82_FR_9400 82 FR 9377 - City of South Bend, Indiana, University of Notre Dame; Notice of Transfer of Exemption

82 FR 9377 - City of South Bend, Indiana, University of Notre Dame; Notice of Transfer of Exemption

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 23 (February 6, 2017)

Page Range9377-9377
FR Document2017-02419

Federal Register, Volume 82 Issue 23 (Monday, February 6, 2017)
[Federal Register Volume 82, Number 23 (Monday, February 6, 2017)]
[Notices]
[Page 9377]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02419]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7569-005]


City of South Bend, Indiana, University of Notre Dame; Notice of 
Transfer of Exemption

    1. By letter filed December 15, 2016, the City of South Bend, 
Indiana and The University of Notre Dame informed the Commission that 
the exemption from licensing for the South Bend Hydroelectric Project 
No. 7569, originally issued April 18, 1984 \1\ has been transferred to 
the University of Notre Dame. The project is located on the St. Joseph 
River in St. Joseph County, Indiana. The transfer of an exemption does 
not require Commission approval.
---------------------------------------------------------------------------

    \1\ Order Granting Exemption from Licensing of a Small 
Hydroelectric Project of 5 Megawatts or Less. City of South Bend, 
Indiana, 27 FERC 62,056 (1984).
---------------------------------------------------------------------------

    2. The University of Notre Dame is now the exemptee of the South 
Bend Hydroelectric Project No. 7569. All correspondence should be 
forwarded to: Mr. Paul Kempf, Director of Utilities & Maintenance, The 
University of Notre Dame, 100 Facilities Building, Notre Dame, IN 
46556, Phone: 574-631-0142, Email: Paul.A.Kempf.2@nd.edu.

    Dated: January 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-02419 Filed 2-3-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 82, No. 23 / Monday, February 6, 2017 / Notices                                                   9377

                                                   n. Comments, Motions to Intervene, or                DEPARTMENT OF ENERGY                                  accordance with Rules 211 and 214 of
                                                Protests: Anyone may submit                                                                                   the Commission’s Rules of Practice and
                                                comments, a motion to intervene, or a                   Federal Energy Regulatory                             Procedure (18 CFR 385.211 and 385.214.
                                                protest in accordance with the                          Commission                                            Protests will be considered by the
                                                requirements of Rules of Practice and                   [Project No. 7569–005]                                Commission in determining the
                                                Procedure, 18 CFR 385.210, .211, .214.                                                                        appropriate action to be taken, but will
                                                In determining the appropriate action to                City of South Bend, Indiana, University               not serve to make protestants parties to
                                                take, the Commission will consider all                  of Notre Dame; Notice of Transfer of                  the proceeding. Any person wishing to
                                                protests or other comments filed, but                   Exemption                                             become a party must file a notice of
                                                only those who file a motion to                                                                               intervention or motion to intervene, as
                                                                                                           1. By letter filed December 15, 2016,              appropriate. Such notices, motions, or
                                                intervene in accordance with the                        the City of South Bend, Indiana and The
                                                Commission’s Rules may become a                                                                               protests must be filed on or before the
                                                                                                        University of Notre Dame informed the                 comment date. Anyone filing a motion
                                                party to the proceeding. Any comments,                  Commission that the exemption from                    to intervene or protest must serve a copy
                                                motions to intervene, or protests must                  licensing for the South Bend                          of that document on the Petitioner.
                                                be received on or before the specified                  Hydroelectric Project No. 7569,
                                                                                                                                                                 The Commission encourages
                                                comment date for the particular                         originally issued April 18, 1984 1 has
                                                                                                                                                              electronic submission of protests and
                                                application.                                            been transferred to the University of
                                                                                                                                                              interventions in lieu of paper using the
                                                                                                        Notre Dame. The project is located on
                                                   o. Filing and Service of Responsive                                                                        ‘‘eFiling’’ link at http://www.ferc.gov.
                                                                                                        the St. Joseph River in St. Joseph
                                                Documents: Any filing must (1) bear in                                                                        Persons unable to file electronically
                                                                                                        County, Indiana. The transfer of an
                                                all capital letters the title                           exemption does not require Commission                 should submit an original and 5 copies
                                                ‘‘COMMENTS’’, ‘‘MOTION TO                               approval.                                             of the protest or intervention to the
                                                INTERVENE’’, or ‘‘PROTEST’’ as                             2. The University of Notre Dame is                 Federal Energy Regulatory Commission,
                                                applicable; (2) set forth in the heading                now the exemptee of the South Bend                    888 First Street NE., Washington, DC
                                                the name of the applicant and the                       Hydroelectric Project No. 7569. All                   20426.
                                                project number of the application to                    correspondence should be forwarded to:                   This filing is accessible on-line at
                                                which the filing responds; (3) furnish                  Mr. Paul Kempf, Director of Utilities &               http://www.ferc.gov, using the
                                                the name, address, and telephone                        Maintenance, The University of Notre                  ‘‘eLibrary’’ link and is available for
                                                number of the person protesting or                      Dame, 100 Facilities Building, Notre                  review in the Commission’s Public
                                                intervening; and (4) otherwise comply                   Dame, IN 46556, Phone: 574–631–0142,                  Reference Room in Washington, DC.
                                                with the requirements of 18 CFR                         Email: Paul.A.Kempf.2@nd.edu.                         There is an ‘‘eSubscription’’ link on the
                                                385.2001 through 385.2005. All                                                                                Web site that enables subscribers to
                                                                                                          Dated: January 31, 2017.
                                                comments, motions to intervene, or                                                                            receive email notification when a
                                                                                                        Kimberly D. Bose,
                                                                                                                                                              document is added to a subscribed
                                                protests must set forth their evidentiary               Secretary.                                            docket(s). For assistance with any FERC
                                                basis and otherwise comply with the                     [FR Doc. 2017–02419 Filed 2–3–17; 8:45 am]            Online service, please email
                                                requirements of 18 CFR 4.34(b). All                     BILLING CODE 6717–01–P                                FERCOnlineSupport@ferc.gov, or call
                                                comments, motions to intervene, or                                                                            (866) 208–3676 (toll free). For TTY, call
                                                protests should relate to project works                                                                       (202) 502–8659.
                                                which are the subject of this                           DEPARTMENT OF ENERGY                                     Comment Date: 5:00 p.m. Eastern time
                                                application. Agencies may obtain copies                                                                       on February 17, 2017.
                                                of the application directly from the                    Federal Energy Regulatory
                                                applicant. A copy of any protest or                     Commission                                              Dated: January 31, 2017.
                                                motion to intervene must be served                      [Docket No. OR17–6–000]                               Kimberly D. Bose,
                                                upon each representative of the                                                                               Secretary.
                                                applicant specified in the particular                   Discovery DJ Pipeline LLC; Notice of                  [FR Doc. 2017–02418 Filed 2–3–17; 8:45 am]
                                                application. If an intervener files                     Request for Temporary Waiver                          BILLING CODE 6717–01–P

                                                comments or documents with the                             Take notice that on January 25, 2017,
                                                Commission relating to the merits of an                 pursuant to Rule 204 of the Federal
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                issue that may affect the responsibilities              Energy Regulatory Commission’s
                                                of a particular resource agency, they                   (Commission) Rules of Practice and                    Federal Energy Regulatory
                                                must also serve a copy of the document                  Procedure, 18 CFR 385.204, Discovery                  Commission
                                                on that resource agency. A copy of all                  DJ Pipeline LLC (Discovery Pipeline)
                                                other filings in reference to this                      filed a petition for temporary waiver of
                                                                                                                                                              [Docket No. EL17–38–000]
                                                application must be accompanied by                      the tariff filing and reporting
                                                proof of service on all persons listed in               requirements of sections 6 and 20 of the              Alpaca Energy LLC; Milan Energy LLC;
                                                the service list prepared by the                        Interstate Commerce Act and parts 341                 Notice of Institution of Section 206
                                                Commission in this proceeding, in                       and 357 of the Commission’s regulations               Proceeding and Refund Effective Date
                                                accordance with 18 CFR 4.34(b) and                      for a crude petroleum gathering system
                                                                                                        to be constructed in Adams and Weld                      On January 30, 2017, the Commission
                                                385.2010.
                                                                                                        Counties, Colorado, as more fully                     issued an order in Docket No. EL17–38–
sradovich on DSK3GMQ082PROD with NOTICES




                                                  Dated: January 31, 2017.                              explained in the petition.                            000, pursuant to section 206 of the
                                                Kimberly D. Bose,                                          Any person desiring to intervene or to             Federal Power Act (FPA), 16 U.S.C.
                                                Secretary.                                              protest this filing must file in                      824e (2012), instituting an investigation
                                                [FR Doc. 2017–02420 Filed 2–3–17; 8:45 am]                                                                    into whether the Reactive Service Rate
                                                                                                          1 Order Granting Exemption from Licensing of a

                                                BILLING CODE 6717–01–P                                  Small Hydroelectric Project of 5 Megawatts or Less.
                                                                                                                                                              Schedules of Alpaca Energy LLC and
                                                                                                        City of South Bend, Indiana, 27 FERC 62,056           Milan Energy LLC may be unjust,
                                                                                                        (1984).                                               unreasonable, unduly discriminatory or


                                           VerDate Sep<11>2014   16:03 Feb 03, 2017   Jkt 241001   PO 00000   Frm 00008   Fmt 4703   Sfmt 4703   E:\FR\FM\06FEN1.SGM   06FEN1



Document Created: 2017-02-04 00:25:13
Document Modified: 2017-02-04 00:25:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 9377 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR