cause a major increase in               (b) Meets the criteria of section 3(b)(2)
                                                 Management and Budget will review all
                                                                                                                                                                          requiring that all regulations be written
                                                 significant rules. The Office of                                    costs or prices for consumers,
                                                                                                                                                                          in clear language and contain clear legal
                                                 Information and Regulatory Affairs has                              individual industries, Federal, State, or
                                                                                                                                                                          standards.
                                                 determined that this rule is not                                    local government agencies, or
                                                 significant.                                                        geographic regions;                                  H. Consultation With Indian Tribes
                                                                                                                        (c) Does not have significant adverse             (E.O. 13175 and Departmental Policy)
                                                   E.O. 13563 reaffirms the principles of
                                                 E.O. 12866 while calling for                                        effects on competition, employment,                     The Department of the Interior strives
                                                 improvements in the nation’s regulatory                             investment, productivity, innovation, or             to strengthen its government-to-
                                                 system to promote predictability, to                                the ability of U.S.-based enterprises to             government relationship with Indian
                                                 reduce uncertainty, and to use the best,                            compete with foreign-based enterprises.              Tribes through a commitment to consult
                                                 most innovative, and least burdensome                                                                                    with Indian Tribes and recognize their
                                                                                                                     D. Unfunded Mandates Reform Act                      right to self-governance and Tribal
                                                 tools for achieving regulatory ends. The
                                                 executive order directs agencies to                                                                                      sovereignty. We have evaluated this rule
                                                                                                                        This rule does not impose an                      under the Department’s consultation
                                                 consider regulatory approaches that                                 unfunded mandate on State, local, or                 policy and under the criteria in E.O.
                                                 reduce burdens and maintain flexibility                             tribal governments or the private sector             13175 for substantial direct effects on
                                                 and freedom of choice for the public                                of more than $100 million per year. The              federally recognized Indian Tribes and
                                                 where these approaches are relevant,                                rule does not have a significant or                  have consulted with those Tribes served
                                                 feasible, and consistent with regulatory                            unique effect on State, local, or tribal             by the electric power utilities subject to
                                                 objectives. E.O. 13563 emphasizes                                   governments or the private sector. A                 this rule. We hosted two in-person
                                                 further that regulations must be based                              statement containing the information                 Tribal consultation sessions in the
                                                 on the best available science and that                              required by the Unfunded Mandates                    vicinity of Tribes served by the electric
                                                 the rulemaking process must allow for                               Reform Act (2 U.S.C. 1531 et seq.) is not            power utilities: one on April 14, 2016,
                                                 public participation and an open                                    required.                                            in Pablo, Montana, and one on April 19,
                                                 exchange of ideas. We have developed                                                                                     2016, in Phoenix, Arizona. One Tribe
                                                 this rule in a manner consistent with                               E. Takings (E.O. 12630)                              submitted comments on the draft
                                                 these requirements.                                                   This rule does not effect a taking of              regulation, to which we have responded
                                                   This proposed rule is not expected to                             private property or otherwise have                   by letter because the comments are
                                                 be an E.O. 13771 regulatory action                                  taking implications under E.O. 12630. A              primarily unique to the local utility. If
                                                 because this proposed rule is not                                   takings implication assessment is not                any Tribe would like additional
                                                 significant under E.O. 12866.                                       required.                                            consultation opportunities on these
                                                                                                                                                                          regulatory changes, please contact the
                                                 B. Regulatory Flexibility Act                                       F. Federalism (E.O. 13132)                           person listed in the FOR FURTHER
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                                                                                                                                          INFORMATION CONTACT section of this
                                                   This document will not have a                                       Under the criteria in section 1 of E.O.            notice, preferably within the first 30
                                                 significant economic effect on a                                    13132, this rule does not have sufficient            days of the comment period.
                                                 substantial number of small entities                                Federalism implications to warrant the
                                                 under the Regulatory Flexibility Act (5                             preparation of a Federalism summary                  I. Paperwork Reduction Act
                                                 U.S.C. 601 et seq.) because the rule does                           impact statement. A Federalism                          The information collection
                                                 not make any changes to electric power                              summary impact statement is not                      requirements contained in 25 CFR part
                                                 rates or service fees.                                              required.                                            175 are authorized by OMB Control


                                            VerDate Sep<11>2014         20:10 Dec 26, 2017        Jkt 244001   PO 00000   Frm 00004   Fmt 4702   Sfmt 4702   E:\FR\FM\27DEP1.SGM   27DEP1


                                                 61196             Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules

                                                 Number 1076–0021, with an expiration                    List of Subjects in 25 CFR Part 175                   175.500 How does BIA manage rights-of-
                                                 date of June 30, 2019. A submission to                                                                            way?
                                                                                                           Administrative practice and                         175.600 How does the Paperwork
                                                 the Office of Management and Budget                     procedure, Electric power, Indians-                       Reduction Act affect this part?
                                                 under the Paperwork Reduction Act (44                   lands, Reporting and recordkeeping
                                                 U.S.C. 3501 et seq.) is not required                                                                            Authority: 5 U.S.C. 301; 25 U.S.C. 13; 25
                                                                                                         requirements.
                                                 because this proposed rule would not                                                                          U.S.C. 385c; 43 Stat. 475–76; 45 Stat. 210–13;
                                                                                                           For the reasons given in the preamble,              49 Stat. 1039–40; 49 Stat. 1822–23; 54 Stat.
                                                 affect the information collection                       the Bureau of Indian Affairs,                         422; 62 Stat. 269–73; 65 Stat. 254; 99 Stat.
                                                 requirements contained in 25 CFR part                   Department of the Interior proposes to                319–20.
                                                 175. We may not conduct or sponsor,                     amend chapter 1 of title 25 Code of
                                                 and you are not required to respond to,                 Federal Regulations by revising part 175              Subpart A—General Provisions
                                                 a collection of information unless it                   to read as follows:
                                                 displays a currently valid OMB control                                                                        § 175.100 What terms should I know for
                                                 number.                                                                                                       this part?
                                                                                                         PART 175—INDIAN ELECTRIC POWER
                                                                                                         UTILITIES                                                Agreement means the executed
                                                 J. National Environmental Policy Act
                                                                                                                                                               written form between you and the
                                                    This rule does not constitute a major                Subpart A—General Provisions                          utility providing your service, except for
                                                 Federal action significantly affecting the              Sec.                                                  service provided under a Special
                                                 quality of the human environment. A                     175.100 What terms should I know for this             Agreement.
                                                 detailed statement under the National                        part?                                               BIA means the Bureau of Indian
                                                 Environmental Policy Act of 1969                        175.105 What is the purpose of this part?             Affairs within the United States
                                                                                                         175.110 Does this part apply to me?                   Department of the Interior or the BIA’s
                                                 (NEPA) is not required because the rule                 175.115 How does BIA administer its
                                                 is covered by a categorical exclusion.                       electric power utilities?                        authorized representative.
                                                 This rule is excluded from the                          175.120 What are Operations Manuals?                     Bill means our written statement
                                                 requirement to prepare a detailed                       175.125 How do I request and receive                  notifying you of the charges and/or fees
                                                 statement because it is a regulation of an                   service?                                         you owe the United States for the
                                                 administrative nature. (For further                     175.130 What information must I provide               administration, operation, maintenance,
                                                 information, see 43 CFR 46.210(i).) We                       when I request service?                          rehabilitation, and/or construction of
                                                                                                         175.135 Why is BIA collecting this                    the electric power utility servicing you.
                                                 have also determined that the rule does
                                                                                                              information?                                        CFR means Code of Federal
                                                 not involve any of the extraordinary                    175.140 What is BIA’s authority to collect
                                                 circumstances listed in 43 CFR 46.215                        my taxpayer identification number?               Regulations.
                                                 that would require further analysis                     175.145 Can I appeal a BIA decision?                     Customer means any person or entity
                                                 under NEPA.                                                                                                   to whom we provide service.
                                                                                                         Subpart B—Service Fees, Electric Power                   Customer service is the assistance or
                                                 K. Effects on the Energy Supply (E.O.                   Rates and Revenues                                    service provided to customers, except
                                                 13211)                                                  175.200 Why does BIA collect revenue from             for the actual delivery of electric power
                                                                                                             you and the other customers it serves,            or energy. Customer service may
                                                   This rule is not a significant energy                     and how is that revenue used?
                                                 action under the definition in E.O.                                                                           include: Line extension, system
                                                                                                         175.205 When are BIA rates and fees
                                                 13211. A Statement of Energy Effects is                     reviewed?                                         upgrade, meter testing, connections or
                                                 not required.                                           175.210 What is BIA’s procedure for                   disconnection, special meter reading, or
                                                                                                             adjusting service fees?                           other assistance or service as provided
                                                 L. Clarity of This Regulation                           175.215 What is BIA’s procedure for                   in the Operations Manual.
                                                    We are required by Executive Orders                      adjusting electric power rates?                      Day(s) means calendar day(s).
                                                 12866 (section 1(b)(12)), 12988 (section                175.220 How long do rate and fee                         Delinquent means an account that has
                                                                                                             adjustments stay in effect?                       not been paid and settled by the due
                                                 3(b)(1)(B)), and 13563 (section 1(a)), and              175.225 What is the Federal Register, and
                                                 by the Presidential Memorandum of                                                                             date.
                                                                                                             where can I get it?                                  Due date means the date by which
                                                 June 1, 1998, to write all rules in plain               175.230 Why are changes to purchased
                                                 language. This means that each rule we                      power costs not included in the
                                                                                                                                                               you must pay your bill. The due date is
                                                 publish must:                                               procedure for adjusting electric power            printed on your bill.
                                                    (a) Be logically organized;                              rates?                                               Electric energy (see Electric power).
                                                                                                         175.235 How does BIA include changes in                  Electric power means the energy we
                                                    (b) Use the active voice to address
                                                                                                             purchased power costs to our electric             deliver to meet customers’ electrical
                                                 readers directly;                                           power rates?                                      needs.
                                                    (c) Use common, everyday words and                                                                            Electric power rate means the charges
                                                 clear language rather than jargon;                      Subpart C—Billing, Payments, and
                                                                                                         Collections                                           we establish for delivery of energy to
                                                    (d) Be divided into short sections and                                                                     our customers, which includes
                                                 sentences; and                                          175.300 How does BIA calculate my electric
                                                                                                             power bill?                                       administration costs and operation and
                                                    (e) Use lists and tables wherever                                                                          maintenance costs in addition to the
                                                                                                         175.305 When is my bill due?
                                                 possible.                                               175.310 How do I pay my bill?                         cost of purchased power.
                                                    If you feel that we have not met these               175.315 What will happen if I do not pay                 Electric power utility means all
                                                 requirements, send us comments by one                       my bill?                                          structures, equipment, components, and
                                                 of the methods listed in the ADDRESSES                  175.320 What will happen if my service is             human resources necessary for the
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 section. To better help us revise the                       disconnected and my account remains               delivery of electric service.
                                                 rule, your comments should be as                            delinquent?                                          Electric service means the delivery of
                                                 specific as possible. For example, you                  Subpart D—System Extensions and                       electric power by our utility to our
                                                 should tell us the numbers of the                       Upgrades, Rights-of-Way, and Paperwork                customers.
                                                 sections or paragraphs that you find                    Reduction Act                                            Energy means electric power.
                                                 unclear, which sections or sentences are                175.400 Will the utility extend or upgrade               Fee (see Service fee).
                                                 too long, the sections where you think                      its electric system to serve new or                  I, me, my, you, and your means all
                                                 lists or tables would be useful, etc.                       increased loads?                                  interested parties, especially persons or


                                            VerDate Sep<11>2014   20:10 Dec 26, 2017   Jkt 244001   PO 00000   Frm 00005   Fmt 4702   Sfmt 4702   E:\FR\FM\27DEP1.SGM   27DEP1


                                                                   Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules                                             61197

                                                 entities to which we provide service and                construction of our utilities by following              (c) Account for monies you pay us,
                                                 receive use of our electric power                       and enforcing:                                        including any deposits as outlined in
                                                 service.                                                  (a) Applicable statutes, regulations,               the Operations Manual.
                                                   Must means an imperative or                           Executive Orders, Indian Affairs
                                                 mandatory act or requirement.                           manuals, Operations Manuals;                          § 175.140 What is BIA’s authority to collect
                                                   Operations manual means the written                                                                         my taxpayer identification number?
                                                                                                           (b) Applicable written policies,
                                                 policies, practices, procedures and                     procedures, directives, safety codes; and               We are required to collect your
                                                 requirements of the utility providing                     (c) Utility industry standards.                     taxpayer identification number under
                                                 your service. The Operations Manual                                                                           the authority of, and as prescribed in,
                                                 supplements this Part and includes our                  § 175.120    What are Operations Manuals?             the Debt Collection Improvement Act of
                                                 responsibilities to our customers and                      (a) We maintain an Operations                      1996, Public Law 104–134 (110 Stat.
                                                 our customers’ responsibilities to the                  Manual for each of our utilities. Each                1321–364).
                                                 utility.                                                utility’s Operations Manual is available
                                                                                                                                                               § 175.145   Can I appeal a BIA decision?
                                                   Past due bill means a bill that has not               at the utility.
                                                 been paid by the due date.                                 (b) The Operations Manual sets forth                 (a) You may appeal a decision in
                                                   Power (see Energy).                                   the requirements for the administration,              accordance with the procedures set out
                                                   Public notice is the notice provided                  management, policies, and                             in 25 CFR part 2, unless otherwise
                                                 by publishing information consistent                    responsibilities of that utility and its              prohibited by law.
                                                 with the utility’s Operations Manual.                   customers.                                              (b) If the appeal involves the
                                                   Purchased power means the power we                       (c) We update our Operations Manual                discontinuation of service, the utility is
                                                 must purchase from power marketing                      for each utility to reflect changing                  not required to resume the service
                                                 providers for resale to our customers to                requirements to administer, operate, or               during the appeal process unless the
                                                 meet changing power demands. Each of                    maintain that utility.                                customer meets the utility’s
                                                 our utilities establishes its own power                    (d) When we determine it necessary to              requirements.
                                                 purchasing agreement based on its                       revise an Operations Manual, we will:                   (c) If you appeal your bill, you must
                                                 power demands and firm power                               (1) Provide public notice of the                   pay your bill in accordance with this
                                                 availability.                                           proposed revision;                                    part to continue to receive service from
                                                   Rate (see Electric power rate).                          (2) State the effective date of the                us.
                                                    Reserve funds means funds held in                    proposed revision;                                      (1) If the appeal involves the amount
                                                 reserve for maintenance, repairs, or                       (3) State how and when to submit                   of your bill, the bill will be considered
                                                 unexpected expenses.                                    your comments on our proposed                         paid under protest until the final
                                                    Revenue means the monies we collect                  revision;                                             decision has been rendered on appeal.
                                                 from our customers through service fees                    (4) Provide 30 days from the date of                 (2) If you appeal your bill but do not
                                                 and electric power rates.                               the notice to submit your comments;                   pay the bill in full, you may not
                                                    Service (see Electric service).                      and                                                   continue to receive service from us. If
                                                    Service fee means our charge for                        (5) Consider your comments and                     the final decision rendered in the appeal
                                                 providing or performing a specific                      provide notice of our final decision.                 requires payment of the bill, the bill will
                                                 administrative or customer service.                                                                           be handled as a delinquent account and
                                                    Special agreement means a written                    § 175.125    How do I request and receive             the amount of the bill may be subject to
                                                 agreement between you and us for                        service?                                              interest, penalties, and administrative
                                                 special conditions or circumstances                        (a) If you need electrical service in an           costs pursuant to 31 U.S.C. 3717 and 31
                                                 including unmetered services.                           area where we provide service, you                    CFR 901.9.
                                                    Taxpayer identification number                       must contact our utility in that service                (3) If the appeal involves an electric
                                                 means either your Social Security                       area.                                                 power rate, the rate will be applied and
                                                 Number or your Employer Identification                     (b) To receive service, you must enter             remain in effect subject to the final
                                                 Number.                                                 into an Agreement with that utility after             decision on the appeal.
                                                    Utility(ies) (see Electric power utility).           it has determined that you have met its
                                                    Utility office(s) means our facility                 requirements.                                         Subpart B—Service Fees, Electric
                                                 used for conducting business with our                                                                         Power Rates and Revenues
                                                                                                         § 175.130 What information must I provide
                                                 customers and the general public.
                                                                                                         when I request service?                               § 175.200 Why does BIA collect revenue
                                                    We, us, and our means the United                                                                           from you and the other customers it serves,
                                                 States Government, the Secretary of the                   At a minimum, you must provide the
                                                                                                         utility with the following information                and how is that revenue used?
                                                 Interior, the BIA, and all who are
                                                                                                         when you request service:                               (a) The revenue we collect from you
                                                 authorized to represent us in matters
                                                                                                           (a) Your full legal name or the legal               and the other customers is authorized
                                                 covered under this Part.
                                                                                                         name of the entity needing service;                   by 25 U.S.C. 385c (60 Stat. 895, as
                                                 § 175.105   What is the purpose of this part?             (b) Your taxpayer identification                    amended by 65 Stat. 254).
                                                   The purpose of this part is to establish              number;                                                 (b) The revenue we collect may be
                                                 the regulations for administering BIA                     (c) Your billing address;                           used to:
                                                 electric power utilities.                                 (d) Your service address; and                         (1) Pay for operation and maintenance
                                                                                                           (e) Any additional information                      of the utility; and
                                                 § 175.110   Does this part apply to me?                 required by the utility.                                (2) Maintain Reserve Funds to:
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                    This part applies to you if we provide                                                                       (i) Make repairs and replacements to
                                                 you service or if you request service                   § 175.135 Why is BIA collecting this                  the utility;
                                                                                                         information?                                            (ii) Defray emergency expenses;
                                                 from us.
                                                                                                           We are collecting this information so                 (iii) Ensure the continuous operation
                                                 § 175.115 How does BIA administer its                   we can:                                               of the power system; and
                                                 electric power utilities?                                 (a) Provide you with service;                         (iv) Pay other allowable expenses and
                                                   We promote efficient administration,                    (b) Bill you for the service we provide;            obligations to the extent required or
                                                 operation, maintenance, and                             and                                                   permitted by law.


                                            VerDate Sep<11>2014   20:10 Dec 26, 2017   Jkt 244001   PO 00000   Frm 00006   Fmt 4702   Sfmt 4702   E:\FR\FM\27DEP1.SGM   27DEP1


                                                 61198             Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules

                                                 § 175.205 When are BIA rates and fees                     (b) Writing to the GPO at                             (3) Our utility personnel are unable to
                                                 reviewed?                                               Superintendent of Documents, P.O. Box                 read your meter.
                                                   We review our rates and fees at least                 371954, Pittsburgh, PA 15250–7954; or                   (d) If you have an unmetered service,
                                                 annually to:                                              (c) Calling the GPO at (202) 512–1800.              we calculate your bill in accordance
                                                   (a) Determine if our financial                                                                              with your Special Agreement.
                                                 requirements are being met to ensure                    § 175.230 Why are changes to purchased
                                                                                                         power costs not included in the procedure             § 175.305   When is my bill due?
                                                 the reliable operation of the utility                   for adjusting electric power rates?
                                                 serving you; and                                                                                                 The due date is provided on your bill.
                                                   (b) Determine if revenues are                            Changes to purchased power costs are
                                                                                                         not included in the procedure for                     § 175.310   How do I pay my bill?
                                                 sufficient to meet the statutory
                                                 requirements.                                           adjusting electric power rates because                  You may pay your bill by any of the
                                                                                                         unforeseen increases in the cost of                   following methods:
                                                 § 175.210 What is BIA’s procedure for                   purchased power are:                                    (a) In person at our utility office;
                                                 adjusting service fees?                                    (a) Not under our control;                           (b) Mail your payment to the address
                                                   If, based on our annual review, we                       (b) Determined by current market                   stated on your bill; or
                                                 determine our service fees need to be                   rates; and                                              (c) As further provided by the electric
                                                 adjusted:                                                  (c) Subject to market fluctuations that            utility that serves you.
                                                   (a) We will notify you at least 30 days               can occur at an undetermined time and
                                                                                                                                                               § 175.315   What will happen if I do not pay
                                                 prior to the effective date of the                      frequency.
                                                                                                                                                               my bill?
                                                 adjustment; and
                                                   (b) We will publish a schedule of the                 § 175.235 How does BIA include changes                   (a) If you do not pay your bill prior
                                                                                                         in purchased power costs in electric power            to the close of business on the due date,
                                                 adjusted service fees in a local                        rates?
                                                 newspaper(s) and post them in the local                                                                       your bill will be past due.
                                                 utility office serving you.                               When our cost of purchased power                       (b) If your bill is past due we may:
                                                                                                         changes:                                                 (1) Disconnect your service; and
                                                 § 175.215 What is BIA’s procedure for                     (a) We determine the effect of the                     (2) Not reconnect your service until
                                                 adjusting electric power rates?                         change;                                               your bill, including any applicable fees,
                                                   Except for purchased power costs, if                    (b) We adjust the purchased power                   is paid in full.
                                                 we determine electric power rates need                  component of your bill accordingly;                      (c) Specific regulations regarding non-
                                                 to be adjusted, we will:                                  (c) We add the purchased power                      payment can be found in 25 CFR
                                                   (a) Hold public meetings and notify                   adjustment to the existing electric                   143.5(c).
                                                 you of their respective time, date, and                 power rate and put it into effect
                                                                                                                                                               § 175.320 What will happen if my service is
                                                 location by newspaper notice and a                      immediately;
                                                                                                                                                               disconnected and my account remains
                                                 notice posted in the utility office serving               (d) The purchased power adjustment                  delinquent?
                                                 you;                                                    remains in effect until we determine
                                                                                                         future adjustments are necessary;                        (a) If your service has been
                                                   (b) Provide you notice at least 15 days
                                                                                                           (e) We must publish in the local                    disconnected and you still have an
                                                 prior to the meeting;
                                                                                                         newspaper and post at our office a                    outstanding balance, we will assess you
                                                   (c) Provide you a description of the
                                                                                                         notice of the purchase power                          interest, penalties, and administrative
                                                 proposed rate adjustment;
                                                   (d) Provide you information on how,                   adjustment and the basis for the                      costs in accordance with 31 CFR 901.9.
                                                                                                         adjustment; and                                          (b) We must forward your delinquent
                                                 where, and when to submit comments
                                                                                                           (f) Our decision to make a purchased                balance to the United States Treasury if
                                                 on our proposed rate adjustment;
                                                   (e) Make a final determination on the                 power adjustment must be final.                       it is not paid within 180 days after the
                                                 proposed rate adjustment after all                                                                            original due date in accordance with 31
                                                 comments have been received,                            Subpart C—Billing, Payments, and                      CFR 901.1.
                                                 reviewed, and evaluated; and                            Collections
                                                                                                                                                               Subpart D—System Extensions and
                                                   (f) Publish the proposed rate                         § 175.300 How does BIA calculate my                   Upgrades, Rights-of-Way, and
                                                 adjustment and the final rate in the                    electric power bill?                                  Paperwork Reduction Act
                                                 Federal Register if we determine the
                                                                                                           (a) We calculate your electric power
                                                 rate adjustment is necessary.                                                                                 § 175.400 Will the utility extend or upgrade
                                                                                                         bill based on the:                                    its electric system to serve new or
                                                 § 175.220 How long do rate and fee                        (1) Current rate schedule for your type             increased loads?
                                                 adjustments stay in effect?                             service; and
                                                                                                                                                                 The utility may extend or upgrade its
                                                   These adjustments remain in effect                      (2) Applicable service fees for your
                                                                                                                                                               electric system to serve new or
                                                 until we conduct a review and                           type service.
                                                                                                                                                               increased loads. Contact your electric
                                                 determine adjustments are necessary.                      (b) If you have a metered service we
                                                                                                                                                               power utility providing service in your
                                                                                                         must:
                                                 § 175.225 What is the Federal Register,                   (1) Read your meter monthly;                        area for further information on new or
                                                 and where can I get it?                                   (2) Calculate your bill based on your               increased loads.
                                                   The Federal Register is the official                  metered energy consumption; and                       § 175.500   How does BIA manage rights-of-
                                                 daily publication for rules, proposed                     (3) Issue your bill monthly, unless                 way?
                                                 rules, and notices of official actions by               otherwise provided in a Special                         Contact your electric power utility
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 Federal agencies and organizations, as                  Agreement.                                            providing service in your area for
                                                 well as Executive Orders and other                        (c) If we are unable to calculate your              further information on rights-of-way.
                                                 Presidential Documents and is produced                  metered energy consumption, we must
                                                 by the Government Publishing Office                     make a reasonable estimate based on                   § 175.600 How does the Paperwork
                                                 (GPO). You can get Federal Register                     one of the following reasons:                         Reduction Act affect this part?
                                                 publications by:                                          (1) Your meter has failed;                            The collection of information
                                                   (a) Visiting www.federalregister.gov or                 (2) Your meter has been tampered                    contained in this part have been
                                                 www.gpo.gov/fdsys;                                      with; or                                              approved by the Office of Management


                                            VerDate Sep<11>2014   20:10 Dec 26, 2017   Jkt 244001   PO 00000   Frm 00007   Fmt 4702   Sfmt 4702   E:\FR\FM\27DEP1.SGM   27DEP1


                                                                   Federal Register / Vol. 82, No. 247 / Wednesday, December 27, 2017 / Proposed Rules                                                61199

                                                 and Budget under 44 U.S.C. 3501 et seq.                 notice of proposed rulemaking at 82 FR                center CFC’s foreign currency gains and
                                                 and assigned OMB Control Number                         60135, December 19, 2017, are still                   losses under a variety of theories. No
                                                 1076–0021. Response is required to                      being accepted and must be received by                inference is intended in these proposed
                                                 obtain a benefit. A Federal agency may                  March 19, 2018.                                       regulations as to whether these
                                                 not conduct or sponsor, and you are not                 ADDRESSES: Send submissions to                        positions are permissible in the years
                                                 required to respond to, a collection of                 CC:PA:LPD:PR (REG–119514–15), Room                    prior to the application of these
                                                 information unless the form or                          5203, Internal Revenue Service, P.O.                  proposed regulations.’’
                                                 regulation requesting the information                   Box 7604, Ben Franklin Station,
                                                 displays a currently valid OMB Control                  Washington, DC 20044. Submissions                     Martin V. Franks,
                                                 Number. Send comments regarding this                    may be hand delivered Monday through                  Chief, Publications and Regulations Branch,
                                                 collection of information, including                    Friday between the hours of 8 a.m. and                Legal Processing Division, Associate Chief
                                                 suggestions for reducing the burden, to                 4 p.m. to CC:PA:LPD:PR (REG–119514–                   Counsel, Procedure and Administration.
                                                 the Information Collection Clearance                    15), Courier’s desk, Internal Revenue                 [FR Doc. 2017–27865 Filed 12–26–17; 8:45 am]
                                                 Officer—Indian Affairs, 1849 C Street                   Service, 1111 Constitution Avenue NW,                 BILLING CODE 4830–01–P
                                                 NW, Washington, DC 20240.                               Washington, DC 20224, or sent
                                                   Dated: October 19, 2017.                              electronically, via the Federal
                                                 John Tahsuda,                                           eRulemaking Portal at
                                                 Principal Deputy Assistant Secretary—Indian             www.regulations.gov (IRS REG–119514–                  DEPARTMENT OF THE INTERIOR
                                                 Affairs, Exercising the Authority of the                15).
                                                 Assistant Secretary—Indian Affairs.                     FOR FURTHER INFORMATION CONTACT:                      National Park Service
                                                 [FR Doc. 2017–27668 Filed 12–26–17; 8:45 am]            Jeffery G. Mitchell, (202) 317–6934 (not
                                                 BILLING CODE 4337–15–P                                  a toll-free number).                                  36 CFR Part 7
                                                                                                         SUPPLEMENTARY INFORMATION:
                                                                                                                                                               [NPS–PWR–GOGA–24579; PPPWGOGAPO,
                                                                                                         Background                                            PPMPSPD1Z.YM0000]
                                                 DEPARTMENT OF THE TREASURY
                                                                                                           The proposed regulations that are the
                                                 Internal Revenue Service                                subject of this correction are under                  Withdrawal of Proposed Rule for Dog
                                                                                                         sections 446, 954 and 988 of the Internal             Management at the Golden Gate
                                                 26 CFR Part 1                                           Revenue Code.                                         National Recreation Area, California

                                                 [REG–119514–15]                                         Need for Correction                                   AGENCY:    National Park Service, Interior.
                                                 RIN 1545–BM80                                             As published, the proposed                          ACTION:   Withdrawal of proposed rule.
                                                                                                         regulations contain errors which may
                                                 Exclusion of Foreign Currency Gain or                   prove to be misleading and need to be
                                                                                                                                                               SUMMARY:   The National Park Service
                                                 Loss Related to Business Needs From                     clarified.
                                                                                                                                                               (NPS) no longer intends to prepare a
                                                 Foreign Personal Holding Company                        Correction of Publication                             final rule or issue a Golden Gate
                                                 Income; Mark-to-Market Method of
                                                                                                            Accordingly, the proposed regulations              National Recreation Area dog
                                                 Accounting for Section 988
                                                                                                         (REG–119514–15) that are the subject of               management plan. The NPS has
                                                 Transactions; Correction
                                                                                                         FR Doc. 2017–27320 are corrected as                   terminated the rulemaking process.
                                                 AGENCY:  Internal Revenue Service (IRS),                follows:                                              DATES: The proposed rule is withdrawn
                                                 Treasury.                                                  On page 60138, in the preamble, first              as of December 27, 2017.
                                                 ACTION: Notice of proposed rulemaking;                  column, the first full paragraph is
                                                 correction.                                             corrected to read:                                    FOR FURTHER INFORMATION CONTACT:
                                                                                                            ‘‘Although the borrowing and lending               Dana Polk, Public Affairs Office, Park
                                                 SUMMARY:   This document contains                       in the same nonfunctional currency are                Headquarters, Fort Mason, Building 201,
                                                 corrections to the proposed regulations                 economically offsetting, section 475                  San Francisco, CA 94123; phone 415–
                                                 (REG–119514–15) that were published                     creates the potential for a mismatch of               561–4728.
                                                 in the Federal Register on Tuesday,                     gains and losses for a treasury center
                                                 December 19, 2017. The proposed                         CFC. If the treasury center CFC qualifies             SUPPLEMENTARY INFORMATION:     Pursuant
                                                 regulations provide guidance on the                     as a dealer under section 475, for                    to the National Environmental Policy
                                                 treatment of foreign currency gain or                   example because it regularly purchases                Act (NEPA) and the regulations
                                                 loss of a controlled foreign corporation                debt from related CFCs in the ordinary                implementing NEPA (40 CFR parts
                                                 (CFC) under the business needs                          course of a trade or business, the                    1500–1508 and 43 CFR part 46), the
                                                 exclusion from foreign personal holding                 treasury center CFC generally must use                NPS published a proposed rule for dog
                                                 company income (FPHCI). The                             a mark-to-market method of accounting                 management on February 24, 2016 (81
                                                 proposed regulations also provide an                    for its securities. See section 475 and               FR 9139). The NPS has now cancelled
                                                 election for a taxpayer to use a mark-to-               § 1.475(c)–1(a)(3)(i). However,                       that planning process and terminated
                                                 market method of accounting for foreign                 § 1.475(c)–2(a)(2) provides that a                    the associated NEPA and rulemaking
                                                 currency gain or loss attributable to                   dealer’s own issued debt liabilities are              processes. No final rule will be issued.
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 section 988 transactions. In addition,                  not securities for purposes of section                 Dated: December 19, 2017.
                                                 the proposed regulations permit the                     475. Consequently, a treasury center
                                                 controlling United States shareholders                                                                        Martha J. Lee,
                                                                                                         CFC that marks to market its assets but
                                                 of a CFC to automatically revoke certain                not its liabilities may recognize any                 Acting Regional Director, Pacific West Region.
                                                 elections concerning the treatment of                   offsetting foreign currency gains and                 [FR Doc. 2017–27827 Filed 12–26–17; 8:45 am]
                                                 foreign currency gain or loss.                          losses in different taxable years. To                 BILLING CODE 4312–52–P
                                                 DATES: Written or electronic comments                   avoid this mismatch, taxpayers have
                                                 and requests for a public hearing, for the              taken positions that match a treasury


                                            VerDate Sep<11>2014   20:10 Dec 26, 2017   Jkt 244001   PO 00000   Frm 00008   Fmt 4702   Sfmt 9990   E:\FR\FM\27DEP1.SGM   27DEP1



Document Created: 2017-12-27 02:23:51
Document Modified: 2017-12-27 02:23:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionProposed rule.
DatesComments must be received on or before February 26, 2018.
ContactElizabeth Appel, Director, Office of Regulatory Affairs and Collaborative Action, Office of the Assistant Secretary--Indian Affairs; telephone (202) 273-4680, [email protected]
FR Citation82 FR 61193 
RIN Number1076-AF31
CFR AssociatedAdministrative Practice and Procedure; Electric Power; Indians-Lands and Reporting and Recordkeeping Requirements

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR