Southwest Power Pool, Inc. (SPP or Applicant) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.

Federal Register, Volume 82 Issue 2 (Wednesday, January 4, 2017)
[Federal Register Volume 82, Number 2 (Wednesday, January 4, 2017)]
[Notices]
[Page 831]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31884]



[[Page 831]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-434]


Application To Export Electric Energy; Southwest Power Pool, Inc.

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Southwest Power Pool, Inc. (SPP or Applicant) has applied for 
authority to transmit electric energy from the United States to Canada 
pursuant to section 202(e) of the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before February 3, 2017.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
[email protected], or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On November 14, 2016, DOE received an application from SPP for 
authority to transmit electric energy from the United States to Canada 
on an emergency basis for five years using existing international 
transmission facilities owned by Basin Electric Power Cooperative. SPP 
is a FERC approved Regional Transmission Organization (RTO).
    In its application, SPP states that Basin Electric, a utility 
currently holding an Export Authorization issued by the Department in 
EA-64, became a full transmission-owning member of SPP on October 1, 
2015. Upon the October 1, 2015 integration of Basin Electric into SPP, 
SPP began administering transmission service over and assumed 
functional control of Basin Electric's transmission system, while Basin 
Electric retains actual ownership and operational control of its 
transmission facilities. Through Basin Electric's membership in SPP, 
electricity transmission transactions along Basin Electric's 
transmission facilities are now governed by SPP's Tariff. The electric 
energy that SPP proposes to export to Canada would be surplus energy in 
excess of SPP's load requirements. The existing international 
transmission facilities to be utilized by SPP have previously been 
authorized by Presidential permit PP-64 issued pursuant to Executive 
Order 10485, as amended, and are appropriate for open access 
transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
copies of such comments, protests, or motions to intervene should be 
sent to the address provided above on or before the date listed above.
    Comments and other filings concerning SPP's application to export 
electric energy to Canada should be clearly marked with OE Docket No. 
EA-434. An additional copy is to be provided directly to Matthew 
Harward, Attorney, Southwest Power Pool, Inc., 201 Worthen Drive, 
Little Rock, AR 72223 and Matthew J. Binette, Victoria M. Lauterbach, 
and Brett K. White, Wright & Talisman, P.C., 1200 G Street NW., Suite 
600, Washington, DC 20005.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Issued in Washington, DC, on December 28, 2016.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2016-31884 Filed 1-3-17; 8:45 am]
BILLING CODE 6450-01-P



                                                                               Federal Register / Vol. 82, No. 2 / Wednesday, January 4, 2017 / Notices                                                       831

                                                  DEPARTMENT OF ENERGY                                    electricity transmission transactions                  DEPARTMENT OF ENERGY
                                                                                                          along Basin Electric’s transmission
                                                  [OE Docket No. EA–434]                                                                                         Federal Energy Regulatory
                                                                                                          facilities are now governed by SPP’s
                                                                                                          Tariff. The electric energy that SPP                   Commission
                                                  Application To Export Electric Energy;
                                                  Southwest Power Pool, Inc.                              proposes to export to Canada would be                  [Docket No. EL17–25–000]
                                                                                                          surplus energy in excess of SPP’s load
                                                  AGENCY: Office of Electricity Delivery                  requirements. The existing international               Dayton Power and Light Company AES
                                                  and Energy Reliability, DOE.                            transmission facilities to be utilized by              Ohio Generation, LLC; Notice of
                                                  ACTION: Notice of application.                          SPP have previously been authorized by                 Institution of Section 206 Proceeding
                                                                                                          Presidential permit PP–64 issued                       and Refund Effective Date
                                                  SUMMARY:    Southwest Power Pool, Inc.                  pursuant to Executive Order 10485, as
                                                  (SPP or Applicant) has applied for                      amended, and are appropriate for open                     On December 21, 2016, the
                                                  authority to transmit electric energy                   access transmission by third parties.                  Commission issued an order in Docket
                                                  from the United States to Canada                                                                               No. EL17–25–000, pursuant to section
                                                  pursuant to section 202(e) of the Federal                  Procedural Matters: Any person                      206 of the Federal Power Act (FPA), 16
                                                  Power Act.                                              desiring to be heard in this proceeding                U.S.C. 824e (2012), instituting an
                                                                                                          should file a comment or protest to the                investigation into whether the Revised
                                                  DATES: Comments, protests, or motions
                                                                                                          application at the address provided                    Reactive Rate Schedule of Dayton Power
                                                  to intervene must be submitted on or                    above. Protests should be filed in
                                                  before February 3, 2017.                                                                                       and Light Company may be unjust and
                                                                                                          accordance with Rule 211 of the Federal                unreasonable. Dayton Power and Light
                                                  ADDRESSES: Comments, protests,                          Energy Regulatory Commission’s (FERC)                  Company, et al., 157 FERC ¶ 61,231
                                                  motions to intervene, or requests for                   Rules of Practice and Procedures (18                   (2016).
                                                  more information should be addressed                    CFR 385.211). Any person desiring to                      The refund effective date in Docket
                                                  to: Office of Electricity Delivery and                  become a party to these proceedings                    No. EL17–25–000, established pursuant
                                                  Energy Reliability, Mail Code: OE–20,                   should file a motion to intervene at the               to section 206(b) of the FPA, will be the
                                                  U.S. Department of Energy, 1000                         above address in accordance with FERC                  date of publication of this notice in the
                                                  Independence Avenue SW.,                                Rule 214 (18 CFR 385.214). Five copies                 Federal Register.
                                                  Washington, DC 20585–0350. Because                      of such comments, protests, or motions                    Any interested person desiring to be
                                                  of delays in handling conventional mail,                to intervene should be sent to the                     heard in Docket No. EL17–25–000 must
                                                  it is recommended that documents be                     address provided above on or before the                file a notice of intervention or motion to
                                                  transmitted by overnight mail, by                       date listed above.                                     intervene, as appropriate, with the
                                                  electronic mail to Electricity.Exports@                                                                        Federal Energy Regulatory Commission,
                                                  hq.doe.gov, or by facsimile to 202–586–                    Comments and other filings
                                                                                                          concerning SPP’s application to export                 888 First Street NE., Washington, DC
                                                  8008.                                                                                                          20426, in accordance with Rule 214 of
                                                                                                          electric energy to Canada should be
                                                  SUPPLEMENTARY INFORMATION: Exports of                                                                          the Commission’s Rules of Practice and
                                                                                                          clearly marked with OE Docket No. EA–
                                                  electricity from the United States to a                 434. An additional copy is to be                       Procedure, 18 CFR 385.214, within 21
                                                  foreign country are regulated by the                    provided directly to Matthew Harward,                  days of the date of issuance of the order.
                                                  Department of Energy (DOE) pursuant to                  Attorney, Southwest Power Pool, Inc.,                    Dated: December 27, 2016.
                                                  sections 301(b) and 402(f) of the                       201 Worthen Drive, Little Rock, AR                     Kimberly D. Bose,
                                                  Department of Energy Organization Act                   72223 and Matthew J. Binette, Victoria                 Secretary.
                                                  (42 U.S.C. 7151(b), 7172(f)) and require                M. Lauterbach, and Brett K. White,
                                                  authorization under section 202(e) of                                                                          [FR Doc. 2016–31842 Filed 1–3–17; 8:45 am]
                                                                                                          Wright & Talisman, P.C., 1200 G Street                 BILLING CODE 6717–01–P
                                                  the Federal Power Act (16 U.S.C.                        NW., Suite 600, Washington, DC 20005.
                                                  824a(e)).
                                                     On November 14, 2016, DOE received                      A final decision will be made on this
                                                  an application from SPP for authority to                application after the environmental                    DEPARTMENT OF ENERGY
                                                  transmit electric energy from the United                impacts have been evaluated pursuant
                                                                                                          to DOE’s National Environmental Policy                 Federal Energy Regulatory
                                                  States to Canada on an emergency basis                                                                         Commission
                                                  for five years using existing                           Act Implementing Procedures (10 CFR
                                                  international transmission facilities                   part 1021) and after a determination is                [Docket No. RC11–6–005]
                                                  owned by Basin Electric Power                           made by DOE that the proposed action
                                                  Cooperative. SPP is a FERC approved                     will not have an adverse impact on the                 North American Electric Reliability
                                                  Regional Transmission Organization                      sufficiency of supply or reliability of the            Corporation; Notice of Filing
                                                  (RTO).                                                  U.S. electric power supply system.                       Take notice that on November 14,
                                                     In its application, SPP states that                     Copies of this application will be                  2016, the North American Electric
                                                  Basin Electric, a utility currently                     made available, upon request, for public               Reliability Corporation submitted an
                                                  holding an Export Authorization issued                  inspection and copying at the address                  annual report on Find, Fix, Track and
                                                  by the Department in EA–64, became a                    provided above, by accessing the                       Report and Compliance Exception
                                                  full transmission-owning member of                      program Web site at http://energy.gov/                 programs, in accordance with the
                                                  SPP on October 1, 2015. Upon the                        node/11845, or by emailing Angela Troy                 Federal Energy Regulatory
                                                  October 1, 2015 integration of Basin                    at Angela.Troy@hq.doe.gov.                             Commission’s (Commission) Orders.1
                                                  Electric into SPP, SPP began                                                                                     Any person desiring to intervene or to
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                            Issued in Washington, DC, on December
                                                  administering transmission service over                                                                        protest this filing must file in
                                                                                                          28, 2016.
                                                  and assumed functional control of Basin
                                                  Electric’s transmission system, while                   Christopher Lawrence,                                    1 North American Electric Reliability Corp, 143

                                                  Basin Electric retains actual ownership                 Electricity Policy Analyst, Office of Electricity      FERC ¶ 61,253 (2013), North American Electric
                                                                                                          Delivery and Energy Reliability.                       Reliability Corp, 148 FERC ¶ 61,214 (2014), and
                                                  and operational control of its                                                                                 North American Electric Reliability Corp, Docket
                                                  transmission facilities. Through Basin                  [FR Doc. 2016–31884 Filed 1–3–17; 8:45 am]
                                                                                                                                                                 No. RC11–6–004, (Nov. 13, 2015) (delegated letter
                                                  Electric’s membership in SPP,                           BILLING CODE 6450–01–P                                 order).



                                             VerDate Sep<11>2014   16:46 Jan 03, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\04JAN1.SGM   04JAN1



Document Created: 2017-01-04 00:29:41
Document Modified: 2017-01-04 00:29:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before February 3, 2017.
FR Citation82 FR 831 