82_FR_9399 82 FR 9376 - CPV Maryland, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date

82 FR 9376 - CPV Maryland, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 23 (February 6, 2017)

Page Range9376-9376
FR Document2017-02422

Federal Register, Volume 82 Issue 23 (Monday, February 6, 2017)
[Federal Register Volume 82, Number 23 (Monday, February 6, 2017)]
[Notices]
[Page 9376]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02422]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL17-39-000]


CPV Maryland, LLC; Notice of Institution of Section 206 
Proceeding and Refund Effective Date

    On January 30, 2017, the Commission issued an order in Docket No. 
EL17-39-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e (2012), instituting an investigation into whether the Rate 
Schedule for Reactive Service of CPV Maryland, LLC may be unjust, 
unreasonable, unduly discriminatory or preferential. CPV Maryland, LLC, 
158 FERC 61,084 (2017).
    The refund effective date in Docket No. EL17-39-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.
    Any interested person desiring to be heard in Docket No. EL17-39-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426, in accordance with Rule 214 of the 
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21 
days of the date of issuance of the order.

    Dated: January 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-02422 Filed 2-3-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                9376                         Federal Register / Vol. 82, No. 23 / Monday, February 6, 2017 / Notices

                                                   Applicants: PJM Interconnection,                     to section 206(b) of the FPA, will be the             Commission’s eFiling system at http://
                                                L.L.C.                                                  date of publication of this notice in the             www.ferc.gov/docs-filing/efiling.asp.
                                                   Description: § 205(d) Rate Filing:                   Federal Register.                                     Commenters can submit brief comments
                                                Amendment to WMPA SA No. 4469,                             Any interested person desiring to be               up to 6,000 characters, without prior
                                                Queue No. AA1–106 to be effective 5/                    heard in Docket No. EL17–39–000 must                  registration, using the eComment system
                                                3/2016.                                                 file a notice of intervention or motion to            at http://www.ferc.gov/doc-sfiling/
                                                   Filed Date: 1/31/17.                                 intervene, as appropriate, with the                   ecomment.asp. You must include your
                                                   Accession Number: 20170131–5089.                     Federal Energy Regulatory Commission,                 name and contact information at the end
                                                   Comments Due: 5 p.m. ET 2/21/17.                     888 First Street NE., Washington, DC                  of your comments. For assistance,
                                                   Docket Numbers: ER17–897–000.                        20426, in accordance with Rule 214 of                 please contact FERC Online Support at
                                                   Applicants: Entergy Louisiana, LLC.                  the Commission’s Rules of Practice and                FERCOnlineSupport@ferc.gov, (866)
                                                   Description: Request for Limited                     Procedure, 18 CFR 385.214, within 21                  208–3676 (toll free), or (202) 502–8659
                                                Waiver of Entergy Louisiana, LLC under                  days of the date of issuance of the order.            (TTY). In lieu of electronic filing, please
                                                ER17–897.                                                 Dated: January 31, 2017.                            send a paper copy to: Secretary, Federal
                                                   Filed Date: 1/30/17.                                 Kimberly D. Bose,
                                                                                                                                                              Energy Regulatory Commission, 888
                                                   Accession Number: 20170130–5394.                                                                           First Street NE., Washington, DC 20426.
                                                                                                        Secretary.
                                                   Comments Due: 5 p.m. ET 2/21/17.                                                                           The first page of any filing should
                                                                                                        [FR Doc. 2017–02422 Filed 2–3–17; 8:45 am]
                                                   The filings are accessible in the                                                                          include docket number P–12756–007.
                                                                                                        BILLING CODE 6717–01–P
                                                Commission’s eLibrary system by                                                                                  k. Description of Amendment: The
                                                clicking on the links or querying the                                                                         licensee proposes certain design
                                                docket number.                                                                                                changes to the project’s powerhouse,
                                                                                                        DEPARTMENT OF ENERGY
                                                   Any person desiring to intervene or                                                                        generating units, draft tube, switchyard
                                                protest in any of the above proceedings                 Federal Energy Regulatory                             location and transmission line route, as
                                                must file in accordance with Rules 211                  Commission                                            follows: (1) The powerhouse will be 93-
                                                and 214 of the Commission’s                                                                                   foot-long by 198-foot-wide by 83 foot-
                                                Regulations (18 CFR 385.211 and                         [Project No. 12756–007]                               high, with five 7.2 MW Kaplan bulb
                                                385.214) on or before 5:00 p.m. Eastern                                                                       turbine-generator units: (2) five 70-foot-
                                                                                                        BOST3 Hydroelectric Company, LLC
                                                time on the specified comment date.                                                                           long by 198-foot-wide by 73-foot-high
                                                                                                        (BOST3); Notice of Application
                                                Protests may be considered, but                                                                               draft tubes that would convey water
                                                                                                        Accepted for Filing and Soliciting
                                                intervention is necessary to become a                                                                         from the turbines to the tailrace; (3)
                                                                                                        Comments, Motions To Intervene and
                                                party to the proceeding.                                                                                      move the location of the project’s
                                                                                                        Protests
                                                   eFiling is encouraged. More detailed                                                                       switchyard about 1400 feet southwest
                                                information relating to filing                             Take notice that the following                     from the current licensed location; and
                                                requirements, interventions, protests,                  hydroelectric application has been filed              (4) the transmission line would be about
                                                service, and qualifying facilities filings              with the Commission and is available                  2300-foot-long, 230-kV line connecting
                                                can be found at: http://www.ferc.gov/                   for public inspection.                                the powerhouse to Central Louisiana
                                                docs-filing/efiling/filing-req.pdf. For                    a. Type of Application: Non-Capacity               Electric Company at the project’s 100-
                                                other information, call (866) 208–3676                  Amendment of License.                                 foot-long by 100-foot-wide switchyard.
                                                (toll free). For TTY, call (202) 502–8659.                 b. Project No.: P–12756–007.                       The design changes would reduce the
                                                  Dated: January 31, 2017.                                 c. Date filed: November 14, 2016 and               total project’s hydraulic capacity from
                                                Nathaniel J. Davis, Sr.,                                supplemented on January 30, 2017.                     19,085 cubic feet per second (cfs) to
                                                                                                           d. Applicant: BOST3 Hydroelectric                  19,055 cfs. The amount of federal lands
                                                Deputy Secretary.
                                                                                                        Company, LLC (BOST3).                                 used by the project would increase from
                                                [FR Doc. 2017–02389 Filed 2–3–17; 8:45 am]
                                                                                                           e. Name of Project: Red River Lock &               61.8 acres to 76.31 acres.
                                                BILLING CODE 6717–01–P
                                                                                                        Dam No. 3 Hydroelectric Project.                         l. Locations of the Applications: A
                                                                                                           f. Location: The proposed project                  copy of the application is available for
                                                                                                        would be located at the existing Army                 inspection and reproduction at the
                                                DEPARTMENT OF ENERGY
                                                                                                        Corps of Engineer’s (Corps) Red River                 Commission’s Public Reference Room,
                                                Federal Energy Regulatory                               Lock & Dam No. 3 on the Red River, in                 located at 888 First Street NE., Room
                                                Commission                                              Natchitoches Parish near the City of                  2A, Washington, DC 20426, or by calling
                                                                                                        Colfax, Louisiana.                                    (202) 502–8371. The filing may also be
                                                [Docket No. EL17–39–000]                                   g. Filed Pursuant to: Federal Power                viewed on the Commission’s Web site at
                                                                                                        Act, 16 U.S.C. 791a–825r                              http://www.ferc.gov/docs-filing/
                                                CPV Maryland, LLC; Notice of
                                                                                                           h. Applicant Contact: Mr. Douglas A.               elibrary.asp. Enter the docket number
                                                Institution of Section 206 Proceeding
                                                                                                        Spalding, BOST3 Hydroelectric                         excluding the last three digits in the
                                                and Refund Effective Date
                                                                                                        Company, LLC, 8441 Wayzata Blvd.,                     docket number field to access the
                                                   On January 30, 2017, the Commission                  Suite 101, Golden Valley, MN 55426;                   document. You may also register online
                                                issued an order in Docket No. EL17–39–                  (952) 544–8133.                                       at http://www.ferc.gov/docs-filing/
                                                000, pursuant to section 206 of the                        i. FERC Contact: M. Joseph Fayyad                  esubscription.asp to be notified via
                                                Federal Power Act (FPA), 16 U.S.C.                      (202) 502–8759, or by email at                        email of new filings and issuances
                                                824e (2012), instituting an investigation               mo.fayyad@ferc.gov.                                   related to this or other pending projects.
sradovich on DSK3GMQ082PROD with NOTICES




                                                into whether the Rate Schedule for                         j. Deadline for filing comments,                   For assistance, call 1–866–208–3676 or
                                                Reactive Service of CPV Maryland, LLC                   motions to intervene and protests is 30               email FERCOnlineSupport@ferc.gov, for
                                                may be unjust, unreasonable, unduly                     days from the issuance of this notice by              TTY, call (202) 502–8659.
                                                discriminatory or preferential. CPV                     the Commission. The Commission                           m. Individuals desiring to be included
                                                Maryland, LLC, 158 FERC 61,084 (2017).                  strongly encourages electronic filing.                on the Commission’s mailing list should
                                                   The refund effective date in Docket                  Please file comments, motions to                      so indicate by writing to the Secretary
                                                No. EL17–39–000, established pursuant                   intervene, and protests using the                     of the Commission.


                                           VerDate Sep<11>2014   16:03 Feb 03, 2017   Jkt 241001   PO 00000   Frm 00007   Fmt 4703   Sfmt 4703   E:\FR\FM\06FEN1.SGM   06FEN1



Document Created: 2017-02-04 00:25:19
Document Modified: 2017-02-04 00:25:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 9376 

2026 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR