82_FR_8239 82 FR 8225 - South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; Tier 1 Editorial and Consistency Changes

82 FR 8225 - South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; Tier 1 Editorial and Consistency Changes

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 14 (January 24, 2017)

Page Range8225-8226
FR Document2017-01551

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 55 to Combined Licenses (COLs), NPF-93 and NPF- 94. The COLs were issued to South Carolina Electric & Gas Company, (the licensee); for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 82 Issue 14 (Tuesday, January 24, 2017)
[Federal Register Volume 82, Number 14 (Tuesday, January 24, 2017)]
[Notices]
[Pages 8225-8226]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-01551]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; 
Tier 1 Editorial and Consistency Changes

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment No. 55 to Combined Licenses (COLs), NPF-93 and NPF-
94. The COLs were issued to South Carolina Electric & Gas Company, (the 
licensee); for construction and operation of the Virgil C. Summer 
Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, 
South Carolina.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on November 25, 2016.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated May 16, 2016, and available in ADAMS under Accession No. 
ML16137A169.
     NRC's PDR: You may examine and purchase copies of public 
documents at

[[Page 8226]]

the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville 
Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: William (Billy) Gleaves, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-5848; email: Bill.Gleaves@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from Paragraph B of Section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment No. 55 to COLs, NPF-93 and NPF-
94, to the licensee. The exemption is required by Paragraph A.4 of 
Section VIII, ``Processes for Changes and Departures,'' appendix D, to 
10 CFR part 52 to allow the licensee to depart from Tier 1 information. 
With the requested amendment, the licensee sought proposed changes that 
would correct editorial errors in plant-specific Tier 1 information, 
with corresponding changes to the associated COL Appendix C 
information, to promote consistency with the Updated Final Safety 
Analysis Report Tier 2 information. One of the proposed changes to 
plant-specific Tier 1 information also involves a change to Updated 
Final Safety Analysis Report Tier 2 information. The proposed amendment 
also involves a proposed editorial correction to COL Paragraph 
2.D.(12)(f)1.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in 10 CFR 50.12, 10 CFR 52.7, and Section VIII.A.4 of appendix D 
to 10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML16288A818.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VCSNS Units 2 and 
3 (COLs NPF-93 and NPF-94). The exemption documents for VCSNS Units 2 
and 3 can be found in ADAMS under Accession Nos. ML16288A806 and 
ML16288A813, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-93 and NPF-94 
are available in ADAMS under Accession Nos. ML16288A795 and 
ML16288A798, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to Summer Units 2 
and Unit 3. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In an application dated May 16, 2016, the licensee requested 
from the Commission an exemption to allow departures from Tier 1 
information in the certified DCD incorporated by reference in 10 CFR 
part 52, appendix D as part of license amendment request 15-05, ``Tier 
1 Editorial and Consistency Changes.''
    For the reasons set forth in Section 3 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML16288A818, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding information in 
Appendix C of the Facility Combined License as described in the 
licensee's request dated May 16, 2016. This exemption is related to, 
and necessary for the granting of License Amendment No. 55, which is 
being issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML16288A818), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated May 16, 2016, the licensee requested that the NRC 
amend the COLs for VCSNS, Units 2 and 3, COLs NPF-93 and NPF-94. The 
proposed amendment is described in Section I of this Federal Register 
notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed no 
significant hazards consideration determination, and opportunity for a 
hearing in connection with these actions, was published in the Federal 
Register on July 5, 2016 (81 FR 43646). No comments were received 
during the 30-day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on May 16, 2016.
    The exemption and amendment were issued on November 25, 2016 as 
part of a combined package to the licensee (ADAMS Accession No. 
ML16288A775).

    Dated at Rockville, Maryland, this 10th day of January 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-01551 Filed 1-23-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                              Federal Register / Vol. 82, No. 14 / Tuesday, January 24, 2017 / Notices                                             8225

                                                   C. the exemption is consistent with                  League and its Chapter Concerned                       ACTION: Exemption and combined
                                                the common defense and security;                        Citizens of Shell Bluff (BREDL),                       license amendment; issuance.
                                                   D. special circumstances are present                 regarding the proposed amendment
                                                in that the application of the rule in this             request for the VEGP, Units 3 and 4.                   SUMMARY:    The U.S. Nuclear Regulatory
                                                circumstance is not necessary to serve                  This document can be found in ADAMS                    Commission (NRC) is granting an
                                                the underlying purpose of the rule;                     under Accession No. ML15320A016. On                    exemption to allow a departure from the
                                                   E. the special circumstances outweigh                December 7, 2015, BREDL filed its                      certification information of Tier 1 of the
                                                any decrease in safety that may result                  Petition and on December 23, 2015,                     generic design control document (DCD)
                                                from the reduction in standardization                   BREDL filed a corrected petition                       and is issuing License Amendment No.
                                                caused by the exemption, and                            (ADAMS Accession Nos. ML15341A348                      55 to Combined Licenses (COLs), NPF–
                                                   F. the exemption will not result in a                and ML15357A000, respectively). On                     93 and NPF–94. The COLs were issued
                                                significant decrease in the level of safety                                                                    to South Carolina Electric & Gas
                                                                                                        January 4, 2016, NRC and SNC filed
                                                otherwise provided by the design.                                                                              Company, (the licensee); for
                                                                                                        their respective answers to the Petition
                                                   2. Accordingly, the licensee is granted                                                                     construction and operation of the Virgil
                                                                                                        for Leave to Intervene and Request for
                                                an exemption from the certified DCD                                                                            C. Summer Nuclear Station (VCSNS)
                                                                                                        Hearing (ADAMS Accession Nos.
                                                Tier 1 Table: 3.3–1, as described in the                                                                       Units 2 and 3, located in Fairfield
                                                                                                        ML16004A471 and ML16004A479,
                                                licensee’s request dated September 18,                                                                         County, South Carolina.
                                                                                                        respectively). The Atomic Safety and                      The granting of the exemption allows
                                                2015. This exemption is related to, and                 Licensing Board issued a ruling on the
                                                necessary for the granting of License                                                                          the changes to Tier 1 information asked
                                                                                                        VEGP Units 3 and 4 license amendment                   for in the amendment. Because the
                                                Amendment No. 42, which is being                        request contention admissibility
                                                issued concurrently with this                                                                                  acceptability of the exemption was
                                                                                                        proceeding on April 29, 2016. This                     determined in part by the acceptability
                                                exemption.                                              document can be found in ADAMS
                                                   3. As explained in Section 5.0 of the                                                                       of the amendment, the exemption and
                                                                                                        under Accession No. ML16120A508.                       amendment are being issued
                                                NRC staff’s Safety Evaluation (ADAMS                      The NRC staff has found that the
                                                Accession No. ML15302A473), this                                                                               concurrently.
                                                                                                        amendment involves no significant
                                                exemption meets the eligibility criteria                                                                       DATES: The exemption and amendment
                                                                                                        hazards consideration. The Commission
                                                for categorical exclusion set forth in 10               has determined that these amendments                   were issued on November 25, 2016.
                                                CFR 51.22(c)(9). Therefore, pursuant to                 satisfy the criteria for categorical                   ADDRESSES: Please refer to Docket ID
                                                10 CFR 51.22(b), no environmental                       exclusion in accordance with 10 CFR                    NRC–2008–0441 when contacting the
                                                impact statement or environmental                       51.22(c)(9). Therefore, pursuant to 10                 NRC about the availability of
                                                assessment needs to be prepared in                      CFR 51.22(b), no environmental impact                  information regarding this document.
                                                connection with the issuance of the                     statement or environmental assessment                  You may obtain publicly-available
                                                exemption.                                              need be prepared for these amendments.                 information related to this document
                                                   4. This exemption is effective as of the                                                                    using any of the following methods:
                                                date of its issuance.                                   V. Conclusion                                             • Federal Rulemaking Web site: Go to
                                                                                                                                                               http://www.regulations.gov and search
                                                III. License Amendment Request                            Using the reasons set forth in the
                                                                                                                                                               for Docket ID NRC–2008–0441. Address
                                                   The request for the amendment and                    combined safety evaluation, the staff
                                                                                                                                                               questions about NRC dockets to Carol
                                                exemption was submitted by the letter                   granted the exemption and issued the
                                                                                                                                                               Gallagher; telephone: 301–415–3463;
                                                dated September 18, 2015. The                           amendment that the licensee requested
                                                                                                                                                               email: Carol.Gallagher@nrc.gov. For
                                                proposed amendment is described in                      on September 18, 2015. The exemption
                                                                                                                                                               technical questions, contact the
                                                Section I, above.                                       and amendment were issued on
                                                                                                                                                               individual listed in the FOR FURTHER
                                                   The Commission has determined for                    December 16, 2015, as part of a                        INFORMATION CONTACT section of this
                                                these amendments that the application                   combined package to the licensee                       document.
                                                complies with the standards and                         (ADAMS Accession No. ML15302A398).                        • NRC’s Agencywide Documents
                                                requirements of the Atomic Energy Act                     Dated at Rockville, Maryland, this 12th day          Access and Management System
                                                of 1954, as amended (the Act), and the                  of January 2017.                                       (ADAMS): You may obtain publicly-
                                                Commission’s rules and regulations.                       For the Nuclear Regulatory Commission.               available documents online in the
                                                The Commission has made appropriate                     Jennifer Dixon-Herrity,                                ADAMS Public Documents collection at
                                                findings as required by the Act and the                 Chief, Licensing Branch 4, Division of New             http://www.nrc.gov/reading-rm/
                                                Commission’s rules and regulations in                   Reactor Licensing, Office of New Reactors.             adams.html. To begin the search, select
                                                10 CFR chapter I, which are set forth in                [FR Doc. 2017–01548 Filed 1–23–17; 8:45 am]            ‘‘ADAMS Public Documents’’ and then
                                                the license amendment.                                  BILLING CODE 7590–01–P
                                                                                                                                                               select ‘‘Begin Web-based ADAMS
                                                   A notice of consideration of issuance                                                                       Search.’’ For problems with ADAMS,
                                                of amendment to facility operating                                                                             please contact the NRC’s Public
                                                license or combined license, as                         NUCLEAR REGULATORY                                     Document Room (PDR) reference staff at
                                                applicable, proposed no significant                     COMMISSION                                             1–800–397–4209, 301–415–4737, or by
                                                hazards consideration determination,                                                                           email to pdr.resource@nrc.gov. The
                                                and opportunity for a hearing in                                                                               ADAMS accession number for each
                                                                                                        [Docket Nos. 52–027 and 52–028; NRC–
                                                connection with these actions, was                      2008–0441]                                             document referenced (if it is available in
                                                published in the Federal Register on                                                                           ADAMS) is provided the first time that
sradovich on DSK3GMQ082PROD with NOTICES




                                                October 8, 2015 (80 FR 60937).                          South Carolina Electric & Gas                          it is mentioned in this document. The
                                                Comments were received during the 30-                   Company, South Carolina Public                         request for the amendment and
                                                day comment period.                                     Service Authority; Virgil C. Summer                    exemption was submitted by letter
                                                                                                        Nuclear Station, Units 2 and 3; Tier 1                 dated May 16, 2016, and available in
                                                IV. Public Comments                                                                                            ADAMS under Accession No.
                                                                                                        Editorial and Consistency Changes
                                                  On November 9, 2015, the staff                                                                               ML16137A169.
                                                received a public comment from the                      AGENCY:Nuclear Regulatory                                 • NRC’s PDR: You may examine and
                                                Blue Ridge Environmental Defense                        Commission.                                            purchase copies of public documents at


                                           VerDate Sep<11>2014   19:36 Jan 23, 2017   Jkt 241001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\24JAN1.SGM   24JAN1


                                                8226                          Federal Register / Vol. 82, No. 14 / Tuesday, January 24, 2017 / Notices

                                                the NRC’s PDR, Room O1–F21, One                         respectively. The exemption is                         impact statement or environmental
                                                White Flint North, 11555 Rockville                      reproduced (with the exception of                      assessment needs to be prepared in
                                                Pike, Rockville, Maryland 20852.                        abbreviated titles and additional                      connection with the issuance of the
                                                FOR FURTHER INFORMATION CONTACT:                        citations) in Section II of this document.             exemption.
                                                William (Billy) Gleaves, Office of New                  The amendment documents for COLs                         4. This exemption is effective as of the
                                                Reactors, U.S. Nuclear Regulatory                       NPF–93 and NPF–94 are available in
                                                                                                                                                               date of its issuance.
                                                Commission, Washington, DC 20555–                       ADAMS under Accession Nos.
                                                0001; telephone: 301–415–5848; email:                   ML16288A795 and ML16288A798,                           III. License Amendment Request
                                                Bill.Gleaves@nrc.gov.                                   respectively. A summary of the
                                                                                                        amendment documents is provided in                        By letter dated May 16, 2016, the
                                                SUPPLEMENTARY INFORMATION:
                                                                                                        Section III of this document.                          licensee requested that the NRC amend
                                                I. Introduction                                                                                                the COLs for VCSNS, Units 2 and 3,
                                                                                                        II. Exemption                                          COLs NPF–93 and NPF–94. The
                                                   The NRC is granting an exemption
                                                from Paragraph B of Section III, ‘‘Scope                   Reproduced below is the exemption                   proposed amendment is described in
                                                and Contents,’’ of appendix D, ‘‘Design                 document issued to Summer Units 2                      Section I of this Federal Register notice.
                                                Certification Rule for the AP1000,’’ to                 and Unit 3. It makes reference to the
                                                                                                                                                                  The Commission has determined for
                                                part 52 of title 10 of the Code of Federal              combined safety evaluation that
                                                                                                                                                               these amendments that the application
                                                Regulations (10 CFR), and issuing                       provides the reasoning for the findings
                                                                                                                                                               complies with the standards and
                                                License Amendment No. 55 to COLs,                       made by the NRC (and listed under Item
                                                                                                        1) in order to grant the exemption:                    requirements of the Atomic Energy Act
                                                NPF–93 and NPF–94, to the licensee.                                                                            of 1954, as amended (the Act), and the
                                                                                                           1. In an application dated May 16,
                                                The exemption is required by Paragraph                                                                         Commission’s rules and regulations.
                                                                                                        2016, the licensee requested from the
                                                A.4 of Section VIII, ‘‘Processes for                                                                           The Commission has made appropriate
                                                                                                        Commission an exemption to allow
                                                Changes and Departures,’’ appendix D,                                                                          findings as required by the Act and the
                                                                                                        departures from Tier 1 information in
                                                to 10 CFR part 52 to allow the licensee                                                                        Commission’s rules and regulations in
                                                                                                        the certified DCD incorporated by
                                                to depart from Tier 1 information. With                                                                        10 CFR chapter I, which are set forth in
                                                                                                        reference in 10 CFR part 52, appendix
                                                the requested amendment, the licensee
                                                                                                        D as part of license amendment request                 the license amendment.
                                                sought proposed changes that would
                                                                                                        15–05, ‘‘Tier 1 Editorial and                             A notice of consideration of issuance
                                                correct editorial errors in plant-specific
                                                                                                        Consistency Changes.’’                                 of amendment to facility operating
                                                Tier 1 information, with corresponding                     For the reasons set forth in Section 3
                                                changes to the associated COL                                                                                  license or combined license, as
                                                                                                        of the NRC staff’s Safety Evaluation,
                                                Appendix C information, to promote                                                                             applicable, proposed no significant
                                                                                                        which can be found in ADAMS under
                                                consistency with the Updated Final                                                                             hazards consideration determination,
                                                                                                        Accession No. ML16288A818, the
                                                Safety Analysis Report Tier 2                                                                                  and opportunity for a hearing in
                                                                                                        Commission finds that:
                                                information. One of the proposed                           A. The exemption is authorized by                   connection with these actions, was
                                                changes to plant-specific Tier 1                        law;                                                   published in the Federal Register on
                                                information also involves a change to                      B. the exemption presents no undue                  July 5, 2016 (81 FR 43646). No
                                                Updated Final Safety Analysis Report                    risk to public health and safety;                      comments were received during the 30-
                                                Tier 2 information. The proposed                           C. the exemption is consistent with                 day comment period.
                                                amendment also involves a proposed                      the common defense and security;                          The Commission has determined that
                                                editorial correction to COL Paragraph                      D. special circumstances are present                these amendments satisfy the criteria for
                                                2.D.(12)(f)1.                                           in that the application of the rule in this
                                                   Part of the justification for granting                                                                      categorical exclusion in accordance
                                                                                                        circumstance is not necessary to serve                 with 10 CFR 51.22. Therefore, pursuant
                                                the exemption was provided by the                       the underlying purpose of the rule;
                                                review of the amendment. Because the                                                                           to 10 CFR 51.22(b), no environmental
                                                                                                           E. the special circumstances outweigh
                                                exemption is necessary in order to issue                any decrease in safety that may result                 impact statement or environmental
                                                the requested license amendment, the                    from the reduction in standardization                  assessment need be prepared for these
                                                NRC granted the exemption and issued                    caused by the exemption; and                           amendments.
                                                the amendment concurrently, rather                         F. the exemption will not result in a               IV. Conclusion
                                                than in sequence. This included issuing                 significant decrease in the level of safety
                                                a combined safety evaluation containing                 otherwise provided by the design.                         Using the reasons set forth in the
                                                the NRC staff’s review of both the                         2. Accordingly, the licensee is granted             combined safety evaluation, the staff
                                                exemption request and the license                       an exemption from the certified DCD                    granted the exemption and issued the
                                                amendment. The exemption met all                        Tier 1 information, with corresponding                 amendment that the licensee requested
                                                applicable regulatory criteria set forth in             information in Appendix C of the                       on May 16, 2016.
                                                10 CFR 50.12, 10 CFR 52.7, and Section                  Facility Combined License as described
                                                VIII.A.4 of appendix D to 10 CFR part                   in the licensee’s request dated May 16,                   The exemption and amendment were
                                                52. The license amendment was found                     2016. This exemption is related to, and                issued on November 25, 2016 as part of
                                                to be acceptable as well. The combined                  necessary for the granting of License                  a combined package to the licensee
                                                safety evaluation is available in ADAMS                 Amendment No. 55, which is being                       (ADAMS Accession No. ML16288A775).
                                                under Accession No. ML16288A818.                        issued concurrently with this                            Dated at Rockville, Maryland, this 10th day
                                                   Identical exemption documents
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        exemption.                                             of January 2017.
                                                (except for referenced unit numbers and                    3. As explained in Section 5.0 of the                 For the Nuclear Regulatory Commission.
                                                license numbers) were issued to the                     NRC staff’s Safety Evaluation (ADAMS
                                                                                                                                                               Jennifer Dixon-Herrity,
                                                licensee for VCSNS Units 2 and 3 (COLs                  Accession No. ML16288A818), this
                                                NPF–93 and NPF–94). The exemption                       exemption meets the eligibility criteria               Chief, Licensing Branch 4, Division of New
                                                                                                                                                               Reactor Licensing, Office of New Reactors.
                                                documents for VCSNS Units 2 and 3 can                   for categorical exclusion set forth in 10
                                                be found in ADAMS under Accession                       CFR 51.22(c)(9). Therefore, pursuant to                [FR Doc. 2017–01551 Filed 1–23–17; 8:45 am]
                                                Nos. ML16288A806 and ML16288A813,                       10 CFR 51.22(b), no environmental                      BILLING CODE 7590–01–P




                                           VerDate Sep<11>2014   19:36 Jan 23, 2017   Jkt 241001   PO 00000   Frm 00053   Fmt 4703   Sfmt 9990   E:\FR\FM\24JAN1.SGM   24JAN1



Document Created: 2018-02-01 15:12:41
Document Modified: 2018-02-01 15:12:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on November 25, 2016.
ContactWilliam (Billy) Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 8225 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR